the epoch development - wordpress.com · 2016. 2. 24. · the epoch development boma worksession...
TRANSCRIPT
![Page 1: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/1.jpg)
THE EPOCH DEVELOPMENT
BOMA WORKSESSION AND NEIGHBORHOOD PRESENTATION
FEBRUARY 25, 2016
MARCH 2, 2016
![Page 2: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/2.jpg)
Building Trust Every Day
Founded in 1970
Headquartered in Winter Park, Florida
Full Service Apartment Firm: Developer, General Contractor and Property Manager
Has Developed 150 Properties in 56 Cities Throughout the United States; Primarily in the Southeast and Southwest
Specialize in Class A, Institutional Quality Apartments
![Page 3: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/3.jpg)
Recently Completed Communities
![Page 4: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/4.jpg)
![Page 5: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/5.jpg)
![Page 6: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/6.jpg)
PROJECT LOCATION
![Page 7: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/7.jpg)
SURROUNDING LAND USES
![Page 8: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/8.jpg)
PROPOSED SITE PLAN • Proposed Zone Change From GC to SD-R with PUD • 355 Total units on 30.4 acres (11.7 units/acre) • Designed as single development • 50% Open Space • 2 Ac. Parcel at Royal Oaks/Oak Meadow to remain GC • Site Constraints
• Watson Branch & Floodplain • Interstate Buffer • Stream dividing project and 2 Ac. GC Parcel.
![Page 9: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/9.jpg)
NORTH SITE PLAN
![Page 10: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/10.jpg)
SOUTH SITE PLAN
![Page 11: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/11.jpg)
CREEKSTONE CROSS-SECTION
330 ft 170 ft
Property Line
![Page 12: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/12.jpg)
REAR ELEVATION
SIDE ELEVATION
NORTH PARCEL ELEVATIONS
![Page 13: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/13.jpg)
NORTH PARCEL
![Page 14: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/14.jpg)
SOUTH PARCEL ELEVATION
![Page 15: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/15.jpg)
SOUTH PARCEL INSPIRATION
![Page 16: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/16.jpg)
SOUTH PARCEL INSPIRATION
![Page 17: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/17.jpg)
SOUTH PARCEL INSPIRATION
![Page 18: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016](https://reader034.vdocuments.site/reader034/viewer/2022052014/602b0eef133b9448df029049/html5/thumbnails/18.jpg)
STAFF CONCERNS FROM PRE-APP • Pitched Roof Required • Exceed 200 ft building length limit (currently exceed
by 14 feet) • Prefer Connection to Private Drive south of Home
Depot • Possibility of Reduced Parking Requirement with
Study • Lack of Usable Open Space, Pedestrian Connectivity
to Open Space • Traffic Study being conducted with 3rd party review