the dam plan final

Upload: jendibbern

Post on 10-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 The Dam Plan Final

    1/23

    The Denver Art Museum Library

    Strategic Plan

    2010-2011

    http://www.geraldinecampbell.com/09/wp-content/uploads/2009/06/Daniel-Libeskind-Denver-Art-Museum.jpg

    Presented by:Jennifer Dibbern Barbara Durland Laura Olson Emporia State University

    March 11, 2010

    LI805XC Organizational Theories for Administering Information Agencies

  • 8/8/2019 The Dam Plan Final

    2/23

    Table of Contents.2

    Introduction..3

    Our Hopes and Dreams4

    The Planning Team..5

    Strategic Planning Consultants7

    Planning Time Line...8

    Milestones8

    Needs Assessment..10

    Environmental Scan

    Library and Community Analysis (SWOT)...11

    Library and Community Analysis (PEST).12

    Mission...13

    Vision.14

    Values15

    Strategic Goals, Objectives, Actions and Measures...16

    Budget19

    Implementation Plan..20

    Conclusion.21

    Future Planning..22

    References..23

    805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

    Table of Contents

  • 8/8/2019 The Dam Plan Final

    3/23

    Introduction

    On the corner of 14th

    and Tremont in Denver, Colorado, several

    blocks from the (DAM) Denver Art Museum, lies a relatively untapped

    resource of art historical information. The DAM Library is housed in the

    administration building, a separate building from the Denver Art Museum.

    It holds a collection of about 27,000 books, serials, catalogs and a small

    collection of rare books. The library serves as a resource for Denver Art

    Museum staff, docents, volunteers, interns, and researchers. Because of its

    remote and locked location it is hard for the general public to access thelibrary, thus there is an increased need to provide better access. Therefore, it

    is our goal to increase access and public awareness.

    http://www.burningmatches.com/images/photography/artMuseum.jpg

    Welcome to the Denver Art Museum Library

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    4/23

    At the current time the Denver Art Museum Librarys income is fixed

    and, if anything, decreasing each year. Meanwhile, the library would like to

    extend its services to meet the needs of the public. The hope is to increaseuse of the library by the public as well as reach out to students in local high

    schools and colleges. However this cannot be accomplished without

    additional funding. Therefore, a large part of our strategic plan is to increase

    revenue streams. The librarian's hours are limited to three days a week. She

    does not have time to write a grant, nor are there enough hours to provide

    the public accessibility and community outreach the DAM Library strives to

    provide. An increased and reliable revenue stream would be a solution to

    these issues.

    Our Hopes and Dreams

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    5/23

    Librarian:

    SUSAN FERRER-VINENT is the librarian and the only paid position of the library.She only works three days a week. She received her MLIS from University of

    Denver and has been with the DAM library since 2003.

    Chief Curator:MARGARET YOUNG-SANCHEZ is currently the DAM chief curator for DAM. She

    formerly was the curator of the New World Art at the DAM.

    Library Patron:CLYFFORD STILL is employed as a curator for the DAM. He utilizes the library

    on a regular basis and has contact with other DAM staff. He will assist withinternal needs, such as surveys, obtaining assistance from other departments.

    http://www.clyffordstillmuseum.org/

    High School Instructor:LEONARDO DA VINCI is a teacher at a nearby

    high school. He frequently utilizes the DAMon field trips and is interested in increasing

    his students use of the library as well ashaving outreach to his school by the DAM

    library. He will assist with external needssuch as high school teacher surveys, focus

    groups, and contacting high school teachers tobegin outreach.

    http://www.hschamberlain.net/kant/kant_02_leonardo.html

    The Plannin Team

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    6/23

    Community College

    Instructor:FRIDA KAHLO is an art history teacher at

    a local community college. Shefrequently sends her students to the DAMfor assignments and is interested in

    increasing their access to the library andthe librarian's expertise. She is also

    interested in library outreach to hercollege. She will assist with external

    needs such as college teacher surveys andfocus groups as well as contacting

    college instructors for outreach.

    http://midorilei.com/blog/eyebrowsare

    important/

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    7/23

    Strategic Planning Consultants:

    Library Outreach Services: a non-profit local strategic planning consulting firmspecializing in assisting small libraries. This consulting project will be completed on a

    pro bono basis for the DAM library.

    Project LeaderLAURA OLSON is the project leader for Library

    Outreach Services.

    SecretaryBARBARA DURLAND provides secretarial

    and organizational skills to the consulting

    practice.

    Project CoordinatorJENNIFERDIBBERN provides project

    coordination as well as creative design for Library

    Outreach Services.

    Librar Outreach Services

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    8/23

    Milestones:

    January 2, 2010 - Planning Committee developed

    March 15, 2010 - Needs assessment completed

    May 15, 2010 - Strategic plan completed

    May 15, 2010 - Proposed budget turned in for approval

    June 1, 2010 - Interns and volunteers recruited to extend library hours

    June 15, 2010 - New library hours take effect

    June 15, 2010 - Library begins to offer school tours of library during librarian's work

    hours

    September 1, 2010 Budget approval by Denver Art Museum

    October 1, 2010 - Fundraising gala (based on budget approval)

    November 21, 2010 - Selection of grant writing consultant

    December 1, 2010 - January 2, 2011 - Completion of grant proposals and beginning ofnew strategic plan

    January 2, 2011 Begins the development of new strategic plan that will focus on hiringof an outreach coordinator as well as creating outreach programming, and increasing paid

    staff. We will also focus on increasing use of technology and purchase of automatedcheckout system. These next steps are dependent upon new revenue generation from

    grants.

    Planning Stages

    STAGE 1NEEDS ASSESSMENT

    TIME FRAME: February 1 - March 11, 2010

    COMMITTEE MEMBERS

    Internal assessment:

    Susan, Laura, Clyfford

    External (High School teachers):

    Susan, Laura, Leonardo (assistance with external action)

    External (Community college teachers):

    Susan, Laura, Frida

    ACTIONS: The committee will prepare and conduct internal and external surveysand focus groups.

    The Plannin Timeline

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    9/23

    STAGE 2PEST, AND SWOTDOCUMENTS,MISSION,VALUES ANDVISION

    TIME FRAME: February 1 - April 15, 2010

    Team: Susan, Margaret, Clyfford, Jen, Laura, Barb

    ACTIONS: Creation of Mission, Values, Vision, PEST and SWOT Documents

    STAGE 3GOALS,OBJECTIVES,ACTION STEPS AND EVALUATION PLAN

    TIME FRAME: April 15 - May 15, 2010

    Team: Susan, Margaret, Jen, Laura, Barb, Clyfford, Leonardo

    ACTIONS: Creation of goals, objectives and evaluation plan

    STAGE 4CREATION OF PRELIMINARY BUDGET AND COMPLETION OFSTRATEGIC PLAN

    TIME FRAME: April 15 - May 15, 2010

    Committee: Susan, Laura, Jen, Barb

    ACTIONS: Proposed budget completed and submitted for approval.

    STAGE 5IMPLEMENTATION TIME LINE

    TIME FRAME: May 15, 2010 - January 2, 2011

    Committees: Committee members will vary. See action steps under goalssection.

    Evaluation Time line:

    Please see evaluation plan.

    LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    10/23

    Internal:Survey to determine if increased hours would be utilized by staff members.

    External:Anonymous comment cards were distributed in the DAM gift shop and membershipkiosks surveying public's interest in using the DAM library. Cards were also distributed

    within the discovery libraries in the western and European gallery spaces.

    Surveys were sent to high school and community college art teachers to determineeducational outreach desired. If needed, additional focus groups will be conducted, one

    with high school teachers and one with college teachers.

    Conclusions:The internal needs assessment of the DAM staff indicated a desire for increased library

    hours of operation. External needs assessments indicated a desire by local high schoolteachers and community college instructors to have access to and outreach from the

    DAM library to increase their students participation and appreciation of the arts. Focusgroups were performed within the schools to brainstorm educational outreach needs and

    ideas for the library. Furthermore, external surveys consisting of short, anonymouscomment cards conducted at the DAM gift shop and membership kiosks within the

    museum indicated a desire on public patrons part to have increased access to the DAMlibrary.

    Needs Assessment

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    11/23

    Strengths (Internal)

    - Attached to a large, established

    organization

    - Dependable catalog system

    - Good collection (27,000 items)

    - Excellent databases

    - Good reputation and use by DAM staff

    - New museum director with new vision

    -Dependable volunteers

    Weaknesses (Internal)

    - One employee

    -Outdated checkout system

    -No community outreach

    -Budget entirely dependent on DAMallocation

    -Separate from art museum in a lockedbuilding 4 blocks away

    Opportunities

    (External)

    -IMLS grants

    -LSTA grants

    -Increased use of interns and volunteers

    -Increased participation in community

    -Increased use of technology

    Threats (External)

    - Poor economy

    - Low museum attendance, decreasedincome and therefore, budget cuts for

    library

    -Rapidly changing technology--keeping

    up with needs of patrons

    SWOT

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    12/23

    PEST!- EXTERNAL FACTORS THAT INFLUENCE THE DENVERART MUSEUM LIBRARY

    Political

    SCFD-Scientific and Cultural Facilities

    District (a 1/10 of 1% sales tax used tofund cultural institutions in the Denver

    area)

    IMLS grants

    Tourism numbers down, so less moneyflowing in to the museum and tricklingdown

    Conservative voting due to economy

    Economic

    General economic trends in Denver

    Increase in consumer spending on

    necessities leads away from culturalspending

    The Stay-cation and unemployment-

    effects visitor numbers

    Impact of globalization

    Social

    DAM demographic

    Advertising and publicity (presently-

    none)

    Large-scale social trends- i.e. newClyfford Still museum, so more people

    researching the artist

    Traveling exhibitions inspiring moreresearch- i.e. Tut

    Library accessibility-blocks from themuseum

    Technological

    Replacement technology solutions i.e.scanning equipment

    Technology access, licensing, patents-cost of subscriptions going up (serials,

    databases, etc.)

    The internet and new media - visitorsexpectations of remote access

    Cost of technology

    PEST

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    13/23

    EXISTING MISSIONThe DAM library serves as a specialized research resource for

    museum staff, volunteers, and visiting scholars.

    PROPOSED MISSION

    The DAM Library serves as a specialized research resource for

    museum staff, volunteers, visiting scholars, and the public spherethrough internal communication and external outreach.

    The Mission Statement

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    14/23

    The Denver Art Museum library is a revolutionary resource for art

    historical research that empowers learning and places the future

    growth of visual and information literacy within reach of our

    community.

    The Vision Statement

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    15/23

    Respect Respect each user of the library as unique and important

    Inclusivity and diversity

    Confidentiality and privacy

    Ethics and Integrity

    Promote intellectual freedom Use funds wisely and with transparency

    Build trust through honest communications

    Development The pursuit of knowledge

    Diverse and quality collections

    Assist in the development of information literacy Promote intellectual growth through the participation in the arts

    Communication Within DAM and outreach to community

    Solicit feedback regarding our collection and services

    Collaboration with DAM employees, stakeholders, and interested communitymembers

    Values

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    16/23

    Goal #1 DEVELOP NEW REVENUE STREAMS .OBJECTIVES:

    1. Fundraising gala event (To be held on October 1, 2010).

    ACTION STEPS:

    a. Plan event: Venue, caterer, food, tickets, marketing, speakers,

    and entertainment. Complete planning by September 1, 2010.

    RESPONSIBILITY: Gala Planning Committee willprovide monthly progress reports to the Project Leader by

    the first of each month.

    b. Day of event: Strategic planning team members and other

    personnel will participate in Gala Planning Committeesassignments.

    RESPONSIBILITY: All members and personnel asassigned.

    2. With funding from gala, hire a grant writing consultant and begin grantprocurement.

    ACTION STEPS:

    a. Recruitment of grant writing consultant

    RESPONSIBILITY: Librarian will have researched localgrant writing consultants by November 1, 2010. She will

    report on the candidates to the strategic planning team byNovember 15, 2010. The strategic planning team will vote

    on selection of a grant writer by November 19, 2010.

    b. Grant writer will identify appropriate grants for community

    outreach and education by December 1, 2010.

    RESPONSIBILITY: Project leader will be available asneeded.

    Goals, Ob ectives and Action Ste s

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    17/23

    Goal #2 DEVELOP PUBLIC AWARENESS ANDUSE OF THE LIBRARY AND CREATE FUTURE

    PATRONS OF THE ARTS .OBJECTIVES:

    1. Increase public access by extending library hours.

    ACTION STEPS:

    a. Recruit volunteers and interns to extend library hours.

    RESPONSIBILITY: Librarian will determine appropriatestaff from current pool of volunteers and interns. The newhours will be effective by June 15, 2010.

    b. Advertise library at Denver Art Museum.

    RESPONSIBILITY:

    -Project Leader will contact DAM's marketingdepartment by April 30, 2010 to design posters and flyers.

    Posters will be completed and posted by May 15, 2010.

    -Librarian will post new hours on library website by

    May 30, 2010. Flyers will also be posted at themembership kiosks in the museum.

    2. Develop outreach program for high schools and community colleges.

    ACTION STEPS:

    a. Discuss outreach with high school teachers and

    university/college instructors based on findings of needsassessments.

    RESPONSIBILITY: Librarian will make school contactsby May 15, 2010 with assistance from high school liaison.Tours of library will be offered during librarian's work

    hours.

    b. Hire Outreach Coordinator

    RESPONSIBILITY: After grant money is awarded, theplanning committee will begin recruitment of outreachcoordinator who will further develop programs with

    community. The goal will be hiring of outreach coordinatorby January 2012. At that time a new strategic plan will be

    developed to further refine the outreach activities that willbe conducted along with review and revision of staffing

    and budget.

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    18/23

    Long-Term Goals (to be discussed in 2012after awarding of grants):

    Increase paid staff hours to extend library hours and outreach to

    the community.

    Purchase automated checkout system.

    Increase use of innovative technology through social networking

    sites.

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    19/23

    Denver Art Museum Library Proposed Budget

    Fiscal Year 2010-2011

    Subscriptions 325

    OCLC Services 1025

    Library Supplies 1000

    Salary 25500

    Online Catalog 1700

    Gala Fundraiser 5000

    TOTAL $34,550

    Proposed Budget

    1LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    20/23

    Monitoring and Evaluation

    The implementation of the activities of the strategic plan will be

    overseen by monthly status reports given to the Project Leader.

    Each committee sends a monthly report for review that includes

    the following:

    Summary of the goal(s)

    Progress on the objectives

    Progress completed on the action steps

    Action steps are to be completed each month and include:

    ---Who is responsible for each task?

    ---What is the task deadline?

    ---What resources does the responsible person need to

    accomplish the task?

    ---What is the anticipated cost of the step?

    Im lementation Plan

    2LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    21/23

    This strategic plan conveys what we do, who we are and what values

    we hold ourselves to on a daily basis. It takes our mission, values and goals

    and presents those ideas in written form for our constituents to look upon.

    Although this strategic plan is mapped out based on information attained in

    present time and has been developed in preparation for changes in the near

    future, the strategic planning process is ongoing and ever evolving. This

    strategic plan is set in place to lead as an example for future strategic

    planning at the Denver Art Museum Library. It serves as the framework on

    which our future planning relies and it provides a smooth transition into the

    transformation of the Denver Art Museum Library.

    Conclusions

    2LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

  • 8/8/2019 The Dam Plan Final

    22/23

    Follow-Up Strategic Plan EvaluationsDue to the existence of important long-term goals, future strategic plans are figurativelymapped out. Evaluation of this strategic plan will take place before the 2011 strategic

    plan is developed. The planning team will hold a follow-up meeting with the StrategicPlanning Consultants from Library Outreach Services, on or about January 2, 2011. The

    topics that will be covered include:

    Overall, how does everyone think the process went?

    Changes for next time?

    Were goals achieved?

    What was learned from the Monitoring and Evaluation that was held during the

    process?

    Has everyone involved remained financially comfortable since the conclusion of

    the planning process?

    REPORTING:

    ANSWERS to listed questions.

    STATS gathered at end of planning process to see how things are

    functioning.

    RECOMMENDATIONS for future planning.

    ACTIONS to be carried out in next strategic plan.

    Celebrate! The planning process is completed and the plan has been set in

    motion; it is time to celebrate that achievement.

    TBA: Celebratory Dinner to include all parties involved.

    2LI805XC Denver Art Museum Librar Strate ic Plan Jennifer Dibbern Barbara Durland Laura Olson

    Lookin Into the Future

  • 8/8/2019 The Dam Plan Final

    23/23

    Denver Art Museum Library. (2003).Denver Art Museum Library Catalog. Retrieved

    January 31, 2010. http://207.67.203.66/D60000Staff/OPAC/index.asp.

    Ferrrer-Vinent, S. (2009).Denver Art Museum Library Annual Report. Denver: Denver

    Art Museum.

    Ferrrer-Vinent, S. (2003).Denver Art Museum Library Collections Development Policy.

    Denver: Denver Art Museum.

    Ferrrer-Vinent, S. (2009).Denver Art Museum Library Budget, FY09. Denver: Denver

    Art Museum.

    Ferrrer-Vinent, S. (2006). Department Profile: Denver Art Museum Library.DAM

    ARTiculations: Staff Newsletter, 5, 1.

    McNamara, C. (2006).Field guide to nonprofit program design, marketing andevaluation. Minneapolis, MN: Authenticity Consulting.

    Stueart, R.D. and Moran, B.B. (2007). Library and information center management.

    Westport, CT: Libraries Unlimited.

    References