Title V Oil and Gas General Operating Permits. Whitney Hill Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014. Objectives. Learn the differences between a GOP and a SOP Learn the technical review procedures for an ATO application - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/1.jpg)
Title V Oil and Gas General Operating
Permits
Whitney HillAir Permits Division
Texas Commission on Environmental QualityEnvironmental Trade Fair 2014
![Page 2: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/2.jpg)
Objectives▼Learn the differences between a GOP
and a SOP▼Learn the technical review
procedures for an ATO application▼Learn the procedures for a GOP
renewal or revision
The difference between a GOP and a SOP.
Technical review procedures for an ATO application.
The procedures for a GOP renewal or revision.
![Page 3: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/3.jpg)
Types of Title V Permits
▼Site Operating Permit (SOP)▼General Operating Permit (GOP)• Oil & Gas: 511, 512, 513, 514• MSW Landfill: 517• Air Curtain Incinerator: 518
![Page 4: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/4.jpg)
Important Terminology
GOP:The documents that contain all permit requirements for the industry type.
ATO:Authorization to operate under a general operating permit.
![Page 5: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/5.jpg)
GOPs vs. SOPs• General
requirements• De minimis,
standard permits, & PBRs only• No public
notice/EPA review done by TCEQ
•Site specific review•Compliance plans allowed
• Public notice/ EPA review for each site
• FOPs• Renewed
every 5 years• Legislative
notification
• General requirements• De minimis,
standard permits, & PBRs only• No public
notice/EPA review for ATO
•Site specific review•Compliance plans allowed
• Public notice/ EPA review for each site
• FOPs• Renewed
every 5 years• Legislative
notification
![Page 6: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/6.jpg)
Permit Content▼ATO Letter▼GOP Cover Letter▼GOP Terms▼GOP Tables▼CAM/PM (if applicable)▼Statement of Basis▼Application (federally enforceable)
• GOP Tables
• CAM/PM (if applicable)
• Statement of Basis
• Application (federally enforceable)
• ATO Letter
• GOP Cover Letter
• GOP Terms
![Page 7: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/7.jpg)
Initial ATO Application Procedure
▼Qualify▼Required information▼Forms▼Applicable requirements▼Compliance assurance
monitoring/Periodic monitoring
Qualify
Required Info.
Forms
Applicable Reqs.
CAM/PM
![Page 8: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/8.jpg)
Initial Application
Qualify
• County• Criteria• PCAs• Compliance
Qualification • County for appropriate GOP• Qualification criteria• Preconstruction authorizations• Compliance with GOP requirements
![Page 9: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/9.jpg)
Required Information
Required Information
• Process description• Process flow• Area map• Plot plan
Required Information▼ Process description▼ Process flow▼ Area map▼ Plot plan
![Page 10: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/10.jpg)
Required FormsAdministrative Forms• Core Data
Form• OP-1• OP-CRO1• OP-DEL
(optional)• OP-SUM• OP-ACPS
Applicable Requirement Forms• OP-REQ1• OP-UA• OP-MON
(optional)• OP-REQ3
(optional)
▼ Admin. Forms• Core Data Form• OP-1• OP-CRO1• OP-DEL (optional)• OP-SUM
▼ Applicable Req. Forms• OP-REQ1• OP-UA• OP-MON (optional)• OP-REQ3 (optional)
![Page 11: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/11.jpg)
OP-REQ1
ATO indicator
![Page 12: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/12.jpg)
Applicable RequirementsGOP Index No.
GOP TableOP-UA
![Page 13: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/13.jpg)
Example▼ Site
• Webb County• Major source of HAPs
▼ Unit Attributes• Stationary RICE (non-emergency)• > 500 HP• Four stroke lean burn (4 SLB)• Constructed on/after 12/19/2002• REDCO - Reducing CO emissions by 93% or more
Site
Webb County
Major Source of HAPS
Attributes
RICE (non-
emerg)
> 500 HP
4 SLB Post 12/19/200
2
REDCO
![Page 14: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/14.jpg)
Example GOP 514 TableUnit Attributes
GOP Index No.
Requirements
> 500 hp
![Page 15: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/15.jpg)
Example GOP 514 Table (cont.)Constructed
On/ After 12/19/2002
Normal Service
4SLBReducing CO emissions 514-21-013 Requirements
![Page 16: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/16.jpg)
Compliance Assurance Monitoring/
Periodic MonitoringCompliance Assurance Monitoring (CAM) ▼Is in section (d) of
the GOP▼Has applicability
criteria ▼May be required
for standard permits or permits by rule
Periodic Monitoring (PM) ▼In section (f) of
the GOP▼Has applicability
criteria▼May be indicated
in the tables
CAM
Section (d) of GOP
Applicability Criteria
Standard Permits and
PBRs
PM
Section (f) of GOP
Applicability Criteria
Indicated in Tables
![Page 17: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/17.jpg)
Example GOP Table With PM
![Page 18: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/18.jpg)
Example PM TablePollutant
Indicator Monitored
Periodic Monitoring Requirement
Min. Freq.Averaging Period
PM Option No.
Both Options are Required
![Page 19: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/19.jpg)
ATO Technical Review
▼Provisional terms and conditions▼TCEQ reviews application▼Deficiencies resolved▼TCEQ issues ATO letter
![Page 20: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/20.jpg)
Revision to ATO
▼Correction of typographical errors▼Change, add, or remove
applicability determinations▼Change in name/ownership (Form)▼Revision to GOP
![Page 21: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/21.jpg)
Revision to ATO FormsRequired▼OP-2▼OP-CRO1
Potentially Required▼OP-1▼OP-REQ1▼OP-SUMR▼OP-UA▼OP-MON▼OP-REQ3▼OP-CRO2
Required▼ OP-2▼ OP-CRO1
Potentially Required
▼ OP-1▼ OP-REQ1▼ OP-SUMR▼ OP-UA▼ OP-MON▼ OP-REQ3▼ OP-CRO2
![Page 22: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/22.jpg)
Revision Review Policies
▼PBR effective dates▼Scope of revision▼Expected timeline of review
![Page 23: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/23.jpg)
ATO Renewal
ATO issue
dATO
expiration
Five year authorization term
Application due(6-18 months before
expiration)
TCEQ sendsrenewal
notification
![Page 24: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/24.jpg)
ATO Renewal FormsRequired▼OP-1▼OP-2▼OP-CRO1▼OP-ACPS▼OP-REQ1
Potentially Required▼OP-SUMR▼OP-UA▼OP-MON▼OP-REQ3
Required▼ OP-1▼ OP-2▼ OP-CRO1▼ OP-ACPS▼ OP-REQ1
Potentially Required
▼ OP-SUMR▼ OP-UA▼ OP-MON▼ OP-REQ3
![Page 25: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/25.jpg)
Void Requests
Lowering PTE▼ATO Void Request
Letter▼APD-Cert or PI-7-
Cert
Application Area or Site Shutdown▼Void Request Letter▼PCAs Voided▼OP-CRO1
Lowering PTE
ATO Void Request Letter
APD-CERT or PI-7-CERT
Application Area or Site Shutdown
Request to Void PCAs
ATO Void Request Letter
![Page 26: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/26.jpg)
GOP Revisions and Renewals
▼Renewal -- every 5 years
▼Revision -- between renewals
▼Update tables and terms
▼Procedures• Public notice• Affected states review• EPA review
▼ATO responsibility
![Page 27: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/27.jpg)
Oil and GasGOP Guidance
▼TexasOilandGasHelp.org
▼GOP Guidance
▼GOP Information
![Page 28: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/28.jpg)
Signing Up for E-mail Updates
![Page 29: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/29.jpg)
Submitting ATO Applications(Initial, Revisions, and
Renewals)TCEQ
APIRT, MC 161P.O. Box 13087
Austin, TX 78711-3087
Copies must be mailed to the appropriate TCEQ regional office.
![Page 30: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/30.jpg)
Submitting ATO ApplicationUpdates
[Name of Assigned Permit Reviewer]
TCEQAPD, MC 163
P.O. Box 13087Austin, TX 78711-3087
![Page 31: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/31.jpg)
Submitting ATO Application to EPA
Air Permits Section (6PD-R)EPA, Region 6
1445 Ross Ave., Suite 1200Dallas, TX 75202-2733
Submit application updates to EPA at [email protected]. Identify the associated permit number when submitting information.
![Page 32: Title V Oil and Gas General Operating Permits](https://reader038.vdocuments.site/reader038/viewer/2022102912/56815da4550346895dcbcf83/html5/thumbnails/32.jpg)
Oil and Gas GOP
Questions?Air Permits Division
512-239-1250Air Permits Division
512-239-1250