  • 8/17/2019 Final Report on Lakhwar Dam

    1/14

    SYNOPIS ON LAKHWAR DAM

    A project report submitted in partial fulfillment of the requirements for the award

    of the

    Diploma

    In

    Civil Engineering

    By

    AKASH KUMAR BHART!"#A$SH %A$!

     $A"&&$ KUMAR 

    %R#A$K '(!#A)

    SA)&SH M(HA$ U$#A)SURA* BHA$!AR

    'AMBHR 

    POLYTECHNIC

    DEPARTMENT OF CIVIL ENINEERIN

    !TTARANCHAL !NIVERSITY

    DEHRAD!N " #$%&&' (INDIA)

    APRIL* #&'+

  • 8/17/2019 Final Report on Lakhwar Dam

    2/14

    A,STRACT

    Hydropower plants are undoubtedly the lifeline of the nation and its de+elopment is a crucial

    concern, &+en thou-h Hydropower plants projects aim to impro+e transportation infrastructureand irri-ation and electricity ser+ices. this paper e/plains on H#!R(%(0&R %)A$TS which

    demands spatial and temporal coordination of these wor1 2ones for efficient use of the e/istin-

    H#!R(&)&3TR3T#,

  • 8/17/2019 Final Report on Lakhwar Dam

    3/14

    ACKNOWLEDEMENT

    0e are -reat full to our internal -uide %rof, Mr, Rishide+ $autiyal for his +aluable -uidance. co4

    operation. ad+ice and e+erlastin- encoura-ement throu-hout the wor1 because of which. we ha+e

     been able to prepare of this project report in the present form, 3ompletion of this project for a

    Residential Buildin- is li1e a -olden feather for me,

    !ate4

    Rishi !e+ $autiyal

  • 8/17/2019 Final Report on Lakhwar Dam

    4/14

    CONTENTS

    '- ntroduction#- !ams

    .- Types of !ams

    (i) Based on 5unction

    (ii) Based on Structure

    $- ma-es of !ifferent type of !ams

    /- )a1hwar !am

    +- History

    0- )ocation of !am

    %- Salient features

    1- 5uture aspects

    '&-References

     

    INTROD!CTION

  • 8/17/2019 Final Report on Lakhwar Dam

    5/14

    Hydropower plays a per+asi+e and critically important role in the socio4economy and

    de+elopment of any country, 0ater resource projects -enerally increase prosperity and result in

    -eneral socio economic de+elopment of the re-ion. particularly in rural areas of de+elopin-

    countries, Hydropower projects create many direct jobs and associated demands for -oods and

    ser+ices, n addition. they pro+ide infrastructures i,e,. electricity. roads. water supply and

    distribution networ1 etc,. which act as stimulus for further de+elopment and economic -rowth,

     $o dam can be built without en+ironmental costs and benefits of some 1ind, A dam becomes a

    dominant factor in the hydrolo-ical re-ime. and sets in motion a series of impacts on physical.

     biolo-ical and socio4cultural system, The construction of dam and fillin- of reser+oir causes

    substantial local chan-e in microclimate and weather, The floodin- of the re-ion has immediate

    si-nificant impacts on means of communication. historic sites. communities and local flora and

    fauna,

    DAM

    A dam is a hydraulic structure of fairly imper+ious material built across a ri+er to create a

    reser+oir on its upstream side for impoundin- water for +arious purposes, These purposes may be

    rri-ation. Hydropower. 0ater4supply. 5lood 3ontrol. $a+i-ation. 5ishin- and Recreation, !ams

    may be built to meet the one of the abo+e purposes or they may be constructed fulfillin- more

    than one, As such. !am can be classified as6 Sin-le4purpose and Multipurpose !am,

    A dam can also be used to collect water or for stora-e of water which can be e+enly distributed

     between locations, !ams -enerally ser+e the primary purpose of retainin- water. while other 

    structures such as flood-ates or le+ees 7also 1nown as di1es8 are used to mana-e or pre+ent water 

    flow into specific land re-ions,

  • 8/17/2019 Final Report on Lakhwar Dam

    6/14

    TYPES OF DAM

    !ams can be classified in number of ways, But most usual ways of classification of dams are

    mentioned below6

    (I)- ,a2e3 on 45e 67n84ion2 o6 3am* i4 8an 9e 8la22i6ie3 a2 6ollo:2;

    9, S4orage 3am2;

    They are constructed to store water durin- the rainy season when there is a lar-e flow in the

    ri+er, Many small dams impound the sprin- runoff for later use in dry summers, Stora-e

    dams may also pro+ide a water supply. or impro+ed habitat for fish and wildlife,

    :, Diver2ion 3am2; A di+ersion dam is constructed for the purpose of di+ertin- water of the ri+er into an off4

    ta1in- canal 7or a conduit8, They pro+ide sufficient pressure for pushin- water into ditches.

    canals. or other con+eyance systems, Such shorter dams are used for irri-ation. and for 

    di+ersion from a stream to a distant stora-e reser+oir,;, De4en4ion 3am2;

     !etention dams are constructed for flood control, A detention dam retards the flow in the

    ri+er on its downstream durin- floods by storin- some flood water, Thus the effect of sudden

    floods is reduced to some e/tent

  • 8/17/2019 Final Report on Lakhwar Dam

    7/14

  • 8/17/2019 Final Report on Lakhwar Dam

    8/14

    !AMS BAS&! ($ STRU3TUR& A$! !&S'$

    LAKHWAR DAM

  • 8/17/2019 Final Report on Lakhwar Dam

    9/14

    The )a1hwar hydroelectric project is proposed to be constructed on ri+er #amuna in !ehradun

    district of Uttara1hand to -enerate Hydroelectricity, The primary purpose of the project

    is hydroelectric power -eneration and it will support a ;>> M0 power station when complete,

    Under this project a :>< m hi-h dam at )a1hwar +illa-e alon- with a balancin- reser+oir at9;,?=> 1m downstream from the dam site at Katapathar is proposed, The dam has a -ross stora-e

    of =@ Mm; 7dead:>M0 of hydroelectric power, The re-ulated

    water released from the reser+oir will be balanced at Katapathar by constructin- a barra-e for 

    irri-ation and drin1in- water supply purposes,

    HST(R#

    The project was proposed way bac1 in the year 9C@? by the rri-ation !epartment of erstwhile

    state of Uttar %radesh, At that time. le-islation for mandatory &A did not e/ist in the country.

    therefore. accordin-ly only en+ironmental and forest clearance was obtained, 3onstruction wor1 

    of the project was started in the year 9C@ but unfortunately could not proceed beyond 9CC: for 

    want of funds as the state -o+ernment was under financial crunch, n these four years. major 

    wor1s relatin- to strippin- of dam site at )a1hwar and e/ca+ation for under-round powerhouse

    were ta1en up alon- with other infrastructure de+elopment wor1s such as residential colonies.

    roads. land acquisition. etc, Unfortunately. the project acti+ities remained suspended for a period

    of about 9: years till the MoU between $H%3 and the state -o+ernment of Uttara1hand was

    si-ned for completion of the project in the $o+ember :>>;, The suspension of wor1 for such a

    lon- time led to cost escalation and chan-e in -o+ernment policies which ha+e resulted in ha+in-

    a fresh transfer of necessary clearances in the name of new project proponent, See1in- a fresh

    en+ironmental clearance which incorporates en+ironmental impact assessment study alon- with

    en+ironmental mana-ement plans becomes imperati+e as per the -o+ernment policies as on date

    under &A act 7Mo&5. 9CC>?,

    LOCATION OF DAM

  • 8/17/2019 Final Report on Lakhwar Dam

    10/14

    The )a1hwar !am is a -ra+ity dam currently under construction on the #amuna Ri+er near the

    town of  )a1hwar  in !ehradun district of Uttara1hand. ndia, The study area is located between

    ;>>:@E>>F to ;>>>F $ latitude and >>=:E>>F to @>9?E>>F & lon-itude co+erin- the parts of 

    Tehri and !ehradun district of Uttara1hand,

    !am site on -oo-le earth

    https://en.wikipedia.org/w/index.php?title=Lakhwar&action=edit&redlink=1https://en.wikipedia.org/w/index.php?title=Lakhwar&action=edit&redlink=1https://en.wikipedia.org/w/index.php?title=Lakhwar&action=edit&redlink=1

  • 8/17/2019 Final Report on Lakhwar Dam

    11/14

  • 8/17/2019 Final Report on Lakhwar Dam

    12/14

    SAILENT FEAT!RES

    Under this project a :>< m hi-h dam at )a1hwar +illa-e alon- with a balancin- reser+oir at

    9;,?=> 1m downstream from the dam site at Katapathar is proposed, The dam has a -ross stora-e

    of =@ Mm; 7dead:

  • 8/17/2019 Final Report on Lakhwar Dam

    13/14

    F!T!RE ASPECTS

    9, %re4monsoon and post monsoon collection,

    :, 3apacity;, Ad+anta-e of this dam

    , !istribution of reser+oir water 

     

    REFRENCES

  • 8/17/2019 Final Report on Lakhwar Dam

    14/14

    All references are ta1en from -oo-le,