Page 1: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

THUMS Long BeachAutomated Safety Systems

Page 2: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Presentation Agenda

Introduction to Thums Evolution of Safety Systems at ThumsSafety System RequirementsSafety System ArchitectureSafety System TestingQuestions and Answers

Page 3: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

THUMS – A Unique Facility

Background information– State of California –Owns 90% of the

Wilmington Oil and Gas Field, Fourth largest in the USA

– Operator – City of Long Beach – Field Contractor -THUMS/Occidental

•Facilities 4 man-made islands1 pier facility1 gas processing facility1 power plant

•Peak rate 150,000 BOPD in 1969•Present rate 30,000 BOPD•Injection rate 1,000,000 BPD•737 producers and 455 injection wells•50 MW/H annual electrical load

THUMS/Occidental PetroleumField Contractor for oil producing property in Long Beach, Ca

Page 4: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Thums Islands and Subsea Pipelines

White

Chaffee

Freeman

GrissomWhite

Chaffee

Freeman

Grissom

Pier J

Page 5: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Evolution of Safety Systems at Thums

Safety by DesignProduction and Injection Wells located in CellarsSecondary Containment on Islands

Automation Safety System UpgradeProcess Hazard Review for Critical SystemsSubsea Line Emergency Shutdown ValvesSegregation of Process and Critical ShutdownsRedundant Safety System ProcessorInter-Island Communication

Page 6: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Safety in Original DesignSecondary Containment

At SeawallProduction Cellars

Page 7: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Subsea Line ESD Valves

Page 8: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Safety System Requirements

Shutdown ProductionFWKO Levels and PressuresHigh Tank LevelsCellar Gas Detection

Isolate Subsea LinesHigh and Low Subsea Line PressureESD Valve Closure

Divert at J-2 (Shore Facilities)Divert oil on high FWKO levelDivert water on high pressure

FailsafePower and Air required to maintain operations.Valves fail to predefined positions on loss of power or airSystem response predefined for transmitter failure

Page 9: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Safety System Architecture

Redundant Safety PLC for each locationSegregation of Critical and Process InterlocksDedicated Safety system transmitters and valvesMicrowave Ring to communicate with other locationsSeparate IT network for Automation systemHand shaking communication between Safety PLCs on each locationUninterruptible Power Supply for Safety PLCSafety PLC in secured location, limited accessOperator Paging System for Alarms

Page 10: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Island Control System Architecture

ES

Safety I/O

OSClient

Field I/O

Self-Healing Ethernet Fiber Optic Ring

FieldEnclosure

OS

OSClient

ServerServer

OSClient

AS-417H AS-417H

AS-417HAS-417H

Network Switch

Field I/O Field I/O

Uplink to Microwave

Safety PLC

Page 11: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Automation Network

Island Grissom OS Servers

Island White OS Servers

Island Chaffee OS Servers

Island Freeman OS Servers

Pier JOS Servers

THUMS Corporate Office

Central Archive Server

Automation Network is separate from the IT Network using VPN and Switches

Important Points about Automation Network

Only Automation computers are allowed on the Automation NetworkArchive Server is the only computer on both the IT and Automation Network. Networks protected by firewalls within server

Page 12: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Safety PLC and Server Racks

Page 13: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Operator Control Station (HMI)

Page 14: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Operator Shut-in System Graphic

Page 15: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Operator Cellar Isolation Graphic

Page 16: THUMS Long Beach Automated Safety Systems · Prevention First 2008 Safety System Requirements Shutdown Production FWKO Levels and Pressures High Tank Levels Cellar Gas Detection Isolate

Prevention First 2008

Safety System Testing

Quarterly DOG TestingPartial Stroke Testing of Subsea line ESD ValvesTesting of Cellar Gas DetectionTesting of Shut-in DevicesTesting of Switches and Buttons

Annual DOG TestingFull closure test of Subsea ESD ValvesQuarterly DOG Tests