themi gbo meeting 1 ucb 06/02/2003 themis ground based observatories s. b. mende

9
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende

Upload: rudolph-collins

Post on 03-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

THEMI GBO meeting 1 UCB 06/02/2003

THEMIS Ground Based Observatories

S. B. Mende

THEMI GBO meeting 2 UCB 06/02/2003

Ground Based Observatories

THEMIS GBO heritage

• IMAGE satellite FUV imager system;

• ROCSAT-2 ISUAL imager;

• NSF’s Automatic Geophysical

Observatories ( All Sky Imagers in

Antarctica)

IMAGE FUV

ISUAL

PENGUIN-ASI

THEMI GBO meeting 3 UCB 06/02/2003

• Each GBO has an all sky imager (ASI) and -as necessary- a ground magnetometer (GMAG).

• Sites have existing infrastructure (some have GMAGs).

• GBOs cover North American sector.

• GBOs satisfy L1 requirements of t-res (<10s), density/extent (1/MLT; >8GLT) with high margins (>2).

• Supplemented by existing Canadian& Alaskan magnetometers (densercoverage) and intl. networks (extendedMLT coverage).

• 20 GBO sites in Canada and Alaska.

• 10 Education and Public Outreachground magnetometers (EPO/GMAGs)in the US, under EPO program mngt.

GBOs: A synoptic view of the aurora

THEMI GBO meeting 4 UCB 06/02/2003

GBOs: A synoptic view of the aurora

Global auroral image taken by IMAGE WIC. Proposed THEMIS ground sites.

THEMI GBO meeting 5 UCB 06/02/2003

GBOs: A synoptic view of the aurora

2

19

20

17

18

16

14

11

15

1312

8

9

76

5

41

THEMIS

(2006)

10

3

THEMI GBO meeting 6 UCB 06/02/2003

• Environmental protection/deployment and automation drawn from AGOs (flawless multi-year operation in Antarctica).

• Prototype camera field tested in Canada

– High cadence, high sensitivity

– 1.8Mbits/s taking 3s images

GBO/ASIs: Based on AGOs

THEMI GBO meeting 7 UCB 06/02/2003

• Primary science data daily via VSAT

Stream #1 (1.4kbps)

• Monthly backups via disk swapping

Stream #2 (180 kbps)

THEMI GBO meeting 8 UCB 06/02/2003

THEMI GBO meeting 9 UCB 06/02/2003

Ground Based Observatories

S. Mende, UCB• GBO management• GBO I&T• Data dissemination

Ground Based Observatories

S. Mende, UCB• GBO management• GBO I&T• Data dissemination

ASIsS. Mende, UCB

ASIsS. Mende, UCB

Install/Maintain/RetrieveE. Dovovan, UC

Install/Maintain/RetrieveE. Dovovan, UC

GBO-GMAGsC. T. Russell, UCLA

GBO-GMAGsC. T. Russell, UCLA

EPO OfficerN. Craig, UCBEPO OfficerN. Craig, UCB

EPO-GMAGsC. T. Russell, UCLA EPO-GMAGsC. T. Russell, UCLA

GBO team roles based on heritage

• Common I&T at UCB before shipment to sites

• ASIs, the largest part of effort (UCB)

• GBO-GMAG (UCLA) boards plug into computer in common housing

• Fielding in Canada and logistical support is Canadian responsibility

• Alaskan sites is UCB responsibility

• EPO-GMAGs (copy of existing units) under EPO management