Project No.: T08-199 [ Month Year ] BALLANTRY HOMES TRAFFIC IMPACT STUDY - UPDATE Proposed Khalsa Gate Mixed-Use Development Town of Oakville COLE ENGINEERING GROUP LTD. HEAD OFFICE 70 Valleywood Drive Markham, ON CANADA L3R 4T5 T. 905.940.6161 | 416.987.6161 F. 905.940.2064 | www.ColeEngineering.ca GTA WEST OFFICE 150 Courtneypark Drive West, Unit C100 Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 F. 905.364.6162 MARCH 2014

Upload: others

Post on 17-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Project No.: T08-199

[ Month Year ]

BALLANTRY HOMES

TRAFFIC IMPACT STUDY - UPDATE

Proposed Khalsa Gate Mixed-Use DevelopmentTown of Oakville

COLE ENGINEERING GROUP LTD.

HEAD OFFICE

70 Valleywood DriveMarkham, ON CANADA L3R 4T5T. 905.940.6161 | 416.987.6161F. 905.940.2064 | www.ColeEngineering.ca

GTA WEST OFFICE

150 Courtneypark Drive West, Unit C100Mississauga, ON CANADA L5W 1Y6T. 905.364.6161F. 905.364.6162MARCH 2014

Page 2: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 3: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page i

Table of Contents

1.0 Introduction....................................................................................................................1

2.0 Proposed Development ..................................................................................................1

3.0 Existing Traffic.................................................................................................................1 3.1. Existing Road Network......................................................................................................2 3.2. Existing Traffic Analysis.....................................................................................................2

4.0 Future Background Traffic...............................................................................................3 4.1. Growth Rate .....................................................................................................................3 4.2. Background Development ................................................................................................4 4.3. Future (2019) Background Traffic Analysis........................................................................4

5.0 Trip Generation and Distribution....................................................................................5 5.1. Trip Generation.................................................................................................................5 5.2. Trip Distribution................................................................................................................6

6.0 Future Total Traffic Conditions .......................................................................................6 6.1. Future (2019) Total Traffic Analysis ..................................................................................6

7.0 Conclusions .....................................................................................................................8

Page 4: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page ii

LIST OF FIGURES 

Figure 1‐1  Proposed Site Location Figure 2‐1  Proposed Site Plan  Figure 3‐1  Existing Lane Configurations Figure 3‐2  Existing Traffic Volumes Figure 4‐1  Future Lane Configurations Figure 4‐2  Future (2019) Background Traffic Volumes Figure 5‐1  Site Traffic Volumes  Figure 6‐1  Future (2019) Total Traffic Volumes  LIST OF TABLES 

Table 3.1 – Existing Traffic – Level of Service............................................................................................ 3 Table 4.1 – Future (2019) Background Traffic – Level of Service............................................................... 4 Table 5.1 – Site Trip Generation............................................................................................................... 5 Table 5.2 – Trip Distribution .................................................................................................................... 6 Table 6.1 – Future (2019) Total Traffic – Level of Service ......................................................................... 7   APPENDICES 

Appendix A – Existing Traffic Data Appendix B – Existing Traffic Level of Service Calculations Appendix C – Future (2019) Background Traffic Level of Service Calculations Appendix D – Future (2019) Total Traffic Level of Service Calculations  Appendix E – Statement of Limiting Conditions and Assumptions 

Page 5: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 1  

1.0 Introduction

Cole Engineering Group Ltd. (Cole Engineering) was retained by Ballantry Homes  Inc. (the “Owner”) to update  a  Traffic  Impact  Study  (TIS)  in  support  of  a  proposed mixed‐use  development.    The  site  is approximately 4.84 acres in area and is located on the north side of Khalsa Gate, between Regional Road 25  (Bronte  Road)  and Old  Bronte  Road,  in  the  Town  of Oakville  (the  “Town”).    The  site  location  is illustrated in Figure 1‐1. 

The purpose of the study is as follows: 

• Document the traffic impacts associated with the proposed development; • Identify any traffic operational concerns; • Identify any traffic mitigation measures; and, • Assess various road network configurations. 

2.0 Proposed Development

The proposed land uses include 123 Townhouse units as well as a ten (10)‐storey Condominium building consisting of 248 units. The proposed conceptual site plan is provided in Figure 2‐1.  

Two (2) site accesses will be provided to the proposed residential development via Old Bronte Road. For the purpose of this study, the following intersections were assessed: 

• Bronte Road / Highvalley Road‐Pine Glen Road;  • Bronte Road / Khalsa Gate, and; • Old Bronte Road / Access 1; and, • Old Bronte Road / Access 2. 

3.0 Existing Traffic

Turning movement counts for the Bronte Road / Highvalley Road – Pine Glen Road and Bronte Road / Khalsa Gate  intersections were undertaken by Accu‐Traffic  Inc. on behalf of Cole Engineering.   These counts were conducted on Thursday, March 20, 2014.  Existing traffic data is shown in Appendix A. 

Counts were not conducted for the Pine Glen Road and Khalsa Gate intersections with Old Bronte Road.  This was  due  to  the  isolated  configuration  of  the  road  network  and  low  trip  generators within  this portion of the study area.   Thus, a growth rate of 2% was applied to the Old Bronte Road / Pine Glen Road and Old Bronte Road  / Khalsa Gate  intersections data  for 2014 horizon year  to accumulate  the most approximate recent traffic data from Cole Engineering’s previous report of March, 2012.     

Page 6: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 2

3.1. Existing Road Network

The existing road network and lane configurations within the study area are provided in Figure 3‐1.  To the south of Khalsa Gate, Old Bronte Road terminates into a cul‐de‐sac.  This configuration isolates this segment  of  the  road  network  from  traffic  originating  from  outside  the  study  area.   Also,  a  site  visit revealed that Old Bronte Road within the study area  is predominantly a residential roadway providing access  to  seven  (7)  single  family  homes  and  two  (2)  places  of worship, which  generate  a  negligible amount of vehicle trips during the weekday a.m. and p.m. peak hours.  The details of the road sections are outlined below. 

Bronte Road is a north‐south arterial road with a four‐lane urban cross‐section, in the Town of Oakville.  Within the study area, Bronte Road has a posted speed limit of 60 km/h and is under the jurisdiction of the Region of Halton.  

Old Bronte Road is a north‐south local road under the jurisdiction of the Town of Oakville with a posted speed limit of 60 km/h. 

Highvalley Road is an east‐west local road under the jurisdiction of the Town of Oakville with a posted speed limit of 50 km/h. 

Pine Glen Road is an east‐west local road under the jurisdiction of the Town of Oakville with a suggested speed limit of 50 km/h. 

Khalsa Gate  is an east‐west  local road under the  jurisdiction of the Town of Oakville with a suggested speed limit of 50 km/h. 

3.2. Existing Traffic Analysis

Existing  traffic volumes are provided  in Figure 3‐2. The  study area  intersections were analyzed under existing  traffic conditions using SYNCHRO 6.0  software. The methodology of  the  software  follows  the procedures  described  and  outlined  in  the  Highway  Capacity  Manual,  HCM2000,  published  by  the Transportation Research Board. The  results,  including  the  critical movements  (i.e. movements with a volume to capacity v/c ratio greater than 0.85 shown in bold) are summarized in Table 3.1, and detailed calculations are provided in Appendix B.  

Page 7: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 3

Table 3.1 – Existing Traffic – Level of Service 

Intersection  Key Movement  AM Peak Weekday LOS (v/c) 

PM Peak Weekday LOS (v/c) 

Bronte Road/  Highvalley Road‐Pine Glen Road 

(signalized) 

Overall EB left 

EB through‐right WB left 

WB though‐right NB left 

NB through NB right SB left 

SB through SB right 

A (0.58) D (0.13) D (0.32) E (0.63) D (0.13) A (0.18) A (0.33) A (0.01) A (0.04) A (0.57) A (0.01) 

A (0.50) D (0.09) D (0.10) D (0.45) D (0.11) A (0.14) A (0.51) A (0.03) A (0.25) A (0.30) A (0.03) 

Bronte Road / Khalsa Gate (unsignalized)  WB right  B (<0.01)  C (0.02) 

Old Bronte Road / Pine Glen Road (Unsignalized) 

EB left‐right NB left‐through SB through‐right 

A (0.04) A (0.11) A (<0.01) 

A (0.12) A (0.07) A (<0.01) 

Old Bronte Road / Khalsa Gate (Unsignalized) 

EB left‐right NB left‐through SB through‐right 

A (0.02) A (<0.01) A (<0.01) 

A (0.03) A (0.01) A (<0.01) 

The analysis  indicates that the existing signalized  intersection of Bronte Road / Highvalley Road – Pine Glen Road operates at an overall level of service (LOS) ‘A’ during both analyzed time periods.  Individual movements operate at LOS ‘E’ or better.    

The unsignalized intersections operate at LOS ‘C’ or better during both the a.m. and p.m. peak hours.   

4.0 Future Background Traffic

Future background traffic for the study area is based on five (5) year horizon (2019) traffic projections.  Future background traffic consists of traffic due to other developments within the study area plus the traffic  growth  outside  the  study  area.    Pine  Glen  Road will  be  expanded  in  the  future.  Figure  4‐1 illustrates the future lane configurations. The details of the traffic forecast and analyses are outlined in the following sub‐sections.  

4.1. Growth Rate

According to the discussion we had with Halton Region staff, an annual growth rate of two percent (2%) is appropriate to apply to the turning movement counts. 

Page 8: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 4

4.2. Background Development

Based on discussions with the Town, a number of proposed future developments within the study area were identified as follows: 

• Bronte Creek Community; • AMC Real Estate Management Inc.; • Crystal Development; • Mattamy Development;  • FoxFarm Development; and, • Ballantry Residential Phase. 

The background traffic generated from these developments was included in our analysis and distributed to the study area network.   

4.3. Future (2019) Background Traffic Analysis

Future (2019) background traffic is provided in Figure 4‐2.   The study area intersections were analyzed under future (2019) background traffic conditions using SYNCHRO 6.0 software. The methodology of the software  follows  the procedures described and outlined  in  the Highway Capacity Manual, HCM2000, published  by  the  Transportation  Research  Board.  The  results,  including  the  critical movements  (i.e. movements with a volume  to capacity v/c  ratio greater  than 0.85  shown  in bold) are  summarized  in Table 4.1.  Detailed calculations are provided in Appendix C. 

Table 4.1 – Future (2019) Background Traffic – Level of Service 

Intersection  Key Movement  AM Peak Weekday LOS (v/c) 

PM Peak WeekdayLOS (v/c) 

Bronte Road /  Highvalley Road‐Pine Glen Road 

(signalized) 

Overall EB left 

EB through‐right WB left 

WB though‐right NB left 

NB through NB right SB left 

SB through SB right 

B (0.87) D (0.36) D (0.73) F (0.86) D (0.13) E (0.88) A (0.46) A (0.01) A (0.35) B (0.71) A (0.05) 

B (0.76) D (0.56) D (0.17) F (0.77) D (0.39) A (0.51) A (0.64) A (0.03) D (0.76) A (0.49) A (0.09) 

Bronte Road / Khalsa Gate (unsignalized)  WB right  B (0.01)  C (0.03) 

Old Bronte Road / Pine Glen Road (Unsignalized) 

EB left‐through‐right WB left‐through‐right NB left‐through‐right SB left‐through‐right 

A (0.14) A (0.04) A (0.15) A (<0.01) 

A (0.19) A (0.09) A (0.08) A (<0.01) 

Old Bronte Road / Khalsa Gate (Unsignalized) 

EB left‐right NB left‐through SB through‐right 

A (0.02) A (<0.01) A (<0.01) 

A (0.03) A (0.01) A (<0.01) 

 

Page 9: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 5

The  future  (2019)  background  analysis  indicates  that  the  signalized  intersection  at  Bronte  Road  / Highvalley Road – Pine Glen Road is expected to operate at an overall LOS ‘B’ during both analyzed time periods. However, during the a.m. peak hour, the overall intersection is anticipated to operate with a v/c ratio of 0.87. Critical movements  include the westbound  left and northbound  left movements and are anticipated to operate at LOS ‘F’ and ‘E’ with volume to capacity ratios of 0.86 and 0.88, respectively.  

Pine Glen Road will be expanded in the future; therefore, Old Bronte Road / Pine Glen Road will become a  standard  intersection  and  is  expected  to  operate  with  excellent  LOS  during  both  analyzed  time periods.  

All unsignalized intersections are anticipated to operate with LOS ‘C’ or better during both analyzed time periods.    

5.0 Trip Generation and Distribution

5.1. Trip Generation

Trip  generation  for  the  proposed  development was  undertaken  using  information  contained  in  Trip Generation,  9th  Edition  published  by  the  Institute  of  Transportation  Engineers  (ITE).    The  proposed development is to include 123 townhouse units and 248 condominium units.  

The peak hour trip generation volumes for the proposed development was derived using the established equation  for Residential Condominium  / Townhouse  (Land Use Code 230). The detailed  volumes and rates are shown in Table 5.1. 

Table 5.1 – Site Trip Generation  WEEKDAY AM  Peak Hour 

WEEKDAY PM  Peak Hour Land Use  Parameter 

In  Out  Total  In  Out  Total 

Gross Rate  (Trips / unit)  0.09  0.41  0.50  0.39  0.19  0.58 Residential – Townhouse 

123 Dwelling Units New Trips  10  51  61  48  23  71 

Gross Rate  (Trips / Unit) 

0.07  0.36  0.43  0.34  0.17  0.51 Residential – Condominium 248 Dwelling Units 

New Trips  18  89  107  85  42  127 

TOTAL  28  140  168  133  65  198 

The proposed development  is expected to generate 168 two‐way trips during the weekday a.m. peak hour  (28  inbound trips and 140 outbound trips) and 198 two‐way trips during the weekday p.m. peak hour (133 inbound trips and 65 outbound trips).   

Page 10: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 6

5.2. Trip Distribution

The distribution of  traffic  related  to  the Khalsa Gate Commercial development  is based on  the 2006 Transportation  Tomorrow  Survey  (TTS)  and  existing  travel  patterns  within  the  study  area.  For  the purposes of this study, trips are assumed to be created to the north and south as Bronte Road  is the major  arterial  roadway  providing  access  to  the  development  site.  Table  5.2  summarize  the  trip distribution results and Figure 5‐1 illustrates the site trips. 

Table 5.2 – Trip Distribution 

Direction  Via  Proportion Inbound (Outbound) 

Bronte Road  20% (20%) North 

Old Bronte Road  5% (5%) 

South  Bronte Road  75% (75%) 

Total  100% (100%) 

6.0 Future Total Traffic Conditions

6.1. Future (2019) Total Traffic Analysis

Future  (2019)  total  traffic  volumes  are  illustrated  in  Figure  6‐1.  The  study  area  intersections were analyzed under future (2019) total traffic conditions using SYNCHRO 6.0 software. The methodology of the software follows the procedures described and outlined in the Highway Capacity Manual, HCM2000, published  by  the  Transportation  Research  Board.  The  results,  including  the  critical movements  (i.e. movements with a volume  to capacity v/c  ratio greater  than 0.85  shown  in bold) are  summarized  in Table 6.1 and detailed calculations are provided in Appendix D.  It should be noted that the signal timing for  the  intersection  of  Bronte  Road  /  Highvalley  Road‐Pine  Glen  Road  was  optimized  in  order  to accommodate additional traffic.  

Page 11: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 7

Table 6.1 – Future (2019) Total Traffic – Level of Service 

Intersection  Key Movement  AM Peak Weekday LOS (v/c) 

PM Peak WeekdayLOS (v/c) 

Bronte Road /  Highvalley Road‐Pine Glen Road 

(signalized) 

Overall EB left 

EB through‐right WB left 

WB though‐right NB left 

NB through NB right SB left 

SB through SB right 

C (0.84) D (0.33) D (0.24) D (0.74) D (0.16) C (0.52) B (0.51) A (0.01) C (0.46) C (0.93) B (0.07) 

C (0.84) D (0.36) A (0.36) D (0.74) A  (0.29) C (0.71) C (0.89) A (0.01) C (0.63) C (0.69) B (0.12) 

Bronte Road / Khalsa Gate (unsignalized)  WB right  B (0.01)  D (0.35) 

Old Bronte Road / Pine Glen Road (Unsignalized) 

EB left‐through‐right WB left‐through‐right NB left‐through‐right SB left‐through‐right 

A (0.16) A (0.05) B (0.37) A (0.03) 

A (0.15) A (0.09) A (0.22) A (0.03) 

Old Bronte Road / Khalsa Gate (Unsignalized) 

EB left‐right NB left‐through SB through‐right 

A (0.04) A (<0.01) A (0.04) 

A (0.23) A (0.01) 

Old Bronte Road / Access 1 (Unsignalized) 

EB left‐right NB left 

A (0.11) A (0.01) 

B (0.21) A (0.07) 

Old Bronte Road / Access 2 (Unsignalized)  NB left‐through  A (0.01)  A (0.03) 

Old Bronte Road / Access 3 (Unsignalized)  EB left‐right  B (0.09)  A (0.04) 

The  future  (2019)  total analysis  indicates  that  the  signalized  intersection at Bronte Road  / Highvalley Road – Pine Glen Road is expected to operate at an overall LOS  ‘C’ during both analyzed time periods.  However,  during  the  a.m.  peak  hour,  the  southbound  through movement  is  anticipated  to  operate below capacity at LOS ‘C’ with a v/c ratio of 0.93. During the p.m. peak hour, the northbound through is anticipated to operate with LOS ‘C’ and v/c ratio of 0.89. 

Pine Glen  Road will  be  lengthened  in  the  future;  therefore, Old  Bronte  Road  /  Pine Glen  Road will become a  standard  intersection and  is expected  to  operate with excellent  LOS during both analyzed time periods.  

All unsignalized  intersections are anticipated  to operate with  LOS  ‘D’ or better during both analyzed time periods.    

Page 12: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Ballantry Homes Proposed Khalsa Gate Mixed-Use Development Town of Oakville Traffic Impact Study - Update  

T08-199 (March 2014) Page 8

7.0 Conclusions

Based on this traffic review, the study findings indicate: 

• All key  intersections are expected  to  function at acceptable  levels of  service  in  the existing and future background traffic conditions. 

• The proposed development  is expected  to generate 168  two‐way  trips during  the weekday AM peak hour  (28  inbound trips and 140 outbound trips) and 198 two‐way trips during the weekday PM peak hour (133 inbound trips and 65 outbound trips).   

• Under future (2019) total traffic conditions, all key intersections are anticipated to operate at acceptable levels of service. 

• The  proposed  development  is  expected  to  have  negligible  impacts  to  the  study  area  road network.  

 

Page 13: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 14: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 15: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 16: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 17: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 18: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 19: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 20: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent
Page 21: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

APPENDIX A Existing Traffic Data 

 

Page 22: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Morning Peak Diagram Specified PeriodFrom:To:

7:00:00

9:00:00

One Hour PeakFrom:To:

7:30:00

8:30:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800001

Bronte Road & Highvalley Road

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2438

1522

1

Heavys

Trucks

Cars

Totals

1

0

10

11

45

14

1435

1494

1

0

16

17

47

14

1461

Heavys

Trucks

Cars

Totals

38

9

869

916

Heavys Trucks Cars Totals

2 0 57 59

Heavys Trucks Cars Totals

1 0 17 18

0 0 11 11

5 0 67 72

6 0 95

Peds Cross:

West Peds:

West Entering:

West Leg Total:

1

101

160

Bronte Road

Highvalley RoadW

N

E

S

Pine Glen Road

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

178

142

4

Cars Trucks Heavys Totals

42 0 2 44

17 0 1 18

75 0 5 80

134 0 8

Cars Trucks Heavys Totals

35 0 1 36

Cars

Trucks

Heavys

Totals

1577

14

55

1646

Cars

Trucks

Heavys

Totals

30

0

0

30

810

9

35

854

8

0

0

8

848

9

35

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

892

2538

Comments

Page 23: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Afternoon Peak Diagram Specified PeriodFrom:To:

16:00:00

18:00:00

One Hour PeakFrom:To:

16:45:00

17:45:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800001

Bronte Road & Highvalley Road

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2335

912

5

Heavys

Trucks

Cars

Totals

0

0

36

36

23

9

790

822

0

0

54

54

23

9

880

Heavys

Trucks

Cars

Totals

35

13

1375

1423

Heavys Trucks Cars Totals

0 0 112 112

Heavys Trucks Cars Totals

0 0 9 9

0 0 11 11

0 0 30 30

0 0 50

Peds Cross:

West Peds:

West Entering:

West Leg Total:

2

50

162

Bronte Road

Highvalley RoadW

N

E

S

Pine Glen Road

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

189

88

2

Cars Trucks Heavys Totals

27 0 0 27

13 0 0 13

46 1 1 48

86 1 1

Cars Trucks Heavys Totals

101 0 0 101

Cars

Trucks

Heavys

Totals

866

10

24

900

Cars

Trucks

Heavys

Totals

63

0

0

63

1339

13

35

1387

36

0

0

36

1438

13

35

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

1486

2386

Comments

Page 24: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800001

Bronte Road & Highvalley Road

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

8656

4460

7

Heavys

Trucks

Cars

Totals

3

0

84

87

148

45

4053

4246

4

0

123

127

155

45

4260

Heavys

Trucks

Cars

Totals

165

36

3995

4196

Heavys Trucks Cars Totals

6 1 318 325

Heavys Trucks Cars Totals

1 0 49 50

3 0 31 34

6 1 182 189

10 1 262

Peds Cross:

West Peds:

West Entering:

West Leg Total:

6

273

598

Bronte Road

Highvalley RoadW

N

E

S

Pine Glen Road

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

671

413

7

Cars Trucks Heavys Totals

131 0 4 135

49 0 2 51

216 2 9 227

396 2 15

Cars Trucks Heavys Totals

250 1 7 258

Cars

Trucks

Heavys

Totals

4451

48

163

4662

Cars

Trucks

Heavys

Totals

185

1

1

187

3815

36

160

4011

96

1

0

97

4096

38

161

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

4295

8957

Comments

Page 25: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Traffic Count Summary

Intersection Bronte Road & Highvalley Road Count Date 20-Mar-14 Municipality Oakville

North Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Hour Hour

Hour Hour

Ending Ending

Ending Ending

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

Grand Grand

Grand Grand

Total Total

Total Total

Total Total

Total Total

Peds Peds

Peds Peds

North/South

East/West

Total

Total

Approaches

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 18 1235 12 1265 0 2048 8:00:00 10 767 6 783 09:00:00 20 1403 12 1435 1 2296 9:00:00 56 789 16 861 0

16:00:00 0 1 0 1 0 2 16:00:00 0 1 0 1 017:00:00 40 786 29 855 1 2091 17:00:00 57 1145 34 1236 018:00:00 49 821 34 904 5 2318 18:00:00 64 1309 41 1414 0

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 60 2 34 96 3 174 8:00:00 15 5 58 78 09:00:00 76 26 44 146 1 246 9:00:00 12 14 74 100 3

16:00:00 2 2 0 4 0 5 16:00:00 1 0 0 1 017:00:00 38 7 27 72 1 119 17:00:00 13 4 30 47 118:00:00 51 14 30 95 2 142 18:00:00 9 11 27 47 2

0:00 0:00 7:00 8:00 9:00 16:00 17:00 18:000 0 0 80 115 5 59 79

127 4246 87 4460 7 8755 187 4011 97 4295 0

227 51 135 413 7 686 50 34 189 273 6

Page 26: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800001

IntervalTime

Passenger Cars - North Approach Trucks - North Approach Heavys - North Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right North Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 3 3 158 158 2 2 0 0 3 3 0 0 1 1 10 10 1 1 0 07:30:00 6 3 460 302 4 2 0 0 7 4 0 0 2 1 22 12 1 0 0 07:45:00 9 3 796 336 6 2 0 0 12 5 0 0 2 0 31 9 1 0 0 08:00:00 16 7 1177 381 10 4 0 0 14 2 0 0 2 0 44 13 2 1 0 08:15:00 18 2 1505 328 12 2 0 0 15 1 0 0 3 1 54 10 2 0 1 18:30:00 22 4 1895 390 14 2 0 0 21 6 0 0 3 0 67 13 2 0 1 08:45:00 26 4 2241 346 18 4 0 0 22 1 0 0 3 0 86 19 2 0 1 09:00:00 34 8 2506 265 22 4 0 0 28 6 0 0 4 1 104 18 2 0 1 09:00:10 34 0 2507 1 22 0 0 0 28 0 0 0 4 0 104 0 2 0 1 0

16:00:00 34 0 2507 0 22 0 0 0 28 0 0 0 4 0 104 0 2 0 1 016:15:00 42 8 2647 140 25 3 0 0 30 2 0 0 4 0 111 7 3 1 2 116:30:00 54 12 2874 227 33 8 0 0 32 2 0 0 4 0 116 5 3 0 2 016:45:00 61 7 3064 190 42 9 0 0 34 2 0 0 4 0 122 6 3 0 2 017:00:00 74 13 3260 196 50 8 0 0 36 2 0 0 4 0 129 7 3 0 2 017:15:00 88 14 3452 192 59 9 0 0 37 1 0 0 4 0 134 5 3 0 2 017:30:00 102 14 3664 212 73 14 0 0 39 2 0 0 4 0 140 6 3 0 7 517:45:00 115 13 3854 190 78 5 0 0 43 4 0 0 4 0 145 5 3 0 7 018:00:00 123 8 4053 199 84 6 0 0 45 2 0 0 4 0 148 3 3 0 7 018:15:00 123 0 4053 0 84 0 0 0 45 0 0 0 4 0 148 0 3 0 7 018:15:07 123 0 4053 0 84 0 0 0 45 0 0 0 4 0 148 0 3 0 7 0

Page 27: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800001

IntervalTime

Passenger Cars - East Approach Trucks - East Approach Heavys - East Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right East Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 11 11 0 0 5 5 0 0 0 0 0 0 1 1 0 0 0 0 0 07:30:00 20 9 0 0 12 7 0 0 0 0 0 0 1 0 0 0 0 0 0 07:45:00 41 21 2 2 21 9 0 0 0 0 0 0 2 1 0 0 0 0 0 08:00:00 56 15 2 0 32 11 0 0 0 0 0 0 4 2 0 0 2 2 3 38:15:00 78 22 8 6 41 9 0 0 0 0 0 0 5 1 1 1 2 0 4 18:30:00 95 17 17 9 54 13 0 0 0 0 0 0 6 1 1 0 2 0 4 08:45:00 116 21 23 6 64 10 0 0 0 0 0 0 7 1 1 0 2 0 4 09:00:00 129 13 27 4 76 12 0 0 0 0 0 0 7 0 1 0 2 0 4 09:00:10 131 2 29 2 76 0 0 0 0 0 0 0 7 0 1 0 2 0 4 0

16:00:00 131 0 29 0 76 0 0 0 0 0 0 0 7 0 1 0 2 0 4 016:15:00 137 6 30 1 80 4 0 0 0 0 0 0 7 0 1 0 2 0 4 016:30:00 145 8 33 3 85 5 0 0 0 0 0 0 7 0 2 1 4 2 4 016:45:00 158 13 35 2 92 7 0 0 0 0 0 0 7 0 2 0 4 0 5 117:00:00 169 11 35 0 101 9 0 0 0 0 0 0 7 0 2 0 4 0 5 017:15:00 183 14 38 3 105 4 1 1 0 0 0 0 7 0 2 0 4 0 6 117:30:00 194 11 41 3 108 3 1 0 0 0 0 0 7 0 2 0 4 0 7 117:45:00 204 10 48 7 119 11 1 0 0 0 0 0 8 1 2 0 4 0 7 018:00:00 216 12 49 1 131 12 2 1 0 0 0 0 9 1 2 0 4 0 7 018:15:00 216 0 49 0 131 0 2 0 0 0 0 0 9 0 2 0 4 0 7 018:15:07 216 0 49 0 131 0 2 0 0 0 0 0 9 0 2 0 4 0 7 0

Page 28: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800001

IntervalTime

Passenger Cars - South Approach Trucks - South Approach Heavys - South Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right South Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 2 2 114 114 1 1 0 0 2 2 0 0 0 0 5 5 0 0 0 07:30:00 6 4 318 204 3 2 0 0 2 0 0 0 0 0 13 8 0 0 0 07:45:00 8 2 543 225 4 1 0 0 5 3 0 0 0 0 21 8 0 0 0 08:00:00 10 2 730 187 6 2 0 0 7 2 0 0 0 0 30 9 0 0 0 08:15:00 18 8 926 196 7 1 0 0 8 1 0 0 0 0 44 14 0 0 0 08:30:00 36 18 1128 202 11 4 0 0 11 3 0 0 0 0 48 4 0 0 0 08:45:00 48 12 1291 163 17 6 0 0 13 2 0 0 0 0 68 20 0 0 0 09:00:00 66 18 1459 168 22 5 0 0 15 2 0 0 0 0 82 14 0 0 0 09:00:10 66 0 1460 1 22 0 0 0 15 0 0 0 0 0 82 0 0 0 0 0

16:00:00 66 0 1460 0 22 0 0 0 15 0 0 0 0 0 82 0 0 0 0 016:15:00 75 9 1670 210 29 7 0 0 18 3 0 0 0 0 98 16 0 0 0 016:30:00 91 16 1933 263 38 9 0 0 20 2 0 0 1 1 113 15 0 0 0 016:45:00 106 15 2222 289 49 11 0 0 22 2 1 1 1 0 121 8 0 0 0 017:00:00 122 16 2546 324 55 6 0 0 28 6 1 0 1 0 128 7 0 0 0 017:15:00 133 11 2879 333 67 12 0 0 28 0 1 0 1 0 139 11 0 0 0 017:30:00 151 18 3239 360 76 9 0 0 31 3 1 0 1 0 144 5 0 0 0 017:45:00 169 18 3561 322 85 9 0 0 35 4 1 0 1 0 156 12 0 0 0 018:00:00 185 16 3815 254 96 11 1 1 36 1 1 0 1 0 160 4 0 0 0 018:15:00 185 0 3815 0 96 0 1 0 36 0 1 0 1 0 160 0 0 0 0 018:15:07 185 0 3815 0 96 0 1 0 36 0 1 0 1 0 160 0 0 0 0 0

Page 29: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800001

IntervalTime

Passenger Cars - West Approach Trucks - West Approach Heavys - West Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right West Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 1 1 0 0 13 13 0 0 0 0 0 0 0 0 0 0 1 1 0 07:30:00 5 4 2 2 24 11 0 0 0 0 0 0 0 0 1 1 1 0 0 07:45:00 6 1 3 1 40 16 0 0 0 0 0 0 0 0 1 0 5 4 0 08:00:00 14 8 4 1 53 13 0 0 0 0 0 0 1 1 1 0 5 0 0 08:15:00 19 5 8 4 75 22 0 0 0 0 0 0 1 0 1 0 5 0 1 18:30:00 22 3 13 5 91 16 0 0 0 0 0 0 1 0 1 0 6 1 1 08:45:00 25 3 15 2 105 14 0 0 0 0 1 1 1 0 2 1 6 0 1 09:00:00 26 1 16 1 125 20 0 0 0 0 1 0 1 0 3 1 6 0 3 29:00:10 27 1 16 0 125 0 0 0 0 0 1 0 1 0 3 0 6 0 3 0

16:00:00 27 0 16 0 125 0 0 0 0 0 1 0 1 0 3 0 6 0 3 016:15:00 31 4 18 2 130 5 0 0 0 0 1 0 1 0 3 0 6 0 3 016:30:00 35 4 18 0 134 4 0 0 0 0 1 0 1 0 3 0 6 0 3 016:45:00 38 3 19 1 144 10 0 0 0 0 1 0 1 0 3 0 6 0 4 117:00:00 40 2 20 1 155 11 0 0 0 0 1 0 1 0 3 0 6 0 4 017:15:00 42 2 24 4 164 9 0 0 0 0 1 0 1 0 3 0 6 0 6 217:30:00 45 3 25 1 167 3 0 0 0 0 1 0 1 0 3 0 6 0 6 017:45:00 47 2 30 5 174 7 0 0 0 0 1 0 1 0 3 0 6 0 6 018:00:00 49 2 31 1 182 8 0 0 0 0 1 0 1 0 3 0 6 0 6 018:15:00 49 0 31 0 182 0 0 0 0 0 1 0 1 0 3 0 6 0 6 018:15:07 49 0 31 0 182 0 0 0 0 0 1 0 1 0 3 0 6 0 6 0

Page 30: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Morning Peak Diagram Specified PeriodFrom:To:

7:00:00

9:00:00

One Hour PeakFrom:To:

7:30:00

8:30:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800002

Bronte Road & Khalsa Gate

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2539

1647

0

Heavys

Trucks

Cars

Totals

55

14

1578

1647

0

0

0

0

55

14

1578

Heavys

Trucks

Cars

Totals

35

9

848

892

Bronte Road

W

N

E

S

Khalsa Gate

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

11

1

3

Cars Trucks Heavys Totals

1 0 0 1

0 0 0 0

1 0 0

Cars Trucks Heavys Totals

8 1 1 10

Cars

Trucks

Heavys

Totals

1578

14

55

1647

Cars

Trucks

Heavys

Totals

847

9

35

891

8

1

1

10

855

10

36

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

901

2548

Comments

Page 31: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Afternoon Peak Diagram Specified PeriodFrom:To:

16:00:00

18:00:00

One Hour PeakFrom:To:

16:45:00

17:45:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800002

Bronte Road & Khalsa Gate

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2381

898

0

Heavys

Trucks

Cars

Totals

24

10

864

898

0

0

0

0

24

10

864

Heavys

Trucks

Cars

Totals

35

13

1435

1483

Bronte Road

W

N

E

S

Khalsa Gate

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

12

1

2

Cars Trucks Heavys Totals

1 0 0 1

0 0 0 0

1 0 0

Cars Trucks Heavys Totals

10 1 0 11

Cars

Trucks

Heavys

Totals

864

10

24

898

Cars

Trucks

Heavys

Totals

1434

13

35

1482

10

1

0

11

1444

14

35

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

1493

2391

Comments

Page 32: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.

Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville

1403800002

Bronte Road & Khalsa Gate

1

20-Mar-14

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Bronte Road runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

8958

4660

0

Heavys

Trucks

Cars

Totals

163

48

4449

4660

0

0

0

0

163

48

4449

Heavys

Trucks

Cars

Totals

161

39

4098

4298

Bronte Road

W

N

E

S

Khalsa Gate

Bronte Road

East Leg Total:

East Entering:

East Peds:

Peds Cross:

50

3

7

Cars Trucks Heavys Totals

3 0 0 3

0 0 0 0

3 0 0

Cars Trucks Heavys Totals

42 2 3 47

Cars

Trucks

Heavys

Totals

4449

48

163

4660

Cars

Trucks

Heavys

Totals

4095

39

161

4295

42

2

3

47

4137

41

164

Peds Cross:

South Peds:

South Entering:

South Leg Total:

0

4342

9002

Comments

Page 33: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Traffic Count Summary

Intersection Bronte Road & Khalsa Gate Count Date 20-Mar-14 Municipality Oakville

North Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Hour Hour

Hour Hour

Ending Ending

Ending Ending

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

Grand Grand

Grand Grand

Total Total

Total Total

Total Total

Total Total

Peds Peds

Peds Peds

North/South

East/West

Total

Total

Approaches

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 0 1353 0 1353 0 2146 8:00:00 0 789 4 793 09:00:00 0 1556 0 1556 0 2432 9:00:00 0 858 18 876 0

16:00:00 0 0 0 0 0 2 16:00:00 0 2 0 2 017:00:00 0 853 0 853 0 2096 17:00:00 0 1233 10 1243 018:00:00 0 898 0 898 0 2326 18:00:00 0 1413 15 1428 0

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 0 0 0 0 3 0 8:00:00 0 0 0 0 09:00:00 0 0 1 1 1 1 9:00:00 0 0 0 0 0

16:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 0 0 1 1 1 1 17:00:00 0 0 0 0 018:00:00 0 0 1 1 2 1 18:00:00 0 0 0 0 0

7:00 8:00 9:00 16:00 17:00 17:00 18:00 18:000 0 0 0 0 0 0 0

0 4660 0 4660 0 9002 0 4295 47 4342 0

0 0 3 3 7 3 0 0 0 0 0

Page 34: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800002

IntervalTime

Passenger Cars - North Approach Trucks - North Approach Heavys - North Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right North Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 184 184 0 0 0 0 3 3 0 0 0 0 12 12 0 0 0 07:30:00 0 0 504 320 0 0 0 0 7 4 0 0 0 0 24 12 0 0 0 07:45:00 0 0 876 372 0 0 0 0 12 5 0 0 0 0 38 14 0 0 0 08:00:00 0 0 1286 410 0 0 0 0 14 2 0 0 0 0 53 15 0 0 0 08:15:00 0 0 1660 374 0 0 0 0 15 1 0 0 0 0 64 11 0 0 0 08:30:00 0 0 2082 422 0 0 0 0 21 6 0 0 0 0 79 15 0 0 0 08:45:00 0 0 2464 382 0 0 0 0 23 2 0 0 0 0 99 20 0 0 0 09:00:00 0 0 2763 299 0 0 0 0 29 6 0 0 0 0 117 18 0 0 0 09:00:10 0 0 2763 0 0 0 0 0 29 0 0 0 0 0 117 0 0 0 0 0

16:00:00 0 0 2763 0 0 0 0 0 29 0 0 0 0 0 117 0 0 0 0 016:15:00 0 0 2915 152 0 0 0 0 31 2 0 0 0 0 124 7 0 0 0 016:30:00 0 0 3153 238 0 0 0 0 33 2 0 0 0 0 129 5 0 0 0 016:45:00 0 0 3367 214 0 0 0 0 35 2 0 0 0 0 135 6 0 0 0 017:00:00 0 0 3583 216 0 0 0 0 37 2 0 0 0 0 142 7 0 0 0 017:15:00 0 0 3797 214 0 0 0 0 39 2 0 0 0 0 147 5 0 0 0 017:30:00 0 0 4024 227 0 0 0 0 41 2 0 0 0 0 153 6 0 0 0 017:45:00 0 0 4231 207 0 0 0 0 45 4 0 0 0 0 159 6 0 0 0 018:00:00 0 0 4449 218 0 0 0 0 48 3 0 0 0 0 163 4 0 0 0 018:15:00 0 0 4449 0 0 0 0 0 48 0 0 0 0 0 163 0 0 0 0 018:15:06 0 0 4449 0 0 0 0 0 48 0 0 0 0 0 163 0 0 0 0 0

Page 35: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800002

IntervalTime

Passenger Cars - East Approach Trucks - East Approach Heavys - East Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right East Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 17:45:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 08:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 28:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 18:30:00 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 4 08:45:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 09:00:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 09:00:10 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0

16:00:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 016:15:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 016:30:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4 016:45:00 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 5 117:00:00 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5 017:15:00 0 0 0 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 6 117:30:00 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7 117:45:00 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7 018:00:00 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7 018:15:00 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7 018:15:06 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0

Page 36: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800002

IntervalTime

Passenger Cars - South Approach Trucks - South Approach Heavys - South Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right South Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 118 118 0 0 0 0 3 3 0 0 0 0 5 5 0 0 0 07:30:00 0 0 331 213 0 0 0 0 3 0 0 0 0 0 13 8 0 0 0 07:45:00 0 0 558 227 2 2 0 0 6 3 0 0 0 0 21 8 0 0 0 08:00:00 0 0 751 193 4 2 0 0 8 2 0 0 0 0 30 9 0 0 0 08:15:00 0 0 953 202 6 2 0 0 9 1 0 0 0 0 44 14 0 0 0 08:30:00 0 0 1178 225 8 2 0 0 12 3 1 1 0 0 48 4 1 1 0 08:45:00 0 0 1357 179 14 6 0 0 14 2 1 0 0 0 68 20 2 1 0 09:00:00 0 0 1549 192 19 5 0 0 16 2 1 0 0 0 82 14 2 0 0 09:00:10 0 0 1550 1 19 0 0 0 17 1 1 0 0 0 82 0 2 0 0 0

16:00:00 0 0 1550 0 19 0 0 0 17 0 1 0 0 0 82 0 2 0 0 016:15:00 0 0 1777 227 21 2 0 0 19 2 1 0 0 0 98 16 3 1 0 016:30:00 0 0 2066 289 24 3 0 0 21 2 1 0 0 0 114 16 3 0 0 016:45:00 0 0 2381 315 26 2 0 0 24 3 1 0 0 0 122 8 3 0 0 017:00:00 0 0 2723 342 27 1 0 0 30 6 2 1 0 0 129 7 3 0 0 017:15:00 0 0 3080 357 31 4 0 0 30 0 2 0 0 0 140 11 3 0 0 017:30:00 0 0 3464 384 31 0 0 0 33 3 2 0 0 0 145 5 3 0 0 017:45:00 0 0 3815 351 36 5 0 0 37 4 2 0 0 0 157 12 3 0 0 018:00:00 0 0 4095 280 42 6 0 0 39 2 2 0 0 0 161 4 3 0 0 018:15:00 0 0 4095 0 42 0 0 0 39 0 2 0 0 0 161 0 3 0 0 018:15:06 0 0 4095 0 42 0 0 0 39 0 2 0 0 0 161 0 3 0 0 0

Page 37: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Accu-Traffic Inc.Count Date: 20-Mar-14 Site #: 1403800002

IntervalTime

Passenger Cars - West Approach Trucks - West Approach Heavys - West Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right West Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:45:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:00:10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 016:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 016:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 016:45:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 017:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 017:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 017:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 017:45:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:15:06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 38: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

APPENDIX B Existing Traffic 

Level Of Service Calculations  

Page 39: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Existing AM1: Highvalley Drive & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 18 11 80 18 30 855 8 17 1495 11Lane Group Flow (vph) 20 90 87 68 33 929 9 18 1625 12Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Detector Phases 4 4 8 8 2 2 2 6 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0Total Split (s) 42.0 42.0 42.0 42.0 78.0 78.0 78.0 78.0 78.0 78.0Total Split (%) 35.0% 35.0% 35.0% 35.0% 65.0% 65.0% 65.0% 65.0% 65.0% 65.0%Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lead/LagLead-Lag Optimize?Recall Mode None None None None C-Max C-Max C-Max C-Max C-Max C-Maxv/c Ratio 0.13 0.40 0.57 0.28 0.30 0.33 0.01 0.05 0.57 0.01Control Delay 45.9 36.2 63.0 21.1 11.9 3.8 1.8 3.5 5.6 2.7Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 45.9 36.2 63.0 21.1 11.9 3.8 1.8 3.5 5.6 2.7Queue Length 50th (m) 4.2 12.8 19.6 4.2 1.6 24.1 0.0 0.7 57.6 0.3Queue Length 95th (m) 11.1 27.2 34.6 16.5 8.6 40.8 1.2 2.8 94.7 1.8Internal Link Dist (m) 65.6 107.9 159.7 83.6Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 391 515 380 544 111 2799 1290 353 2827 1182Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.05 0.17 0.23 0.13 0.30 0.33 0.01 0.05 0.57 0.01

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 60Control Type: Actuated-Coordinated

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 40: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Existing AM1: Highvalley Drive & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.87 1.00 0.89 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1646 1558 1646 1613 1745 3471 1597 1646 3505 1465Flt Permitted 0.71 1.00 0.63 1.00 0.13 1.00 1.00 0.29 1.00 1.00Satd. Flow (perm) 1226 1558 1090 1613 231 3471 1597 507 3505 1465Volume (vph) 18 11 72 80 18 44 30 855 8 17 1495 11Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 20 12 78 87 20 48 33 929 9 18 1625 12RTOR Reduction (vph) 0 27 0 0 42 0 0 0 2 0 0 1Lane Group Flow (vph) 20 63 0 87 26 0 33 929 7 18 1625 11Heavy Vehicles (%) 6% 0% 7% 6% 6% 5% 0% 4% 0% 6% 3% 9%Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 13.2 13.2 13.2 13.2 94.8 94.8 94.8 94.8 94.8 94.8Effective Green, g (s) 15.2 15.2 15.2 15.2 96.8 96.8 96.8 96.8 96.8 96.8Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.81 0.81 0.81 0.81 0.81 0.81Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 155 197 138 204 186 2800 1288 409 2827 1182v/s Ratio Prot 0.04 0.02 0.27 c0.46v/s Ratio Perm 0.02 c0.08 0.14 0.00 0.04 0.01v/c Ratio 0.13 0.32 0.63 0.13 0.18 0.33 0.01 0.04 0.57 0.01Uniform Delay, d1 46.5 47.7 49.7 46.5 2.6 3.1 2.3 2.3 4.2 2.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.9 9.0 0.3 2.1 0.3 0.0 0.2 0.9 0.0Delay (s) 46.9 48.6 58.8 46.8 4.7 3.4 2.3 2.5 5.0 2.3Level of Service D D E D A A A A A AApproach Delay (s) 48.3 53.5 3.4 5.0Approach LOS D D A A

Intersection SummaryHCM Average Control Delay 8.7 HCM Level of Service AHCM Volume to Capacity ratio 0.58Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 59.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 41: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing AM2: Khalsa Gate & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 0 2 891 13 0 1647Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 2 968 14 0 1790PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m) 351pX, platoon unblocked 0.79vC, conflicting volume 1864 484 983vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1828 484 983tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 55 534 711

Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 2 484 484 14 895 895Volume Left 0 0 0 0 0 0Volume Right 2 0 0 14 0 0cSH 534 1700 1700 1700 1700 1700Volume to Capacity 0.00 0.28 0.28 0.01 0.53 0.53Queue Length 95th (m) 0.1 0.0 0.0 0.0 0.0 0.0Control Delay (s) 11.8 0.0 0.0 0.0 0.0 0.0Lane LOS BApproach Delay (s) 11.8 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 48.9% ICU Level of Service AAnalysis Period (min) 15

Page 42: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing AM3: Pine Glen Drive & Old Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 7 29 77 8 0 65Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 8 32 84 9 0 71

Direction, Lane # EB 1 NB 1 SB 1 SB 2Volume Total (vph) 39 92 0 71Volume Left (vph) 8 84 0 0Volume Right (vph) 32 0 0 71Hadj (s) -0.41 0.22 0.00 -0.67Departure Headway (s) 3.8 4.4 4.6 4.0Degree Utilization, x 0.04 0.11 0.00 0.08Capacity (veh/h) 893 807 775 882Control Delay (s) 7.0 7.9 6.4 6.1Approach Delay (s) 7.0 7.9 6.1Approach LOS A A A

Intersection SummaryDelay 7.1HCM Level of Service AIntersection Capacity Utilization 21.4% ICU Level of Service AAnalysis Period (min) 15

Page 43: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing AM4: Khalsa Gate & Old Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 9 4 2 0 0 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 10 4 2 0 0 0

Direction, Lane # EB 1 NB 1 SB 1Volume Total (vph) 14 2 0Volume Left (vph) 10 2 0Volume Right (vph) 4 0 0Hadj (s) -0.01 0.23 0.00Departure Headway (s) 3.9 4.2 3.9Degree Utilization, x 0.02 0.00 0.00Capacity (veh/h) 917 849 900Control Delay (s) 7.0 7.2 6.9Approach Delay (s) 7.0 7.2 0.0Approach LOS A A A

Intersection SummaryDelay 7.0HCM Level of Service AIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 44: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Existing PM1: Highvalley Drive & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 9 11 48 13 63 1389 36 54 822 36Lane Group Flow (vph) 10 45 52 43 68 1510 39 59 893 39Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Detector Phases 4 4 8 8 2 2 2 6 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0Total Split (s) 43.0 43.0 43.0 43.0 77.0 77.0 77.0 77.0 77.0 77.0Total Split (%) 35.8% 35.8% 35.8% 35.8% 64.2% 64.2% 64.2% 64.2% 64.2% 64.2%Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lead/LagLead-Lag Optimize?Recall Mode None None None None C-Max C-Max C-Max C-Max C-Max C-Maxv/c Ratio 0.08 0.23 0.41 0.22 0.16 0.50 0.03 0.40 0.30 0.03Control Delay 48.6 24.2 59.6 26.1 3.2 3.5 0.9 12.0 2.4 1.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 48.6 24.2 59.6 26.1 3.2 3.5 0.9 12.0 2.4 1.4Queue Length 50th (m) 2.2 2.6 11.7 3.1 2.3 40.2 0.2 2.6 18.2 0.6Queue Length 95th (m) 7.2 13.4 23.7 13.6 6.6 63.5 2.1 12.9 29.5 2.6Internal Link Dist (m) 65.6 107.9 159.7 40.1Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 435 572 426 575 418 3023 1382 149 3023 1380Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.02 0.08 0.12 0.07 0.16 0.50 0.03 0.40 0.30 0.03

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 60Control Type: Actuated-Coordinated

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 45: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Existing PM1: Highvalley Drive & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.89 1.00 0.90 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1745 1691 1711 1708 1745 3505 1597 1745 3505 1597Flt Permitted 0.73 1.00 0.73 1.00 0.31 1.00 1.00 0.15 1.00 1.00Satd. Flow (perm) 1339 1691 1310 1708 571 3505 1597 282 3505 1597Volume (vph) 9 11 30 48 13 27 63 1389 36 54 822 36Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 10 12 33 52 14 29 68 1510 39 59 893 39RTOR Reduction (vph) 0 30 0 0 26 0 0 0 5 0 0 3Lane Group Flow (vph) 10 15 0 52 17 0 68 1510 34 59 893 36Heavy Vehicles (%) 0% 0% 0% 2% 0% 0% 0% 3% 0% 0% 3% 0%Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 8.5 8.5 8.5 8.5 99.5 99.5 99.5 99.5 99.5 99.5Effective Green, g (s) 10.5 10.5 10.5 10.5 101.5 101.5 101.5 101.5 101.5 101.5Actuated g/C Ratio 0.09 0.09 0.09 0.09 0.85 0.85 0.85 0.85 0.85 0.85Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 117 148 115 149 483 2965 1351 239 2965 1351v/s Ratio Prot 0.01 0.01 c0.43 0.25v/s Ratio Perm 0.01 c0.04 0.12 0.02 0.21 0.02v/c Ratio 0.09 0.10 0.45 0.11 0.14 0.51 0.03 0.25 0.30 0.03Uniform Delay, d1 50.3 50.4 52.0 50.4 1.6 2.5 1.5 1.8 1.9 1.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.3 2.8 0.3 0.6 0.6 0.0 2.5 0.3 0.0Delay (s) 50.7 50.7 54.8 50.8 2.2 3.1 1.5 4.3 2.2 1.5Level of Service D D D D A A A A A AApproach Delay (s) 50.7 53.0 3.1 2.3Approach LOS D D A A

Intersection SummaryHCM Average Control Delay 5.4 HCM Level of Service AHCM Volume to Capacity ratio 0.50Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 61.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 46: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing PM2: Khalsa Gate & Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 0 6 1482 22 0 900Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 7 1611 24 0 978PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m) 351pX, platoon unblockedvC, conflicting volume 2100 805 1635vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 2100 805 1635tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 98 100cM capacity (veh/h) 46 329 402

Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 7 805 805 24 489 489Volume Left 0 0 0 0 0 0Volume Right 7 0 0 24 0 0cSH 329 1700 1700 1700 1700 1700Volume to Capacity 0.02 0.47 0.47 0.01 0.29 0.29Queue Length 95th (m) 0.5 0.0 0.0 0.0 0.0 0.0Control Delay (s) 16.1 0.0 0.0 0.0 0.0 0.0Lane LOS CApproach Delay (s) 16.1 0.0 0.0Approach LOS C

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 51.0% ICU Level of Service AAnalysis Period (min) 15

Page 47: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing PM3: Pine Glen Drive & Old Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 32 69 34 18 0 54Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 35 75 37 20 0 59

Direction, Lane # EB 1 NB 1 SB 1 SB 2Volume Total (vph) 110 57 0 59Volume Left (vph) 35 37 0 0Volume Right (vph) 75 0 0 59Hadj (s) -0.31 0.16 0.00 -0.67Departure Headway (s) 3.8 4.4 4.8 4.1Degree Utilization, x 0.12 0.07 0.00 0.07Capacity (veh/h) 907 779 747 843Control Delay (s) 7.4 7.8 6.6 6.2Approach Delay (s) 7.4 7.8 6.2Approach LOS A A A

Intersection SummaryDelay 7.2HCM Level of Service AIntersection Capacity Utilization 22.2% ICU Level of Service AAnalysis Period (min) 15

Page 48: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Existing PM4: Khalsa Gate & Old Bronte Road 2014

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 18 4 6 0 0 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 20 4 7 0 0 0

Direction, Lane # EB 1 NB 1 SB 1Volume Total (vph) 24 7 0Volume Left (vph) 20 7 0Volume Right (vph) 4 0 0Hadj (s) 0.09 0.23 0.00Departure Headway (s) 4.0 4.2 4.0Degree Utilization, x 0.03 0.01 0.00Capacity (veh/h) 891 842 900Control Delay (s) 7.1 7.2 7.0Approach Delay (s) 7.1 7.2 0.0Approach LOS A A A

Intersection SummaryDelay 7.1HCM Level of Service AIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 49: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

APPENDIX C Future (2019) Background Traffic 

Level Of Service Calculations  

Page 50: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Future Background AM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 69 14 88 21 85 1088 11 86 1703 54Lane Group Flow (vph) 75 232 96 109 92 1183 12 93 1851 59Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Detector Phases 4 4 8 8 2 2 2 6 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0 22.0Total Split (s) 39.0 39.0 39.0 39.0 81.0 81.0 81.0 81.0 81.0 81.0Total Split (%) 32.5% 32.5% 32.5% 32.5% 67.5% 67.5% 67.5% 67.5% 67.5% 67.5%Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lead/LagLead-Lag Optimize?Recall Mode None None None None C-Max C-Max C-Max C-Max C-Max C-Maxv/c Ratio 0.34 0.74 0.62 0.29 1.30 0.46 0.01 0.40 0.71 0.05Control Delay 44.4 55.2 60.9 13.5 227.6 7.4 2.9 13.5 11.5 4.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 44.4 55.2 60.9 13.5 227.6 7.4 2.9 13.5 11.5 4.4Queue Length 50th (m) 15.4 47.2 21.0 4.5 ~27.6 49.8 0.0 7.0 108.8 2.4Queue Length 95th (m) 27.5 68.9 36.6 18.1 #47.8 81.0 1.9 23.4 175.2 7.5Internal Link Dist (m) 65.6 107.9 159.7 97.7Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 333 463 235 526 71 2574 1188 233 2600 1090Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.23 0.50 0.41 0.21 1.30 0.46 0.01 0.40 0.71 0.05

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: Actuated-Coordinated~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 51: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Future Background AM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.86 1.00 0.88 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1646 1533 1646 1592 1745 3471 1597 1646 3505 1465Flt Permitted 0.62 1.00 0.34 1.00 0.08 1.00 1.00 0.21 1.00 1.00Satd. Flow (perm) 1073 1533 585 1592 141 3471 1597 356 3505 1465Volume (vph) 69 14 200 88 21 79 85 1088 11 86 1703 54Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 15 217 96 23 86 92 1183 12 93 1851 59RTOR Reduction (vph) 0 18 0 0 70 0 0 0 3 0 0 4Lane Group Flow (vph) 75 214 0 96 39 0 92 1183 9 93 1851 55Heavy Vehicles (%) 6% 0% 7% 6% 6% 5% 0% 4% 0% 6% 3% 9%Turn Type Perm Perm Perm Perm Perm PermProtected Phases 4 8 2 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 21.0 21.0 21.0 21.0 87.0 87.0 87.0 87.0 87.0 87.0Effective Green, g (s) 23.0 23.0 23.0 23.0 89.0 89.0 89.0 89.0 89.0 89.0Actuated g/C Ratio 0.19 0.19 0.19 0.19 0.74 0.74 0.74 0.74 0.74 0.74Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 206 294 112 305 105 2574 1184 264 2600 1087v/s Ratio Prot 0.14 0.02 0.34 0.53v/s Ratio Perm 0.07 c0.16 c0.65 0.01 0.26 0.04v/c Ratio 0.36 0.73 0.86 0.13 0.88 0.46 0.01 0.35 0.71 0.05Uniform Delay, d1 42.1 45.6 46.9 40.2 11.4 6.1 4.0 5.4 8.5 4.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 8.7 43.6 0.2 58.9 0.6 0.0 3.7 1.7 0.1Delay (s) 43.2 54.3 90.6 40.4 70.4 6.7 4.0 9.1 10.2 4.2Level of Service D D F D E A A A B AApproach Delay (s) 51.6 63.9 11.2 9.9Approach LOS D E B A

Intersection SummaryHCM Average Control Delay 16.6 HCM Level of Service BHCM Volume to Capacity ratio 0.87Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 83.1% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 52: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background AM2: Khalsa Gate & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 0 2 1182 14 0 1991Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 2 1285 15 0 2164PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m) 351pX, platoon unblocked 0.61vC, conflicting volume 2367 642 1300vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 2597 642 1300tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 99 100cM capacity (veh/h) 13 421 540

Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 2 642 642 15 1082 1082Volume Left 0 0 0 0 0 0Volume Right 2 0 0 15 0 0cSH 421 1700 1700 1700 1700 1700Volume to Capacity 0.01 0.38 0.38 0.01 0.64 0.64Queue Length 95th (m) 0.1 0.0 0.0 0.0 0.0 0.0Control Delay (s) 13.6 0.0 0.0 0.0 0.0 0.0Lane LOS BApproach Delay (s) 13.6 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 58.4% ICU Level of Service BAnalysis Period (min) 15

Page 53: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background AM3: Pine Glen Drive & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 8 71 32 0 31 0 85 9 0 0 0 72Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 9 77 35 0 34 0 92 10 0 0 0 78

Direction, Lane # EB 1 WB 1 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 121 34 97 5 0 78Volume Left (vph) 9 0 92 0 0 0Volume Right (vph) 35 0 0 0 0 78Hadj (s) -0.12 0.03 0.51 0.03 0.00 -0.67Departure Headway (s) 4.3 4.5 5.4 5.0 5.0 4.3Degree Utilization, x 0.14 0.04 0.15 0.01 0.00 0.09Capacity (veh/h) 808 747 639 697 716 799Control Delay (s) 8.0 7.7 8.2 6.8 6.8 6.5Approach Delay (s) 8.0 7.7 8.1 6.5Approach LOS A A A A

Intersection SummaryDelay 7.6HCM Level of Service AIntersection Capacity Utilization 30.6% ICU Level of Service AAnalysis Period (min) 15

Page 54: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background AM4: Khalsa Gate & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 10 4 2 0 0 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 4 2 0 0 0

Direction, Lane # EB 1 NB 1 SB 1Volume Total (vph) 15 2 0Volume Left (vph) 11 2 0Volume Right (vph) 4 0 0Hadj (s) 0.01 0.23 0.00Departure Headway (s) 3.9 4.2 3.9Degree Utilization, x 0.02 0.00 0.00Capacity (veh/h) 913 848 900Control Delay (s) 7.0 7.2 6.9Approach Delay (s) 7.0 7.2 0.0Approach LOS A A A

Intersection SummaryDelay 7.0HCM Level of Service AIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 55: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Future Background PM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 14 53 15 178 1669 40 99 1098 105Lane Group Flow (vph) 71 182 58 118 193 1814 43 108 1193 114Turn Type Perm Perm pm+pt Perm Perm PermProtected Phases 4 8 5 2 6Permitted Phases 4 8 2 2 6 6Detector Phases 4 4 8 8 5 2 2 6 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0 22.0 9.0 22.0 22.0 22.0 22.0 22.0Total Split (s) 28.0 28.0 28.0 28.0 12.0 92.0 92.0 80.0 80.0 80.0Total Split (%) 23.3% 23.3% 23.3% 23.3% 10.0% 76.7% 76.7% 66.7% 66.7% 66.7%Yellow Time (s) 4.0 4.0 4.0 4.0 3.0 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0Lead/Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes YesRecall Mode None None None None None C-Max C-Max C-Max C-Max C-Maxv/c Ratio 0.49 0.51 0.54 0.48 0.55 0.64 0.03 0.92 0.49 0.10Control Delay 58.7 13.6 65.5 37.1 9.1 6.8 1.2 87.6 10.0 4.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 58.7 13.6 65.5 37.1 9.1 6.8 1.2 87.6 10.0 4.8Queue Length 50th (m) 15.8 3.2 13.0 17.3 7.9 72.2 0.0 19.4 61.5 4.7Queue Length 95th (m) 28.8 22.2 25.4 33.2 18.1 126.2 2.7 #37.9 93.0 12.8Internal Link Dist (m) 65.6 107.9 159.7 40.1Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 222 461 166 362 355 2817 1292 118 2440 1125Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.32 0.39 0.35 0.33 0.54 0.64 0.03 0.92 0.49 0.10

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: Actuated-Coordinated# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 56: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Future Background PM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.86 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1745 1638 1711 1654 1745 3505 1597 1745 3505 1597Flt Permitted 0.53 1.00 0.32 1.00 0.18 1.00 1.00 0.11 1.00 1.00Satd. Flow (perm) 982 1638 578 1654 337 3505 1597 204 3505 1597Volume (vph) 65 14 154 53 15 94 178 1669 40 99 1098 105Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 71 15 167 58 16 102 193 1814 43 108 1193 114RTOR Reduction (vph) 0 145 0 0 34 0 0 0 8 0 0 13Lane Group Flow (vph) 71 37 0 58 84 0 193 1814 35 108 1193 101Heavy Vehicles (%) 0% 0% 0% 2% 0% 0% 0% 3% 0% 0% 3% 0%Turn Type Perm Perm pm+pt Perm Perm PermProtected Phases 4 8 5 2 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 13.5 13.5 13.5 13.5 94.5 94.5 94.5 81.6 81.6 81.6Effective Green, g (s) 15.5 15.5 15.5 15.5 96.5 96.5 96.5 83.6 83.6 83.6Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.80 0.80 0.80 0.70 0.70 0.70Clearance Time (s) 6.0 6.0 6.0 6.0 5.0 6.0 6.0 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 127 212 75 214 375 2819 1284 142 2442 1113v/s Ratio Prot 0.02 0.05 0.04 c0.52 0.34v/s Ratio Perm 0.07 c0.10 0.37 0.02 c0.53 0.06v/c Ratio 0.56 0.17 0.77 0.39 0.51 0.64 0.03 0.76 0.49 0.09Uniform Delay, d1 49.0 46.5 50.6 47.9 5.4 4.8 2.4 11.7 8.4 5.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.3 0.4 38.0 1.2 1.2 1.1 0.0 31.2 0.7 0.2Delay (s) 54.3 46.9 88.6 49.1 6.6 5.9 2.4 43.0 9.1 6.1Level of Service D D F D A A A D A AApproach Delay (s) 49.0 62.1 5.9 11.4Approach LOS D E A B

Intersection SummaryHCM Average Control Delay 13.2 HCM Level of Service BHCM Volume to Capacity ratio 0.76Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0Intersection Capacity Utilization 78.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 57: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background PM2: Khalsa Gate & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 0 7 1880 24 0 1305Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 8 2043 26 0 1418PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m) 351pX, platoon unblocked 0.84vC, conflicting volume 2753 1022 2070vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 2897 1022 2070tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 97 100cM capacity (veh/h) 11 237 273

Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 8 1022 1022 26 709 709Volume Left 0 0 0 0 0 0Volume Right 8 0 0 26 0 0cSH 237 1700 1700 1700 1700 1700Volume to Capacity 0.03 0.60 0.60 0.02 0.42 0.42Queue Length 95th (m) 0.8 0.0 0.0 0.0 0.0 0.0Control Delay (s) 20.7 0.0 0.0 0.0 0.0 0.0Lane LOS CApproach Delay (s) 20.7 0.0 0.0Approach LOS C

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 62.0% ICU Level of Service BAnalysis Period (min) 15

Page 58: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background PM3: Pine Glen Drive & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 35 42 76 0 65 0 37 20 0 0 0 60Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 38 46 83 0 71 0 40 22 0 0 0 65

Direction, Lane # EB 1 WB 1 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 166 71 51 11 0 65Volume Left (vph) 38 0 40 0 0 0Volume Right (vph) 83 0 0 0 0 65Hadj (s) -0.22 0.03 0.43 0.03 0.00 -0.67Departure Headway (s) 4.1 4.4 5.5 5.1 5.1 4.4Degree Utilization, x 0.19 0.09 0.08 0.02 0.00 0.08Capacity (veh/h) 853 772 620 665 678 763Control Delay (s) 8.0 7.8 7.8 7.0 6.9 6.6Approach Delay (s) 8.0 7.8 7.6 6.6Approach LOS A A A A

Intersection SummaryDelay 7.7HCM Level of Service AIntersection Capacity Utilization 30.9% ICU Level of Service AAnalysis Period (min) 15

Page 59: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Background PM4: Khalsa Gate & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 20 4 7 0 0 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 4 8 0 0 0

Direction, Lane # EB 1 NB 1 SB 1Volume Total (vph) 26 8 0Volume Left (vph) 22 8 0Volume Right (vph) 4 0 0Hadj (s) 0.10 0.23 0.00Departure Headway (s) 4.0 4.2 4.0Degree Utilization, x 0.03 0.01 0.00Capacity (veh/h) 888 841 900Control Delay (s) 7.1 7.2 7.0Approach Delay (s) 7.1 7.2 0.0Approach LOS A A A

Intersection SummaryDelay 7.2HCM Level of Service AIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 60: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

APPENDIX D Future (2019) Total Traffic 

Level Of Service Calculations  

Page 61: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Future Total AM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 69 14 193 21 85 1088 11 92 1703 54Lane Group Flow (vph) 75 232 210 139 92 1183 12 100 1851 59Turn Type pm+pt pm+pt pm+pt Perm Perm PermProtected Phases 7 4 3 8 5 2 6Permitted Phases 4 8 2 2 6 6Detector Phases 7 4 3 8 5 2 2 6 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 8.0 22.0 8.0 22.0 10.0 22.0 22.0 22.0 22.0 22.0Total Split (s) 19.0 22.0 22.0 25.0 22.0 76.0 76.0 54.0 54.0 54.0Total Split (%) 15.8% 18.3% 18.3% 20.8% 18.3% 63.3% 63.3% 45.0% 45.0% 45.0%Yellow Time (s) 3.5 4.0 3.5 4.0 3.5 4.0 4.0 4.0 4.0 4.0All-Red Time (s) 0.5 2.0 0.5 2.0 0.5 2.0 2.0 2.0 2.0 2.0Lead/Lag Lead Lag Lead Lag Lead Lag Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes YesRecall Mode None None None None None C-Max C-Max C-Max C-Max C-Maxv/c Ratio 0.33 0.69 0.78 0.39 0.46 0.51 0.01 0.42 0.92 0.07Control Delay 36.8 19.3 56.2 14.6 17.8 11.5 4.4 24.6 33.6 12.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 36.8 19.3 56.2 14.6 17.8 11.5 4.4 24.6 33.6 12.4Queue Length 50th (m) 13.8 3.4 42.3 4.8 6.7 65.2 0.0 12.4 193.0 4.8Queue Length 95th (m) 23.6 26.3 59.0 21.7 19.0 102.5 2.4 35.2 #305.3 13.8Internal Link Dist (m) 65.6 107.9 159.7 85.7Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 303 415 286 385 333 2332 1077 237 2004 842Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.25 0.56 0.73 0.36 0.28 0.51 0.01 0.42 0.92 0.07

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 90Control Type: Actuated-Coordinated# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 62: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Future Total AM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.86 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1646 1533 1646 1581 1745 3471 1597 1646 3505 1465Flt Permitted 0.67 1.00 0.26 1.00 0.06 1.00 1.00 0.22 1.00 1.00Satd. Flow (perm) 1158 1533 444 1581 102 3471 1597 382 3505 1465Volume (vph) 69 14 200 193 21 107 85 1088 11 92 1703 54Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 75 15 217 210 23 116 92 1183 12 100 1851 59RTOR Reduction (vph) 0 196 0 0 97 0 0 0 4 0 0 4Lane Group Flow (vph) 75 36 0 210 42 0 92 1183 8 100 1851 55Heavy Vehicles (%) 6% 0% 7% 6% 6% 5% 0% 4% 0% 6% 3% 9%Turn Type pm+pt pm+pt pm+pt Perm Perm PermProtected Phases 7 4 3 8 5 2 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 17.9 9.6 30.1 17.8 77.9 77.9 77.9 65.9 65.9 65.9Effective Green, g (s) 19.9 11.6 32.1 19.8 79.9 79.9 79.9 67.9 67.9 67.9Actuated g/C Ratio 0.17 0.10 0.27 0.17 0.67 0.67 0.67 0.57 0.57 0.57Clearance Time (s) 4.0 6.0 4.0 6.0 4.0 6.0 6.0 6.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 226 148 284 261 177 2311 1063 216 1983 829v/s Ratio Prot 0.02 0.02 c0.10 0.03 0.03 c0.34 c0.53v/s Ratio Perm 0.03 c0.10 0.31 0.01 0.26 0.04v/c Ratio 0.33 0.24 0.74 0.16 0.52 0.51 0.01 0.46 0.93 0.07Uniform Delay, d1 43.7 50.1 37.9 43.0 25.2 10.2 6.7 15.3 24.0 11.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.9 9.7 0.3 2.6 0.8 0.0 7.0 9.6 0.2Delay (s) 44.6 51.0 47.6 43.3 27.7 11.0 6.7 22.3 33.6 11.9Level of Service D D D D C B A C C BApproach Delay (s) 49.4 45.9 12.1 32.4Approach LOS D D B C

Intersection SummaryHCM Average Control Delay 28.3 HCM Level of Service CHCM Volume to Capacity ratio 0.84Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0Intersection Capacity Utilization 88.9% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 63: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Total AM2: Khalsa Gate & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 0 2 1182 34 0 2096Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 2 1285 37 0 2278PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m) 351pX, platoon unblocked 0.48vC, conflicting volume 2424 642 1322vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 2887 642 1322tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 99 100cM capacity (veh/h) 6 421 529

Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 2 642 642 37 1139 1139Volume Left 0 0 0 0 0 0Volume Right 2 0 0 37 0 0cSH 421 1700 1700 1700 1700 1700Volume to Capacity 0.01 0.38 0.38 0.02 0.67 0.67Queue Length 95th (m) 0.1 0.0 0.0 0.0 0.0 0.0Control Delay (s) 13.6 0.0 0.0 0.0 0.0 0.0Lane LOS BApproach Delay (s) 13.6 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 61.3% ICU Level of Service BAnalysis Period (min) 15

Page 64: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Total AM3: Pine Glen Drive & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 8 71 38 0 31 0 218 16 0 0 2 72Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 9 77 41 0 34 0 237 17 0 0 2 78

Direction, Lane # EB 1 WB 1 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 127 34 246 9 1 79Volume Left (vph) 9 0 237 0 0 0Volume Right (vph) 41 0 0 0 0 78Hadj (s) -0.15 0.03 0.52 0.03 0.03 -0.66Departure Headway (s) 4.7 5.0 5.5 5.0 5.2 4.5Degree Utilization, x 0.16 0.05 0.37 0.01 0.00 0.10Capacity (veh/h) 717 665 638 694 656 758Control Delay (s) 8.6 8.2 10.6 6.9 7.0 6.8Approach Delay (s) 8.6 8.2 10.4 6.8Approach LOS A A B A

Intersection SummaryDelay 9.2HCM Level of Service AIntersection Capacity Utilization 38.4% ICU Level of Service AAnalysis Period (min) 15

Page 65: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Total AM4: Khalsa Gate & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Stop StopVolume (vph) 30 4 2 0 32 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 4 2 0 35 0

Direction, Lane # EB 1 NB 1 SB 1Volume Total (vph) 37 2 35Volume Left (vph) 33 2 0Volume Right (vph) 4 0 0Hadj (s) 0.14 0.23 0.03Departure Headway (s) 4.1 4.2 4.0Degree Utilization, x 0.04 0.00 0.04Capacity (veh/h) 860 826 883Control Delay (s) 7.3 7.3 7.2Approach Delay (s) 7.3 7.3 7.2Approach LOS A A A

Intersection SummaryDelay 7.2HCM Level of Service AIntersection Capacity Utilization 13.3% ICU Level of Service AAnalysis Period (min) 15

Page 66: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Total AM6: Access 2 & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 89 0 11 19 32 0Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 97 0 12 21 35 0PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 79 35 35vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 79 35 35tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 89 100 99cM capacity (veh/h) 916 1038 1577

Direction, Lane # EB 1 NB 1 SB 1Volume Total 97 33 35Volume Left 97 12 0Volume Right 0 0 0cSH 916 1577 1700Volume to Capacity 0.11 0.01 0.02Queue Length 95th (m) 2.7 0.2 0.0Control Delay (s) 9.4 2.7 0.0Lane LOS A AApproach Delay (s) 9.4 2.7 0.0Approach LOS A

Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 19.9% ICU Level of Service AAnalysis Period (min) 15

Page 67: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Unsignalized Intersection Capacity Analysis Future Total AM7: Access 1 & Old Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsSign Control Stop Free FreeGrade 0% 0% 0%Volume (veh/h) 51 0 9 99 32 8Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 55 0 10 108 35 9PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 166 39 43vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 166 39 43tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 93 100 99cM capacity (veh/h) 819 1032 1565

Direction, Lane # EB 1 NB 1 SB 1Volume Total 55 117 43Volume Left 55 10 0Volume Right 0 0 9cSH 819 1565 1700Volume to Capacity 0.07 0.01 0.03Queue Length 95th (m) 1.7 0.1 0.0Control Delay (s) 9.7 0.7 0.0Lane LOS A AApproach Delay (s) 9.7 0.7 0.0Approach LOS A

Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 22.4% ICU Level of Service AAnalysis Period (min) 15

Page 68: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Queues Future Total PM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Lane Group EBL EBT WBL WBT NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 65 14 102 15 178 1669 40 126 1098 105Lane Group Flow (vph) 71 182 111 132 193 1814 43 137 1193 114Turn Type Perm Perm pm+pt Perm pm+pt PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 2 2 6 6Detector Phases 4 4 8 8 5 2 2 1 6 6Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Minimum Split (s) 22.0 22.0 22.0 22.0 9.0 22.0 22.0 8.0 22.0 22.0Total Split (s) 34.0 34.0 34.0 34.0 20.0 72.0 72.0 14.0 66.0 66.0Total Split (%) 28.3% 28.3% 28.3% 28.3% 16.7% 60.0% 60.0% 11.7% 55.0% 55.0%Yellow Time (s) 4.0 4.0 4.0 4.0 3.0 4.0 4.0 3.5 4.0 4.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 0.5 2.0 2.0Lead/Lag Lead Lag Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes YesRecall Mode None None None None None C-Max C-Max None C-Max C-Maxv/c Ratio 0.37 0.43 0.69 0.34 0.63 0.80 0.04 0.63 0.54 0.11Control Delay 46.7 10.5 66.5 11.6 18.3 21.2 5.6 32.9 15.0 8.3Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 46.7 10.5 66.5 11.6 18.3 21.2 5.6 32.9 15.0 8.3Queue Length 50th (m) 14.9 3.0 24.8 3.2 10.6 157.9 1.2 11.5 74.8 6.6Queue Length 95th (m) 26.6 20.3 41.1 18.1 32.5 232.2 6.5 #40.6 127.5 18.9Internal Link Dist (m) 65.6 107.9 159.7 82.3Turn Bay Length (m) 15.0 35.0 90.0 60.0 75.0 15.0Base Capacity (vph) 277 535 230 499 376 2258 1039 232 2219 1024Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.26 0.34 0.48 0.26 0.51 0.80 0.04 0.59 0.54 0.11

Intersection SummaryCycle Length: 120Actuated Cycle Length: 120Offset: 110 (92%), Referenced to phase 2:NBTL and 6:SBTL, Start of GreenNatural Cycle: 80Control Type: Actuated-Coordinated# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Splits and Phases: 1: Highvalley Drive & Bronte Road

Page 69: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

HCM Signalized Intersection Capacity Analysis Future Total PM1: Highvalley Drive & Bronte Road 2019

Synchro 6Cole Engineering Group Ltd

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsIdeal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Lane Width 3.3 3.6 3.6 3.3 3.6 3.6 3.3 3.6 3.5 3.3 3.6 3.5Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 0.86 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1745 1638 1711 1650 1745 3505 1597 1745 3505 1597Flt Permitted 0.55 1.00 0.42 1.00 0.17 1.00 1.00 0.05 1.00 1.00Satd. Flow (perm) 1010 1638 764 1650 317 3505 1597 101 3505 1597Volume (vph) 65 14 154 102 15 107 178 1669 40 126 1098 105Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 71 15 167 111 16 116 193 1814 43 137 1193 114RTOR Reduction (vph) 0 138 0 0 96 0 0 0 10 0 0 12Lane Group Flow (vph) 71 44 0 111 36 0 193 1814 33 137 1193 102Heavy Vehicles (%) 0% 0% 0% 2% 0% 0% 0% 3% 0% 0% 3% 0%Turn Type Perm Perm pm+pt Perm pm+pt PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 19.0 19.0 19.0 19.0 85.3 75.3 75.3 83.7 74.0 74.0Effective Green, g (s) 21.0 21.0 21.0 21.0 88.3 77.3 77.3 85.7 76.0 76.0Actuated g/C Ratio 0.18 0.18 0.18 0.18 0.74 0.64 0.64 0.71 0.63 0.63Clearance Time (s) 6.0 6.0 6.0 6.0 5.0 6.0 6.0 4.0 6.0 6.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 177 287 134 289 364 2258 1029 205 2220 1011v/s Ratio Prot 0.03 0.02 0.05 c0.52 c0.05 0.34v/s Ratio Perm 0.07 c0.15 0.34 0.02 0.43 0.06v/c Ratio 0.40 0.15 0.83 0.13 0.53 0.80 0.03 0.67 0.54 0.10Uniform Delay, d1 43.9 42.0 47.8 41.8 8.0 15.7 7.8 28.1 12.2 8.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.5 0.3 32.5 0.2 1.5 3.1 0.1 8.0 0.9 0.2Delay (s) 45.4 42.2 80.3 42.0 9.5 18.9 7.8 36.1 13.2 8.8Level of Service D D F D A B A D B AApproach Delay (s) 43.1 59.4 17.8 15.0Approach LOS D E B B

Intersection SummaryHCM Average Control Delay 20.9 HCM Level of Service CHCM Volume to Capacity ratio 0.77Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 82.4% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group

Page 70: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

APPENDIX E Statement Of Limiting Conditions And Assumptions 

Page 71: TIS Update Cover 03 26 2014 - Oakville, Ontario planning/da-143115-tis.pdf · Mississauga, ON CANADA L5W 1Y6 T. 905.364.6161 MARCH 2014 F. 905.364.6162. ... most approximate recent

Statement of Limiting Conditions and Assumptions

1. This Report/Study (the “Work”) has been prepared at the request of, and for the exclusive use of, the Owner, and its

affiliates (the “Intended Users”). No one other than the Intended Users has the right to use and rely on the Work without first obtaining the written authorization of Cole Engineering Group Ltd. (Cole Engineering) and its Owner.

2. Cole Engineering expressly excludes liability to any party except the Intended Users for any use of, and/or reliance upon, the Work.

3. Cole Engineering notes that the following assumptions were made in completing the Work:

a) the land use description(s) supplied to us are correct; b) the surveys and data supplied to Cole Engineering by the Owner are accurate; c) market timing, approval delivery and secondary source information is within the control of Parties other than Cole

Engineering; and d) there are no encroachments, leases, covenants, binding agreements, restrictions, pledges, charges, liens or special

assessments outstanding, or encumbrances which would significantly affect the use or servicing. Investigations have not been carried out to verify these assumptions. Cole Engineering deems the sources of data and statistical information contained herein to be reliable, but we extend no guarantee of accuracy in these respects.

4. Cole Engineering accepts no responsibility for legal interpretations, questions of survey, opinion of title, hidden or inconspicuous conditions of the property, toxic wastes or contaminated materials, soil or sub-soil conditions, environmental, engineering or other factual and technical matters disclosed by the Owner, the Client, or any public agency, which by their nature, may change the outcome of the Work. Such factors, beyond the scope of this Work, could affect the findings, conclusions and opinions rendered in the Work. We have made disclosure of related potential problems that have come to our attention. Responsibility for diligence with respect to all matters of fact reported herein rests with the Intended Users.

5. Cole Engineering practices engineering in the general areas of infrastructure and transportation. It is not qualified to and is not providing legal or planning advice in this Work.

6. The legal description of the property and the area of the site were based upon surveys and data supplied to us by the Owner. The plans, photographs, and sketches contained in this report are included solely to aide in visualizing the location of the property, the configuration and boundaries of the site, and the relative position of the improvements on the said lands.

7. We have made investigations from secondary sources as documented in the Work, but we have not checked for compliance with by-laws, codes, agency and governmental regulations, etc., unless specifically noted in the Work.

8. Because conditions, including capacity, allocation, economic, social, and political factors change rapidly and, on occasion, without notice or warning, the findings of the Work expressed herein, are as of the date of the Work and cannot necessarily be relied upon as of any other date without subsequent advice from Cole Engineering.

9. The value of proposed improvements should be applied only with regard to the purpose and function of the Work, as outlined in the body of this Work. Any cost estimates set out in the Work are based on construction averages and subject to change.

10. Neither possession of the Work, nor a copy of it, carries the right of publication. All copyright in the Work is reserved to Cole Engineering. The Work shall not be disclosed, produced or reproduced, quoted from, or referred to, in whole or in part, or published in any manner, without the express written consent of Cole Engineering and the Owner.