THE ITALIAN ERTMS EXPERIENCE
UIC ERTMS Conference – Bern
September 2007
2UIC ERTMS Conference – Bern September 2007
RFI - RETE FERROVIARIA ITALIANA
ITALIAN INFRASTRUCTURE MANAGER ITALIAN INFRASTRUCTURE MANAGER
MainMain taskstasks::
ToTo managemanage railwayrailway network network accordingaccording toto nationalnational and and EuropeanEuropeanrulesrulesToTo ensureensure and and toto assessassess railwayrailway safetysafety at system at system levellevelToTo assessassess featuresfeatures of the of the railwaysrailways undertakingsundertakingsToTo propose and propose and issueissue rulesrules and and regulationregulation forfor railwayrailwayoperationsoperations
3 UIC ERTMS Conference – Bern September 2007
1. ETCS implementation Interoperability choices (GSM-R coverage of the HS and CR network, ETCS level 2 on high-speed lines, SCMT as prefitted ETCS level 1 on conventional main lines and nodes, rolling stock coherently equipped)
2. First experiences with ETCS level 2 on the high-speed line Rome -Naples and Novara -Torino in commercial operation (infrastructure and rolling stock solved and unsolved problems) – Main lesson learnt – Certification and Assessment
3. Extension of SCMT towards ETCS level 1 on Corridors linking Europe (Add standard ETCS features to track-side SCMT: consequences for balise configuration, how to solve the infill issue –the proposed radio infill solution)
Italian strategy for ERTMS/ETCS implementationItalian strategy for ERTMS/ETCS implementation
Main PMain Phaseshases and and relatedrelated basic basic elementselements
4UIC ERTMS Conference – Bern September 2007
NAPOLI
ROMA
Padova
VENEZIA
GENOVA
TORINO
Novara
BOLOGNA
FIRENZE
MILANO
Verona Corridor B
Corridor D
Corridor A – 1^ phase
Corridor A – 2^ phase (The belt line south of Milan)
Parigi Parigi -- LioneLione
SempioneSempioneGottardoGottardo
BrenneroBrennero
LubianaLubiana
Domodossola LuinoChiasso
Bolzano
TRIESTE
HS network in progress 2008: Milano – Bologna (182 km)2009: Bologna – Firenze (78 km) 2009: Novara - Milano (34 km)2011: Firenze - Roma (260 Km)2013: Milano - Verona (112 km) 2013: Padova – Mestre (25 km) 2013: Verona - Padova (77 km) 2013: Terzo Valico (52 Km)
HS network - 20072005: Roma – Napoli (204 Km) 2006: Torino – Novara (91 Km)
Interoperable Corridor in ItalyCorridor A Rotterdam - Genova (1^phase) km 230Corridor A Rotterdam - Genova (2^phase) km 290Corridor B Stochkolm - Napoli km 978Corridor D Valencia - Budapest km 674
About 3. 285 Km of Interoperable Net (20% of RFI whole net = 16. 850 Km)
(100% HS/HC net (1.115 Km)) + 14% (2.170 Km / 15.750 Km) (100% HS/HC net (1.115 Km)) + 14% (2.170 Km / 15.750 Km) CR net: corridors A,B,D)CR net: corridors A,B,D)
Scenario 2015Scenario 2015
The RFI interoperable network The RFI interoperable network HS/HC HS/HC LinesLines + interoperable + interoperable corridorscorridors A,B,D A,B,D
5 UIC ERTMS Conference – Bern September 2007
RFI Main adopted technological InnovationsRFI Main adopted technological Innovations
1.1. ERTMS/ETCSERTMS/ETCS
2.2. GSMGSM--RR
3.3. COMPUTER CONTROLLED INTERLOCKING (ACC)COMPUTER CONTROLLED INTERLOCKING (ACC)
4.4. INTEGRATED MULTIFUNCTION DIAGNOSTIC TRAININTEGRATED MULTIFUNCTION DIAGNOSTIC TRAIN
5.5. PHYSICAL AND FUNCTIONAL TECHNOLOGY INTEGRATIONPHYSICAL AND FUNCTIONAL TECHNOLOGY INTEGRATION
6 UIC ERTMS Conference – Bern September 2007
System System lifecyclelifecycleSystem Definition andApplication Conditions
Risk Analysis
System Requirements
Apportionment ofSystem Requirements
Design andImplementation
Manufacture
Installation
System Validation(Including Safety Acceptance
and Commissioning)
System Acceptance
Operation andMaintenance
PerformanceMonitoring
Modificationand Retrofit
De-commissioningand Disposal
Re-apply Lifecycle14
131112
10
9
8
7
6
5
4
3
2
Concept 1
Re-apply Risk Analysis
RFI
RFI
Manufacturer and/orThird Party
7 UIC ERTMS Conference – Bern September 2007
EERTMS/ETCS on RTMS/ETCS on HS / HC : the benefitsHS / HC : the benefits
Less environmental impact than road, equivalent to the discharge of a city with 220 thousand inhabitants (e.g. Perugia+Treviso) and consumption and emissions of a 102 Mw power station (1.3% of Italy’s domestic power consumption).
TransportationTransportation
EnvironmentEnvironment
Doubles available capacity on the routeEstimated traffic in 2015 on the vertical axis – 35 M passengers and 10 M tonnes of freightExisting lines dedicated to freight transport and local and urban transportRegional rail services redesigned and completion of large rail hubs
8 UIC ERTMS Conference – Bern September 2007
The OnThe On-- Board Sub SystemBoard Sub System
(DMI SCMT Separated in phase 1)
Nationalized transmissionmodule
9 UIC ERTMS Conference – Bern September 2007
The OnThe On--Board Sub System ERTMS/ETCS+STMBoard Sub System ERTMS/ETCS+STM(integrated architecture)(integrated architecture)
Control and ProtectionSystem
Speed MeasuringSystem
Driving Personnelmonitoring
System Recording
Unit
Rolling Stock-Interface Sub System
Trackside-Interface
Sub System
Computing-Sub System
-Driving Personnel
Interface
GT GT
AntennaX CdB
AntennaX
AntennaX CdB
Antenna
JRU
DMI
ERTMS
Driver SupportSystem
niDetectingSystem Mobile
MMI
Radio
recordingmedia
ORGANI TRENOtrain
devices
AntennaPer PI
AntennaPer PI
NationalizedDisplays
Radar
Modulo Euroradio
STMX
STMY
STMSCMT
EVCSISTEMIITRENOtrain
systems
10 UIC ERTMS Conference – Bern September 2007
DISTRIBUTED ARCHITECTURE DISTRIBUTED ARCHITECTURE COMPUTER CONTROLLED INTERLOCKINGCOMPUTER CONTROLLED INTERLOCKING
New New ItalianItalian High High SpeedSpeed LinesLines MilanoMilano--BolognaBologna--FirenzeFirenze ArchitectureArchitecture
Conventional line
PJ
HS LINE
PTPM
RBC
LLPC
BTS
TrainPosition Movement
Authority
Eurobalise
GSM-R
SCC NVC
nPP nPP nPP nPP
CENTALIZED SUPERVISION ROOMCOMMAND AND CONTROL - RADIO BLOCK CENTER - CENTRAL INTERLOCKING COMPUTER
FIBER OPTIC BACKBONE
SINGLE INTERLOCKING PERIPHERAL UNITS
11 UIC ERTMS Conference – Bern September 2007
SCC
QL RBCTD
GSM-R
ERTMS/ETCS HIGH SPEED LINE CONTROL ROOM : ROMAERTMS/ETCS HIGH SPEED LINE CONTROL ROOM : ROMA--NAPOLINAPOLI
12 UIC ERTMS Conference – Bern September 2007
ERTMS/ETCS HIGH SPEED LINE CONTROL ROOM :ERTMS/ETCS HIGH SPEED LINE CONTROL ROOM :TORINOTORINO--NOVARANOVARA
13 UIC ERTMS Conference – Bern September 2007
RBC OPERATOR INTERFACERBC OPERATOR INTERFACE
GE
A
Unità ventole
Unità diagnostica
QLv2 (1)QLv1(1)Vnv
KDI DVC
IPA
Cestello VMMI-HSL(armadio elaborazione)
RBC1RBC2RBC3 RBC1RBC2RBC3
Arresti di EmMenù Principale
Arresti di EmMessaggi di TTacitaz Suon
RBC EducatioTabelle
Rallentam Pun Rallentam Pre
OpzioniLogout
Modo operativo
FS21 53 4
01 5Numero Treno
Testa del Treno
Coda del Treno
Velocità
ID RBC ID Treno Stato Data Operatore
1 RBC1 12345 CONFERMATO 13/02/2004 08:05:52 3267
2 RBC2 56789 ATTESA 13/02/2004 08:55:24 3267
3 RBC2 08765 CONFERMATO 13/02/2004 09:28:32 3267
4 RBC1 25625 REVOCATO 13/02/2004 10:56:12 3267
5 RBC3 14881 CONFERMATO 15/02/2004 08:35:06 1294
6 RBC3 06654 CONFERMATO 15/02/2004 08:52:58 1294
7 RBC1 01888 CANCELLATO 15/02/2004 10:55:05 1294
8 RBC1 63999 ATTESA REV 15/02/2004 13:55:58 1294
9 RBC1 22233 CONFERMATO 15/02/2004 14:26:01 1294
Slowdowns or emercencies
to trains via radio from centre
keyboardTrain icon
MovementAuthority
End of section
End of 1st station section
14 UIC ERTMS Conference – Bern September 2007
E404 PLT R1 R2 R3 R4 R5 R6 R7 R8 E404 PL
Diagnostic sub system on-board:
SIGNALLING: ERTMS – GSMR –SCMT e BACC
INFRASTRUCTURE: gaugemeasurement
Dinamic measurement: boogieacceleration, Q and Y forcesmeasurement
Pantograph-catenary interaction
Integrated Multifunction Diagnostic TrainIntegrated Multifunction Diagnostic Train
15 UIC ERTMS Conference – Bern September 2007
Technology Technology -- IntegrationIntegration
Integration of National Regulation with
ERTMS Rules
SST - SSB
SST SSB GSM-R
Safety Case ofSupplier Integration
At System Level
ASF
AF
AF
ALS
ETCS ETCS –– SCMTSCMTIXL IXL –– RBCRBCRBC RBC –– CTCCTCIXL IXL –– Track circuitTrack circuit
ETCS ETCS –– SCMTSCMT
EVC EVC -- STMSTM
EVC EVC -- TRAINTRAIN
NORTELNORTEL
SIEMENSSIEMENS
16 UIC ERTMS Conference – Bern September 2007
Sub System Release Certification for Commercial OperationSub System Release Certification for Commercial Operation
Radio Block Centre
7 software releases
N
BC
a
10 software releases
17 UIC ERTMS Conference – Bern September 2007
Sub System Release Certification for Commercial OperationSub System Release Certification for Commercial Operation
ERTMS/ETCS On-Board Sub-System
ERTMS/ETCS stand-alone
ETR 485
ERTMS/ETCS + STM (integrated)
ETR 500 ETR 600 ETR 610
ERTMS/ETCS + STM (external)
ETR 500
ERTMS/ETCS + STM (external)ERTMS/ETCS + STM (integrated)
ETR 402 ETR 403
ETR 500 Brand AV
ETR 600 “New Pendolino “
ETR 485
ETR 470
ETR 470
60 trains
30trains
15trains
15trains
=120 trains
18 UIC ERTMS Conference – Bern September 2007
System Integration: System Integration: Achieving compatibility between Nortel and Siemens Achieving compatibility between Nortel and Siemens GSMGSM--R constituentsR constituents
Salone
GricignanoRoma
Working withBTS SIEMENS
NapoliWorking with
BTS SIEMENSBTS SIEMENSAV/AC Roma-Napoli Working with
BTS NORTELBTS NORTEL
MSC
SR11.0
NSS CoreNSS Core
Conventional line
Siemens
BSSBSS
VMS
SMSCHLRi
IN
Billing
SGSN
GGSNInterception
OTA
TRAU
BTS
GPRS
HS line Roma - Napoli
NortelNetworks
IN
SMSC
Interfaccia A
BTS
BSC
BTS
TRAU
BTSBSS
BR7.0
/SR11.0
V15R.1BSC
BTSBTSBSS
TRAU
MSC
V12R.0
4
Roma Tuscolana
MSCHLR
NUOVO
BSS Nortel
AbisBSC
BTSBTS
BTSBTS
RBC
Test Plant – PCS Roma T.ni
SIEMENS – NortelNetworks
BSS Nortel
RBC
Radio Block Centre
MSC Siemens LS
Pre-ese
rcizio
BTS di migrazione
MSC Siemens
19 UIC ERTMS Conference – Bern September 2007
The GRASS (The GRASS (GGSMSM--R R RRisk isk ASSASSessmentessment) Project) Project
OUT OF
SERVICE
NOMINAL
SERVICE
10-5
10-4
10-3
10-2
10-1
100
Ave
rage
Bit
Erro
r Rat
e
40353025201510
Signal-to-noise Ratio
GRASS is a project research that has GRASS is a project research that has been carried out to investigate on the been carried out to investigate on the possible cause of degradation of the possible cause of degradation of the GSMGSM--R system, R system, related risks and related risks and possible mitigationspossible mitigations
Field LevelCoverage map
20 UIC ERTMS Conference – Bern September 2007
ITALIAN HIGH SPEED LINES IN OPERATION SINCE DEC 2005ITALIAN HIGH SPEED LINES IN OPERATION SINCE DEC 2005
ROMA ROMA –– NAPOLINAPOLI
30 30 trainstrains/day/day
96% on time 96% on time ((withinwithin 5’ 5’ delaydelay))
98 % ERTMS/ETCS 98 % ERTMS/ETCS onlyonly
TORINOTORINO--NOVARANOVARA
16 16 trainstrains/day/day
96% on time (96% on time (withinwithin 5’ 5’ delaydelay) )
98 % ERTMS/ETCS 98 % ERTMS/ETCS onlyonly
PERFORMANCESPERFORMANCES
OverallOverall distancedistance runrun: : 2 2 MillionMillion of of KmsKms
ERTMS (ETCS+GSM-R) DIRECT CAUSES OF DELAYS:
LESS THAN 2%LESS THAN 2%
21 UIC ERTMS Conference – Bern September 2007
PunctualityPunctuality
Reliability targets: • All materials HS to be in class traction A+• Critical breakdown /Mkm = 7 (tgt ‘06: 8) • Repairable breakdown /Mkm = 93 (tgt ’06: 110)
Punctuality targets: • 95% of the trains on time (tol.: 5’)
Punctuality HS Rome - Naples - Year 2006
86,25%
97,32%98,65%
97,49%
94,35%95,36%
96,37%
93,48% 94,03%
96,17% 96,38%95,58%
97,57%
80,00%
85,00%
90,00%
95,00%
100,00%
Gen
naio
Febb
raio
Mar
zo
Apr
ile
Mag
gio
Giu
gno
Lugl
io
Ago
sto
Sette
mbr
e
Otto
bre
Nov
embr
e
Dic
embr
e
Gen
naio
2007
% Result Obj
22 UIC ERTMS Conference – Bern September 2007
Market Share on RMMarket Share on RM--NA routeNA route
Local; 1.000; 5%
IC; 2.100; 11%
ES; 4.000; 21%
Air: 150; 1%
Others: 1.200; 6%
Car:10.900; 56%
NAPLES NAPLES –– ROME (2005)ROME (2005) NAPLES NAPLES –– ROME (2006)ROME (2006)
ES; 3.400; 17%
IC; 2.700; 14%
Local: 1.100; 6%Car: 9.300;
46%
Air: 150; 1%
HS; 2000; 10%
Others: 1.200; 6%
The launch of our first 4 couples of trains, together withthe oil price shift in mid-2006, increased our total modalmarket share by 10 points.
The market share of High Speed trains is about 10%, of which 4 points are taken from ES standard trains.
The total market increased altogether by 2%
Analysis date: July ‘06. Update in progress
Total Total TrainTrain Market Share Market Share ( after 7 ( after 7 monthsmonths ))
47% (+10 47% (+10 pointspoints))
23 UIC ERTMS Conference – Bern September 2007
A
C
B
D E
F
G
H
D
Inserzione del SSB
Ingresso in ERTMS/ETCS L2
Gestione itinerari
POC
POC
Uscita da ERTMS/ETCS L2
Hand Over RBC
Cambio Fase attivo
Legenda
Marcia in FS con EoA su segnale virtuale chiuso di PdS(TSR a 90km/h)
Grafico dei Dati da Log di RBC1,2,3
=
RBC 1 RBC 2 RBC 3RBC 2
Velo
cità
Gra
dien
te(°
/ °°)
Posti di servizio e tempo di passaggio
Performance Performance MonitoringMonitoring
24 UIC ERTMS Conference – Bern September 2007
Overall trackside signalling sys maintenanceevent/operation year 2006 - (excluding ETCS)
Power supply 3Base Transmission Stations 4Track Circuit 14Hot Box Detectors 14Switches 5GSM-R 2Centalized Traffic Control 1
ItalianItalian High High SpeedSpeed / High / High CapacityCapacity LinesLines MaintenanceMaintenance Data Data fromfrom the the fieldfield
Maximum Allowed Unaivalability at System Levelless than 8’ (RFI Requirements):
C O N F I R M E Dby the collected data of the Overall ERTMS/ETCS Signalling
Results from the experiences of the ERTMS operation
System availability by the proper‘tuning’ of GSM-R and ETCS configuration parameter stabilizated
Learning level of the dagraded mode management either for drivers and fortrackside RBC and IXL manager improved
Technical and functional interationamong several ERTMS suppliersachived