The Big Reno February – October 2007. The Vision. The Reality. The Permits April 3, 2007. Before…. The Hole - April 4. Dumpster #1. Weather April 4-5. The Snow - April 5. The Footings. The Foundation - April 22. The Good Guys. Bret. Todd. The Framing - April 25. - PowerPoint PPT PresentationTRANSCRIPT
The Big Reno
February – October 2007
The Vision
The Reality
The Permits April 3, 2007
Before…
The Hole - April 4
Dumpster #1
Weather April 4-5
The Snow - April 5
The Footings
The Foundation - April 22
The Good GuysBret Todd
The Framing - April 25
The Structure - April 26
Dumpster #2 - May 1
The Roof - May 3
The Old Kitchen
Kitchen Removal - May 11
The Demo
The Temporary Kitchen
The Dust
Reclaiming Brick - May 21
Brick Dated 1926
TDB - June 5
TDB - June 8
TDB - June 12
Guestroom Demo - Pinning
Kitchen Beam is in - June 15
TDB – June 22
Weather June 25-26
TDB – June 28
TDB – July 1
TDB – July 6
The Pockets & Pinning
The Pinning
Dumpster #3 – July 5-10
Wrong Windows – July 5Right Windows – August
18
Exterior viewWrong – Right!
Progress – July 7
Drywall
Taping
TDB – July 10
Heat Wave
TDB – July 15
Basement Beam is in July ??
Basement Beam
The Stairs
Foundation Wall Going…
…gone!
Basement Floor
Lighting
Heat Wave Continues
Hardwood Floors – July 14
Outdoor Oasis
Kitchen Installation
Soapstone - July 20
Kitchen installation July 19 – August 19
Powder Room
Basement Framing - July 21
LED Lights – WRONG; Zenon lights RIGHT!
Basement Drywall – Aug 2
Brick work – Aug 1-3Concept Reality
Brick finish
Finished Kitchen
Finished Basement