127 Apr. 06 Lake Kivu - ticking bomb..
#
Lake Kivu -
Ticking bomb or Rwanda's salvation
Jørgen S. Steenfelt
COWI A/S
227 Apr. 06 Lake Kivu - ticking bomb..
#
Contents
Killer lakes, Rwanda, Natural gas
Project & involvement
Facts and suppositions for Lake Kivu
Potential risks and consequences
Monitoring and action planning
Environmental concerns
Future
327 Apr. 06 Lake Kivu - ticking bomb..
#
Preamble
"Killer lakes" in Africa
CO2-rich lakesMonoun & Nyos
Eruptions 1984, 1986
427 Apr. 06 Lake Kivu - ticking bomb..
#
Lake Nyos limnic eruption disaster 1986
> 1700 killed
> 3000 cows
countless animals
527 Apr. 06 Lake Kivu - ticking bomb..
#
Lake Kivu
"Killer lakes" in Africa
CO2-rich lakesMonoun & Nyos
Eruptions 1984, 1986
Methane-rich Lake Kivu
Saturation not imminent
627 Apr. 06 Lake Kivu - ticking bomb..
#
Rwanda - background
727 Apr. 06 Lake Kivu - ticking bomb..
#
Rwanda - background
Genocide 19941 M killed; 2 M fled
Population 8.4 M
26 338 km2
GNI/capita (2003) US$ 220
51% in poverty; (70% in rural areas)
1500 km to ocean
827 Apr. 06 Lake Kivu - ticking bomb..
#
Rwanda - background
1990 1995
Deforestation: civil war; lack of energy
927 Apr. 06 Lake Kivu - ticking bomb..
#
Rwanda - background
Wood burning for cookingdrying tea …..
Fossil fuel expensive
1027 Apr. 06 Lake Kivu - ticking bomb..
#
Rwanda - salvation?
1127 Apr. 06 Lake Kivu - ticking bomb..
#
Salvation?
Lake Kivu - Gas Extraction project KP1
GisenyiPilot plant
KibuyePower plant
Size 2400 km2
Surface 1463 m
Depth 485 m
Water vol. 550 km3
CO2 (STP) 330 km3
CH4 (STP) 57 km3
CH4/year +0.25 km3
1227 Apr. 06 Lake Kivu - ticking bomb..
#
Methane - a Natural Gas
NG Oil Coal
NO's 43 142 359
SO2 0.3 430 731
Part. 2 36 1333
Greenhouse effect:
Methane = CO2 × 20-25!
1327 Apr. 06 Lake Kivu - ticking bomb..
#
Pipelines (DK; EU)
LNG ships (terminals)
liquid: -161° (1/600)
flammable only in 5-15% fuel/air ratio
Methane - a Natural Gas
Transport of NG
Over land
1427 Apr. 06 Lake Kivu - ticking bomb..
#
Methane - a Natural Gasterrorist threat?
1527 Apr. 06 Lake Kivu - ticking bomb..
#
Gas Extraction Project
Kibuye Stage 1 Power Limited (KP1)
1627 Apr. 06 Lake Kivu - ticking bomb..
#
Kibuye Stage 1 Power Limited (KP1)
Public-Private-Partnership GoR and Dane Associates
Build-Own-Operate basis
Production and processing plant 198,000 m3 methane/day
35 MW power plant
Deliver to national grid at 5.25 US¢/kWh(33 øre/kWh!)
49 year gas concession from GoR to Daneat Gisenyi & Kibuye - up to 200 MW
1727 Apr. 06 Lake Kivu - ticking bomb..
#
COWI A/S hired by World Bank Independent Engineer
Review of KP1 project (by HAZOP's)
Pilot platform Gisenyi
KP1 production platform
9 km pipeline to shore
Power plant
Transmission & substation design;Network capability
Estbl. Expert Committee on Lake stability
1827 Apr. 06 Lake Kivu - ticking bomb..
#
Expert Committee -work by internet & meetings
1927 Apr. 06 Lake Kivu - ticking bomb..
#
Expert Committee
Establish Expert Committee charge
address concern that lake could erupt
independent report on lake stability
influence from KP1
needs and recommendations for: monitoring & supervision of lake stability
complement or dovetail EIA
Draft Report early April
2027 Apr. 06 Lake Kivu - ticking bomb..
#
Facts and supposition on Lake Kivu
Deep water gas establ. 1935
Numerous scientific expeditions
Dangerous; exploitable
CO2 and CH4
2127 Apr. 06 Lake Kivu - ticking bomb..
#
Facts and supposition on Lake Kivu
Deep water gas establ. 1935
Numerous scientific expeditions
Dangerous; exploitable
CO2 and CH4© Dr. Klaus TIETZE
2227 Apr. 06 Lake Kivu - ticking bomb..
#
Methane deposits in Lake Kivu
Main CH4 basin
4 "non-productive"
Cumulated gas volume (km3)
Depth(m)
2327 Apr. 06 Lake Kivu - ticking bomb..
#
Scientific expeditions and evidences
45 y production; Gisenyi
5 M m3 water & 1.5 M m3(STP) CH4/year
© Dr. Klaus TIETZE © Dr. Klaus TIETZE
German expedition 1974/75Numerous profilesDensity measurements
Tietze 1978, 2000
2427 Apr. 06 Lake Kivu - ticking bomb..
#
Scientific expeditions and evidences
Lahmayer & OSAE, 1998Bathymetric survey
Halbwachs, Tietze, Lorke, Mudeharanwa 2002(Mt. Nyiragongo eruption; sub-water lava inflow)
Schmid, Halbwachs, Wehrli2003/4; New profilesSchmid et al 2004, 2005
Support from WB, UN, EU, GoR, GoC and NGO's
2527 Apr. 06 Lake Kivu - ticking bomb..
#
Sources of gasgeological - chemical -biological
Magmatic CO2 from active volcanoes
Decomposition of organic matter
Bacterial reduction of magmatic CO2???
Assisted by heat flux and ground water flow
2627 Apr. 06 Lake Kivu - ticking bomb..
#
Methane concentration with time
d(m)
CH4 (mmol/l)
Schmid et al. (2004)
Partial pressure (MPa)
Over 30 years: 15-20% increase in methane
Decreased stability with CH4 as "detonator"
2727 Apr. 06 Lake Kivu - ticking bomb..
#
Vertical profiling
Tell tales: Temperature - conductivity - density
depth
[m]
1.00510.0
0
4850.9950.0
density without pressure effect [g/cm³] -- in-situ density [g/cm³]electrical conductivity [mS/cm]
0.021.0
1000.031.0
pressure [dbar]temperature [°C]
L A K E K I V U– main basin –
© Dr. Klaus TIETZE
HL1
GL3HL4
GL4
HL5
GL5
HL6GL6HL7
GL1
HL2
GL2
HL3
HL1
GL3HL4
GL4
HL5
GL5
HL6GL6HL7
GL1
HL2
GL2
HL3
2827 Apr. 06 Lake Kivu - ticking bomb..
#
Gradients and stability
BiozoneDeep water
Mixing Limited mixing
d(m)
Temperature [°C]
Density: temperature - concentration - pressure
Mixing: molecular -temperature -external winds
Change: trigger event
2927 Apr. 06 Lake Kivu - ticking bomb..
#
Gradients and stability
Temperature [°C]
d(m)
Temperature [°C]
Double diffusive layering (heat/salt diffus.=100)
Influence by global warming?
3027 Apr. 06 Lake Kivu - ticking bomb..
#
Density gradients and stability
H L 1
G L 3H L 4
G L 4
H L 5
G L 5
H L 6G L 6H L 7
G L 1
H L 2
G L 2
H L 3
s tab ility [10 -6 / m ]
© D r. K laus T IE T Z E
L A K E K I V U- m a in b as in -
0 100
d(m)
(δρ/δz)/ρ [10-6/m]
3127 Apr. 06 Lake Kivu - ticking bomb..
#
Capping layers - "flexible lids"
H L1
G L3H L4
G L4
H L5
G L5
H L6G L6H L7
G L1
H L2
G L2
H L3
s tab ility [10 -6 / m ]
© D r. K laus T IE T Z E
L A K E K I V U- m a in b as in -
0 100
Biozone
Major gas deposit
d(m)
3227 Apr. 06 Lake Kivu - ticking bomb..
#
Eruption risks
Gas accumulationin lake
Gas accumulationin sediment
Volcanic activity
3327 Apr. 06 Lake Kivu - ticking bomb..
#
Eruption risks
Gas accumulationin lake
Gas accumulationin sediment
Volcanic activity
Earthquakes
3427 Apr. 06 Lake Kivu - ticking bomb..
#
Eruption risks
Gas accumulationin lake
Gas accumulationin sediment
Volcanic activity
Earthquakes
3527 Apr. 06 Lake Kivu - ticking bomb..
#
Eruption risks
Gas accumulationin lake
Gas accumulationin sediment
Volcanic activity
Earth quakes
Gas extraction per se or malfunction
Others dropping anchor -unidentified mech.
3627 Apr. 06 Lake Kivu - ticking bomb..
#
Sizes and consequences of eruptions
3727 Apr. 06 Lake Kivu - ticking bomb..
#
Sizes, causes and consequences of outbursts
Moderate local Large scale Catastrophic 100-10 000 m3 1 km3 300 km3
Tsunami wave
Spont. erupt. sediment
Accidental rupture of prod. pipe
Lava inflow >2002 eruption
Closer to sat. point + trigger
Combinations
Eruption at lake bottom
Large scale lava inflow
Major earthquake
10's 10 000's Millionsplatform downwind val. entire "valley"
3827 Apr. 06 Lake Kivu - ticking bomb..
#
Production & stability forecast
0
25
50
75
100
1950 2000 2050 2100 2150
Year
p/psat
(%)
current
3 "KP1"
6 "KP1"
3927 Apr. 06 Lake Kivu - ticking bomb..
#
Production & stability forecast
Significant uncertainties - BUT
No action ⇒ catastrophe 2166
1 "KP1" - insufficient measure
3 "KP1" - production "forever"
6 "KP1" - production to 2200
Political challenge/choice
Production "forever"risk at current level
"empty" lakeeruption risk eliminated
0
50
100
1950 2050 2150
4027 Apr. 06 Lake Kivu - ticking bomb..
#
Experience from Lake Monoun
Lake Monoun - Total Gas Pressure (bar)
0
10
20
30
40
50
60
70
80
90
100
0 2 4 6 8
Dep
th (
m)
20032006saturation line
Pipe Inlet
4127 Apr. 06 Lake Kivu - ticking bomb..
#
Experience from Lake Monoun
Lake behaves as bath tub
To eliminate risk pipe near bottom
Gradient layer sinks
Gradient layer "sharpens"
4227 Apr. 06 Lake Kivu - ticking bomb..
#
Monitoring - actions
4327 Apr. 06 Lake Kivu - ticking bomb..
#
Monitoring - actions
Action planning for stability of lake– Amount of extraction -
more plants
– Re-injection water quality position vs. capping layers
– CO2 management
"Save the world" -"safeguard project"– Separate & inter-connected
4427 Apr. 06 Lake Kivu - ticking bomb..
#
Recommended actions
Establish Monitoring Group long-term benefits & stability– Ministries, outside consultant,
professors, sponsors
Commission Baseline studyIndependent scientific team
Set up local Institute– Scientists from Rwanda-Congo
Commission repeats of Baseline study (5-10 years)
4527 Apr. 06 Lake Kivu - ticking bomb..
#
Scope for Monitoring Group
Initiate Baseline studyevaluate outcome
Set up Local Institute & define scope– Approval from GoR and GoC
– Manning - equipmenttraining - reporting
– Evaluate annual reports
Re-evaluate production conditions"forever" or "emptying"
Initiate regular updates of Baseline study & evaluate
4627 Apr. 06 Lake Kivu - ticking bomb..
#
Monitoring - Baseline studyeliminate/reduce errors and uncertainties
Baseline study (external)– reproducible, repeatable
parameters for action plan
– Establish comparable data trend - single event
– All inclusive for decision making - 10 year updates
– Use staff at Local Institutetraining
– Hand over equipment for continuous monitoring
4727 Apr. 06 Lake Kivu - ticking bomb..
#
Monitoring - Local Instituteeliminate/reduce errors and uncertainties
Scope for Local InstituteContinuous monitoring
– Frequent CTD profiling around extraction point(s)(for Developer)
– Annual profiling in Lake Kivu(for Steering Committee)
Other activities– Volcanic, earthquake monitoring
– Check influence of "events"
– Improve meteorological data
– Fish yield
4827 Apr. 06 Lake Kivu - ticking bomb..
#
Monitoring -impact of "KP1"
Extract water:7.5 105 m3/day at -320 m
Produce CH4: 2.3 105 m3 /day
Re-inject water below bio-zone (-90 m)
Overall small impact(25 - 50% CH4 recharge/y)
Project monitoring to fit overall programme
4927 Apr. 06 Lake Kivu - ticking bomb..
#
Environmental issues at large
Extraction benefits the environment
Panoramic beauty Virunga range deceitful
Nyiragongo (2002-2004) sulphur gas release = all other in the world
Per day: 17,000 - 24000 t (up to 57,000 t)
5027 Apr. 06 Lake Kivu - ticking bomb..
#
Environmental issues at large
Volcanoes orders of magnitude worse
Acid rain and destruction of crops in large area
5127 Apr. 06 Lake Kivu - ticking bomb..
#
Future work
5227 Apr. 06 Lake Kivu - ticking bomb..
#
Future work
Activity Action Time
Review EC-report IFC/WB April
Review of IE-report IFC/WB May
Final issue EC 15/5opinion and report
Follow Pilot Plant testing IE July/Aug.
Proposal for further work IE Ongoing
KP1 production Dane 2007
5327 Apr. 06 Lake Kivu - ticking bomb..
#
Conclusion by IE & EC
5427 Apr. 06 Lake Kivu - ticking bomb..
#
Conclusion by IE & EC
Technical Evaluation Report
No drastic conclusions
Project will function as designed
EI observations basis for improvements
Expert Committee Report
Based on risks, environment & economy
Only viable option is: gas extraction
Venting the gas: worse from all points
To do nothing is unacceptable (criminal)