the epoch development - wordpress.com · 2016. 2. 24. · the epoch development boma worksession...

18
THE EPOCH DEVELOPMENT BOMA WORKSESSION AND NEIGHBORHOOD PRESENTATION FEBRUARY 25, 2016 MARCH 2, 2016

Upload: others

Post on 04-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

THE EPOCH DEVELOPMENT

BOMA WORKSESSION AND NEIGHBORHOOD PRESENTATION

FEBRUARY 25, 2016

MARCH 2, 2016

Page 2: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

Building Trust Every Day

Founded in 1970

Headquartered in Winter Park, Florida

Full Service Apartment Firm: Developer, General Contractor and Property Manager

Has Developed 150 Properties in 56 Cities Throughout the United States; Primarily in the Southeast and Southwest

Specialize in Class A, Institutional Quality Apartments

Page 3: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

Recently Completed Communities

Page 4: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016
Page 5: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016
Page 6: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

PROJECT LOCATION

Page 7: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SURROUNDING LAND USES

Page 8: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

PROPOSED SITE PLAN • Proposed Zone Change From GC to SD-R with PUD • 355 Total units on 30.4 acres (11.7 units/acre) • Designed as single development • 50% Open Space • 2 Ac. Parcel at Royal Oaks/Oak Meadow to remain GC • Site Constraints

• Watson Branch & Floodplain • Interstate Buffer • Stream dividing project and 2 Ac. GC Parcel.

Page 9: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

NORTH SITE PLAN

Page 10: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SOUTH SITE PLAN

Page 11: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

CREEKSTONE CROSS-SECTION

330 ft 170 ft

Property Line

Page 12: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

REAR ELEVATION

SIDE ELEVATION

NORTH PARCEL ELEVATIONS

Page 13: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

NORTH PARCEL

Page 14: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SOUTH PARCEL ELEVATION

Page 15: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SOUTH PARCEL INSPIRATION

Page 16: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SOUTH PARCEL INSPIRATION

Page 17: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

SOUTH PARCEL INSPIRATION

Page 18: THE EPOCH DEVELOPMENT - WordPress.com · 2016. 2. 24. · the epoch development boma worksession and neighborhood presentation february 25, 2016 march 2, 2016

STAFF CONCERNS FROM PRE-APP • Pitched Roof Required • Exceed 200 ft building length limit (currently exceed

by 14 feet) • Prefer Connection to Private Drive south of Home

Depot • Possibility of Reduced Parking Requirement with

Study • Lack of Usable Open Space, Pedestrian Connectivity

to Open Space • Traffic Study being conducted with 3rd party review