the crown estate + the homes & … park... · july 2016. wardell armstrong ... planning...
TRANSCRIPT
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
JULY 2016
Wardell Armstrong
Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom
Telephone: +44 (0)845 111 7777 Facsimile: +44 (0)845 111 8888 www.wardell-armstrong.com
Wardell Armstrong is the trading name of Wardell Armstrong LLP, Registered in England No. OC307138.
Registered office: Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom
UK Offices: Stoke-on-Trent, Birmingham, Cardiff, Carlisle, Edinburgh, Greater Manchester, London, Newcastle upon Tyne,
Penryn, Sheffield, Truro, West Bromwich. International Offices: Almaty, Moscow
ENERGY AND CLIMATE CHANGE
ENVIRONMENT AND SUSTAINABILITY
INFRASTRUCTURE AND UTILITIES
LAND AND PROPERTY
MINING AND MINERAL PROCESSING
MINERAL ESTATES AND QUARRYING
WASTE RESOURCE MANAGEMENT
DATE ISSUED: July 2016
JOB NUMBER: ST14699
REPORT NUMBER: 002
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
JULY 2016
This report has been prepared by Wardell Armstrong LLP with all reasonable skill, care and diligence, within the terms of the Contract
with the Client. The report is confidential to the Client and Wardell Armstrong LLP accepts no responsibility of whatever nature to third
parties to whom this report may be made known.
No part of this document may be reproduced without the prior written approval of Wardell Armstrong LLP.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY
ST14699
JULY 2016
CONTENTS
1 INTRODUCTION ............................................................................................................. 1
2 THE SITE, PROPOSED DEVELOPMENT & CONSIDERATION OF ALTERNATIVES ................. 4
3 ENVIRONMENTAL EFFECTS ............................................................................................ 8
4 MITIGATION ................................................................................................................ 20
5 CUMULATIVE EFFECTS ................................................................................................. 24
6 SUMMERY ................................................................................................................... 26
7 FURTHER INFORMATION ............................................................................................. 27
DRAWINGS
DRAWING TP 001 Location Plan
DRAWING TP 002 Red Line Boundary Plan
DRAWING TP 003 Framework Parameter Plan - Dacorum Borough Council
DRAWING TP 004 Framework Parameter Plan - Saint Albans City & District Council
DRAWING SK005 Illustrative Masterplan
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 1
1 INTRODUCTION
1.1 About the Project
1.1.1 The Crown Estate and the Homes & Communities Agency (i.e. the ‘Applicants’) have
submitted an outline planning application for a mixed-use development for up to 600
dwellings, a two-form entry primary school and commercial units (i.e. the Proposed
Development) upon a 24.6 hectare (ha) site (hereafter referred to as ‘the Site’) located
to the northeast of Hemel Hempstead, Hertfordshire (see Drawing TP 001 Location
plan). Detailed approval is sought for access arrangements, only, with all other matters
reserved.
1.1.2 The redline boundary of the Site includes land within the administrative boundaries of
both Dacorum Borough Council and Saint Albans City & District Council. The redline
boundary to which the outline planning applications apply is illustrated by Drawing TP
002 Red Line Boundary Plan.
1.1.3 It should be noted that any references in this document to ‘application’ should be
taken to read as ‘applications’, reflecting the fact that two identical planning
applications have been submitted; one to Dacorum Borough Council and one to Saint
Albans City & District Council. Each Local Planning Authority will determine whether
consent should be granted for the extent of the Proposed Development that falls
within its respective administrative area. The Proposed Development is illustrated by
Drawing TP 003 Framework Parameter Plan - Dacorum Borough Council and Drawing
TP 004 Framework Parameter Plan - Saint Albans City & District Council.
1.1.4 Drawing SK005 Illustrative Masterplan is included is for illustration purposes, only, and
illustrates one way in which the Proposed Development may be delivered. The
assessments that have been undertaken to inform the Environmental statement are
based upon the Proposed Development as described on the application form and
shown on the Framework Parameter Plans.
1.1.5 Accordingly, references to ‘planning permission’ should also be taken to read
‘planning permissions’, given that two planning permissions will be required for the
Proposed Development to proceed in its entirety. Both applications will be supported
by this Environmental Statement. Thus, both councils have been consulted in relation
to the Proposed Development and the Environmental Impact Assessment and
Environmental Statement.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 2
1.2 Environmental Impact Assessment
1.2.1 The Town & Country Planning (Environmental Impact Assessment) Regulations 2011
(as amended) (i.e. the ‘EIA Regulations’) require that before planning permission is
granted for certain types of development, an Environmental Impact Assessment must
be undertaken.
1.2.2 An Environmental Impact Assessment is a process that identifies the likely significant
environmental effects of a Proposed Development and, if required, identifies ways
that any significant adverse effects on the environment can be avoided, reduced or
remedied. An Environmental Statement is the product of the Environmental Impact
Assessment, intended to inform decision-making during the determination of a
planning application by presenting the key findings of the assessment.
1.2.3 Owing to the size of the Site and the nature of the Proposed Development, an
Environmental Impact Assessment was required to support the outline planning
application. The Environmental Impact Assessment was undertaken in accordance
with the criteria set out in the EIA Regulations, in respect of the Proposed
Development on the Site, as shown by the illustrative masterplan.
1.2.4 The key components of the Proposed Development are as follows:
• Up to 600 2-4 storey dwellings, including 1-2 bedroom apartments and 2-4
bedroom houses (up to 35% of which will constitute affordable housing);
• Land for Two Form Entry Primary School located upon 2.4 ha of land;
• Two-storey (Class B1 Business1 + B8 General Industry2) commercial units with car
parking located upon 1.92 ha of land at the south of the Site;
• Community provisions, including local supporting facilities centre (with tennis
courts and Multi Use Games Area) and car parking;
• Supporting access infrastructure, with principal vehicular access from south of the
Site off of Three Cherry Trees Lane and secondary access from the north of the
Site via an integrated connection with the Spencer’s Park Phase 1 development.
Employment and emergency access will also be via Cherry Tree Lane, to the east
of the Site;
• Sustainable Drainage System (SuDS), with 0.8 ha attenuation pond provision;
1 Offices, research and development of products or processes, or light industry. 2 For industrial processes other than those within Class B1.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 3
• Public open space, with a comprehensive landscape design that incorporates both
new planting and landscaping (including 5.51 ha green infrastructure); and
• Utilities provision (including gas, electricity, water and drainage).
1.2.5 The Environmental Impact Assessment was undertaken by Wardell Armstrong LLP.
The findings of this process are reported in an Environmental Statement, which has
been submitted along with the outline planning applications to both Dacorum
Borough Council and Saint Albans City & District Council and is publicly available for
anyone to review, if they wish to understand in more detail the nature and form of
the Proposed Development and the likely effects upon the environment.
1.2.6 A number of other Technical Reports and Plans have also been submitted with the
outline planning application, with pertinent information incorporated into the
Environmental Statement as appropriate.
1.2.7 The Environmental Statement is divided in to the following three parts:
• Volume 1: Main Text - This constitutes the main body of the Environmental
Statement and includes the environmental assessments, accompanying
drawings/figures/plans and an appendix of supporting supplementary data;
• Volume 2: Technical Appendices - This includes all of the standalone technical
reports that have been prepared to support Volume 1; and
• Non-Technical Summary.
1.3 What is a Non-Technical Summary?
1.3.1 This Non-Technical Summary has been prepared by Wardell Armstrong LLP on behalf
of the Applicants and provides a summary (in non-technical language) of the findings
of the Environmental Impact Assessment that are presented within the Environmental
Statement.
1.3.2 This includes the identification of likely significant effects and how any significant
adverse effects are proposed to be mitigated (i.e. avoided, reduced or remedied) by
the Applicants during the construction and operation of the Proposed Development.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 4
2 THE SITE, PROPOSED DEVELOPMENT & CONSIDERATION OF ALTERNATIVES
2.1 The Site and Surrounding Area
2.1.1 The Site is 24.6 ha in size and is situated to the northeast of Hemel Hempstead (at
Central Grid Reference: TL 0825 0924). The Site is comprised of three irregular-shaped
fields in arable cultivation. The fields are bounded by hedgerows and trees that form
woodland strips in places. There is a reservoir located to the immediate north east of
the Site boundary and a small waterbody located to the immediate west.
2.1.2 The Site is bordered by Cherry Tree Lane to the east and by Three Cherry Trees Lane
to the southwest. The Three Cherry Trees Lane Caravan Park is a traveller park located
on Three Cherry Trees Lane, to the west of the site. No Public Rights of Way (PRoW)
cross the Site, but some common land is present.
2.1.3 Within the wider environment, the Site abuts agricultural land to the east. Beyond
this, the M1 Motorway is situated approximately 0.95 kilometres (km) away at its
closest point. The Site abuts the Maylands Industrial Estate to the south and south-
west, and Hemel Hempstead Town Centre is located 4 km to the west.
2.1.4 To the north, the Site immediately abuts an area of ongoing residential development
(referred to as ‘Spencer’s Park Phase 1’) upon a circa 16.4 ha Site. The Spencer’s Park
Phase 1 Site is owned by the Homes & Communities Agency and is being developed
under licence by Barratt Homes. Following the submission of a planning application
(DBC Ref. No. 4/02351/13/RES) for a residential development of 357 dwellings,
associated amenity space, access, community facilities and a retail building, the Phase
1 Site was granted reserved matters consent on the 26th June 2015. At the time of
writing, activities associated with construction are ongoing at the Phase 1 Site (and
thereby constitute baseline conditions at the Phase 1 Site).
2.1.5 The Nickey Line is a disused railway line that runs east-west along the northern
boundary of the Spencer’s Park Phase 1 site. It forms part of Route 57 of the Sustrans
National Cycle Network (CNC), is a Recreational Path and a Permitted Bridleway.
Beyond this, there is an existing residential area and then agricultural land.
2.2 Consultation
2.2.1 Consultation was undertaken with statutory and non-statutory consultees and
members of the public, the purpose of which was to identify any sensitivities or
concerns relating to the Proposed Development that may need to be considered
within the design process and assessed within the Environmental Impact Assessment.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 5
Scoping
2.2.2 A Request for Environmental Impact Scoping Opinion was submitted to both Dacorum
Borough Council and Saint Albans City & District Council on the 28th January 2016.
Returning scoping responses (received up to the 29th March 2016) were used to inform
and amend, where appropriate, the scope of the Environmental Impact Assessment
in order to ensure that all issues and concerns were addressed during the assessment.
Pre-Application Meetings
2.2.3 A series of pre-application meetings were held to discuss various aspects of the
development proposals for the Site.
Meeting with Thames Water & Barratt Homes
2.2.4 Three meetings were held between Thames Water, Barratt Homes, Mott MacDonald,
the Homes & Communities Agency and Wardell Armstrong LLP in relation to
integrating the drainage strategies for the proposed Phase 2 mixed-use development
and the neighbouring Phase 1 residential development.
Public Consultation
2.2.5 A public consultation was held at the Woodhall Farm Community Centre on Friday 26th
February 2016. Three sessions were held over the course of the day, comprising of
two preview sessions and one open public session. The feedback received from this
event enabled the design to evolve in order to address local issues and concerns.
2.3 Consideration of Alternatives
2.3.1 A ‘Do Nothing’ scenario was considered that assumes no development takes place and
that the Site remains as agricultural land. Whilst the ‘Do Nothing’ scenario would not
introduce any new significant environmental effects, it would not help to address the
need for more housing and additional school provisions, nor provide the ecological
enhancements that have been incorporated in to the design proposals. As such, the
‘Do Nothing’ was discounted.
2.3.2 In addition to the ‘Do Nothing’ scenario, consideration was given to alternative sites
within the locale. However, the Site has been identified by both Dacorum Borough
Council and Saint Albans City & District Council as a Site for strategic development. As
such, utilising an alternative Site was discounted.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 6
2.4 Design Evolution
2.4.1 The Spencer’s Park Phase 2 Framework Parameter Plans have been designed to avoid
as many likely significant adverse effects as possible, whilst providing as many
potential beneficial enhancements as possible. To this end, the design proposals have
evolved over the course of the design process.
2.4.2 Throughout the design process, the design proposals were influenced by the following
primary principles:
• Improve access and movement for pedestrians, cyclists and vehicles;
• Create public open spaces;
• Development of character areas;
• Create logical street hierarchy; and
• Provide positive spatial experience.
2.4.3 Following the public consultation event in February 2016, the design proposals were
amended to reflect the views of local residents. This included the following key points:
• The creation of a design that is sympathetic to the landscape character of the locale
and incorporates green infrastructure, new planting, open space and buffer zones;
• An appropriate housing density that permits sufficient standoff distances and
buffer zones;
• The incorporation of pedestrian, cycleway and public transport provisions in order
to promote alternative (sustainable) means of transport;
• The retention of as much existing border vegetation as possible and the
incorporation of new planting in order to reduce intervisibility;
• The retention of existing habitats of ecological value and enhancement via new
planting to increase onsite habitat diversity/value, along with the incorporation of
green infrastructure to ensure connectivity with the wider area; and
• Local highway infrastructure improvement recommendations.
2.5 Development Timetable
2.5.1 It is anticipated that, subject to outline planning consent being granted in late
2016/early 2017, the Site will be marketed in early to mid-2017 and a preferred
developer selected by late 2017.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 7
2.5.2 The land within the Site that is owned by The Crown Estate and the Homes &
Communities Agency will be developed by a reputable housing developer. At this
stage, the method of disposal has yet to be confirmed. Based upon the timescales
above, it is anticipated that (phased) construction of the development would
commence in late 2018. Depending upon market conditions at the time, it is
anticipated that the first (50-100) dwellings would be occupied by 2019. Depending
upon the number of units built per annum, final completion is expected around 2024.
2.6 Cumulative Effects
2.6.1 The EIA Regulations state that an Environmental Impact Assessment must include a
description of the likely significant effects of the Proposed Development, including
consideration to possible cumulative effects. When considering potential significant
cumulative effects, the assessments have (where appropriate) considered:
• Intra-cumulative effects (i.e. those occurring as a result of the proposed
development in isolation); and
• Inter-cumulative effects (i.e. those occurring as a result of the proposed
development in combination with other development).
2.6.2 For the purpose of considering inter-cumulative effects, ‘other developments’ include:
• Existing, operational developments (considered as part of the baseline);
• Developments under construction (considered as part of the baseline);
• Developments with planning consent, but construction has yet to start; and
• Developments that are the subject of a valid planning application that have yet to
be determined.
2.6.3 The Environmental Impact Assessment considered the ‘other developments’ provided
by Dacorum Borough Council, only. Whilst requests for other developments were also
made to Saint Albans City & District Council, none were received. As such, a search for
appropriate other developments that could (in combination with the Proposed
Development) result in likely significant cumulative effects was undertaken by Wardell
Armstrong on the 21/07/16 using Saint Albans City & District Council’s online planning
application search facility. The search found no other developments that would result
in likely significant cumulative effects. Thus, no other developments within the
administrative boundaries of Saint Albans City & District Council were considered.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 8
3 ENVIRONMENTAL EFFECTS
3.1 Introduction
3.1.1 The effects of the Proposed Development on the environmental assets of the Site and
the surrounding area that are likely to be significant have been assessed. Where
required, measures intended to avoid, reduce or remedy any significant adverse
effects have been included within the design and development proposals.
3.1.2 Unavoidable adverse effects on nearby existing residents may arise during the
construction works, including increases in noise levels and the generation of dust from
activities associate with construction and the presence of construction traffic. To
mitigate such effects, a Construction Environmental Management Plan will be
prepared (in agreement with Dacorum Borough Council and Saint Albans City &
District Council) and the Principal Contractor will sign-up to the Considerate
Constructors Scheme. Together, these will set-out the management measures that will
be adopted and implemented during the construction of the Proposed Development
in order to avoid and manage any adverse construction effects on the environment
and the local community. Regular liaison with the local community will also be
undertaken (as necessary) throughout the construction period.
3.1.3 The following provides an overview of the environmental assessments undertaken
during the Environmental Impact Assessment and detailed within the Environmental
Statement.
3.2 Air Quality
3.2.1 The effects on air quality resulting from the Proposed Development during
construction and operation have been assessed. Specifically, the assessment
considered the likely significant effects of dust and fine particulate matter associated
with construction and road traffic emissions associated with the operational phase of
the Proposed Development.
3.2.2 The Site is not located within an existing Air Quality Management Area; the closest are
located at approximately 3.5km to the south east and 4km to the south. Background
concentrations of particulate matter have been obtained from the 2011-based default
concentration maps provided by the Department for Environment, Food & Rural
Affairs. These show that pollutant concentrations at the Site and the surrounding area
are well below the relevant Air Quality Objectives, which is expected given the edge-
of-town location of the Site. Air dispersion modelling has also been undertaken to
consider baseline pollutant concentrations at nine existing sensitive receptors.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 9
3.2.3 The earthworks and construction activities during the construction of the Proposed
Development could result in dust soiling on localised roads and impact upon human
health. Mitigation measures are required to ensure that the dust from construction
activities are not significant. In that regard, a Dust Mitigation Plan will be prepared
and adopted for the Site as part of a Construction Environmental Management Plan.
With these mitigation measures in place, there is likely to be a direct, temporary,
medium-term effect on human receptors that is not significant.
3.2.4 Air dispersion modelling has also been undertaken to assess the effect of traffic
generated pollutants concentrations as a result of the Proposed Development at the
nine existing sensitive receptor locations. This assessment has considered the year
2015 with and without development. This has been repeated for six proposed
sensitive receptor locations, considered representative of proposed residential areas.
The predicted pollutant concentrations at the proposed sensitive receptors and
existing receptor locations are below the relevant Air Quality Objectives. As a result,
it is not considered necessary to recommend mitigation measures. However, the
effects on existing receptors can be reduced further. It is understood that a Travel Plan
will be put in place to promote sustainable forms of transport. With mitigation
measures in place, there is likely to be a direct, permanent, long-term effect on
receptors that is not significant.
3.3 Archaeology & Cultural Heritage
3.3.1 The potential effects of the Proposed Development on the archaeological and cultural
heritage assets of the Site and the surrounding area have been assessed. A desktop
study was undertaken to establish the presence of heritage assets within the Site and
up to 1km from its boundary, followed by a walkover survey in September 2015. The
Historic Environment Record was consulted for entries within a 1km search area,
which revealed there are no designated heritage assets present within the boundary
of the Site. Four Grade II Listed Buildings are recorded within 1km of the Site.
3.3.2 With regards to archaeological remains, both the Historic Environment Record and the
previous archaeological works undertaken at the Spencer’s Park Phase 1 Site and the
widening of the M1 (located approximately 1km east of the Site) were consulted. A
geophysical survey was undertaken at the site to identify anomalies and was followed
by trial trenching to validate the geophysical survey. This indicates that the landscape
was utilised from the Mesolithic period onwards. However, it was not until the Late
Bronze Age/Early Iron Age that settlement/occupation became established within the
landscape. A Late Iron Age/Roman settlement was recorded at the Spencer’s Park
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 10
Phase 1 Site. Whilst the fieldwork undertaken within the Site did not record any
features of this date, a number of ditches and pits/postholes thought to be associated
with a field-system were undated and could be associated with the recorded
agricultural activity.
3.3.3 The Proposed Development has the potential to cause direct and indirect impacts to
heritage assets. Direct impacts may be caused by ground disturbance and indirect
impacts may be caused by changes in the setting of a given heritage asset (i.e. four the
Grade II Listed Buildings).
3.3.4 The likely importance of the archaeological remains at the Site is low and there would
be a major magnitude of change from the baseline as a result of the Proposed
Development. Therefore there is likely to be a direct effect on archaeological remains
that will be not significant.
3.3.5 Notwithstanding this, the potential for archaeological remains still exists and, due to
the likely importance and dispersed nature of the potential archaeological remains,
an archaeological watching brief may be suitable. If additional fieldwork is necessary,
it will be agreed with the Planning Archaeologist at both Hertfordshire County Council
and Saint Albans City & District Council. If a watching brief is necessary, the loss of any
buried archaeological remains would be fully mitigated. The magnitude of change
from the baseline would reduce, but the likely effect would remain not significant.
3.3.6 The effect of the Proposed Development on the cultural heritage assets has also been
assessed and, due to the lack of intervisibility between the Site and the four Grade II
Listed Buildings, it is considered that the likely effect would be not significant.
3.4 Ecology & Wildlife
3.4.1 The likely significant effects of the Proposed Development in terms of ecology and
wildlife in the context of the Site and surrounding area have been assessed. In
particular, the assessment has considered the effect of construction and operation on
statutory and non-statutory designated nature conservation sites and protected and
notable habitats and species (including UK and Local Biodiversity Action Plan priority
habitats and species).
3.4.2 A desk study was undertaken to identify any statutory designated sites up to 5km from
the Site and non-statutory designated sites up to 2km from the Site. This identified
nine non-statutory sites within 2km and one statutory site within 5km of the Site.
Following a review of the sites, all but one were scoped-out of the assessment (as
unaffected) and were not considered within the Environmental Impact Assessment.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 11
The one site that was considered was the Nicky Way Dismantled Railway Local Wildlife
Site located 100m north of the Site.
3.4.3 An Extended Phase 1 Habitat Survey was undertaken at the Site on the 28th May 2015.
The Extended Phase 1 Habitat Survey was then supplemented by the following seven
surveys (the results of which are detailed within standalone reports included within
Volume 2 Technical Appendices of the Environmental Statement):
• Badger;
• Bat;
• Breeding Birds;
• Dormouse;
• Great Crested Newts;
• Hedgerows; and
• Reptile.
3.4.4 Table 3.1 summarises the likely significant effects of the Proposed Development on
ecological receptors of the Site and the surrounding area.
Table 3.1 Summary of Ecological Effects
Receptor Construction
Effects
Operation
Effects Significance Mitigation
Residual
Effect
Native species-rich
hedgerows (with/
without trees).
Loss of approx.
360m of existing
hedgerow.
None. Significant
adverse prior
to mitigation.
Retained existing hedgerow,
plus new planting as part of
proposed Green Infrastructure.
Not
Significant
Broad-leaved
semi-natural
woodland.
Loss of existing
trees.
None. Significant
adverse prior
to mitigation.
Retained existing woodland,
plus new planting as part of
proposed Green Infrastructure.
Not
Significant
Bats. None. Disturbance/loss
or destruction of
roosts whilst
undertaking
management on
trees.
Significant
adverse prior
to mitigation.
Works will be undertaken in
accordance with the protocol
detailed within the Bat Surveys
for Professional Ecologists:
Good Practice Guidelines
(Collins, J., 2016).
Not
Significant
Breeding Birds. Damage/loss of
nests and eggs
during site
clearance works.
None. Significant
adverse prior
to mitigation.
Any works that require
vegetation clearance will be
timed to avoid the bird nesting
season (March to August,
inclusive).
Not
Significant
3.4.5 No other activities associated with the operation of the Proposed Development will
result in significant adverse effects and, as such, no further mitigation is required.
3.4.6 With regards to the Nicky Line Dismantled Railway Local Wildlife Site, unmanaged
access (by future residents) could result in significant adverse effects due to increased
erosion of border vegetation alongside the existing pedestrian route by residents
cutting through the vegetation in order to access the path. However, as resident
access will be managed via design proposals associated with the neighbouring
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 12
Spencer’s Park Phase 1 development (4/02351/13/RES), this cumulative effect is
mitigated and the residual effect will be Not Significant.
3.5 Ground Conditions (Contaminated Land)
3.5.1 The likely significant effects of the Proposed Development in terms of ground
conditions in the context of the Site and surrounding area have been assessed. In
particular, effects pertaining to soil and water contamination, ground gas and effects
of ground conditions upon buried structures.
3.5.2 A desk top study was undertaken to identify the ground conditions at the Site and 1km
from its boundary. Historical mapping indicates that the Site has remained largely
unchanged since 1883, being occupied by agricultural land with only minor changes to
the field layouts; one structure constructed and subsequently demolished. Whilst
generally agricultural, historical land use in the wider area surrounding the Site
includes some industrial development immediately south. This includes the Buncefield
Oil Storage Depot, which suffered a fire and a series of explosions in 2005.
3.5.3 A walkover inspection was undertaken on the 5th January 2016, during which a large
(approx. 10m deep) depression was recorded adjacent to the northern boundary. This
is currently overgrown and is assumed to be the remnants of a small pond. No
evidence of made ground (i.e. man-made ground, such as rubble overlaid with earth
or areas of concrete) was found.
3.5.4 A Preliminary Site Investigation was subsequently undertaken to assist in defining the
baseline conditions and revealed that the Site has a relatively low risk of soil
contamination. Whilst a single record of naturally occurring nickel was identified and
it is assumed that other spots may be present, these are not considered to represent
a risk to human health.
3.5.5 The likely significant effects have been assessed for both construction and operation
and are summarised in Table 3.2.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 13
Table 3.2: Summary of Effects - Ground Conditions
Receptor Likely Significant Effect Without Mitigation
Significance of Residual (i.e.
with Mitigation) Effects
Construction Operation Construction Operation
Human
health
The critical human health receptor in relation to construction impacts is
construction workers. Close working with soils and dust, etc. has the
potential construction workers to come into contact with contaminants.
There are identified potential sources of contamination (nickel spots, the
Buncefield incident and agricultural land use) at the Site. The likelihood for
soils contamination to present a long-term health risk is present. However,
there is no apparent pathway between contaminants and human health due
to the depth of groundwater levels at the Site and limited activities during
the operation that are likely to mobilise contaminants.
Not
significant
Not
significant
Ground gas There is the potential for gas to ingress into buildings/structures
associated with construction.
There is the potential for gas to ingress into new buildings. Not
significant
Not
significant
Controlled
waters
Ground disturbance during construction provides increased potential for
contaminants leaching in to the groundwater, including the potential
mobilisation of contaminants associated with the Buncefield incident.
Whilst there are site-derived sources of contamination, current conditions at
the Site limit the potential pathways. Also, activities associated with
operation are unlikely to present a risk of mobilising existing groundwater
contamination at depth.
Not
significant
Not
significant
Water
supply
pipes -
Both identified (and potential) contamination sources indicate that there is
the potential for soil contamination to be present that may pose a risk of
contaminant leaching into water supply pipes. However, the risk is
considered to be low.
-
Not
significant
Use and
storage of
fuels and
chemicals
Activities associated with construction have the potential to introduce
new contamination sources that may affect human health and controlled
waters. However, working best practice would include control measures
as standard.
-
Not
significant -
Concrete
structures -
Ground contamination could present a risk to underground concrete
structures. -
Not
significant
Ground
stability
The geology of the area is chalk based and there is the potential for
sudden ground movement associated with chalk dissolution.
The geology of the area is chalk based and there is the potential for sudden
ground movement associated with chalk dissolution.
Not
significant
Not
significant
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 14
3.6 Landscape
3.6.1 The likely significant effects of the Proposed Development in terms of landscape and
visual effects in the context of the Site and surrounding area have been assessed.
Specifically, the assessment considered likely significant effects on the character of
the local landscape as a result of the loss of agricultural land and skyline features (i.e.
trees) to development, and local to medium distance views towards the Site.
3.6.2 The Site is visually well contained as it is bounded by trees along Cherry Tree Lane to
the east and by trees to along Three Cherry Trees Lane the south. To the west, the site
is bounded by the Three Cherry Trees Caravan Site and by the Spencer’s Park Phase 1
development and a reservoir to the north and north-west, respectively.
3.6.3 The Nickey Line is a disused railway line located approximately 100m north of the Site
boundary that forms part of National Cycle Route 57 and is a long distance footpath.
In addition, there are Grade II listed buildings present to the north-east of the Site that
include a timber-framed barn.
3.6.4 The Site is situated within National Character Area 110: Chilterns. The landscape
character at a district level is described within Dacorum Borough Council’s ‘Landscape
Character Assessment, Evaluation and Guidelines’, Landscape Character Area 96:
Upper Ver Valley and Landscape Character Area 94: Buncefield Plateau.
3.6.5 Whilst seven viewpoints were initially selected to represent the range of typical views
towards the Site from public viewpoints, Saint Albans City & District Council requested
that an additional three viewpoints be assessed. Of these ten, it was considered that
the Proposed Development had potential to result in significant effects at four
viewpoints, which were assessed further.
3.6.6 Mitigation measures have been incorporated in to the Illustrative Landscape
Masterplan for the Proposed Development. These include, but are not limited to, the
provision of green space, tree and hedgerow panting at the boundary of the Site and
planting adjacent to the central spine of the Proposed Development. Residual effects
are those remaining once mitigation planting has matured (15 years).
3.6.7 Owing to the physical and visual containment of the Site, the influence of the urban
edge of Hemel Hempstead and other built features/ visual detractors, the residual
landscape effect of the Proposed Development would be not significant.
3.6.8 With mitigation in place, the Proposed Development will result in a significant residual
effect on the character of the Site and its immediate surroundings due to the loss of
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 15
agricultural land/ vegetation in order to accommodate new vehicular accesses.
However, once mitigation planting has matured, it will reinstate a green and planted
edge around the perimeter of the Site, as well as create green focal features along
new access roads, which will further soften the appearance of the Proposed
Development. The residual visual effect, on the four aforementioned viewpoints will
be not significant.
3.7 Noise & Vibration
3.7.1 The effects of noise and vibration resulting from the Proposed Development during
construction and operation have been assessed. The assessment has taken account of
noise as a result of earthworks and construction activities and vibration from
earthworks, construction and road traffic at existing and proposed sensitive receptors,
as well as industrial noise at existing and proposed sensitive receptors.
3.7.2 An attended noise survey was undertaken across the Site on the 8th and 9th September
2015 to assess the current ambient and background noise levels at existing and
proposed sensitive receptor locations, and identified the following sources of noise:
• Road Traffic Noise: Noise from the M1 motorway was audible at all monitoring
locations, particularly at night. Noise from road traffic on Three Cherry Trees
Lane was audible in the southern part of the Site.
• Industrial Noise: Noise from gates at the premises of ‘Framework Specialists’
was audible during both the daytime and night-time.
• Other sources: Birdsong was audible at all locations throughout the
monitoring period.
3.7.3 The receptors identified as likely to be sensitive to noise/vibration associated with
construction, including properties on Hunter’s Oak, Cherry Tree Lane, Lilly Lane and at
the Cherry Tree Caravan Park. Receptors likely to be sensitive to the Proposed
Development during operation include properties on Cherry Tree Lane, Cherry Tree
Court, Three Cherry Trees Lane, Hunters Oak, Phoenix Walk and Redbourn Road.
3.7.4 Activities associated with construction have the potential to generate short-term
increases in noise levels, and the use of plant machinery and pilling have the potential
to give rise to ground-borne vibration. With the implementation of best working
practice and restriction on working hours, the noise and vibration effects associated
with construction of the Proposed Development are likely to be not significant.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 16
3.7.5 The current and future traffic noise levels at nine existing sensitive receptor locations,
both with and without the development, have been predicted and it is considered that
increases in noise levels as a result of the Proposed Development will likely have a
direct, permanent, long-term effect that will be not significant.
3.7.6 Both existing and future road traffic noise levels at proposed residential receptors
have been assessed and the incorporation of mitigation measures into the Site design
will ensure that the required internal daytime/night-time noise levels are achieved.
With the mitigation in place, the effect of road traffic noise levels upon existing and
potential receptors is likely to be not significant.
3.7.7 The effect of the commercial element of the Proposed Development upon existing and
proposed sensitive receptors has been assessed. With appropriate mitigation
measures incorporated into the final Site design at the detailed design stage, there is
likely to be a direct, permanent, long-term effect that will be not significant.
3.8 Socio-Economics
3.8.1 The likely significant effects of the Proposed Development in terms of social,
economic, community and health related receptors in the context of the Site and
surrounding area have been assessed. A desk top study of primary data sources was
undertaken to establish the socio-economic baseline and the study area was identified
as the Ward of Adeyfield East, and the Districts of Dacorum and Saint Albans.
3.8.2 The health of people in Dacorum and Saint Albans is generally better than the England
average, with life expectancy for both men and women being higher than the England
average. However, 13.9% and 8.2% of children live in poverty in Dacorum and Saint
Albans, respectively. Whilst Dacorum has low levels of deprivation (with the borough
being within the 20% least deprived local authority areas in the country), deprivation
is evident in several small areas. Unemployment within the ward is higher than the
two Districts, but lower than the national average. Hemel Hempstead and Dacorum
sit within the M1/M25 Growth Area identified in the Strategic Economic Plan for
Hertfordshire. In 2015 it was confirmed that the Site would be designated an
Economic Zone, which will focus on the environmental technology sector.
3.8.3 The nearest Community Centre is at Woodhall Farm, approximately 1km to the north-
west of the Site. The centre is used for committee meetings, training, interview
sessions and informal group meetings. The Main Hall has a capacity of 120 and is used
for exercise, playgroup, Scouts and dance classes. The nearest library is the Hemel
Hempstead Central Library, which is located in the Town Centre. There is forecasted
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 17
to be a deficit of reception places from 2016 in the north and north-east Hemel
Hempstead education areas, plus a town-wide deficit of capacity in secondary school
provision from September 2019.
3.8.4 The assessment has considered the effects of the Proposed Development during
construction on the following socio-economic indicators: Direct Employment; and
Indirect and Induced (i.e. employment supported by the wage spending of
construction and supply chain workers) employment.
3.8.5 The assessment also considered the effects of the Proposed Development during
operation on the following socio-economic indicators:
• Increase in housing stock;
• Direct on-site employment;
• Indirect and induced employment;
• Effects on the demand for pre-school, primary and secondary education;
• Effect on the demand for GPs and dentists;
• The provision of open space, recreation and leisure facilities; and
• Spending within the local economy from the new community.
3.8.6 During construction, the likely effect of the Proposed Development on direct, indirect
and induced employment will be positive at a level that is significant (positive).
3.8.7 During operation, the Proposed Development will result in positive effects of
moderate significance upon onsite employment and housing provision, of minor to
moderate significance upon education provisions, of minor significance upon open
space, recreation and leisure facility provisions, and of negligible to minor significance
upon indirect and induced employment within the locality and spending within the
local economy, and local medical facilities (which are currently accepting new patients
and will be supplemented via developer contribution). Thus, there will be significant
(positive) effects in relation to housing provision, direct onsite employment,
education provision and GP facilities.
3.9 Soils & Agricultural Land
3.9.1 A desk study and a detailed soil survey were undertaken to ascertain the existing
baseline conditions at the Site and identified the agricultural land present and the
existing soils resource as sensitive receptors.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 18
The Site is classified as agricultural land of good to moderate quality. Climate is not a
limiting factor to agricultural land quality, but that the amount of stones present
within the soil is. Approximately 7.9ha of the land present is classified as Agricultural
Land Classification Grade 3a Best and Most Versatile, 30ha is Grade 3b non-Best and
Most Versatile and 4.46ha is non-agricultural land.
3.9.2 The Proposed Development will result in the loss of 7.9 ha of Best and Most Versatile
land. However, as a loss of BMV land exceeding 20ha is considered to be significant,
the loss of 7.9ha is considered to be not significant. Whilst the effect of the loss of
existing soils resources will be moderate adverse, the effect will be reduced through
mitigation measures. With these in place, the likely effect on the soils resource will
also be not significant.
3.10 Traffic & Transport
3.10.1 The likely significant effects of the Proposed Development in relation to traffic and
transport in the context of the Site and surrounding area have been assessed for both
construction and operation. A standalone Transport Assessment has been prepared
and submitted as part of the planning application.
3.10.2 A desk based study was undertaken in combination with field surveys (conducted in
September 2014 and June 2015) to establish the transport infrastructure present
within the area surrounding the Site, and to obtain traffic data in order to identify the
existing and predict future baselines. It is anticipated that the Proposed Development
will be constructed within approx. eight years, during which time the level of
construction traffic will vary and there will be a mix of both construction and
operation-generated traffic.
3.10.3 The assessment has considered construction and operation phases separately. The
construction process will require a range of skills from general labourers and skilled
operatives through to professionals and management. It is envisaged that workers will
originate from a variety of sources, with the core coming from within Dacorum
Borough and Saint Albans. It is anticipated that workers would arrive onsite between
the hours of 06:00 and 10:00 and depart between the hours 14:00 and 18:00. It is
estimated that the volume of construction workers traffic will be less than the
operation-related traffic.
3.10.4 The Site is located in close proximity to the Strategic Road Network (i.e. the M1 and
the A414). Contractors will be required to adhere to routing agreements along with
measures included within the Construction Traffic Management Plan. Therefore,
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 19
Heavy Duty Vehicles associated with the construction works would only affect main
roads. Table 3.3 summarises the likely traffic effects during construction.
Table 3.3: The likely traffic effects during the construction of the Proposed Development
Effect Summary
Effect on
Road Users
Activities associated with construction would result in increased volumes of traffic on the
local network. The Site is located close to strategic road networks and construction traffic
will adhere to specified routes. It is, therefore, considered that the Proposed Development
will have a temporary, long-term effect on road users that will be not significant.
Effect on
Pedestrians
& Cyclists
As the routes to be used by construction vehicles are currently used by a small number of
pedestrians/cyclists, it is considered that construction-related traffic will have a temporary,
long-term effect on pedestrians and cyclists that will be not significant.
3.10.5 The operational assessment adopted the assumption that the Proposed Development
will be completed by 2024. As such, it considered traffic-related effects as a result of
the Proposed Development for both the Future Baseline 2024 and the Future Baseline
‘With Development’. In addition, at the request of Dacorum County Council, a
sensitivity test was also undertaken (i.e. Future Baseline plus Sensitivity Test 2024)
that considered the Maylands Gateway Site once it is fully complete.
3.10.6 The potential traffic-related effects include: Severance (a measure of the increase in
delay to pedestrians crossing a road); Driver delay; Pedestrian Delay; Pedestrian
Amenity; and Accidents and Safety. The assessment considered four key locations out
of twenty-five locations that were considered to have the potential to be affected by
the Proposed Development.
3.10.7 The design proposals seek to reduce the requirement to travel out of the Proposed
Development for amenities by providing a local shop, primary school and leisure
facilities within the Site. The design proposals also encourage sustainable transport
methods and links, including links to Maylands Industrial Area and the Nickey Line
footpath/cycle route. In addition, existing highway improvements have been
identified to which a contribution will be made; thereby supplementing the
contributions previously made by the Spencer’s Park Phase 1 development.
3.10.8 A summary of the residual operational effects is provided in Table 3.4.
Table 3.4: Traffic Effects as a Result of the Proposed Development during Operation
Effect Significance of Effect with Mitigation in Place
Main Assessment Sensitivity Test
Severance Not Significant Not Significant
Driver Delay Not Significant Not Significant
Pedestrian Delay Not Significant Not Significant
Pedestrian Amenity Not Significant Not Significant
Accidents and Safety Not Significant Not Significant
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 20
4 MITIGATION
4.1.1 The Proposed Development includes measures that are intended to avoid, reduce or
remedy any likely significant adverse environmental effects and to increase any
environmental benefits. This has been achieved by ensuring that likely significant
adverse effects are ‘designed out’ as far as is practicably possible. However, where
effects cannot be reduced or removed through the design process, these are
addressed through a combination of working methods/techniques, best working
practices or specific strategies/action plans. A summary of the proposed mitigation
measures is provided in Table 3.5.
Table 3.5: Mitigation Measures Intended to Avoid, Reduce or Remedy Adverse Effects and to Enhance Beneficial Effects
Topic Construction Operation (Completed Development)
Air Quality Preparation and adoption of a Dust Mitigation Plan as
part of the Construction Environmental Management
Plan. This will include practical measures to be
incorporated as part of a best working practices in
accord with current guidance recommendations.
Dust and air quality complaints would be recorded
and appropriate measures taken to identify causes
and reduce emissions in a timely manner. Exceptional
incidents would be recorded made available upon
request to Dacorum Borough Council and Saint
Albans City and District Council.
As the predicted pollutant concentrations within the
Proposed Development are below the relevant
national Air Quality Objectives, it is not necessary to
recommend measures to mitigate air quality within
the Site. However, whilst the level of effect at the
existing sensitive receptors is not significant, the level
of effect will be reduced via the implementation of a
Travel Plan promoting the use of sustainable forms of
transport.
Archaeology &
Cultural
Heritage
Owing to the likely importance and dispersed nature
of the potential archaeological remains, it is believed
that an archaeological watching brief may be
appropriate. The scope and extent of this would be
agreed in advance with the Planning Archaeologists
for Hertfordshire County Council and Saint Albans
City & District Council. Any additional works in excess
of this would also be agreed in advance with the
Planning Archaeologists.
None.
Ecology &
Wildlife There will be a loss of some boundary and internal
vegetation and habitats during construction. The loss
of native species-rich hedgerows and broad-leaved
semi-natural woodland will be mitigated via new
planting and the inclusion of appropriate working
best practice guidance within the Construction
Environmental Management Plan (e.g. any works
that require vegetation clearance will be timed to
avoid the bird nesting season of March to August,
inclusive. Where this is not possible, areas of
vegetation clearance will first be checked for the
presence of occupied nests by a suitably qualified
ecologist 24-hours in advance of any affecting
works.). Advice will be given (and adopted) to ensure
accordance with legislation for nesting birds.)
With regards to native species-rich hedgerows (with
and without trees), the green infrastructure included
within the design proposals both retains existing and
provides new buffers to existing woodland and
retained hedgerow habitats; thereby providing
enhanced ecological connectivity and habitat value at
the Site. New hedgerow planting will also be provided
along the southern edge of the Site, where it fronts
onto Three Cherry Trees Lane, along key road
frontages, amongst proposed residential housing and
delineating private from public space.
With regards to broad-leaved, semi-natural
woodland, the green infrastructure/tree planting
included within the design proposals retains existing
and provides new buffers to the existing woodland;
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 21
thereby providing enhanced ecological connectivity
and habitat value at the Site.
The location of pedestrian routes through the
woodland strips will be informed by an Arboricultural
Impact Assessment that will be undertaken at the
detailed design stage, with routes chosen to minimise
any tree removal.
Any works that require vegetation management will
be timed to avoid the bird nesting season of March to
August, inclusive. Where this is not possible, affected
vegetation will first be checked for the presence of
occupied nests by a suitably qualified ecologist 24-
hours in advance of any affecting works. Similarly,
prior to any affecting works, a check for likely
presence of roosting bats will be undertaken. Both of
these will be included within the Landscape
Environmental Management Plan for the Site.
Ground
Conditions
(Contaminated
Land)
Mitigation measures will include:
• The use of Personal Protection Equipment, good
housekeeping (i.e. correct storage of fuel and
chemical containers), adoption of Construction
and Environmental Management Plan and the
appropriate disposal of used containers will be
used to reduce the risks to human health during
construction.
• Undertake detailed intrusive site investigations
in relation to gas monitoring, ground
investigations, groundwater risk assessment
and leachability testing of known contaminants
prior to construction. The necessary mitigation
requirements will be designed in accordance
with the results of the site investigations.
Mitigation measures will be designed in accordance
with the results of the additional intrusive
investigations. If required, a remediation strategy will
be prepared and agreed with the regulator.
Landscape None. The layout, retained vegetation, proposed
landscaping, new planting and green infrastructure of
the design proposals seeks to minimise landscape
and visual effects by:
• Integrating the Proposed Development into its
surroundings and providing a strong green
framework and attractive setting;
• Retain the majority of the existing vegetation
framework where practical, beneficial and
appropriate; and
• Adopt a long-term management regime that will
enhance the biodiversity of the Site.
Noise &
Vibration Mitigation measures in relation to noise as a result of
construction include the following:
• Adoption of best working practices,
implemented via the Construction
Environmental Management Plan;
Mitigation measures in relation to both operational
road traffic noise and industrial noise at proposed
sensitive receptors include the following:
• Noise attenuation through building facades and
appropriate glazing; and
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 22
• Implementation of set working hours during the
week and at weekends, and adherence to time
any limits that are imposed on noisy works by
the local authorities;
• Site staff will be made aware that they are
working adjacent to a sensitive area and will
avoid all unnecessary noise;
• Temporary screening of noise sources by will be
employed when works are taking place within
close proximity to sensitive receptors;
• Avoidance of multiple (noisy) operations
occurring simultaneously in close proximity to a
sensitive receptor;
• Ensure engines are turned-off whenever
possible and that all machinery is regularly
maintained to control noise emissions; and
• Advance notification and details of any night-
time working requirements provided to the
local authorities.
Mitigation measures in relation to vibration as a
result of construction include the following:
• Where reasonably practicable, plant and or
methods of work likely to cause significant
levels of vibration at the receptors identified
will be replaced by less intrusive plant/methods
of working;
• Vibration isolation will be considered for any
viable stationary plant (e.g. compressor or
generator) located near to a sensitive receptor;
and:
• Consideration of the most appropriate vibration
techniques in order to minimise the potential
for piling-related vibration. As the construction
programme and methodologies become more
defined, vibration will be reconsidered and a
detailed strategy developed.
• The specific orientation of dwellings and/or
inclusion of close boarded barrier fencing to
screen garden areas;
Mitigation measures in relation to the proposed
mixed-use premises will be identified and agreed at
the detailed design stage.
Socio-
Economics As the likely significant effects of the Proposed
Development during construction will be positive,
there is no requirement for mitigation measures.
However, in order to optimise the generation of
direct, indirect and induced employment, the
following measures are possible:
• Direct employment - Apprenticeships during the
construction phase, including linkages to local
training initiatives and/or voluntary agreements
relating to local recruitment; and
• Indirect and induced employment - Voluntary
agreements relating to local procurement of
local materials, trades and services.
As the likely significant effects of the Proposed
Development during construction will be positive,
there is no requirement for mitigation measures.
However, in order to optimise direct onsite
employment during operation, the following
measures are possible:
• Voluntary agreements relating to local
recruitment.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 23
Soils &
Agricultural
Land
Mitigation measures to avoid, reduce or remedy the
effects of the Proposed Development on the soils
resource include:
• The creation of a soils resource plan that will be
incorporated into the working strategy;
• The handling of soil resources only when
sufficiently dry and (where possible) limiting soil
operations to between April and September;
• The stripping, handling and storage of topsoil
separately from subsoil;
• Minimising the number of plant movements
across topsoil in order to minimise compaction
and retain soil structure; and
• Appropriate seeding of soil storage of any
mounds that are required onsite for a period
longer than six months.
The land will not be in agricultural production, but the
nature of the Proposed Development will allow for
soil reuse within the landscaping of gardens and open
spaces.
Traffic &
Transport In order to mitigate the potential effects of
construction traffic the developer will ensure that a
Construction Traffic Management Plan will be
implemented by the contractor(s). This will include
details on the following, where appropriate:
• Phasing of construction;
• Access arrangements for workers and for Heavy
Duty Vehicles;
• Routing restrictions (i.e. avoiding inappropriate
routes through villages or along narrow lanes
that do not have the capacity to accommodate
large vehicles);
• Vehicle sizes required and schedule of use;
• Necessary highway works;
• Traffic management;
• Parking and loading arrangements;
• Pedestrian and cyclist safety;
• Proposed working hours; and
• Start/end dates for each phase of construction.
The design proposals are intended to minimise the
number of trips out of the Site by providing a local
shop, school and leisure facilities within the Site.
The design proposals also seeks to build on existing
sustainable transport links and include the creation
of footpaths to other employment areas outside of
the Site.
Highway improvements schemes have also been
identified to which the Proposed Development will
contribute towards.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 24
5 CUMULATIVE EFFECTS
5.1.1 When considering potential significant cumulative effects, both ‘intra-cumulative
effects and ‘inter-cumulative effects’ have been considered.
5.1.2 Intra-cumulative effects are those that occur as a result of the Proposed Development
in isolation. They occur as a result of multiple effects within a single environmental
topic or as a result of one or more effects across multiple environmental disciplines
upon one receptor. Owing to the lack of overlap, it is unlikely that any one receptor
would experience significant intra-cumulative effects as a result of a combination of
one or more of the effects identified above. As such, intra-cumulative effects are not
considered further.
5.1.3 Inter-cumulative Effects are those that occur as a result of the Proposed Development
in combination with other developments. Following consultation with Dacorum
Borough Council, the other developments considered include residential, mixed-use
and non-residential developments. Table 4.1 includes the inter-cumulative effects
that have been considered for the Proposed Development and the eight other
committed developments identified.
Table 4.1: Inter-Cumulative Effects as a result of the Proposed Development and the Other Committed
Developments (as provided by Dacorum Borough Council)
Air Quality The Spencer’s Park Phase 1 development (Ref: 4/02351/13/RES) located immediately to
the north of the Proposed Development has been considered. It is assumed that
construction phases of the Proposed Development and the aforementioned committed
development will overlap. As such, a Construction Environmental Management Plan will
be required for the Proposed Development. With this, and other measures in place, the
potential for cumulative effects is considered to be not significant.
Whilst there is the potential for cumulative air quality effects associated with operational
traffic from a number of nearby committed developments and the Proposed
Development, various scenarios were used to assess the potential cumulative effects at
both existing and proposed sensitive receptors and, from the results, the cumulative
effect is considered to be not significant.
Archaeology
& Cultural
Heritage
Cumulative impacts will principally arise where each development removes individual
areas of preserved archaeological remains, thereby resulting in a gradual erosion and
fragmentation of the total archaeological resource. However, this is offset by the further
(archaeological) understanding of the area that is gained through evaluation/excavation
and recording.
During operation, no cumulative effects have been identified in respect to the setting of
designated heritage assets.
Ecology &
Wildlife
The committed developments assessed in combination with the Proposed Development
for potential cumulative effects were selected in relation to proximity to the Site,
ecological connectivity, the level of baseline/assessment information available and
professional judgement. On this basis, three developments (i.e. Ref. 4/02351/13/RES, Ref.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 25
4/00866/14/FUL and Ref. 4/00031/13/MFA) were considered and the cumulative effects
identified will be not significant.
Ground
Conditions
The only potential cumulative effects are those relating to mobile contaminants. The
potential cumulative effects on water quality in the Principal Aquifer is considered to be
low and the effect of the Site on groundwater quality is considered negligible. Similarly,
the gas generation risk from the Site is considered to be low and the potential for the
Proposed Development to contribute ground gas cumulative effects is considered
negligible. Thus, there is negligible potential to contribute towards cumulative effects.
Landscape Both the Spencer's Park Phase 1 development and the modest sized non-residential
scheme located on the south side of Three Cherry Trees Lane were considered in
combination with the Proposed Development. No others were considered as there is no
intervisibility between the Site and the other committed development sites. For both of
the developments considered, once mitigation planting matures, the cumulative effects
will be not significant.
Noise &
Vibration
The effect of changes in traffic noise associated with the other committed developments
and the Proposed Development have been assessed and the changes are considered to
be not significant.
Socio-
Economics
Positive cumulative effects as a result of the Proposed Development in combination with
other employment-related schemes are anticipated for direct, indirect and induced
employment during operational. There is also potential for positive cumulative effects
associated with the residential component of the Proposed Development and the existing
consent at Spencer’s Park Phase 1 (i.e. ref. 4/02351/13/RES), plus effects associated with
spend in the local economy from residents.
Soils &
Agricultural
Land
The neighbouring Spencer’s Park Phase 1 development and the Proposed Development
have been considered for cumulative effects. As no Agricultural Land Classification
information is available for the Phase 1 development, it has been assumed that the site
has a similar Best and Most Versatile to non-Best and Most Versatile ratio as the Site. On
this basis, it is assumed that the Phase 1 development would result in the loss of 5ha of
Best and Most Versatile land and 8.5ha of non-Best and Most Versatile land. Thus, the
cumulative loss of Best and Most Versatile land as a result of the Phase 1 development
and the Proposed Development would remain less than 20ha and not significant.
Traffic &
Transport
The assessment of traffic and transport has been undertaken by comparing the 2024
future baseline traffic conditions with 20204 future baseline + development traffic
conditions in order to assess the effect of the Proposed Development traffic. As the future
baseline traffic conditions include both committed development and traffic growth the
assessment is, in effect, a cumulative assessment, the outcome of which was that (with
mitigation in place), the traffic and transport effect would be not significant.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 26
6 SUMMERY
6.1.1 The Proposed Development is a mixed-use development, the key elements of which
are outlined in paragraph 1.2.4 of this document. The Illustrative Masterplan shows
one way in which the Site could be developed (in accordance with the Framework
Parameter Plans), but is intended for illustration purposes, only. The final layout
design will be determined at the detailed design stage. Thus, the assessments
undertaken to inform this ES are based upon the design proposals as described on the
application form and the accompanying Framework Parameter Plans, with reference
to the Illustrative Masterplan.
6.1.2 There will be a loss of 7.93 ha of BMV agricultural land as a result of the proposed
Development, but there will be an increase in habitat diversity onsite and ecological
value of the Site. There will be a significant effect upon landscape character, but the
overall design strategy and associated landscape proposals will contribute positively
to the visual setting and amenity of the Proposed Development and will, in time, help
to assimilate the Proposed Development within the local landscape. The Proposed
Development will result in beneficial effects upon the local housing, education, open
space, recreation and leisure facility provisions, as well as employment and spending
(within the local economy), and local GP facilities.
THE CROWN ESTATE + THE HOMES & COMMUNITIES AGENCY
SPENCER’S PARK PHASE 2
NON-TECHNICAL SUMMARY (NTS)
ST14699
JULY 2016
Page 27
7 FURTHER INFORMATION
7.1 Next Steps
7.1.1 This ES has been submitted to both Dacorum Borough Council and Saint Albans City &
District Council for the respective Planning Officers to consider in consultation with
the relevant stakeholders in the context of planning policy, prior to making a
recommendation to the planning committee on the planning application.
7.1.2 During the period of determination, Dacorum Borough Council and Saint Albans City
& District Council will contact the relevant government bodies and agencies, and other
consultees regarding the Proposed Development. Members of the public are also
invited to make comments on the planning application. Comments can be sent to:
Planning & Building Control
Civic Centre, Marlowes,
Hemel Hempstead, Hertfordshire,
HP1 1HH.
Telephone: (01442) 228000
Email: [email protected]
Saint Albans City & District Council,
Civic Centre, Saint Peters Street,
St Albans, Hertfordshire,
AL1 3JE.
Telephone: (01727) 866100
Email: [email protected]
7.1.3 Feedback from these discussions will be taken into account by Dacorum Borough
Council and Saint Albans City & District Council in reaching the decision on the
respective planning applications.
7.2 Copies of the Environmental Statement
7.2.1 The Environmental Statement will be available to view online on the Dacorum
Borough Council and Saint Albans City & District Council planning websites
(http://www.dacorum.gov.uk/home/planning-development?redirected=true and
http://www.stalbans.gov.uk/planning/).
Further Information
7.2.2 Further information, including a copy of the planning application documents, the
Environmental Statement and this Non-technical Summary, is available at the
following websites:
• http://www.dacorum.gov.uk/home/planning-development/planning-
applications; and
• http://www.stalbans.gov.uk/planning/Searchforplanningapplications/defa
ult.aspx.
ST14699
JULY 2016
DRAWING TP 001 Location Plan
N
•
© Scott Brownrigg Ltd
Location Plan
06 September 2016 TP 001 - Location Plan
003
Application Red Line Boundary
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
0 1km
ST14699
JULY 2016
DRAWING TP 002 Red Line Boundary Plan
N
•
© Scott Brownrigg Ltd
0 250m SCALE 1 : 5000 @ A350 100 150 200
Red Line Boundary Plan
06 September 2016 TP 002 - Red Line Boundary Plan
003
Application Red Line Boundary 24.43 Ha
Local Authority Boundary Line
DacorumDistrict
St AlbansDistrict
The Crown Estate Land Ownership
Homes & Communities Agency Land Ownership
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
El Sub Sta
LB
Chy
Communication Mast
123.0m
122.5m
120.1m
129.8m
131.3m
113.4m
134.7m
124.4m
118.3m
134.1m
117.7m
120.2m
The Nickey Line (Path)
Tra
ck
The Nickey Line (Path)
Phoenix W
alk
The Nickey Line (Path)
GP
Water
Reservoir
Pond
ETL
ETL
ETL
ETL
ET
L
ETL
ED B
dy
C Tk
C T
k
ED
and W
ard
Bdy
CR
Ward
Bdy
ED Bdy
Ward
Bdy
ED Bdy
ED Bdy
CR
Und
Ward Bdy
C Tk
C R
0.9
1m
RH
0.9
1m
RH
Def
Ward Bdy
Def
Def
0.91m RH
0.9
1m
RH
Co C
onst, C
P a
nd E
D B
dy
Co C
onst, C
P &
ED
Bdy
ED Bdy
RH
C Tk
Und
Und
Co C
onst, C
P a
nd E
d B
dy
CH
Und
ME
W
S
HUNTER
S
HALF MOON
CRACKLEY
CLO
SE
CR
AC
KL
EY
ME
AD
OW
LATIMER CLOSE
CHALFONT
CHALFONT CLOSE
THREE CHERRY TREES LANE
OA
K
LATIM
ER
CLO
SE
CHENIES COURT
DATCHET
SH
EN
LE
Y R
OA
D
MEADOW
BRICKFIELDS INDUSTRIAL ESTATE
FINW
AY RO
AD
TH
E M
ELIN
GS
CLOSE
BO
TLE
Y R
OAD
SW
ALLO
W P
AR
K
REDBOURN R
OAD
CLEVES ROAD
MEADO
W
REDBOURN ROAD
REDBOURN ROAD
MED
WIC
K
ARKLE
Y R
OAD
KIM
PT
ON
CLO
SE
LANE
SWALLOW
DALE
MAXTED ROAD
THREE CHERRY TREES LANE
CHERRY TREES COURT
BO
UN
DA
RY
WA
Y
CH
ER
RY
TR
EE
LA
NE
LO
WE
R
EM
MS
CLO
SE
BRITANNIA CLOSE
BR
OC
KS
WO
OD
DR
IVE
HU
NT
ER
S O
AK
HA
LF
MO
ON
ME
AD
OW
PARR CRESCENT
CH
ER
RY
TR
EE
LA
NE
BIR
CH
LE
YS
CH
ER
RY
TR
EE
LA
NE
CH
ER
RY
TR
EE
LA
NE
AR
AG
O N
Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432
Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432 Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432
Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432
Hemel Hempstead Industrial Estate
Hemel Hempstead Industrial Estate
Horizon Point
Pratt's Dell
1
37
55
46
43
33
105
2
38
1
117
2
34
32
179
40
37
109
12
17
20
24
111
to
20
8
56
1 to 9
4
24
44
6
29
50
19
to
20
939
37
167
25
10
42
69 to
79
Tanks
119
17 to 19
18
32
50
49
10
Multistorey C
ar Park
to
to
4
31
Three Cherry Trees
16a 16
11
10 to 16
City House
60
6
137
14
to
55
to
31
5
26
59
81 to
91
127
Caravan Site
Surg
ery
32
36
18
43
103
1
6
12
125
21
El Sub Sta
44 to
49
30
1
3
10
5
575
to 5
99
Maxted Corner
Sub Sta
Embassy H
ouse
Maxted Park
1
2
1
9
13
Garton Court
1
11
Tank
El Sub Sta
12
Depot
6
2
El Sub Sta
7
Gas Gov
4
14
Tank
El Sub Sta
Apex House
83
82
4 to
9
110
79
1
Pump House
15
109
64
111
35
86
119
1
94
to
74
1
88
67
Rose Cottage
89
15
1
91
7
to
5
9
8
71
11
The Coach House
41
95
6
2
1
29
17
7
40
74
75
30 to 4
6
4
44
11
100
80
1
14
8
Cherrytree
10
2
62
121
85
7
1
51 to 61
19
to92
15
104
to
3
15 to
25
109
3
16
94
66
to107
11
70
120
14
to
2
65
101 to 106
26
20
6
1
17
5
Farm
12
Gas Gov
99
3
105
Hillside Cottage
11
El Sub Sta
Lorry Park
El Sub Sta
CompoundGas Valve
El Sub Sta
El
El Sub Sta
Sub Sta
(save for individual residential plots that have been transferred)
ST14699
JULY 2016
DRAWING TP 003 Framework Parameter Plan - Dacorum Borough Council
•
© Scott Brownrigg Ltd
0 125m SCALE 1 : 2500 @ A325 50 75 100
Framework ParameterMasterplan
06 September 2016 TP 003 - Framework Parameter Masterplan DBC
N
003
El Sub Sta
LB
113.4m
134.7m
134.1m
The Nickey Line (Path)
The Nickey Line (Path)
GP
Reservoir
Pond
HALF MOON
CR
AC
KLE
Y M
EA
DO
W
MEADOW
MEADO
W
MAXTED ROAD
THREE CHERRY TREES LANE
CHERRY TREES COURT
CH
ER
RY
TR
EE
LA
NE
LO
WE
R E
MM
S
HU
NT
ER
S O
AK
HA
LF
MO
ON
ME
AD
OW
BIR
CH
LE
YS
CH
ER
RY
TR
EE
LA
NE
CH
ER
RY
TR
EE
LA
NE
Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432
Pratt's Dell
55
46
43
38
2
24
8
1 to 9
4
24
29
50
to
20
37
42
Tanks
18
32
49
31
Three Cherry Trees
60
to
Caravan Site
32
36
43
44 to
49
30
10
575
to 5
99
Embassy H
ouse
Maxted Park
1
9
1
El Sub Sta
6
2
El Sub Sta
7
4
14
Tank
1101
Pump House
15
109
64
111
1
74
67
Rose Cottage
71
11
The Coach House
95
29
30 to 4
6
100
Cherrytree
62
104
66
70
65
26
20
6
1
Farm
12
99
105
Hillside Cottage
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
DacorumDistrict
St AlbansDistrict
LEAPcatchment
area
LAPcatchment
area
Orchard
Outerzone
Middlezone
Innerzone
DPZ
Note: dph refers to Dwellings per Hectare
HSE CONSULTATION ZONES
ST14699
JULY 2016
DRAWING TP 004 Framework Parameter Plan - Saint Albans City & District Council
N
•
© Scott Brownrigg Ltd
0 125m SCALE 1 : 2500 @ A325 50 75 100
Framework ParameterMasterplan
06 September 2016 TP 004 - Framework Parameter Masterplan SADC
003
El Sub Sta
LB
113.4m
134.7m
134.1m
The Nickey Line (Path)
The Nickey Line (Path)
GP
Reservoir
Pond
HALF MOON
CR
AC
KLE
Y M
EA
DO
W
MEADOW
MEADO
W
MAXTED ROAD
THREE CHERRY TREES LANE
CHERRY TREES COURT
CH
ER
RY
TR
EE
LA
NE
LO
WE
R E
MM
S
HU
NT
ER
S O
AK
HA
LF
MO
ON
ME
AD
OW
BIR
CH
LE
YS
CH
ER
RY
TR
EE
LA
NE
CH
ER
RY
TR
EE
LA
NE
Ordnance Survey, (c) Crown Copyright 2015. All rights reserved. Licence number 100022432
Pratt's Dell
55
46
43
38
2
24
8
1 to 9
4
24
29
50
to
20
37
42
Tanks
18
32
49
31
Three Cherry Trees
60
to
Caravan Site
32
36
43
44 to
49
30
10
575
to 5
99
Embassy H
ouse
Maxted Park
1
9
1
El Sub Sta
6
2
El Sub Sta
7
4
14
Tank
1101
Pump House
15
109
64
111
1
74
67
Rose Cottage
71
11
The Coach House
95
29
30 to 4
6
100
Cherrytree
62
104
66
70
65
26
20
6
1
Farm
12
99
105
Hillside Cottage
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
DacorumDistrict
St AlbansDistrict
LEAPcatchment
area
LAPcatchment
area
Orchard
Outerzone
Middlezone
Innerzone
DPZ
Note: dph refers to Dwellings per Hectare
ST14699
JULY 2016
DRAWING SK 005 Illustrative Masterplan
N
•
© Scott Brownrigg Ltd
0 125m SCALE 1 : 2500 @ A325 50 75 100
Illustrative Masterplan
06 September 2016 SK 005 003
Application Red Line Boundary
Local Authority Boundary Line Note: This masterplan is for illustrative purposes only, for reference to supporting documents within the Outline Appplication for Spencers Park, to demonstratehow the framework masterplan could be brought forward.
© Scott Brownrigg Ltd
Figured dimensions only are to be takenfrom this drawing. All dimensions are tobe checked on site before any work isput in hand.
DacorumDistrict
St AlbansDistrict
ST14699
JULY 2016
Inside Rear Cover
ST14699
JULY 2016