the national computational grid for ireland opscentre infrastructure staff testgrid porting current...
TRANSCRIPT
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
OpsCentre OpsCentre
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•John Walsh: Grid Manager, Site Security,
Deployment ...
•Stephen Childs: Deployment, Gateway in a box
•David O’Callaghan (0.5): AuthN, AuthZ, CA
•Geoff Quigley (0.5): Portals, Trans.deployment
•Keith Rochford: OpsCentre Monitoring
•Stuart Kenny (0.5): CrossGrid deployment
StaffStaff
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
• Grid-Ireland is umbrella for VOs – many VOs, one grid layer
• NREN (HEAnet, like JANet) provides network
Infrastructure
Grid-Ireland
Infrastructure
OpsCentre
NUIG
UCD
TCD
DIASUCC
QUB
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
Gridnm (NM)
Gridui (UI)
Gridmon (WN)
Gridstore (SE)
Gridgate (CE)
Gridinstall (LCFG)Level-3 switch UPS
CHOICES:
• via intranet
• direct connection
• VLAN
• VPN
CHOICES:
• boot from gateway
• install RPMs
• install tarball
Generic Grid-Ireland
Site
Infrastructure
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
TCDGrid-Ireland
Gateway (x3)
Grid-IrelandNational
Servers (x16)
SharedCluster
(16 CPUs)
SharedCluster
(16 CPUs)
SoloVOCluster
(16 CPUs)
Internet
TCD Router
Dept. Router
Firewall
Switch
RAID 1
RAID 2
RAID 3
TestGrid(x36)
CrossGridTestbed
(32 CPUs)
Firewall
csTCDie Site
Infrastructure
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•Implements a fully working replica of the national servers + sites
•Permits experimentation without affecting the national services
•Testing and Validation platform
•Non-reference Porting platform
TestGrid
TestGrid
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
Firewall
TCDGateway
(x4)
Grid-IrelandNational
Servers (x8)
DIASGateway
(x4)
NUIGGateway
(x4)
QUBGateway
(x6)
AIX
IRIX
MacOS X
Athlon
Gateway-in-a-box (x1)
Gateway-in-a-box (x1)
WN Pool (x4)
TestGrid
TestGrid
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•Autobuild from CVS
•Worker Node Ports:
•FC2, FC2 x86_64 (athlon)
•AIX
• IRIX
•MacOS X
Porting
Porting
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•Worker Node Port is:
•Globus, Replica Management, VOMS
client
•Non-trivial exercise
•In collaboration with CERN
•Work in progress
•Eamonn Kenny (1 FTE)
Porting
Porting
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•Security
• concerned about intrusions on LCG
•Student MSc projects
• Grid wide intrusion detection
• OpsCentre monitoring incl.security alerts
•LCG-2 status• Grid-Ireland EGEE/LCG
Current Issues
Current
Issues
The National Computational Grid for Ireland
OpsCentre
Infrastructure
Staff
TestGrid
Porting
Current Issues
Future Plans
Grid-Ireland OpsCentre
•Encourage other Grid-Ireland sites to join EGEE/LCG infrastructure
•Structures are in place on all gateways
•Queuing for shared EGEE/LCG access
•Porting, Transactional Deployment
•Deploy Grid-in-a-box to 11 new sites
•Quattor for install/maintainance
Future
Plans
Future Plans