  • 8/9/2019 The Building Project showcase

    1/116

    Extraordinary Infrastructure of the Be Inspired Awards

    THE BUILDINGPROJECT SHOWCASE

  • 8/9/2019 The Building Project showcase

    2/116

    The Building Project Showcaseand The Year in Infrastructureseries of publications

    are project yearbooks published by Bentley Systems, Incorporated that showcase theextraordinary work of Bentley users sustaining the worlds infrastructure.

    For information about how to enter your innovative project for consideration in the

    next Be Inspired Awardscompetition or for additional information about this program,

    visitwww.bentley.com/beinspired.

    ONLINE VERSIONS

    Digital versions of Be Inspired Awardspublications are available online at

    www.bentley.com/yearininfrastructure.Choose to view a specific issue

    or search within each issue using terms, titles, or keywords.

    Also browse Bentleys Be InspiredProject Portfolios atwww.bentley.com/projects,

    which feature the extraordinary winners and finalists in Bentleys annual Be Inspired

    Awardscompetition. Through these portfolios of exemplary project achievements, Bentleyshares innovative best practices with the architects, engineers, constructors, geospatial

    professionals, and owner-operators who sustain the worlds infrastructure.

    Published by Bentley Systems, Incorporated

    685 Stockton Drive

    Exton, PA 19341

    www.bentley.com

    Bentleys mission is to provide innovative software and services for

    the enterprises and professionals who design, build, and operate the

    worlds infrastructure sustaining the global economy and

    environment for improved quality of life.

    http://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fbeinspiredhttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fbeinspiredhttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fbeinspiredhttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fyearininfrastructurehttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fyearininfrastructurehttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fprojectshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fprojectshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fprojectshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.comhttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.comhttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fprojectshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fyearininfrastructurehttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=IFC&exitLink=http%3A%2F%2Fwww.bentley.com%2Fbeinspired
  • 8/9/2019 The Building Project showcase

    3/116

    There is a growing demand for higher performing buildings due to rising costs, greater global competition, expectations forsustainability, and an increasing focus among owners to maximize the return on their investment.

    Bentleys software for building teams empowers users at all phases of the project from conceptual design and construction

    document through coordination and construction to leverage information modelingthrough integrated projectsfor high-

    performing intelligent infrastructure to achieve Building Success.

    Information Modelingfacilitates the creation and integration of building design, documentation, and analysis in a federated

    repository for design and construction information. This supports rigorous simulation of a buildings performance so that the

    project team can explore the implications of options as they work to maximize design objectives. Working in the context

    of a unifying 3D modeling environment enables highly immersive interaction within the design process, and ensures the

    production of trusted deliverables that reflect the latest decisions and changes throughout the project timeline.

    Integrated Projectsbenefit design, construction, and delivery teams by reducing and managing risk, while enhancing project

    efficiency. This requires well-managed collaboration on the work in progress across distributed teams. Integrated projects

    best equip distributed building teams to harness the contributions of all participants by appropriately bringing to bear the

    right people and expertise. This demands information management for scalable and controlled work sharing, versatile reuse

    of engineering content, and the gathering of dynamic feedback that is actionable. Ultimately, this engages a broader range of

    contributors regardless of location, enhances quality, and accelerates project delivery.

    Intelligent Infrastructureutilizes the resultant digital asset and operational information platform for ongoing maintenance,

    operations, and compliance activities. Disaster and incident response and corrective actions can be addressed with assured

    information integrity. Proactive lifecycle planning can be applied for operational changes such as remodeling, expansion, orrepurposing. Ultimately, this results in higher quality and better-performing infrastructure assets with improved operational

    efficiency and safety, reduced waste, increased resilience, and a greater return on infrastructure investments.

    Within these pages you will find building projects that were inspired on many levels in their approach to addressing todays

    building challenges. What they share is the application of advanced technology to aid in the delivery and operation of high-

    quality buildings in terms of aesthetics, building performance, adherence to program, and meeting budgets.

    These projects showcase excellence in the design, construction and operations of buildings throughout the world. They

    demonstrate our societys resilience in the face of tremendous challenges, both economic and environmental, and serve as a

    testament to the ability of engineers, architects, contractors, and owner-operators around the globe inspiring us all.

    To learn more about how Bentley users are achieving Building Success, see the software in action, or download a free

    trial, please visit:www.Bentley.com/BuildingSuccess.

    http://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=1&exitLink=http%3A%2F%2Fwww.Bentley.com%2FBuildingSuccesshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=1&exitLink=http%3A%2F%2Fwww.Bentley.com%2FBuildingSuccesshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=1&exitLink=http%3A%2F%2Fwww.Bentley.com%2FBuildingSuccesshttp://www.bentleyprojectshowcasedigital-structural.com/projectshowcase/B201307/TrackLink.action?pageName=1&exitLink=http%3A%2F%2Fwww.Bentley.com%2FBuildingSuccess
  • 8/9/2019 The Building Project showcase

    4/116

    INFORMATION MODELING

    INTEGRATED PROJECTS

    INTELLIGENT INFRASTRUCTURE

    INDEX

    ALPHABETICAL BY ORGANIZATION

    3 85

    101 105

    87 100

    2

    TABLE OF CONTENTS

    106 111

    Projects per category are listed alphabetically by country:

  • 8/9/2019 The Building Project showcase

    5/116

    INFORMATIONMODELINGThe projects in this category demonstrate work in the context of a unifying 3D modeling environment, which enables highly

    immersive interaction within the design process that ensures the production of trusted deliverables that reflect the latest

    decisions and changes throughout the project timeline.

  • 8/9/2019 The Building Project showcase

    6/116

    4

    INFORMATION MODELING

    The AUD 650 million South Morang rail extension will improve access to public

    transport for the nor thern suburbs of Melbourne, Australia. The fast-track

    project included redevelopment of two existing stations, 3.5 kilometers of

    new double track extension, and the new South Morang Station and modal

    interchange. Arup provided structural, mechanical, electrical, and hydraulic

    engineering for each station.

    MicroStation and Structural Modeler were used to model and document

    the stations and pedestrian footbridge. Fully set-out 3D steelwork models

    were provided to assist in rapid procurement and sequencing of steelwork

    fabrication. Arup transferred models between Structural Modeler and Autodesk

    Revit, which improved productivity by allowing Arup to utilize 3D building

    information modeling with team members using different applications.

    Arup

    South Morang Rail Extension

    Melbourne, Australia

    Arup

    Melbourne Rectangular Stadium

    Melbourne, Australia

    Providing a missing link in Melbournes sports infrastructure, this new stadium

    in Australia will be a world-class sporting event and administration complex,

    featuring a sports campus, elite training center, and sports administration area.

    The stadium will have a cutting-edge bioframe a lightweight steel designbased on the inherent structural ef ficiencies of the dome with a geodesic roof

    that will substantially cover the seating area while letting in maximum sunlight.

    This design will use 50 percent less steel than a ty pical stadium roof of the

    same size. Using GenerativeComponents, Arup created a centerline wireframe

    model of the structural roof, which was then used by the structural design

    engineers for analysis. Data exported from the GenerativeComponents modelwas used for optimization studies of the roof steelwork for each configuration.

  • 8/9/2019 The Building Project showcase

    7/116

    INFORMATION MODELING

    The redevelopment of Bar won Healths facilities on the Geelong Hospital site in

    Geelong, Australia, included an integrated Teaching, Training & Research (TTR )

    center. The site was constrained by existing buildings and infrastructure. Billard

    Leece Partnerships task was to design a 5,40 0-square-meter, three-storybuilding that serves both Deakin University Medical School and Bar won Health.

    The firm used Bentley A rchitecture and GEOPAK to assist in major areas of the

    design process. Early-stage 3D visualization helped to determine the context-

    sensitive building form, height, and proportion. The 3D modeling translated

    seamlessly into architectural plans, which were easily managed systematically.Potential clashes between services and structure were immediately identified

    and resolved.

    Billard Leece Partnership Pty Ltd

    Barwon Health TTR Building

    Geelong, Australia

    The AUD 18 million Rotary and Fixed Air Wing Facility is a 24-hour operational

    emergency response complex at Essendon Airfield for use by the Victoria

    Police and Ambulance Victoria air services in Melbourne, Australia. The facility

    replaced an old Victoria Police Air Wing airfield that had b een outgrown. The

    new facility includes the apron, hangar, and ancillary structures for mission

    control, offices, maintenance, and staf f amenities.

    For its design work, Billard Leece Partnership used MicroStation, Bentley

    Architecture, and GEOPAK Site. The design team saved time and money by

    deriving coordinated documents from a single 3D model; received greater staff

    buy-in by working in a 3 D environment with instant feedback on design ideas;

    and clearly communicated the design concepts to its clients.

    Billard Leece Partnership Pty Ltd

    Rotary and Fixed Air Wing Facility, Essendon Airport

    Melbourne, Australia

  • 8/9/2019 The Building Project showcase

    8/116

    INFORMATION MODELING

    6

    The Southern Highlands Conference and Events Centre in Australia was

    designed to take advantage of its remarkable site. Located at the top of a

    steep escarpment, the building is cantilevered over the Bargo River, providing

    uninterrupted views of the surrounding wilderness. The building is raised upon

    slender V-braced columns to create a sheltered undercroft caf.

    Building Studio Architects used Bentley Architecture and MicroStations

    Luxology rendering engine to design, develop, and communicate the project

    intent to both the client and local authorities. The built-in rendering engine

    enabled real-time rendering without exporting to a dedicated rendering

    package, and the photorealistic images ensured approval by local council

    without modification.

    Building Studio Architects Pty Limited

    Tahmoor Conference Centre

    Tahmoor, Australia

    Located at the gateway to the Melbourne Docklands in Victoria, Australia,

    this project encompasses a 9,884-square-meter commercial new-build in

    the landmark Lantern building and 10,076 square meters of commercial

    refurbishment in the heritage-listed Goods Shed South. Building StudioArchitects designed the AUD 45 million complex to achieve maximum lettable

    area and a five -star Green Star rating.

    Bentley Architecture was used from the projects inception for design,

    documentation, and visualization to ensure delivery of documentation ahead of

    the fast-track construction program. GenerativeComponents was used to design

    the facetted faade, which had variable panel geometry that required key nodepoints along the building perimeter. The software also allowed the faade and

    heritage building roof to be accurately designed and detailed.

    Building Studio Architects

    The Lantern

    Melbourne, Australia

  • 8/9/2019 The Building Project showcase

    9/116

    INFORMATION MODELING

    The Lantern will be an iconic commercial building at the entrance to the

    Docklands precinct in Melbourne, Australia, which has stringent development

    controls. The design provided for superior environmental performance while

    creating a building with premium office and retail space with enhanced views ofVictoria Harbour. The challenge was to develop the diamond faade system and

    prepare documentation for tender and manufacturing.

    Building Studio Architects used Bentley Architecture from inception to

    completion. GenerativeComponents was used to resolve the variable faade

    geometries, model the building for client approval, and coordinate with

    subconsultants and contractors on installation. Building information modelingensured accurate modeling of building components and subsystems, and

    enabled subsequent production of full contract documents.

    Building Studio Architects Pty Limited

    The Lantern

    Melbourne, Australia

    GroupGSA provided design and project management services for an office

    building for the New South Wales Roads and Traffic Authority. The project

    included one client floor, one executive floor, and eight working floors. Total

    capital expenditure was USD 24 million. The project was designed and

    documented in just six weeks, due to a tight construction deadline.

    To better manage time constraints, Bentley Architecture was used to produce

    overall floor plates. The space tools enabled GroupGSA to present the client

    with running area schedules as the design progressed, which gave the

    stakeholders confidence. These tools were subsequently used to quantify areas

    of finish options for cost planning. The wall tool made for faster changes of

    layouts via a rapid documentation process.

    GroupGSA

    RTA North Sydney

    Sydney, Australia

  • 8/9/2019 The Building Project showcase

    10/116

    INFORMATION MODELING

    8

    The AUD 48 million Mineral & Materials Research Hub in Adelaide, Australia,

    was designed to catalyze education and engagement among students,

    researchers, and industry stakeholders. MicroStation and Bentley Architecture

    allowed John Wardle Architects to visualize the design potential for spatialinterconnection and flexibility throughout the building. Layout, orientation,

    faade, and materials contributed to achieving a five-star Green Star rating.

    Bentley Architecture integrated other CAD platforms and facilitated model

    exchange and coordination among subconsultants. The software also enabled

    the management of documentation to suit a progressive procurement schedule.

    Drawing extraction from the single building model produced productivity gainsof 15 percent compared to 2D methods. Ef ficient design data management

    allowed a smaller team to manage drawing production.

    John Wardle Architects

    Mineral & Materials Research Hub

    Adelaide, Australia

    The Aurecon Centre is a 16,000-square-meter office building that is part of the

    commercial development in Victoria Harbours master plan. The project goal

    was to provide a highly efficient, cost-effec tive, and environmentally designed

    building that conforms to the strict Dockland precinct development standards.

    Aurecon is not only the major tenant, but also the structural and services

    design consultant.

    Lend Lease developed an energy-efficient under-floor mechanical system that

    maximized office space without increasing the floor-to-floor levels and overall

    building height. This was achieved by introducing structural efficiencies in the

    way the slab and beams were designed. Bentley A rchitecture, MicroStation,

    and ProjectWise were used for design development, drawing production, and

    project file management.

    Lend Lease Corporation Limited

    C11 Aurecon Centre Commercial Building

    Melbourne, Australia

  • 8/9/2019 The Building Project showcase

    11/116

    INFORMATION MODELING

    The C11 site in the Victoria Harbour master plan was designated for a multideck

    car park with 570 spaces serving the surrounding commercial district. The

    triangular shape and prime location made design a challenge. The project team

    proposed an unconventional solution: a seven-level car park below four levelsof residential units. The hybrid building is cloaked in a faade system that

    disguises the mixed use.

    The project team used MicroStation and Bentley Architecture to collaborate

    with various consultants on multiple options for site layouts. Multiple iterations

    were produced in relatively short periods of time. The optimum design included

    an efficient use of E XO-skin panels, which created a random look for theabstract building form. ProjectWise was used to manage files and drawing

    approvals.

    Lend Lease Corporation Limited

    C11 EXO Hybrid Building

    Melbourne, Australia

    Lend Lease Corporation developed a proposal for the creation of its clients

    new headquarters in the Victoria Harbour district of Melbourne. The project

    entails three new ecologically sustainable commercial buildings built into a

    dynamic community campus along the waterfront. Design was undertaken

    simultaneously in 2D and 3D using MicroStation and Bentley Architecture.

    Design in 2D was used to resolve the ground plane, core layout, and car

    parking. The 3D modeling of each building was used to resolve massing and

    elevation treatment. The integrated 2D and 3D data saved design time, and

    the Bentley products interoperability allowed the use of other applications to

    design the faade and to enhance presentation visuals.

  • 8/9/2019 The Building Project showcase

    12/116

    INFORMATION MODELING

    10

    Advocated by the Cabramatta Council and funded by the Australian

    Commonwealth Nation Building program, the new multistory car park on Fisher

    Street in Cabramatta, Australia, will provide much needed parking for visitors to

    the town center. Designed on a tight budget, the efficient 5,000-square-meterbuilding maximizes operational use of the site while minimizing both the use of

    materials during construction and ongoing energy consumption.

    MaterialLAB Architecture & Design used Bentley Architecture throughout

    the project to model all details, structure, finishes, and fittings as well as

    complete all documentation. Traditional 2D drawings were extracted to create

    tender documentation, and Luxology was employed to create views that werephotomatched with site photos for presentation purposes. MicroStation and

    Bentley Architecture are credited with cutting working hours by approximately

    50 percent.

    MaterialLAB Architecture & Design

    Fisher Street Car Park

    Cabramatta, Australia

    MaterialLAB Architecture & Design has used Bentley Architecture to complete

    assignments that are larger than expected for a company of its size. The firm

    is committed to bet ter leveraging information technology to deliver enhanced

    value for clients and stakeholders, and have achieved this through the adoption

    of building information modeling (BIM) techniques and delivery practices.

    To test Bentleys BIM technology, this research project modeled a hypothetical

    36-story office tower, enabling the firm to fine-tune work methodologies within

    a Bentley environment; adopt new strategies to maximize return on investment;

    develop performance benchmarks; and determine appropriate levels of

    technology investments in hardware, soft ware, and training.

    MaterialLAB Architecture & Design

    The Hypothetical Tower Study

    Sydney, Australia

  • 8/9/2019 The Building Project showcase

    13/116

    INFORMATION MODELING

    Built in 1927 and located in the Parliamentary Triangle, the West Block Heritage

    Office is one of the earliest government buildings in Australias capital city

    of Canberra. The 7,500-square-meter office building housed international

    communication functions during World War II and has not previously undergonea major renovation.

    MaterialLAB Architecture & Design and Davis Langdon deployed MicroStation

    and Bentley Architecture to deliver a functional statement of requirements

    brief, schematic design studies, and an associated project feasibility study

    for the Department of Finance and Deregulation. In addition, costed conceptdesigns were completed, along with a functional design brief for the future

    refurbishment of this major Commonwealth Government project.

    MaterialLAB Architecture & Design

    West Block Heritage Office Refurbishment

    Canberra, Australia

    Since culturally important heritage sites can be lost or devalued through intentional

    harm, natural disaster, or development. Midland, Australia, wanted to demonstrate

    the value of recording dimensional information on historical buildings through 3D

    modeling and point-cloud data captured via terrestrial laser scanners.

    MicroStation and the Pointools Vortex API engine allowed 3D designers to use

    large point-cloud databases without expensive additional software or extensive

    retraining. By adopting this approach, Midland clients have increased their use

    of 3D laser scanning without the need for expensive third-party software or

    extensive training.

    Midland Survey Services

    Heritage Building Model

    Midland, Australia

  • 8/9/2019 The Building Project showcase

    14/116

    INFORMATION MODELING

    12

    NBRS+Partners was engaged by a private girls school in Sydney, Australia,

    to design and construct a large s wimming and training pool with related

    amenities. This AUD 15 million new construction incorporated pools, a pool hall,

    and a basketball court at levels that matched the floor levels of the existingscience and teaching facilities. The challenge of this large development was its

    potential to cause neighborhood anxiety that could lead to approval delays.

    NBRS+Partners used Bentley Architecture to enhance community and

    professional communication. The project team addressed potential concerns by

    producing easy-to-understand, lifelike 3D images that fostered the community

    consultation process, improved client engagement, and informed the widerschool community to help suppor t the project fundraising.

    NBRS+Partners

    Swimming Pool Integration in a Secondary School

    Sydney, Australia

    The Macquarie Hearing Hub under construction in Sydney, Australia, is a mixed-

    use building with university education facilities, a research facility, and space

    occupied by private tenants. Perumal Pedavoli used this complex building as a

    pilot project for newly acquired building information modeling (BIM) skills. The

    firm had previously documented the building in 2D using MicroStation.

    A group of employees who had completed product training on Bentley

    Architecture was tasked with documenting the building in 3D using the Bentley

    software. The software enabled the group to produce the necessar y plans,

    sections, elevations, and schedules directly from the 3D model. In addition, any

    design changes were instantly reflec ted in the deliverables. This pilot project

    demonstrated the accuracy and time savings made possible by BIM.

    Perumal Pedavoli Pty Limited

    Macquarie Hearing Hub BIM Pilot

    Sydney, Australia

  • 8/9/2019 The Building Project showcase

    15/116

    INFORMATION MODELING

    This family home is located on a narrow street in Marks Point, on the northern

    bank of a peninsula in Lake Macquariek, Australia. The project site is very

    narrow and long, with short boundaries abutting the street and lake. The

    proposal was to demolish the existing garage facing the street and design anew garage and living space. Several design options were developed for a

    two-story addition.

    The 3D modeling and visualization capabilities of Bentley Architecture

    enabled efficient communication with the client as well as the local permitting

    authorities. The AUD 400,000 addition will expand the living space for a

    growing family and create a private, protected courtyard area, maximizingthe potential of the small site. Curb appeal will be improved by the interesting

    architecture.

    Webber Architects

    Emily Street Addition

    Marks Point, Australia

    This AUD 2.1 million single-family dwelling features a plunge pool with

    associated decks and landscaping. The home includes four bedrooms; guest

    room; study; formal living room; laundry ; en suite; and open-plan living, dining,

    and kitchen areas. The objective was to maximize the stunning site attributes

    while providing the client with an energy-efficient, protected, and private

    dwelling.

    One of the main drivers of the design was to create good cross-ventilation in

    summer, with the main rooms open on at least two sides. All walls and roofs

    will be insulated to prevent heat loss. Additionally, the external walls will utilize

    an innovative system of ventilated facades. Bentley Architecture communicated

    the design concept to the client and local permitting authority.

    Webber Architects

    Merewether House 4

    Merewether, Australia

  • 8/9/2019 The Building Project showcase

    16/116

    INFORMATION MODELING

    14

    Webber Architects

    Ourimbah Campus Library

    Ourimbah, Australia

    The AUD 2.1 million extension of the Ourimbah Campus Library in Ourimbah,

    Australia, integrated the building with the adjacent quadrangle, provided an

    entry with a sense of arrival, and modified the interior meeting and study

    spaces. The double-height glazed space included a steel-framed curved stairconnecting the two levels. Challenges included balancing the visual connection

    with the quadrangle against the need to limit heat and glare in the interior.

    Using MicroStation and Bentley Architecture, most details were modeled in

    3D to visualize how they would look in context. Visual communication with the

    client was vital to the success of the project. Accurate modeling facilitated the

    creation of many illustrations depicting options for several design elements,which resulted in clear client feedback.

    Webber Architects designed the AUD 1.55 million Primary School Hall for St.

    James Muswellbrook campus in New Sou th Wales, Australia. Located in plain

    sight of the public road that approaches the school, the new multipurpose hall

    will be a gathering space for the school and community. The iconic building

    combines contemporary form and materials to communicate the institutions

    ideas and motivations.

    The designers used Bentley Architecture to per form 3D modeling with accurate

    lighting and materials. The visualizations helped to resolve, clarify, and explain

    architectural design elements in less time, resulting in cost savings and a

    collective understanding of the inspiration and anticipated final result. The hall

    will expand the schools capacity for gatherings and reinforce the position of

    the school within the community.

    Webber Architects

    St. James Primary School Hall

    Muswellbrook, Australia

  • 8/9/2019 The Building Project showcase

    17/116

    INFORMATION MODELING

    A 14-story building planned for Dhaka, Bangladesh, had to withstand wind

    speeds of up to 2 01 kilometers per hour. Given the 19-meter width and 38-meter

    length of the structure, drift against wind would be severe along the width

    of the building. Complicating the design was the architects specification of adiagonal cross member around the building.

    A design solution for this USD 2 million building had to be found in just eight

    months. McDonald Steel Building Products recommended a prefabricated

    solution and the project team decided on a staggered truss system that

    incorporated the diagonal cross member as a structural support. Modelingin STAAD.Pro enabled the team to quickly design a solution to meet the

    tight deadline.

    McDonald Steel Building Products Ltd.

    SPL Glass House

    Dhaka, Bangladesh

    The USD 60 million extension of the Saint Joseph Clinic in Bornem, Belgium,

    will feature a new main entrance hall that connects two entrances on different

    ground levels. The eye-catching green wall with real vegetation ajardin

    vertical will compensate for the loss of garden space in the expansion and

    improve the acoustics of the hall.

    AAPROG used MicroStation for the development of the plans and a detailed

    visualization of the hospital extension, which also includes additional medical

    and technical facilities. The visualizations were produced with MicroStations

    Luxology rendering engine, which produced high-quality images in near

    real time.

    AAPROG architecten bvba

    Entrance Hall, Saint Joseph Clinic

    Bornem, Belgium

  • 8/9/2019 The Building Project showcase

    18/116

    INFORMATION MODELING

    16

    As a building company that constructs 250 houses each year, Durabrik

    needed a fast and accurate way to develop sales dossiers for potential

    customers. A dossier consists of a set of drawings, visualizations, and

    detailed pricing. Durabrik migrated to Bentley Architecture to take advantage

    of building information modeling tools that optimize the companys work

    method and workspace.

    Durabrik starts from sketches or 2D drawings and then creates a 3D model

    that is used for presentation, drawing generation, and price calculation. Total

    production time has been reduced by features such as pre-defined se ctions,

    detailed datasets, parts linked to components, materials quantification, and

    calculation program customization. Completing a dossier now takes just four to

    six hours, and the 3D P DFs provide a photorealistic image for customers.

    Durabrik Bouwbedrijven NV

    BIM @ Durabrik

    Drongen, Belgium

    Increased demand for Tienen, Belgium-based Photovoltechs highly efficient

    and patented solar cells prompted the company to exp and capacity with a new

    factory containing six high-end solar cell production lines. As prototype lines,

    flexibility for future enhancement was essential. Emphasis was placed on lineone while lines two through six configurations would be determined in the future.

    DHV Buildings used MicroStation, Bentley Architecture, and Bentley Building

    Mechanical Systems for the modeling and testing of various options as it sought

    new solutions for prefabricated construction elements. The integrated products

    better leveraged its working relationship with other contractors and provedinvaluable in terms of reducing costs and saving time.

    DHV Buildings

    Photovoltech Solar Factory

    Tienen, Belgium

  • 8/9/2019 The Building Project showcase

    19/116

    INFORMATION MODELING

    Arup Singapore designed the USD 7 million Singapore Pavilion for the 2010

    World Expo in Shanghai, China. The pavilion spans 3,00 0 square meters and

    resembles a music box. The structural system features floors of various shapes

    and sizes, connected by ramps and stairs suspended off trusses in a state oftorsional balance. Saving time and costs were key project goals.

    Structural models were linked between Arups in-house design tool and Bentley

    Structural to reduce modeling time and allow easier design changes over time.

    Arup created a 3D PDF to enable better interoperability/coordination among

    applications, which resulted in further time and cos t savings that helpedcomplete the project under a tight deadline.

    Arup Singapore Pte Ltd

    Singapore Pavilion at World Expo 2010

    Shanghai, China

    BDP was retained in a USD 2 million project for IKEA retail centers in China. The

    initial goal was to define the design process leading to an optimized solution

    for roof design. An environmentally friendly approach and careful utilization of

    resources has led to higher demands on the efficiency of architectural design

    and the need for interdisciplinary design teams working closely together.

    Each of four roof projects had a unique geometry even though BDP reused

    design strategies, scripts, procedures, 3D details, and paneling strategies.

    Using GenerativeComponents with links to STAAD.Pro minimized the use of

    steel, simplified paneling, optimized daylight, and minimized solar gain. This

    approach resulted in design and documentation time savings of 20 percent.

    BDP

    Design Optimization of Complex Roofs

    Wuxi and Beijing, China

  • 8/9/2019 The Building Project showcase

    20/116

    INFORMATION MODELING

    18

    Now under construction on the waterfront in Shenzhen, China, the Baoan Oct

    Hotel complex is comprised of a 26-story, 360 -room, five-star hotel tower;

    29-story business apar tment tower; four-story atrium with art gallery, ballroom,

    and meeting space; and a three-level b asement. Using building informationmodeling on a common software platform allowed team members in different

    countries to explore options and make revisions while staying on schedule.

    John Portman & Associates used MicroStation and Bentley Architecture to

    define the fluid forms and curvilinear features of the project. T he 3D model was

    used to resolve geometry and joinery, prepare structural detailing, and detect

    interferences or problems with clearances early in the design process. T hearchitects produced renderings and sun studies in-house, saving the firm out-of-

    pocket project costs.

    John Portman & Associates

    Baoan Oct Hotel

    Shenzhen, China

    Lab Architecture Studios competition-winning design proposal for a new city

    government office complex incorporated a five-star hotel with conference,

    meeting, and restaurant facilities. The dramatic building form integrated

    sustainable design features to achieve two stars in Chinas Green Star rating

    system. The key driver of this project was the thermal and solar efficiency of the

    building form and facades.

    Using GenerativeComponents, the Chinese project team incrementally adjusted,

    evaluated, and optimized the buildings solar performance inside a time frame

    that would have been impossible using conventional building analysis tools.

    Despite the irregular building form, GenerativeComponents also enabled design

    of a panelized faade system with a minimal number of custom panels.

    Lab Architecture Studio

    Wujin Council Building (2009-2011)

    Wujin, China

  • 8/9/2019 The Building Project showcase

    21/116

    INFORMATION MODELING

    Part of a development being constructed in the new central business district of

    Binhai-Tianjin in China, the Zovie Towers project encompasses two mixed-use

    buildings. The western office tower is 52 floors with 105,000 square meters of

    gross floor space. The eastern residential building is 87,000 square meters, witha 31-floor tower and a 27-floor tower connected by a 10-level 57,000-square-

    meter podium.

    The towers and podium share the same facade design featuring a large-scale

    glass weave. Lab Architecture Studio demonstrated the constructability of the

    complex geometry using GenerativeComponents to model a series of design

    constraints. After validating the performance of the optimum tower forms,the team constructed a building information model to aid the final faade

    documentation process.

    Lab Architecture Studio

    Zovie Towers (2007-2011)

    Tianjin, China

    The Giant Interactive Group headquarters in Shanghai, China, defies current

    trends toward vertical urban development with a compact campus on the

    outskirts of the city. Its integrated 3D design methodology achieved an organic

    approach to space for work, recreation, and socialization. The 3D models

    improved communication of the design intent and allowed simultaneous

    exploration of complex architectural spaces and coordination of building

    systems.

    Products such as Bentley Architecture and Structural Modeler allowed

    designers to take a holistic view as well as address singular building systems.

    This integrated process increased productivity and reduced the number of staff

    necessary for design, coordination, and delivery of the project. The federated

    model also enabled design and construction teams to coordinate fabrication,

    installation, and construction.

    Morphosis Architects

    Giant Interactive Group Corporate Headquarters

    Shanghai, China

  • 8/9/2019 The Building Project showcase

    22/116

  • 8/9/2019 The Building Project showcase

    23/116

    INFORMATION MODELING

    Following a national design competition, Warren and Mahoney was selected

    as architect of the New Zealand p avilion for the World Expo Shanghai 2010.

    The pavilion was themed Cities of Nature: Living Bet ween Land and Sk y, and

    showcased the balance between city and nature through the indigenous Maoricultures myths about creation. The capital cost was USD 25 million.

    The pavilion design was composed of three sequential experiences: a welcome/

    arrival space, an internal exhibition space, and an external rooftop garden.

    Consolidation on MicroStation, Bentley Architecture, and MicroStation

    PowerDraft helped Warren and Mahoney create a welcoming representation ofNew Zealands culture and identity.

    Warren and Mahoney

    New Zealand Pavilion at Shanghai Expo

    Shanghai, China

    These images were produced by A02 for an international architectural

    competition focused on a cultural and education center in Zlin, Czech Republic.

    Two industrial buildings on the site of the former Bata factory will be renovated

    for public use and converted into a gallery, museum, and library.

    The firm used MicroStations Luxology rendering engine to visually communicate

    its ideas and designs. This was the first time the project team had worked with

    Luxology rendering in MicroStation. It enabled the team to produce high-quality

    images in near real time and quickly create stunning visualizations of the

    proposed buildings.

    A02-Architecture Office

    Cultural Centre Zlin

    Zlin, Czech Republic

  • 8/9/2019 The Building Project showcase

    24/116

    INFORMATION MODELING

    22

    Zaha Hadid Architects

    Stone Towers

    Cairo, Egypt

    The Stone Towers business park planned for a 180,000 -square-meter site in

    Cairo, Egypt, will combine world-class office facilities with retail stores, food

    and beverage facilities, and a five-star hotel. Inspired by the pat terns and

    textures of ancient Egyptian stonework, the towers comprise 550,000 squaremeters above ground and another 60 0,000 square meters below ground.

    Bentleys design software resolved initial concerns regarding collaboration

    among the project team and other consultants in the United Kingdom and

    abroad. The file-referencing system and streamlined workflows among multiple

    disciplines allowed the team to cross-reference complex 2D and 3D informationto efficiently produce a fully integrated and coordinated design.

    Arthur Golding and Associates prepared a conceptual design for the new

    Helsinki (Finland) Central Library international design competition. Budgeted

    for EUR 69.9 million, the concept proposed a building within a building with a

    transparent/translucent outer skin that forms a veil independent of the library

    floors within. Technological innovations included a multistory climate wall and

    advanced structural system without perimeter columns, beams, or mullions.

    MicroStation was used for design, modeling, and visualization. Plug-ins

    enabled incorporation of detailed models of vehicles, trees, escalators, and

    furniture. Using MicroStations integrated modeling and rendering capabilities

    facilitated development of a detailed model with photorealistic images. The

    programs ability to translate, export, and import files in different formats aided

    coordination with structural and energy/ HVAC engineers.

    Arthur Golding and Associates

    Helsinki Central Library Competition

    Helsinki, Finland

  • 8/9/2019 The Building Project showcase

    25/116

    INFORMATION MODELING

    The TU Munich medical center Rechts der Isar in Germany enlarged its surgery

    capacity by adding eight surgery rooms and a centralized sterilization center.

    Design and construction of the USD 13 million project was fast-tracked to

    achieve the very tight time frame required. ProSteels capabilities for modeling,detailing, and fabrication enabled Cadolto to create the 37 building modules in

    six months.

    Prefabrication of the modules occurred in Cadoltos modern fabrication center in

    Cadolzburg, Bavaria. The building modules were then driven by truck to a point

    outside Munich and transported to the construction site at night to minimize

    disruptions. Prefabrication reduced the environmental impact, noise, and waste,and the prefabrication allowed the building to be erected in the required 48-

    hour time frame.

    Cadolto Fertiggebude GmbH & Co. KG

    Hospital Rechts der Isar

    Munich, Germany

    When a 2.5-square-hectare residential complex was under construction

    in Augsburg, Germany, the developer decided to add an adjacent building

    where sales representatives could consult with prospective customers. The

    building would be only in use while construction was underway so it was

    considered temporary.

    Given the location near an urban park, Eger & Par tner developed a compelling

    design that integrated seamlessly with the surroundings. The team used

    MicroStation to develop a graphical representation of the building in the

    context of the park setting. This visualization persuaded local authorities in

    charge of permitting to approve the project.

    Eger & Partner

    Loft Cube

    Augsburg, Germany

  • 8/9/2019 The Building Project showcase

    26/116

    INFORMATION MODELING

    24

    Volkswagen commissioned Ingenieurbro Zammit to plan the ventilation/air

    conditioning and sprinkler systems for a E UR 100 million auto-body production

    facility in Emden, Germany. The 55 0-by-120-meter facility required planning for

    a total supply/exhaust volume of 1.5 million cubic meters per hour. More than 20supply/exhaust units and 40 technical extraction units were integrated within

    the limited space of a penthouse.

    To ensure no interferences with other technical systems in the facility,

    Ingenieurburo Zammit used MicroStation and a building information modeling

    toolkit for 3D project implementation. The 3D representation of technical

    systems in conjunction with the 3D structural model enabled engineers tocoordinate the technical systems, verify clearances with the building structure,

    and support Volkswagens decision-making process.

    Ingenieurbro Zammit GmbH

    Production Facility for Auto Body Construction

    Emden, Germany

    Located in Darmstadt, Germany, Mornewegschool is a place for students to

    learn, play, and have fun. menzel-kossowski Architekten achieved an elegant

    design for the USD 2.5 million Mornewegschool Extension using MicroStation

    from concept through visualization to execution.

    Collaboration technology integrated a design team distributed over multiple

    locations, facilitated rapid deployment of a project team, and accelerated

    information sharing and communications across project teams. The quick and

    easy exchange of interdisciplinary data resulted in a cost-efficient and effective

    design process.

    menzel-kossowski Architekten

    Mornewegschool Extension

    Darmstadt, Germany

  • 8/9/2019 The Building Project showcase

    27/116

  • 8/9/2019 The Building Project showcase

    28/116

    INFORMATION MODELING

    26

    Intelligent Quarters will be a new three-building complex prominently located

    on the Elbe River in Hamburg, Germany. The complex will have a gross floor

    area of 70,000 square meters and include an 18-story tower with residential,

    commercial, and office spaces. Strmer Murphy and Partners performed thehigh-level planning, taking cost and schedule targets into consideration.

    The complex was divided into components to be coordinated by multiple project

    teams using MicroStation for smooth data exchange, reciprocal referencing

    of plans, and reliable performance. The intuitive user interface and adjustable

    functions led to highly efficient workflows, which enabled the firm to finishplanning in less time than comparable projects.

    Strmer Murphy and Partners

    Intelligent Quarters

    Hamburg, Germany

    Gathering inspiration from the northern lights and dramatic Icelandic

    landscape, this project in Reykjavik will stand out as a radiant sculpture

    reflecting the sky and harbor as well as the vibrant life of the city. Apart from

    the concert and congress center, the plan comprises a five-star hotel and

    wellness center, fine arts academy, bank facility, cinema, new urban shopping

    plaza, and a number of residential and commercial buildings along the fiord.

    Together with Henning Larsen Architects, Olafur Eliasson designed the

    faades of the building as a crystalline lattice of glass and steel using

    MicroStation and Bentley Architecture. The 3D tools allowed the project team

    to easily communicate the design to the client, quantity surveyors, engineers,

    suppliers, and contractors.

  • 8/9/2019 The Building Project showcase

    29/116

    INFORMATION MODELING

    The Madhya Pradesh Council of Science and Technology envisioned a new

    200-seat auditorium that blends architectural creativity and engineering skill to

    produce visually stunning geometry. Located near an astronomical observatory

    in Ujjain, India, the INR 20 million auditorium is shell-shaped with an ellipticaldome roof and curved RCC walls.

    As the structural consultants, Ashok Manhar & A ssociates were responsible

    for designing the ellipsis-shaped structure, which occupies 500 square meters

    and has a 30-meter axis and a 20 -meter axis. STAAD.Pro was used to analyze

    and visualize the unique geometry. The software enabled the engineers todetermine the precise forces at critical sections and achieve the optimum

    design for economy and safety.

    Ashok Manhar & Associates

    200-seat Capacity Auditorium

    Ujjain, India

    A new civic auditorium in Mohali, India, was designed as both a gathering

    place for people and an architectural landmark for the city. The building has a

    plan area of 115-by-53.3 meters, with a maximum height of 29.2 meters above

    ground. The curvilinear steel roof structure spans 112 meters from end to end

    and incorporates a 14-meter cantilever slab that serves as the upper level

    balcony.

    STAAD.Pro helped CE Con E ngineering to analyze the curvilinear roof structure

    with different load combinations. Design optimization was also achieved using

    additional Bentley software, which saved time and reduced project costs.

    Design reports helped the engineers to analyze and select for design safety.

    The resulting shape and size of the structure have the desired visual impact.

    CE Con Engineering

    Auditorium at Mohali

    Chandigarh, India

  • 8/9/2019 The Building Project showcase

    30/116

    INFORMATION MODELING

    28

    The 210-room Hotel Quaram Square is located 10 kilometers from the New Delhi

    airport. As part of a 500,000-square-foot shopping and entertainment complex, the

    hotel is 200,000 square feet over 12 floors. The architectural plan for the hotel was

    revised after the first floor was cast, and a major challenge in constructing the

    USD 56 million structure was accommodating this and other revisions.

    STAAD.Pro was critical to planning the structure, adding new elements,

    managing the many design revisions required, and maintaining the aesthetics.

    More than 40 analyses were run on STAAD.Pro before the design was finalized

    and approved. The optimization process saved significant costs in terms of the

    weight of steel used in the structure.

    Constructure Designs Pvt. Ltd.

    Hotel Quaram Square

    Gurgaon, India

    New Delhis first Formula One race track will occupy a sprawling complex

    on 700 acres. T he site includes a 5.4 kilometer race track and 2,100-meter

    grandstand with a wave-shaped roof. The go al of this project was to design the

    first phase of a 640-meter-long hanging cantilever-type roof with minimum riskand maximum cost economy.

    Constructure Designs used STAAD.Pro for modeling and analysis of the entire

    structural system and saved a significant amount of time by expe diting repeated

    tasks and frequently updating of design information. STAAD.Pro also saved

    significant costs in terms of the weight of steel because the design approachoptimized the size and depth of the sections.

    Constructure Designs Pvt. Ltd.

    Grandstand Roof Formula One Track

    Greater Noida, India

  • 8/9/2019 The Building Project showcase

    31/116

    INFORMATION MODELING

    The ice hockey arena in Dehradun is Indias first. The USD 22.5 million facility

    features a state-of-the-art swimming pool and a stadium for basketball,

    volleyball, table tennis, weightlifting, judo, wrestling, and gymnastics. Among the

    design challenges for a structure covering 12,320 square meters were the hillyterrain, the rinks arched roof, and the semicircular roofs needed for other areas.

    STAAD.Pro was used for modeling and analysis of the entire structural system,

    including analyzing all possible load cases combinations for the terrain. STAAD.

    Pros optimization approach enabled engineers to analyze the weight and

    depth of the steel neede d for maximum strength and safety. This resulted inconsiderable cost savings with regard to the amount of steel needed.

    Constructure Designs Pvt. Ltd.

    Ice Hockey and Skating Indoor Stadium

    Dehradun, India

    Located in Kutch, India, the USD 19.63 million project for Kalyani Global

    Engineering involved the supply and construction of an integrated facility for

    advanced subcritical and supercritical power plant equipment. Kirby Building

    Systems India designed two pre-engineered buildings totaling nearly 14,700

    metric tons of steel. One critical area was designed to carry an electrical

    overhead traveling crane weighing 600 metric tons.

    Kirby analyzed the critical load combinations in one third the time using

    STAAD.Pro, which improved productivity, reduced design cycle time, and cut

    costs through design optimization. Designs were easily imported to/exported

    from analysis packages. Integrated 3D models were reviewed to detect and

    resolve clashes. The improved quality resulted in less rework and revision.

    STAAD.Pro reduced man-hours by 20 percent and costs by 15 percent.

    Kirby Building Systems India Ltd.

    Pre-engineered Building Works for Kalyani Global Engineering

    Kutch, India

  • 8/9/2019 The Building Project showcase

    32/116

    INFORMATION MODELING

    30

    The Renault-Nissan Alliance plant in Chennai, India, seamlessly mixes the

    production of both Renault and Nissan products on the same line to achieve

    an annual capacity of 400,000 units. The 310,000-square-meter facility is the

    largest pre-engineered building in the world, with a maximum width of 260meters and single slope of 130 meters. The design took into account thermal

    stress due to temperature fluctuations.

    Kirby Building Systems India per formed engineering-to-construction services

    using STAAD.Pro for design and analysis in a flexible modeling environment.

    Kirbys alternative design scheme reduced the pre-engineered building tonnage

    by 4,110 metric tons and saved the client INR 348 million. Building elementswere erected stage by stage on site. The company reduced man-hours by 20

    percent and costs by 15 percent.

    Kirby Building Systems India Ltd.

    Renault-Nissan Automotive India, Tamil Nadu

    Chennai, India

    The USD 80 million HCC Real Estate Ltd. project is a multitenant, multiuse

    development in Mumbai, India, comprised of 0.2 million square feet of mall

    space on two levels, 1.1 million square feet of office space on three levels, and

    0.5 million square feet of covered parking on four levels. The complex also has

    a rooftop helipad.

    Objectives included energy efficiency, green design, centralized services, and

    fast-track installation. M/s CRN saved time using STAAD.Pro for all structural

    analysis and design, which was conducted for gravity loadings and lateral

    loadings with eight primary loadings and 41 loading combinations.

    M/s CRN Architects and Engineers

    247 Park HCC

    Mumbai, India

  • 8/9/2019 The Building Project showcase

    33/116

    INFORMATION MODELING

    The Anna Centenary Library in Chennai, India, is an international research

    facility with a public library holding 1.5 million books, multipurpose auditorium

    seating 1,200, open-air amphitheater seating 800, a food court, and other

    amenities. The energy-efficient design allows for maximum daylight andminimizes internal heat gain with resource-efficient elements.

    The complex demanded a range of spans and variety of s tructural systems to

    achieve the desired built form. STAAD.Pro was used to model, analyze, design,

    and detail the complete structure. STAAD.Pro saved up to 50 percent of time

    spent in analysis and design, and reduced structural materials by 15 percent.

    M/s CRN Architects and Engineers

    Anna Centenary Library

    Chennai, India

    The 60,00 0-capacity cricket stadium in Guwahati, Assam, India, features

    pre-engineered building construction, in which all structural members were

    manufactured at a Delhi factor y. Using pre-engineered buildings reduces on-site

    labor while maintaining accuracy and quality. Mahadeo Khurd & Associates

    designed the north stand of the stadium, which was an irregular shape with

    curved forms.

    The INR 3.5 billion stadium posed several design challenges, including designing

    a pre-engineered building structure with cur vature to withstand critical seismic

    and wind conditions. Mahadeo Khurd & Associates used STAAD.Pro to analyze

    and design the structure, calculate the forces, and determine the exact size of

    the members. The software reduced total costs by nearly 25 percent.

    Mahadeo Khurd & Associates

    Cricket Stadium

    Guwahati, India

  • 8/9/2019 The Building Project showcase

    34/116

    INFORMATION MODELING

    32

    The USD 70 million Ongc office complex in Rajarhat, India, is an unconventional

    building with multilevel office floors in each of two elevated tubular structures,

    which are different heights and at right angles to each other. The vertical core

    structure common to both horizontal tubes has a larger cross section than theother two core structures.

    The buildings geometry and proportions presented unusual structural design

    challenges, particularly with respect to vibrations. STAAD.Pros 3D model of the

    building optimized structural weight, and its advanced analysis feature reduced

    the engineering hours needed to evaluate several design iterations and analyzedifferent combinations of complex loading on the tubular structure.

    Mehro Consultants

    Office & Energy Centre, Ongc Ltd.

    Rajarhat, India

    Mokha Financial & Industrial Consultants was given three months to complete

    working drawings for a 40-megawatt backup power plant under design-

    build-transfer contract at the Multimodel International Cargo Hub and Airport

    at Nagpur, India. The firm implemented building information modeling to

    coordinate design among stakeholders scattered throughout India.

    Bentley Architecture enabled the firm to generate accurate estimates in the

    early stages. Working with consultants that were using 2D platforms, Mokha

    linked all drawings to the 3D model and distributed 3D PDFs for communications

    and clash detection. When the preliminary generation capacity of 28

    megawatts was nearly doubled, changes to the design and drawings were

    made with minimal man-hours.

    Mokha Financial and Industrial Consultants Pvt. Ltd

    Abhijeet MADC Power Plant

    Nagpur, India

  • 8/9/2019 The Building Project showcase

    35/116

    INFORMATION MODELING

    Mokha Financial and Industrial Consultants designed a residence of Shri Ajay

    Maloo in Raipur, India, using Bentley Architecture. This technology enabled the

    design team to complete renderings of the design more quickly than in the past,

    eliminating the need to retain a subconsultant.

    Using photometric (IES) files enabled the designers to prov ide much more accurate

    renderings. The photorealistic renderings of helped to convince the client that

    the design fulfilled the project intent. Mokha continues to use technologically

    advanced software to continue to upgrade the skills of its designers.

    Mokha Financial and Industrial Consultants Pvt. Ltd

    Residence of Shri Ajay Maloo

    Raipur, India

    The INR 240 million Army Public School in Jalandhar, India, is comprised of

    classrooms, administrative offices, facility block, and a multipurpose hall. The

    facility block is a unique, saucer-type structure with an inverted shell. The

    multipurpose hall is a two-story roller-compacted concrete structure with a

    seven-sided sloped roof.

    Modeling profiles of the structure and connection detailing for the roofs

    trussed joints at each end was challenging. Not more than two members in the

    structure were the same. Shreecon Consultants saved a significant amount of

    time and effort by using STAA D.Pro for the analysis and design of the structure.

    Shreecon Consultants

    Army Public School

    Jalandhar, India

  • 8/9/2019 The Building Project showcase

    36/116

    INFORMATION MODELING

    34

    Tata Consulting Engineers is one of Indias leading engineering consulting

    organizations. When the company designed a green office building in

    Jamshedpur for its own use, the building was conceptualized, planned, and

    designed completely using in-house architectural and engineering designcapabilities. The building consists of a ground floor plus seven stories. When

    complete, it will have basement parking for cars, two-power-wheelers,

    and bicycles.

    Structural steel was used for construction instead of reinforced concrete

    cement to avoid delays and to complete the work on schedule. STAAD.Pros

    structural analysis and design allowed engineers to quickly analyze and design

    the structure. The solution provided IS-800-based steel design, gave promptvalidations, and reduced the time needed for design-related processes.

    Tata Consulting Engineers Limited

    TCE Office Building

    Jamshedpur, India

    The design competition for the Atlantic Residential Project in Arbil, Iraq, pitted

    three engineering firms against one another in pursuit of the most economical

    design. Hamkar Company analyzed four alternatives for the 28-unit apartment

    complex before proposing a solution that was ultimately the most economical

    and the shortest in construction duration, compared to the other proposals.

    The USD 22.4 million quote was USD 5.6 million less than those of the other

    two firms. Hamkar achieved the low-cost alternative by using Bentleys

    Integrated Structural Modeling software to calculate the costs of various

    scenarios and perform finite element analysis. As a result, construction time

    and materials were minimized. Bentley training and technical support were

    instrumental in improving project team productivity.

    Hamkar Company

    Atlantic Residential Project

    Arbil, Iraq

  • 8/9/2019 The Building Project showcase

    37/116

  • 8/9/2019 The Building Project showcase

    38/116

    INFORMATION MODELING

    36

    As the only full-time production theater in Northern Ireland, the Lyric Theatre

    plays an important role in the regeneration of a city marred by recent conflict.

    The old Lyric was demolished in 2008 and replaced by a new USD 295 million

    venue with auditorium, studio theater, rehearsal room, and related facilities.The constraints of the urban site, combined with the functional requirement for

    acoustic separation, made for a complex building geometry.

    MicroStation PowerDraft and TriForma helped ODonnell + Tuomey overcome

    these complexities and deliver a design that embodies the spirit of theater

    production. Lined with Belfast brick, the purpose-built performance spaces

    wrap around intimate social spaces for impromptu gatherings. The softwareenabled precise coordination of the plans, sections, and layers for multiple

    subcontractors.

    ODonnell + Tuomey

    Lyric Theatre

    Belfast, Ireland

    Upon completion in 2010, the Aviva Stadium in Dublin, Ireland will provide

    a new home for the national rugby and football teams, providing weather-

    protected seating for 50,000. Built within the constraints of an existing site, the

    EUR 242 million stadium consists of a continuous curvilinear stand enclosed on

    all four sides. Populous achieved the organic-shape design through a series of

    GenerativeComponents models. The challenge was to ensure the concept was

    maintained from design development through construction stages.

    The exterior skin enveloped the roof and faade structures, combining both

    elements in one controlling form. This form needed to accommodate all the

    tolerances and technical requirements in one 3D model. Certain variables and

    base principles were established within the GenerativeComponents model,

    allowing Populous to push the boundaries of the architectural form without

    compromising on cost and time constraints.

    Populous

    Aviva Stadium

    Dublin, Ireland

  • 8/9/2019 The Building Project showcase

    39/116

    INFORMATION MODELING

    The goal of A.G.A.s Roma Gemelli Hospital project in Rome, Italy, was to

    communicate the idea for a project solution to the customer and then gain

    approval for the idea and move on to the production stage. The designer used

    3D modeling to render views and explain every detailmaterials, finishes,workmanships, assembling stepsto ensure customer satisfaction.

    MicroStation was used for all design work and, in particular, to create

    3D images and animations. The designer used these images to p rovide

    photorealistic, conceptual visualization. The use of MicroStation improved

    ergonomics and safety while paying particular attention to aesthetics and st yle.

    A.G.A.

    Created as Imagined (2)

    Rome, Italy

    The USD 13.2 million Exhibition Center of Scandiano is a 7,282-square-meter

    integrated exhibition complex that will host the Fair Trade Center of Scandiano

    as well as exhibitions, trade fairs, and public events. AEstudio improved

    upon the preliminary design concept by introducing architectural features

    emphasizing low environmental impact, high energy efficiency, minimal carbon

    dioxide emissions, and reduced future operating costs.

    The project team used MicroStation and Bentley Architecture to design the

    green building, which allowed it to develop the project in 3D and facilitated

    the visualization of how the building could be integrated with the surrounding

    environment. The 3D design tools allowed the team to immediately verify the

    project and control costs. Project strengths include the use of renewable energy

    and a green rooftop system.

    AEstudio

    New Exhibition Center of Scandiano

    Scandiano, Italy

  • 8/9/2019 The Building Project showcase

    40/116

    INFORMATION MODELING

    38

    Designed as part of the New Exhibition Center of Scandiano, the USD 2.6

    million self-service restaurant owned by CIR Food will function as a dine-in

    restaurant and food-service kitchen for schools, hospitals, and nursing homes.

    The building defines one side of the centers entrance square. The compact,trapezoidal structure is oriented to maximize solar capture on the faade and

    minimize energy use indoors.

    To the south, a 1,036-square-meter porch shades the 822-square-meter building

    footprint. To the east, vertical shades protect the restaurant windows. Using

    TriForma, AEstudio designed the porch and vertical shading system to let in

    light and heat in winter and block solar radiation in summer. The 3D model wasgeo-referenced to the shape of the shading blades based on building orientation

    and local solar radiation.

    AEstudio

    Self-Service Restaurant of Scandiano

    Scandiano, Italy

    The new owner of a caf and bakery in Casertas Vanvitelli Square had high

    expectations for its dcor. The shop is located near the Royal Palace of Caserta,

    a UNESCO World Heritage Site and emblem of Baroque architecture in Italy.

    The project goal for Andrea Girotto Architetto was to create a classic mood for

    the caf.

    The firm used MicroStation to provide a realistic visualization of the design

    with ultra-detailed views in every frame and angle. Communicating through 3D

    renderings and 3D PDFs allowed real-time checking of furnishing components,

    colors, and textures. Changes took less time than expe cted, and the final 3D

    version became the working drawing for the manufacturer.

    Andrea Girotto Architetto

    Real Classic Mood Caf

    Caserta, Italy

  • 8/9/2019 The Building Project showcase

    41/116

    INFORMATION MODELING

    CEL-ANA retained ARCHITEKNE to perform quantity surveying activities

    on a 4,50 0-square-metre residential building in Italy designed by Caprioglio

    Associates Architecture. In addition, ARCHITEKNE periodically evaluated the

    works carried out by the cons truction company Pio Guaraldo Spa andits subcontractors. The building has a b asement level and seven above-

    ground levels.

    Using Bentley Architecture, 3D models were constructed to organize the levels

    according to functional strata identifiable with the activities of the individual

    subcontractors. The 3D building model integrates the models of each level and

    enabled inspection of the project implementation and contractor works. Reportsgenerated in Excel allowed for quick technical and financial evaluation of the

    different technological solutions.

    ARCHITEKNE

    Quantity Surveying and Evaluation

    Mestre, Italy

    The objective of this USD 4.6 million residential building project in Pontassieve,

    Italy, was to implement innovative energy technologies such as solar

    greenhouse and photovoltaic solar panels with minimal cost as compared

    to conventional building construction. An accurate feasibility study and ROI

    analysis on bioclimatic architecture was adopted as the main driver for design.

    Architetto Enrico Cristoforetti used Bentley design software to facilitate rapid

    deployment of the project team and ensure design quality and project data

    accuracy. Project collaboration and data sharing for structural and mechanical

    design helped to optimize costs. Traditional structural design and construction

    methodologies were also adopted to reduce costs.

    Architetto Enrico Cristoforetti

    Residential Building and Public Facilities

    Pontassieve, Italy

  • 8/9/2019 The Building Project showcase

    42/116

  • 8/9/2019 The Building Project showcase

    43/116

    INFORMATION MODELING

    A EUR 11.9 million residential apartment complex located in the Milan region

    of Italy occupies a former industrial building site that is bisected by the

    administrative border of two municipalities. The complex has two buildings

    housing a total of 98 apartments. The building in San Giuliano Milanese is longwith vertical connections, and the building in San Donato Milanese is a tower.

    Faades feature loggias, stairs, and balconies.

    Caruso Mainardi Architetti Associati used MicroStation to achieve project goals

    and provide a high-quality design within the available budget. MicroStations

    flexible and intuitive software enabled designers to optimize the time spent

    drafting and revising the design. Both buildings achieved energy Class Acertification.

    Caruso Mainardi Architetti Associati

    Residential Buildings

    Milan, Italy

    Ekofarma specializes in studying, designing, and manufacturing custom

    furnishings for pharmacies. S. Onofrio, a privately owned pharmacy in Rome,

    Italy, retained Ekofarma to update the stores retail space and functionality

    to achieve a more modern image and customer experience. The EUR 260,0 00

    redesign created a contemporary pharmacy that featured emotional cues to

    capture consumers attention.

    Ekofarma chose MicroStation to achieve the project goals and Progenio to

    coordinate the project. Progenio is a MicroStation-based Bentley Channel

    Partner-developed application for the furniture, exhibition, building, and other

    markets. From design through development, MicroStation allowed the team

    to meet the requirements for flexibility and 3D photorealistic renderings that

    communicated the design concepts to the customer.

    Ekofarma S.r.l.

    Furnishing of a Pharmacy

    Rome, Italy

  • 8/9/2019 The Building Project showcase

    44/116

    INFORMATION MODELING

    42

    Located in Montefiore Conca, Italy, Borgo Della Neve is a new residential block

    of 30 apartments with buildings arranged in a square around a central garden

    and playground. The challenge for this EUR 5 million development was to blend

    in with the neighboring historic buildings while achieving an environmentally,socially, and economically sustainable design.

    LCA used MicroStation and Bentley Architecture to connect control, display,

    and calculation tools used on multiple platforms and office locations. All of the

    data from consultants working with different software products was merged

    on MicroStation. The ability to exchange data bet ween platforms and officesallowed the team to quickly and effectively deliver quality work, saving time

    and money.

    LCA

    Borgo Della Neve

    Montefiore Conca, Italy

    This USD 154 million project involved construction of a new downtown,

    replacing abandoned industrial buildings with buildings for residential and retail

    use. Architectural design criteria sought to create high-density areas, such as

    residential blocks with garden apartments and shared facilities, as well as open

    space with bicycle and pedestrian paths. Development plans also considered

    the location of existing transport lines.

    Rizzini Architetti used MicroStation to save time and achieve high quality in

    the overall design by taking advantage of the networking environment, working

    as a team, and using references. The ability to work with accuracy and high

    graphic definition in large and small scale contributed to the projects success.

    Rizzini submitted this project in the 2008 de sign competition conducted by

    Buccinasco municipality.

    Rizzini Architetti

    New Downtown

    Buccinasco, Italy

  • 8/9/2019 The Building Project showcase

    45/116

    INFORMATION MODELING

    Completed at a cost of nearly USD 900,000 in Bologna, Italy, this project

    involved a tensile cable-supported glass roof with stainless steel fixing system.

    The steel-and-glass roof presented complex geometric shapes that required

    special attention in the design of structural components.

    Sage used ProSteel to develop the complex design through 3D digital modeling.

    ProSteel enabled the project team to follow the entire design process through

    to completion.

    Sage srl

    DUC Bologna Municipality

    Bologna, Italy

    Renovation of the 4 0-year-old Shinryo Corporation headquarters in Tokyo,

    Japan, aimed to make the building an energy-efficient, comfortable working

    environment. The project team used highly efficient equipment, LED lighting,

    and green energy sources such as solar cooling systems. To maximize energy

    conservation, the team created a layout plan, and a duct and piping route

    installation plan.

    MicroStations 3D technology was used to verify this work, which reduced

    the time required to complete conceptual design by 200 man-hours. Verifying

    construction procedures and consistency reduced ordering of unnecessary

    materials equivalent to 100 man-hours. The 3D model was also used to ex plain

    the renovation work, saving 60 man-hours. The renovation reduced building

    energy usage by 40 percent and carbon dioxide exhaust by 37 percent.

    Shinryo Corporation

    Eco Renewal Project

    Tokyo, Japan

  • 8/9/2019 The Building Project showcase

    46/116

    INFORMATION MODELING

    44

    The USD 3 million Khatib Office Complex in Amman, Jordan, is a multiuse

    building with nine stories above ground and a parking garage below ground.

    The 9,250 -square-meter space accommodates commercial use on lower levels

    and offices on upper levels. The building has glass-and-metal clad facadeswith precast panels, reinforced concrete basement floor, and upper floors of

    composite structural steel and deck.

    Lateral systems use central core-braced frames supplemented with stair

    shear walls. The low floor-to-floor height of 3.3 meters complies with local

    regulations. RAM Structural System was used for the first time, saving at least

    50 percent of the hours under normal conditions. Revisions were easy and quickfor different layouts, loads, and lateral conditions.

    Professional Engineering Consultants Ltd.

    Khatib Office Complex

    Amman, Jordan

    For the conceptual design of a new, multibrand store for children, RendArk

    developed a photorealistic visualization entirely in MicroStation. The

    visualization featured realistic store lighting with high dynamic range

    renderings of area lights and point lights.

    The ability to use one product for the entire workflow, from modeling through

    rendering, was an advantage to the project team. The result was a realistic

    view of the store concept for this project in Astana, Kazakhstan.

    RendArk

    Multibrand Store for Children

    Astana, Kazakhstan

  • 8/9/2019 The Building Project showcase

    47/116

    INFORMATION MODELING

    To design sustainable housing that uses passive-solar energy, Witteveen+ Bos

    had to take into account the orientation of the buildings relative to the sun. The

    housing development was located on two hectares of land in the Kirchberg-

    Plateau quarter of Luxembourg City. The undeveloped area had no nearbybuildings to conduct a solar study, so a new approach was required.

    Witteveen+Bos used MicroStation to model solar sensors with various surfaces

    and angles toward the ground. Solar exposure calculations revealed the ideal

    angle for the building designs to maximize solar panel efficiency. Design

    of the houses incorporated the op timal sun orientation and the ideal angleof solar panels. Using the MicroStation Solar Exposure Calculator allowed

    Witteveen+Bos to quickly recoup the technology investment.

    Witteveen+Bos

    Solar-Orientated Design

    Luxembourg City, Luxembourg

    Bina Puri Construction, a wholly owned subsidiary of Bina Puri Holdings,

    provides civil and building engineering and construction services in both

    Malaysia and internationally. The MYR 17.36 million project in Kota Kinabalu,

    Malaysia, featured 33 units of two- to three-story shop offices occupying

    three blocks.

    The clients highly detailed specifications included a requirement to use 3D

    modeling. The company used Bentley Architecture to develop a contemporary

    layout and design for the commercial spaces. The ef ficiencies gained by using

    the 3D modeling software enabled the company to provide material quantities

    before the construction started.

    Bina Puri Construction Sdn Bhd

    33 Units Alamesra

    Kota Kinabalu, Malaysia

  • 8/9/2019 The Building Project showcase

    48/116

    INFORMATION MODELING

    46

    Menara Hap Seng is a landmark, 21-story office building in the heart of Kuala

    Lumpurs Golden Triangle. Constructed in the 1970s, the building recently

    underwent a USD 55 million upgrade and renovation to meet the requirements

    of modern, premium corporate space. The new design focused on architectural

    potential, site context, building image, ground-level usage, and the environment.

    The building was 50 percent oc cupied during the renovation, so work had to

    be carefully planned to not disrupt the business operations of those tenants.

    Bentley design software was used to design the plan and facilitate a tight

    construction schedule including site coordination, closed monitoring, logistics

    management, weekly forecasts, and ac celerated information sharing across

    project teams.

    DP Architects Sdn Bhd

    Menara Hap Seng

    Kuala Lumpur, Malaysia

    Ken Bangsar is an exclusive, 80-unit service residence located at the highest

    peak of Bangsar, Malaysia, complete with panoramic views of Kuala Lumpur. DP

    Architects was tasked with converting an abandoned 15-story office building

    into a 12-story residential building. With a USD 12 million budget, the architectsunderwent a rigorous design planning exercise to create an appealing and

    environmentally friendly residence.

    The design work was accomplished using MicroStation and its Luxology

    rendering engine. The Ken Bangsar development was Malaysias first high-

    rise residence to win the internationally recognized BCA Green Mark Gold

    Plus Award and Malaysias Green Building Index Gold Award for exemplaryenvironmental efficiencies.

    DP Architects Sdn Bhd

    Ken Bangsar Serviced Residences

    Bangsar, Malaysia

  • 8/9/2019 The Building Project showcase

    49/116

    INFORMATION MODELING

    Located in the hear t of Georgetown, a UNESCO World Heritage Site in

    Malaysia, the USD 1.8 million i Residence apartment complex required a

    rigorous design planning exercise. KH Architect developed a unique and

    modern conceptual design for the 14-story building configured to houseeleven 3,000-square-foot units. Each unit has a private lobby, sky garden, and

    panoramic view of Georgetown.

    KH Architect used MicroStation to perform 3D modeling and produce 2D

    drawings. The 3D modeling provided the opportunity to explore configurations

    with minimal impact on the site as well as eliminate conflicts. This saved

    valuable time for the design team. The visualization tools enhanced the clientsunderstanding of the design elements, and the Luxology rendering engine

    created a graphic p resentation to communicate the overall design.

    KH Architect

    i Residence

    Georgetown, Malaysia

    KH Architect designed a modern, three-story bungalow to be located on

    reclaimed land near the ocean in Malaysia. The client requested a sustainable

    design with environmentally friendly features that take advantage of the sea

    breezes. The conceptual design for the 5,0 00-square-foot home features an

    internal courtyard with floor-to-ceiling sliding and folding shutters for cross-

    ventilation and daylighting.

    Using MicroStation for 3D modeling, KH Architect explored various design

    concepts in the context of the suns orientation and then performed detailed

    modeling of the most sophisticated option. The modeling tools saved time

    and made it easy to generate 2D drawings from the 3D model. The Luxology

    rendering engine created a graphic presentation that communicated the design

    concept to the client.

    KH Architect

    Tanjong Pinang Villa

    Tanjong Pinang, Malaysia

  • 8/9/2019 The Building Project showcase

    50/116

    INFORMATION MODELING

    48

    Perunding Rekamaju was retained to design the roof supporting structure

    for the main terminal building of a USD 9.1 million low-cost carriage terminal

    (LCCT) in Sepang, Malaysia. The complicated structure was comprised of a

    steel truss system supported by pyramid-shaped steel pipe columns and restingon a reinforced concrete column-and-beam-frame. The goal was an economical

    design that met structural and seismic performance standards.

    STAAD.Pro was chosen for modeling, analysis, and design of the integrated

    structure, which included 21,400 nodes and 61,800 beams. A nalysis of

    member groupings reduced member types to 34 primary load cases and 35

    load combination cases. In-depth study and innovative engineering reducedthe clients estimated tonnage quantity from 2,0 00 to 1,900 tons. STAAD.Pro

    helped to produce an optimized design in less time.

    Perunding Rekamaju

    Main Terminal Building LCCT

    Sepang, Malaysia

    The greatest resource issue facing Namibia today is its lack of potable water.

    Left unresolved, this problem could stifle the countrys economic and social

    development. Inspired by the method used by Namibian desert beetles to catch

    moisture from the air, the Hydrological Centre of Excellence along the western

    coastline of Namibia will use its sails to capture large droplets of water from

    desert fog.

    Atlas Industries goal was to develop a design proposal for an education center

    that actively demonstrates alternative means of fresh water generation. The

    team used Bentley design software to quickly visualize 3D building models from

    2D drawings. The designers then used 3D modeling for more detailed analysis

    of critical components of the building. The building model will provide insight

    into the operation of the structure and inform maintenance and development.

    Atlas Industries

    Namibian Hydrological Centre of Excellence

    Western Coast, Namibia

  • 8/9/2019 The Building Project showcase

    51/116

  • 8/9/2019 The Building Project showcase

    52/116

    INFORMATION MODELING

    50

    This USD 142.5 million government office complex in Groningen, Netherlands,

    houses the national student loan administration and national tax offices.

    Located adjacent to a public city garden, the building accommodates 2,500

    workers and associated parking. T he National Buildings Service commissionedUNStudio for the architectural design of the building along with the 20-year

    management and maintenance of the facilities and ser vices.

    UNStudios design considered energy and material consumption as well as the

    buildings impact on the urban green space. Bentley Architecture allowed the

    project team to define all areas of the design, track changes, assess economic

    feasibility, and compare these elements against goals. The building informationmodeling-enabled design resulted in a fully integrated, intelligent design

    approach to sustainability.

    UNStudio

    EEA & Tax Offices

    Groningen, Netherlands

    Warren and Mahoney transformed the 1960s-era corporate campus of the

    Building Research Association of New Zealand ( BRANZ) into headquarters that

    reflect best practices in sustainable design. The NZD 11.4 million refurbishment

    created a contemporary staff facility and laboratory that facilitates inter-

    department communications, with the goal of fostering a more interactive and

    sustainable culture.

    The rural setting is 13 kilometers from Porirua City, requiring on-site provision

    of core services, ranging from sew