the report of visiting pertamina balikpapan 17-18 dec 15
DESCRIPTION
Report DocumentTRANSCRIPT
THE REPORT OF VISITING PERTAMINA RU V BALIKPAPAN WITH JX OIL AND GAS COMPANY
(17-18 DECEMBER 2015)
A. ATTENDANCE
PPT ENERGY TRADING - JAKARTA : Mr.Bianto Mr.Ach Farid Wadjdi
JX Nippon Oil amd Gas Company : Mr.Mashihiro Makino PERTAMINA RU V BALIKPAPAN RPO TEAM Mr. Muhammad Saifullah (RPO Manager) Mr.Syarif Husain Mr. Marsudiyana Mr. Irianto
PERTAMINA TRANS KONTINENTAL Mr. Hari Waluyo
B. MEETING AGENDA:
1. Explanation about flow process of LSWR V-1250 2. Explanation about shipping operation in Pertamina RU V Balikpapan 3. Plant and Laboratory Visit
C. MEETING RESULTS:
1. General
- Introduction of PPT Energy Trading ( The history of PPT Energy in Pertamina and also
PPT Energy Trading position in terms of LSWR V 1250 Ex Balikpapan.
- The purpose of visiting RU-V is to introduce JX Asia as end buyer of LSWR V 1250 Ex
Balikpapan and also to discuss about LSWR V 1250 production process, the quality,
the temperature, the loading operation mechanism and lastly site visit to CDU , VDU
, Jetty and Laboratory.
2. LSWR V-1250 BALIKPAPAN FLOW PROCESS
-
- Problem that often occurs when loading LSWR V 1250 from tank to ship is high
temperature of LSWR. This problem caused by sun’s heating. To fix this problem, when
loading LSWR,Pertamina team has to do the mixing between LSWR of tank with high
temperature with another tank that has a lower temperature. Also they decrease the
pump-rate.
- Another problem is the high number of Sulfur content (around 0.35). The explanation
from Pertamina team is refers to the contract. Because in the contract the limit for
sulfur content is 0.35. So Pertamina think that it’s not their problems.
HVU III
25 MBSD
CDU V
60 MBSD
L.R.
FLUX OIL
30 mbsd
TANK I
TANK III
TANK IV
TANK II
HVU III
81 MBSD
CDU IV
200 MBSD
L.R. TANK II
TANK III
TANK I
S.R.
LSWR S.R.
S.R.
1200
C
75-800
C
600
C
60 MB
60 MB
60 MB
60 MB
60 MB
60 MB
60 MB
Static Mixer
Domestic Crude
Import Crude
N
O
R
T
H A
R
E
A
S
O
U
T
H
A
R
E
A
- The different number of sulfur content is caused by the different of crude feed. So we
can’t ask Pertamina to maintained the sulfur content in one number. The just can
maintained as percontract maximal 0.35.
3. SHIPPING OPERATION
- LSWR only be produced when there will be a lifting schedule. Before the scheduled
lifting, Short Residue from Vacuum Unit will only be stored in the form of Short Residue
without blend with Flux Oil.
- The main problem for shipping operation is the delay for ship time arrival. It will disturb
the other agenda of loading.
- The biggest problem causing by delay time arrival is because their LSWR Tank is limited.
So it can make them decrease the CDU Capacity Process. It means that they will lost
profit.
4. PLANT AND LABORATORY VISIT
The team of Pertamina invites us to visiting their plant and laboratory. We asked about how
to measure the sulfur and viscosity. At this time, Makino-san were satisfied with the
equipment and the explanation process in the lab Pertamina.