the professional group missy mudry, cppb · missy mudry, cppb february 23, 2017. over $100k less...

8
The Professional Group Public Consulting, Inc. Missy Mudry, CPPB February 23, 2017

Upload: others

Post on 02-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

The Professional Group Public Consulting, Inc.

Missy Mudry, CPPB

February 23, 2017

Page 2: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops
Page 3: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

Over $100K

Less than $100K

JOC: lots of strings

Design Build-CM@R

Quotes

Formal Solicitation

Co-ops

Only a Few Vendors receive work

Procurement Thresholds

How does Cooperative Purchasing work given these thresholds?

Page 4: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

Definitions as used in Construction

Quotes

Co-op Quote

IFB

LE

4

Best price that day, open to all, most competitive.

Means CM@R, design-build, & JOC construction services.

This is a JOC. Quicker method but issues with: permission, only large firms, more expensive, lack of oversite, fees.

Simple: provide basic SOW, response is under $100K, license, insurance, bonds optional

APDM

Page 5: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

The Design of the project is a Team Effort

Involves Two Contacts with different fees

The Design Team is the A&E Firm and the CM@R Firm working together from start to finish

Construction Manager @ Risk (CM@R)

First for Design Services Fee %

Next for Construction services1. General

Conditions2. CM@R Fee

as a %

Solicitation has many requirements

Must include how many phases; trades involved, legal/plot address, if using a Construction Administrator, etc, Open Book Audit

Page 6: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

APDM

Specification

With “factors” why it is recommend using this method instead of the hard bid.

R7-2-1001, C, Brand Name

Determinations need to be made by School Board prior to moving forward:

Extremely rare Sole Source

Ex: Four roofs at the District; bid at same time. Multi-Award

With rationale why it is recommend increasing the limits prescribed in R7-2-1112, E,1 JOC Limits

Page 7: The Professional Group Missy Mudry, CPPB · Missy Mudry, CPPB February 23, 2017. Over $100K Less than $100K JOC: lots of strings Design Build-CM@R Quotes Formal Solicitation Co-ops

USFR Q 4Aka After the

Fact

USFR Q29Professional

Services

USFR Q 1Notice

USFR Q 4Catch all

Were sequentially numbered purchase orders prepared beforegoods or services were ordered for all District expenditures?

Process of selecting at least three off list, interview, shortlist & then negotiate price

Public money. Did you notify enough firms, if labor is 50% of cost, must publish in ONC?

Did the IFB included all the requirements?

Where do Districts take the Audit hits?