the dingleton resettlement project...iaia symposium presentation – kruger national park 22 october...
TRANSCRIPT
![Page 1: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/1.jpg)
1
THE DINGLETON RESETTLEMENT PROJECTIAIA Symposium Presentation – Kruger National Park22 October 2014
![Page 2: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/2.jpg)
2
CONTENTS
• Background
• Governance Structures
• Grievance Structures
• Lessons learned
![Page 3: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/3.jpg)
3
1.0BACKGROUND
![Page 4: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/4.jpg)
4
PROJECT LOCATION
South Africa
Sishen mine
Saldanha port
![Page 5: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/5.jpg)
5
PROJECT LOCATION
Host town of Kathu
Dingleton
Kumba property boundary
Pit boundary
![Page 6: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/6.jpg)
6
2.0GOVERNANCE STRUCTURES
![Page 7: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/7.jpg)
7
GROUP-WIDE GOVERNANCE
The following group-wide governance processes have been developed to guideresettlements:
• Resettlement Working Group (RWG) shares lessons learned and best practicesbetween Business Units
• Social Way outlines requirements for resettlements in alignment with the International Finance Corporation (IFC) Performance Standards
• Projects Way outlines requirements and approval process for all capital projects,including social performance requirements
![Page 8: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/8.jpg)
8
PROJECT GOVERNANCE
The following governance processes have been developed to guide the Dingletonresettlement:
• Kumba Steering Committee: An internal steering committee meets on a monthlybasis and guides the project team.
• Dingleton Resettlement Working Group (DRWG): The DRWG meets monthlyand comprises of representatives between Kumba, the Northern Cape Government(NCG), local government and Dingleton residents (quorum requires 51%). TheDRWG convenes feedback sessions to the community every two months.
• Joint Steering Committee: The joint steering committee meets quarterly andcomprises of representatives from Kumba and the NCG.
• Independent monitoring: An independent monitor is appointed to advise the abovegroups forums as well as monitor livelihoods and the grievance procedure.
![Page 9: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/9.jpg)
9
PROJECT MANAGEMENT STRUCTURE:GOVERNANCE STRUCTURE
![Page 10: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/10.jpg)
10
DINGLETON RESETTLEMENT WORK GROUP
NORTHERN CAPE GOVERNMENT/KUMBA STEERING COMMITTEE
![Page 11: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/11.jpg)
11
3.0GRIEVANCE STRUCTURES
![Page 12: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/12.jpg)
12
GRIEVANCE STRUCTURES
The implementation of the grievance procedure has been monitored by an independent third party. The procedure has been successful in defusing community concerns given that is perceived to be robust and fair.
• Accessibility: Grievance Boxes were installed at key locations in the Dingletoncommunity.
• Reporting and investigation: A permanent member of staff was appointed to log all grievances. All the grievances are recorded on a database where the investigation, feedback and any mitigation measures are tracked.
• Response: Feedback is given within a month after receiving of the grievance.
![Page 13: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/13.jpg)
13
4.0LESSONS LEARNED
![Page 14: THE DINGLETON RESETTLEMENT PROJECT...IAIA Symposium Presentation – Kruger National Park 22 October 2014 2 CONTENTS • Background • Governance Structures • Grievance Structures](https://reader033.vdocuments.site/reader033/viewer/2022051810/6019a59f453b8375300b4510/html5/thumbnails/14.jpg)
14
A FEW LESSONS LEARNED• Land ownership: The resettlement is being implemented in an urban environment with
title deed holders (land is not held under community trust or communal ownership). Inthis context, agreements need to be made with individual households (i.e. deed holders)and this has implications for the role of the DRWG.
• Livelihood restoration: The community is moving into another urban environment thatis developing rapidly and there is a need to ensure that Kathu can deliver livelihoodimprovement as this community grows.
• Evolving issues: We learn new things about the community all the time.
• External issues: Resettlement process is vulnerable to national socio economic issuessuch as royalties, mineral rights etc.
• Engagement (community): Paying committee members can drag out engagementprocesses. Be consistent with what you offer to the community – have properprinciples in place.
• Engagement (government): Engage with Government on a high level ASAP to gettheir buy-in from the beginning
• Independence: It is important to win trust! An trusted third party to monitor the currentprocess.