![Page 1: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/1.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
The Barrel Chasing project TAQA’s methodology for improving base well performance
0 0 Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Guido van Yperen Wouter Botermans, Willem-Jan Plug, Simon Vroemen
25 September 2012
7th European Gas Well Deliquification Conference
![Page 2: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/2.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
The Objective
The objective: Increase the production from the existing wells in the asset with 2.5-5%.
Why:
The majority of the TAQA Energy gas asset portfolio contains many
fields that are approaching end of field life. As a consequence many
wells are performing sub-optimal.
Problems: Liquid loading, start-up problems, water ingression, skin increase, etc. Approach: Look at available data. Analyze the well performance of wells and try to improve the bottleneck in a well. Carry out well re-mediations.
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 3: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/3.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Techniques to Consider
De-liquification techniques:
Foam injection (batch or capillary string)
Tailpipe extension
Velocity string
Gas-lifting
Plunger lifting
Wellhead pumps
(Wellhead) Compression
Other techniques
Re-perforation
Water shut-off
Acidizing
Scale inhibitor injection
Etc.
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 4: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/4.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Present Issues – 26 wells
3 TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 5: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/5.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well History
& Completion
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Estimate Gains &
Rank
Identify current production problems and
Identify anomalies on decline curve
Identify potential problem area’s
View historic well problems
Understand and describe changes
in historical P-Q curves
Construct Tubing and Liner Turner Liquid Loading
Curves
Rank on Urgency, Costs, Expected gain,
Chance of Success and Simplicity of Solution.
5. Find Bottleneck Identify problem area in wellbore or production
network
Focus on problem area
Consider list of possible re-mediations
![Page 6: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/6.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well and
Field Data
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Estimate Gains &
Rank
• Use day-to-day production experience
• Identify anomalies on decline curve
Identify potential problem area’s
View historic well problems
Understand and describe changes
in historical P-Q curves
Construct Tubing and Liner Turner Liquid Loading
Curves
Rank on Urgency, Costs, Expected gain,
Chance of Success and Simplicity of Solution.
5. Find Bottleneck Identify problem area in wellbore or production
network
Focus on problem area
Consider list of possible re-mediations
![Page 7: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/7.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Step 1: Analysis of Production Behaviour Example: P/15-09E1
\\pinoffspi001\PI-1215.pv
1.71
MPag
\\pinoffspi001\T I-1211.pv
9.88
C
\\pinoffspi001\PIC-1215.out
0.00
\\pinoffspi001\FI-3021.pv
0.01
e6Sm3d
THP WH-1201 GAS WH1 TEMP P15E WH-R01 top press 15E GAS FLOW
24/08/2012 04:42:0305/08/2012 07:21:11 18.89 days
Well P/15-9E1
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
0
45
0
100
0
0.2
WHP
Qgas
WHT
Production Behaviour:
Clear indications of
Liquid Loading
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 8: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/8.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well and
Field Data
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Rank Solutions
Identify current production problems and
Identify anomalies on decline curve
• Discover historic well problems
• Identify potential problem area’s
Understand and describe changes
in historical P-Q curves
Construct Tubing and Liner Turner Liquid Loading
Curves
Rank on Urgency, Costs, Expected gain,
Chance of Success and Simplicity of Solution.
5. Find Bottleneck Identify problem area in wellbore or production
network
Focus on problem area
Consider list of possible re-mediations
![Page 9: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/9.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
Step 2: Analysis of well history and completion Example: P/15-09E1
7” Liner
5-1/2” Tubing
35 m distance
perfs – perf.joint
GIIP = 4.0 BCM
Current RF = 94%
Pres = 21.5 Bara
Qgas = 100 kNm3/d
CGR = 70 m3/mln Nm3 (dropping out in pipeline)
Water Salinity = 1700 ppm (probably no salt scaling)
1% extra RF means 40 mln Nm3
Production history shows perfect decline
![Page 10: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/10.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well and
Field Data
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Estimate Gains &
Rank
Identify current production problems and
Identify anomalies on decline curve
Identify potential problem area’s
View historic well problems
• Understand and describe changes
in historical P-Q curves
• Construct Tubing and Liner Turner Liquid
Loading Curves
Rank on Urgency, Costs, Expected gain,
Chance of Success and Simplicity of Solution.
5. Find Bottleneck Identify problem area in wellbore or production
network
Focus on problem area
Consider list of possible re-mediations
![Page 11: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/11.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012 TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
Step 3/4: Construction of P-Q curve, Liquid Loading Example: P/15-09E1
Tubing Turner
liquid loading curve
(fixed)
Liner Turner liquid
loading curves
(dep. on BHP)
Wel Performance Curves
Suction Pressure
Reduction
![Page 12: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/12.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well and
Field Data
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Estimate Gains &
Rank
Identify current production problems and
Identify anomalies on decline curve
Identify potential problem area’s
View historic well problems
Understand and describe changes
in historical P-Q curves
Construct Tubing and Liner Turner Liquid Loading
Curves
Rank on Urgency, Costs, Expected gain,
Chance of Success and Simplicity of Solution.
5. Find Bottleneck • Identify problem area in wellbore or production
network
• Focus on problem area
• Consider list of possible re-mediations
![Page 13: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/13.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012 TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
Step 5/6: Problem and Solutions Example: P/15-09E1
• Problem: Liquid Loading
• Analysis:
– well performance stayed the same (no skin increase or water influx).
– The tubing is large 5-1/2”, water loads in the tubing.
– Well dependent on FTHP, tackle liquid problems in the pipeline or riser.
• Solutions Considered:
1) Velocity string 3.5 - 2.5” until perfs.
2) Foam in well
3) Foam in pipeline or P/15-D riser
![Page 14: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/14.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Methodology
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
1. Analyse Production
Data
2. Analyse Well and
Field Data
3. Construct Well
Performance Curve
4. Determine Liquid
Loading Regime
6. Propose Solutions
7. Estimate Gains &
Rank
Identify current production problems and
Identify anomalies on decline curve
Identify potential problem area’s
View historic well problems
Understand and describe changes
in historical P-Q curves
Construct Tubing and Liner Turner Liquid Loading
Curves
• Rank on Urgency, Costs, Expected gain, Chance
of Success and Simplicity of Solution.
5. Find Bottleneck Identify problem area in wellbore or production
network
Focus on problem area
Consider list of possible re-mediations
![Page 15: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/15.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Step 7: Ranking of wells
Rough Estimates (~Appraise Phase):
Costs of Well work
Incremental production (Rate, uptime and duration)
Chances of Success
1st Pass ranking of well work:
Urgency: High, medium, low
Unit Cost €/m3
Size of the Prize: how much potential left in field (“3P”)
Structural Solution preferred above Temporary
Simplicity of Solution
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 16: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/16.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Preliminary Outcomes - Preferred Options
15 TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
First
Choice
Second
Choice
![Page 17: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/17.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
Next Phase
• Further investigate options.
• Focus on up to 15 jobs
• If best option does not make it, second best option will be
evaluated
• Narrow down estimations of costs, benefits, practice etc
• Work out detailed plans with well engineering department
• Search for synergies and group well work in campaigns
16 TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
![Page 18: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/18.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
The Barrel Chasing Project
Other Examples
![Page 19: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/19.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
P/15-15A1: Tailpipe Extension
Key Figures:
GIIP = 0.57 BCM
Pres = 138.5 Bara
Qgas = 60 kNm3/d
Current RF = 35%
Current Qgas = 60 kNm3/d
TBG = 3 1/2”
Liner = 7”
Distance perf-TEG = 27 m
Formation fracked
Issue: start up problems after shut-ins
Analysis:
- Large liquid volumes (LGR = ~800 m3/mln Nm3)
- Water Salinity = 70.000 ppm (high, formation water)
- P/z indicates large drop after frac
- Clear signs of changed productivity on THP-Q plot
Shut off water or improve lifting
Considered Options:
1. Tailpipe Extension
2. Water Shut-Off (cement, plug, polymers)
Liquid
column
Improved
inflow
![Page 20: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/20.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
P/15-14s (and -12s): Foaming via methanol line
Key Figures:
GIIP = 0.8 BCM
Pres = 72 Bara
Qgas = 30 kNm3/d
Current RF = 79%
TBG = 2 7/8”
Liner = 7”
Distance perf-TEG = 27 m
Issue: Liquid Loading
Analysis:
- Large liquid volumes and high salinity (formation water)
- P/z indicates upward deviation (aquifer?)
- WSO not successful and expensive!! (reduction in productivity)
- Clear signs of decreased productivity on THP-Q plot
Improve lifting Considered Options:
1. Foam through methanol line (JIP project)
2. Foam via capstring
3. Re-install tailpipe extension
![Page 21: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/21.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012
P/15-17A3: Water Shut-Off
Key Figures:
GIIP = 0.26 BCM
Pres = 86 Bara
Qgas = 20 kNm3/d
Current RF = 83%
TBG = 3 1/2”
Liner = 7”
Distance perf-TEG = 11 m
Issue: start up problems
Analysis:
- MPLT indicated water influx
- Field map shows large exposure to aquifer
- Aquifer not seen on P/z plot
- Clear reduction of productivity seen on THP-Q plot
Start-up is blocked by liquid column
Considered Options:
1. Water shut-off, plug above Volpriehausen
2. Foam (batch or capillary string)
![Page 22: The Barrel Chasing project EG… · Non-Deal Roadshow Presentation The Barrel Chasing project TAQA’s methodology for improving base well performance 0 Guido van Yperen Wouter Botermans,](https://reader035.vdocuments.site/reader035/viewer/2022081400/6083c3c4123ae41fd95e0617/html5/thumbnails/22.jpg)
Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
The Barrel Chasing Project
21 21 Name Surname, Abu Dhabi, August 2012. Non-Deal Roadshow Presentation www.taqaglobal.com
QUESTIONS?
TAQA Barrel Chasing Project, EGWDC Groningen, 25 Sept 2012