Page 1: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

The New US 31 Hamilton Co.

Page 2: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Purpose & NeedNeed

Traffic congestion & capacity needs– Level of Service (LOS) Scale A-F– Base year (2007) 7 of 15 (47%) of intersections LOS E or F during

AM &/or PM peak hours– Design year (2035) 15 of 15 (100%) of intersections at LOS E or F

during AM &/or PM peakSafety

– 6 of 10 roadway segments crash rates > than statewide average– 7 of 10 roadway segments injury crash rates > than statewide

average

PurposeReduce congestion by improving to at least LOS DImprove level of safetyProvide for reliable & efficient movement of commerce & regional travel

Page 3: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Project tasks

Review elements of the Preferred Alternative/Alignment Review existing thoroughfare plans & transportation studiesConduct Environmental UpdatesUpdate Traffic Numbers & ForecastsFacilitate Public InvolvementDesign Interchanges & Lanes ConfigurationsPublish the Final Environmental Impact Statement & Get Federal “Record of Decision” (expected late fall 2008)Finish Design DetailsContinue Public InvolvementBegin Construction (expected 2011)

Page 4: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction
Page 5: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction
Page 6: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Planning for Trails & Pedestrian Access –“multiuse facilities”

Page 7: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Interchange Type & Selection Criteria

Level of service (freeway/ramps)

Operations (weaving, signage)

Road User Impacts (safety, time)

Driver Expectancy (right side exits)

Roadway ConfigurationConstruction/Maintenance CostsEase of ConstructionRight-of-way impacts/availabilityEnvironmental impactsGrowth of surrounding area

Page 8: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

161s

tM

atrix

Alternative 1:Tight Diamond

Alternative 2:Roundabouts

Consideration

NO NO 161st St. can go under US 31

YES YES 161st St. can go over US 31. (lower construction cost and easier construction staging)

NO NO Can avoid relocation of Farr Hills Drive

-- -- Is preferred intersection and stopping sight distance available for interchange type

-- -- Can accommodate Right turn in / Right Turn Out drive at Pinetree Development (NE Quadrant)

-- -- LOS - Capacity analysis

-- -- Is access to Farr Hills Drive hindered by through traffic on 161st via roundabout or signalized ramp

-- -- Potential for 161st St. Left-Turn queues to block ramp intersection traffic

YES -- Transition from 2-lane to 6-lane section requires significant shift tapers over short distances

YES -- Easily adaptable to future widening of 161st St

YES YES Provides continuity with thoroughfare plan

NO NO High speed unprotected pedestrian crossing

NO YES Low speed unprotected pedestrian crossing

14,600 (yd2) 13,500 (yd2) 161st St. Reconstructed/New Pavement Area

-- -- 161st St. Volume Fill Volume

19,400 (ft2) 15,400 (ft2) Overpass Bridge Cost

Page 9: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

161st alternative #1

Page 10: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

161st alternative #2

Page 11: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

191st alternative #1

Page 12: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

191st alternative #2

Page 13: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Environmental

Stream Relocation

Wetland Impact

SR 38 alternative

Residential Relocations

Page 14: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

SR 32 alternative #1

Page 15: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

SR 32 alternative #2

Page 16: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

146th/151st St. alternative #1

Page 17: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

146th/151st St. alternative #2

Page 18: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

146th/151st St. alternative #3

Page 19: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

146th/151st St. alternative #4

Page 20: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Relocations

CAC Meeting #2February 15, 2008

Page 21: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Mainline profile

exampleexample

Page 22: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Profile Constraints

Page 23: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

U S 3 1 H a m I l t o n

C o u n t y

How Do We Reduce Construction Cost?

• I-465 Flyover Ramp– Explain concept– What is cost savings?

• USE VISUALIZATION FROM RW’S FIRST PRESENTATION

Page 24: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Noise

What Is a Noise Impact?

Affected Receiver Noise Measure

Residential 67 dBA

Change from Current to Predicted 15 dBA

Source: Federal Highway Administration & INDOT Noise Policy

Page 25: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Noise

• Volume of Traffic

• Speed of Traffic

• Number of Trucks

Level of Highway Noise Depends on Three Things:

SPEEDLIMIT

45

SPEEDLIMIT

45232 receptors modeled in 2003 Noise barriers analyzed at 8 locations“Feasible and Reasonable” evaluationsNo barriers considered cost-effective

Page 26: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

I-465II--465465

106th106th106th

116th116th116th

136th136th136th

146th146th146th

151st151st151st

161st161st161st

SR 32SR 32

191st191st191st

SR 38SR 38

131st131st131st

20112011 20132013 20152015 2017201720122012 20142014 20162016

111th111th

126th126th

169th169th

181st181st

Constructing Interchanges First Allows Continuous Crossroad Access

Constructing Interchanges First Allows Continuous Crossroad Access

Traffic Is Routed Over Ramps During Mainline Construction

Traffic Is Routed Over Ramps During Mainline Construction

Page 27: The New US 31 Hamilton Co.Alternative 2: Roundabouts Consideration NO NO 161st St. can go under US 31 YES YES 161st St. can go over US 31. (lower construction cost and easier construction

Late June/early July

Only formal comment period

Public Hearing