the european organisation for the safety of air navigation aixm procedure modelling/encoding seminar...
DESCRIPTION
3 Past AIXM Seminars Focus on XML Schema (#1) OCT 2009, Brussels (#2) DEC 2009, Brussels – re-run, identified XSD corrections applied in the final AIXM 5.1 Release (#3) JAN 2010, Washington – re-run for US participants (#4) MAR 2010, Washington – re-run for US participants Focus on Digital NOTAM (#5) MAR 2010 – discuss Digital NOTAM encoding particularties; input for the Event Specification All presentations available on (see Archive)www.aixm.aeroTRANSCRIPT
The European Organisation for the Safety of Air Navigation
AIXM Procedure Modelling/Encoding seminar
Brussels – 01/02 Sept 2010
2
Objectives
• Share experience between developers & users• Improve the AIXM 5.1 documentation• Scope: AIXM 5.0 & AIXM 5.1• Participants
• EUROCONTROL, FAA, ANSP, Industry, …• Procedure designers, data encoders, developers, …• Please introduce yourself
• and explain your interest for AIXM 5!
3
Past AIXM Seminars
• Focus on XML Schema• (#1) OCT 2009, Brussels• (#2) DEC 2009, Brussels – re-run, identified XSD
corrections applied in the final AIXM 5.1 Release• (#3) JAN 2010, Washington – re-run for US participants• (#4) MAR 2010, Washington – re-run for US participants
• Focus on Digital NOTAM• (#5) MAR 2010 – discuss Digital NOTAM encoding
particularties; input for the Event Specification
• All presentations available on www.aixm.aero (see Archive)
4
AIXM “Procedures” Seminars
• Focus on the encoding of SID/STAR/IAP/Holding procedure data using AIXM 5.0 & 5.1• (#6) 01-02 SEP 2010, Brussels• (#7) 29-30 SEP 2010, Brussels
• Re-run• Not yet announced publicly, long reserve list from #1• Maybe also on Webex
• All presentations will be made available on www.aixm.aero (see Archive)
5
Agenda – Day 1
1. Welcome 10:00
2. Procedure Model Overview EUROCONTROL
3. FAA Implementation Experience FAA
- lunch break - 12:30
4. Latvia Implementation Experience 13:30 LGS & RISK
5. IDS Spa Experience 14:15 IDS
- coffee break - 15:00
Open DiscussionsDefining best practices
- close - 16:30
6
Agenda – Day 2
6.7.
Data Publication requirement (ICAO PANS-OPS)Examples from GermanyObjective: identify minimum dataset to be published
09:00 Roland RawlingsDFS
- coffee break - 10:30
Open DiscussionsDefining best practices
- lunch break - 12:00
8. A424A + SESAR WP.9.31 13:00 EUROCONTROL
9. A424 business rules for AIXM 5.1 13:30 PULSAR Consulting
10 Presentation of Luciad’s experience with Procedure model 14:00 LUCIAD
- coffee break - 15:00
Open discussions
- close - 16:00
7
Topics raised
• Protection areas• The way From procedure design to Coding• The place of the protection areas in the P&T coding• What is the integrity/correctness of a coding regarding P&T• ARINC coding in the AIXM 5.1 model• AIXM 5.1 model compatibility with PANS-OPS• Topologcally Correct Geo-Spatial Data Management (Segment
Legs, Protected Areas etc)• Mapping between ARINC 424 / DAFIF procedure model & AIXM
5.1 procedure model• How to encode conventional procedures• How to handle multiple arrival segments