çB~~RLY CITY OF BEVERLY HILLS STAFF REPORT Meeting Date: July 2, 2013 To: Honorable Mayor & City Council From: Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly Hills Bikeway Images 2. Map of Approved Pilot Bicycle Routes 3. Bike Route Design Graphics 4. Construction Notice 5. Press Release INTRODUCTION At the November 13, 2012 City Council study session, Public Works & Transportation staff received direction to proceed with implementation of pilot bicycle routes on Burton Way and North Crescent Drive. The two bikeways were constructed the week of June 24, 2013 as part of the FYi 2-13 Street Resurfacing capital improvement project (CIP). The pilot bike routes will be monitored for use and impacts on local traffic and safety during the 12-month pilot period. Staff will seek City Council direction prior to the end of the pilot period to either maintain the bikeways permanently, remove the bicycle Street markings, and/or pursue future routes to connect to adjacent bicycle networks. DISCUSSION Approximately 900 Construction Notices were mailed on June 10, 2013 to residents and businesses located on Burton Way and North Crescent Drive within the project area. Additionally, a press release was distributed to the local newspapers and posted on social media networks. The information is available on the City’s Transportation website at www. beverlyhills.orci/bicycles. The Civil Engineering team contacted major stakeholders in the project area and posted construction signage as needed. Most of the construction activity was completed within three days and during non-peak traffic hours (between 10 a.m. and 2 p.m.) and late evening hours.

Upload: others

Post on 24-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

çB~~RLY

CITY OF BEVERLY HILLS

STAFF REPORT

Meeting Date: July 2, 2013

To: Honorable Mayor & City Council

From: Aaron Kunz, Deputy Director of TransportationMartha Eros, Transportation Planner

Subject: PILOT BICYCLE ROUTE PROJECT UPDATE

Attachments: 1. Beverly Hills Bikeway Images2. Map of Approved Pilot Bicycle Routes3. Bike Route Design Graphics4. Construction Notice5. Press Release

INTRODUCTION

At the November 13, 2012 City Council study session, Public Works & Transportation staffreceived direction to proceed with implementation of pilot bicycle routes on Burton Way andNorth Crescent Drive. The two bikeways were constructed the week of June 24, 2013 as part ofthe FYi 2-13 Street Resurfacing capital improvement project (CIP).

The pilot bike routes will be monitored for use and impacts on local traffic and safety during the12-month pilot period. Staff will seek City Council direction prior to the end of the pilot period toeither maintain the bikeways permanently, remove the bicycle Street markings, and/or pursuefuture routes to connect to adjacent bicycle networks.

DISCUSSION

Approximately 900 Construction Notices were mailed on June 10, 2013 to residents andbusinesses located on Burton Way and North Crescent Drive within the project area.Additionally, a press release was distributed to the local newspapers and posted on socialmedia networks. The information is available on the City’s Transportation website atwww. beverlyhills.orci/bicycles.

The Civil Engineering team contacted major stakeholders in the project area and postedconstruction signage as needed. Most of the construction activity was completed within threedays and during non-peak traffic hours (between 10 a.m. and 2 p.m.) and late evening hours.

Page 2: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

Meeting Date: July 2, 2013

Burton Way

A Class II Bike Lane was installed on both sides of Burton Way between North Rexford Driveand the east city limits (Robertson Boulevard on the eastbound lanes and North Oakhurst Driveon the westbound lanes), where it connects to the existing bike lanes in the City of Los Angeleson Burton Way and transitions onto San Vicente Boulevard. Construction activity includedremoval of any existing lane striping, new lane striping, bicycle stencils/markings, signage andposts.

The striping on both sides of the center median includes an 8-ft wide parking lane that starts atcurbside, a 6-ft wide bike lane with bicycle symbols, two travel lanes in each direction (11-ft and1 0-ft), 10-ft wide left-turn lanes, and a dashed line approximately 100-ft from the intersectionapproach to allow interchanging right-turn traffic movements. Signs indicating the presence of abike lane will be installed along both sides of the street in the public right-of-way.

The bike lane transitions to a Class Ill Bike Route with sharrows (bike symbol with chevrons)between North Rexford and Crescent Drives due to existing traffic movements and Street widthson Burton Way/South Santa Monica Boulevard. A sharrow alerts motorists and bicyclists toshare the road and conveys that the Street is a preferred bike route. The sharrows startapproximately 100-ft east of Civic Center Drive on westbound Burton Way and continues toNorth Crescent Drive. On eastbound South Santa Monica Boulevard/Burton Way, sharrows areplaced between North Crescent and Rexford Drives with the bike lane starting on the far side ofNorth Rextord Drive.

North Crescent Drive

North Crescent Drive has a hybrid bike lane and bike route between Wilshire and SunsetBoulevards. A Class Ill Bike Route with sharrow markings was placed between WilshireBoulevard and Park Way and maintains on-street parking and two travel lanes in each direction.A Class II Bike Lane starts at Park Way and continues north to Sunset Boulevard with a 7.5-ftparking lane, 6-ft bike lane with bicycle symbols, and an 11.5-ft travel lane in each direction.Signs indicating the presence of a bike lane will be installed along both sides of the street in thepublic right-of-way.

FISCAL IMPACT

The initial cost for the two pilot bikeways was projected at $80,000 based on Caltrans guidelinesand costs of construction by other municipalities. By incorporating the bike project with theannual Street Resurfacing CIP, the final project cost is $33,000, a 58°c savings.

RECOMMENDATION

This report is for information purposes.

Mahdi AluzriApproved By

Page 2 of 2 6/27/2013

Page 3: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

-I m z -I

Page 4: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

Class II Bike LaneBurton Way (N. Rextord Dr. — East City Limits)

(i~E~i~

.~... ...~ ~ ,. ..~.

E/B ~Burton Way ~ N. Mine D1.,

Page 5: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

Class Ill Bike Route/SharrowBurton Way/South SMB (N. Rexford - Crescent Drives)

A‘~ ~

II ..f~’

I,

-----------

ti: $ —

— ~ ~—‘~

~ W/~BurtOn A ~@Civic Center Driv~

\HILLS/

Page 6: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

Class II Bike LaneNorth Crescent Drive (Park Way - Sunset Blvd.)

— I

S/B N. Crescent Dr. @ Par

.4

~:~

.‘~ ~

‘I’ .~.:

.~

....~ _T

‘~ •~ •‘~~r~

-. ~;1.

• .4~L’ ~l.* -

1~ ~ -~

I •~.•. ~- L4

• • •

~‘ ~a

ay

Page 7: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

I —-

V..,

s—V .

Class II Bike LaneNorth Crescent Drive (Park Way — Sunset Blvd.)

.1 •V

V ~V V VV

• V •~V~:. .

• -:, V ,Vj.~ ~ ~ VVV

VV~~.V

-• ~:V’,~

5’

V : VV • •~V

—“V

~~ V

V _ V

V •. • ‘.~~

• ~r~” “ ~5 V.,—’

— 5’ 5 ‘V-V.’ ~

• - , •~ V V ~. • . ~. - V • •. •.‘ •• •••-• V

r p.”

5’

,~.‘ ..,r~— V.’ —

Cresce r -,

Page 8: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

ATTACHMENT 2

Page 9: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

~LS

C-

I

e e~•1-~ 1ft4)fl

CITY OF BEVERLY HILLSAPPROVED PILOT BICYCLE ROUTES

NOVEMBER 2012~1 ~ ~.

APPROVED PILOT ROUTES:CIass[[ ~B~i’ki Lane _______

Class IJl~ike.R~ü~e m

~. ~ ~• .‘•

• . •. •~•

• . •~

______ ~:.•1 —•- - — —

BUR~rON WAY 2~ ~:. ~ •~

~ ~ ..•~. ,.

I

I~eeF~’rt~

+1~Di

O

e Ivy II i_i Ce~rs~$‘‘ edii~& C

W dSt

CoU

CHARLEVILLE BLVD

Page 10: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

-I -I m z —I

w

Page 11: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

CITY OF BEVERLY HILLSAPPROVED PILOT BICYCLE ROUTES

BURTON WAY BETWEEN N. CRESCENT TO EAST CITY LIMITS

~8’ ha 10’ 111 6 8!.o

Bike L~r1e -

Sign Bike LaneSign

L__ —

11’ 6’ 8’Bike Bike

Parking lane Travel Lane Travel Lane Center Median Travel lane Tiavel Lane lane Parking

Page 12: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

CITY OF BEVERLY HILLSAPPROVED PILOT BICYCLE ROUTES

N. CRESCENT BETWEEN WILSHIRE AND PARK WAY

I II II II II II I

1r14I I

chare the RoadShare the RoadSign

Sign

- - -

I 10 10 — 10.5 .

5Ii~rred Lane Travel Lane Travel Lane Shared Lane Parking

Page 13: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

BIKELANE

Bike LaneSign

BikeParkiiiq La

CITY OF BEVERLY HILLSAPPROVED PILOT BICYCLE ROUTES

N. CRESCENT BETWEEN PARK WAY AND SUNSET BLVD

t

I ~neSign

—=-~Ii

BikeTravel Lane Trawl Lane Lane ~‘arkinri

Page 14: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

m z

Page 15: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION345 Foothill Road, Beverly Hills, CA 90210Email: transportation~beverlyhiIls.orgPhone: (310) 285-2500 Fax: (310) 278-1838

CONSTRUCTION NOTICE

Construction Dates:

Locations:

Activity:

Burton Way Bike Lane

Monday, June 24 — Wednesday, July 3, 2013(work to be scheduled during low traffic hours of the day)

PILOT BICYCLE ROUTE PROJECTBURTON WAY AND NORTH CRESCENT DRIVE

JUNE 24 — JULY 3, 2013The City of Beverly Hills is pleased to announce the placement of our first bikeway pilot project!The City’s contractor will begin installation of two pilot bikeways on Burton Way and North CrescentDrive the week of June 24, 2013. Activity involves restriping the roads and placement of signs tocreate a designated route for bicycle use. The City Council approved a one-year pilot bicycle routeproject in November 2012.

Burton Way between North Crescent Drive and east city limits, andNorth Crescent Drive between Wilshire and Sunset Boulevards

Street crews, striping equipment and vehicles, diverted traffic or parkingduring non-peak daytime work hours and evening hours

A striped bike lane will be installed on both sides of Burton Way between North Crescent Drive andthe east city limits (i.e., Robertson Boulevard on the south side and Oakhurst Drive on the north sideof the street). A six-foot wide bike lane will be installed next to the existing parking lane, and the twotravel lanes in each direction will be maintained. Advance notice will be given of any eveningparking restriction during the construction period.

A combined bike lane and bike route with sharrow markings will be installed on both sides of NorthCrescent Drive between Wilshire and Sunset Boulevards. A bike route is designated with “sharroW’markings (a bicycle with chevrons) on the travel lane adjacent to parking and does not havedesignated lane striping. Sharrows announce the shared use of the road by bicycles and vehicles.

The bike lane section between Sunset Boulevard and Park Way will have similar dimensions asBurton Way, with parking and one travel lane maintained in each direction. The bike route sectionwith sharrow markings will continue south on North Crescent Drive from Park Way to WilshireBoulevard. Sharrow markings will not interfere with existing street markings or parking lanes.

Additional information is available at www.beverlyhills.org/bicycles. If you have any questionsregarding the project, please contact our Transportation Customer Service team at (310) 285-2500.

Thank you in advance for your patience and cooperation during theinstallation of the new pilot bikeways.

06/10/2013

North Crescent Drive Bike Lane and Bike Route

Page 16: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

PILOT BICYCLE ROUTESCONSTRUCTION NOTICE06102013

APPROVED PILOT ROUTES:Class II Bike Lane _______

Class Ill Bike Route • •

~c4 ~ —---.-—

Beve~S

4 ~ Tn~ytI HCC4~)r~S~4, , tAedicMC

~Bever1y Hills W~dS1

~‘$ I - -- -. Bt#fc.~ W~y ~~* BURTON WAY Z

h~i ~ 4,\4~~•~Hdlof~ ‘N~*e 8h’d

Ree,e~ PaokcHAR1ZVIIL~ BLVD2

CLASS II — BIKE LANES (on Burton Way and on N. Crescent Dr* between Park Way and Sunset BIvd)

*N. Crescent Dr will maintain one travel lane in each direction.

CLASS III — BIKE ROUTE w/ SHARROWS (N. Crescent Dr between Wilshire Blvd and Park Way)

~arkwig Lare ZJfkiflg Lane

Page 17: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

-I —I

m z U’

Page 18: To: Honorable Mayor & City Council çB~~RLY From: Aaron ... · 7/2/2013  · Martha Eros, Transportation Planner Subject: PILOT BICYCLE ROUTE PROJECT UPDATE Attachments: 1. Beverly

Office of CommunicationsBEVE R L City of Beverly Hills

455 N. Rexford Dr.HILL Beverly Hills, CA 90210-4817www.beverlyhills.org

For Immediate ReleaseJune 12, 2013Contact: Therese Kosterman(310) 285-2456

Beverly Hill’s Pilot Bike Route Program Gets Rolling

Beverly Hills, CA — As part of a one-year pilot bicycle project, the City of Beverly Hills willbegin installation of two bike routes on Burton Way and North Crescent Drive during theweek of June 24, 2013. The eight to 10-day installation will involve restriping the roads andplacing signs to create a designated route for bicycle use.

The City Council approved the pilot bicycle route project in November 2012. Although allroads are legally open to bicycles, designated bike routes have been shown to increase bothsafety and ridership. Over the next year, the bike routes will be monitored for use andimpacts on local traffic and safety. The City will also be installing custom-made bike racksthroughout the business district.

Burton Way Bike LaneA striped bike lane will be created on both sides of Burton Way between North CrescentDrive and the east city limits (i.e., Robertson Boulevard on the south side and OakhurstDrive on the north side of the street). The six-foot wide bike lane, consisting of two travellanes in each direction, will be installed next to the existing parking lane. The bike lane’seastern end will connect with bike routes in Los Angeles.

North Crescent Drive Bike Lane and Bike RouteA combined bike lane and bike route with sharrow markings will be installed on both sides ofNorth Crescent Drive between Wilshire and Sunset Boulevards. A bike route is designatedwith “sharroW’ markings (a bicycle with chevrons) on the travel lane adjacent to parking anddoes not have designated lane striping. Sharrows announce the shared use of the road bybicycles and vehicles.

Construction of the bike routes will take place during low-traffic hours from Monday, June 24through Wednesday, July 3, 2013. Advance notice will be given of any evening parkingrestriction during the construction period. Additional information is available atwww.beverlyhills.org/bicycles.

###