Page 1: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

www.incose.org/symp2017

The Transport for NSW Transport Network Architecture Model

Gary Arabian System Architecture and Requirements Manager

Asset Standards Authority, Transport for NSW

Page 2: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

Key topics

www.incose.org/symp2017 2

Why TNA model? TfNSW Enterprise Objectives

Our Strategy

Transport Network Architecture

Transport Network Requirements

Where are we now?

Future Direction

Page 3: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

Why TNA model?

www.incose.org/symp2017 3

• Enable innovative solutions

• Project traceability to long term goals

• Improve quality of requirements

• Encourage use of model-based approach

Page 4: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

TfNSW Enterprise Objectives

www.incose.org/symp2017 4

• NSW Long Term Transport Master Plan*

Improve quality of service

Improve liveability

Support economic growth and productivity

Support regional development

Improve safety and security

Reduce social disadvantage

Improve sustainability

Strengthen transport planning processes

“NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘Our Transport Objectives’

*To be superseded by Future Transport Strategy currently under development

Subordinate plans: • Sydney’s Rail Future • Sydney’s Light Rail Future • Sydney’s Bus Future • Sydney’s Ferry Future

Page 5: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

Our Strategy

www.incose.org/symp2017 5

Transport Network Architecture

Management Perspective

Concept Perspective

Enterprise Perspective

Transport Network Requirements

Topic-based Standards

Enterprise / Strategic View

Concept / Operational View

Solution ViewRealises

Document View

Requirement View

SupportsBusiness Req.

System Req.

Generic Business / System

Requirements

Traces to

•Topic 1

•Topic 2

•Topic N

Traces to

Traces to

Page 6: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Architecture

www.incose.org/symp2017 6

Page 7: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Architecture

www.incose.org/symp2017 7

How is it developed?

• Adopt a Model Based approach

• Adopt ‘TRAK’ Metamodel as Framework

• Adopt UML and SysML as Modelling Language

• Acquire stakeholder input

• Use a system architecture tool

Page 8: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Requirements

www.incose.org/symp2017 8

Page 9: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Requirements

www.incose.org/symp2017 9

Page 10: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Requirements

www.incose.org/symp2017 10

Why develop it?

Page 11: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

The Transport Network Requirements

www.incose.org/symp2017 11

How is it developed? • Validate functional model • Establish and develop requirement viewpoints

Page 12: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

Where are we now?

www.incose.org/symp2017 12

TNA Document v2.0 TNA Model v1.0

Page 13: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

Future Direction • Use the model on transport projects • Deploy TNA model • Use case development • Extend TNA model to other modes • Develop transport network requirements

www.incose.org/symp2017 13

Page 14: The Transport for NSW Transport Network …...2017/07/19  · “NSW Long Term Transport Master Plan”, Dec 2012, section 1.1, p22: ‘ Our Transport Objectives ’ *To be superseded

www.incose.org/symp2017