thank you for choosing the ultraframe orangery …...5 dress the joint with lead. screw fi x the...

8
Installation Guide Version 1.1 | May 2011 Window & Door Products Orangery Products Home Extension Products Conservatory Products Skylight Products Orangery

Upload: others

Post on 20-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

Installation GuideVersion 1.1 | May 2011

Window & Door Products

Orangery Products

Home Extension Products

Conservatory Products

Skylight Products

Orangery

Page 2: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

2

Glazing bar

265mm insulatedbox gutter

Soffi t and vertical face in plaster board(not supplied)

Lead fl ashing(not supplied)

Coping stone(not supplied)

GRP fl ashing jointer trimInsulated cavity wall(not supplied)

Breathable membrane

Pre-fabricated structural cassette

Foam insulation

GRP cladding

18mmPlywood

Insulation packer Fascia inc Tapestry Ultraselect

11.5mm Plywood

Insulation BoardDrawing is not to scale

Dear Customer,

Thank you for choosing the Ultraframe Orangery system.

When you commence installation of the roof, please read the main Classic or Classic Plus guide that comes with the roof. It is critical that you follow this guide closely and you will need to co-ordinate masonry trades carefully when installing/completing the Orangery roof.

Any feedback –positive or negative – is welcomed so we can make the Classic roof even better. Please contact tech support on 0843 208 6953 or email [email protected]

Welcome“

”THE ORANGERY SYSTEM Section 1

Page 3: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

3

Locate the structural cassettes in position as shown Fit the hanger brackets to structural cassettes C & D.

Offer up structural cassettes C & D as shown. Ensure the lower faces are supported using props as shown. The critical thing is to make sure the underside of both cassettes are level.

From the top, tap down the hanging bracket tab and secure in place using 65mm round head nails.

Place the lateral structural cassettes A & B on the inner leaf of the cavity wall. Ensure adequate lifting capacity - eg. Genie Lifts.

Complete the walls to 1 brick above the lintel on both leaves of masonry. (Lintel missing to ensure clarity of image.)

Hanging bracket tab

21

3 4

5

ORANGERY INSTALLATION Section 2

6

Page 4: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

Slide the long fi xing brackets down between the structural cassette and the inner leaf of masonry. Screw fi x to the structural cassette. Note: The number of brackets supplied is dependant on the Orangery specifi cation and varies from project to project.

Fix the long fi xing brackets to the walls using the appropriate fi xings for the substrate.

The cassettes have timber packers pre installed around the perimeter of the structural cassettes but NOT where the noggin positions are. This supports the slab insulation and creates a pitch.

Lay the breathable membane in position.

Fix the structural cassettes to the host wall with the ‘L’ shape brackets provided. Fix at approx 1000mm centres. Note: The number of brackets supplied is dependant on the Orangery specifi cation and varies from project to project.

Next fasten the angled tie brackets to the cassettes ensuring that it lines up with the mortar joint - the back leg should fi t fl ush to the inner leaf of masonry.

4

Back leg

ORANGERY INSTALLATION

87

9 10

11 12

Page 5: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

5

Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied.

Screw fi x the pre-cut timber noggins into position. Use the markings on the box gutter to determine the positions. The noggins sit fl at onto the cassettes.

Lay in place the pre-cut insulation slabs.

Run a bead of Gutterbond (supplied) around the joint as shown, prior to fi xing the box gutter sections together. Please ensure that the supplied stainless steel nuts and bolts are used.

Lay the box gutter in position.

ORANGERY INSTALLATION

1413

15 16

17 18

Page 6: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

Fit the timber fi llet between the the GRP panels. Fit the GRP joint cover.. First postion the cover as shown and silde the two prongs under the front edge of the GRP panel. Roll back 90° into the fi nished position. Screw fi x the back edge to the parapet wall.

Using lead, fl ash over the GRP panels around the perimeter of the Orangery roof. Attach coping stone.

Bond the insulation panel to the box gutter (A), then having plaster- boarded the soffi t and fascia, fi t the internal fascia trim by screw fi xing through the fascia as shown, ensuring a packer piece is used behind each fi xing to ensure the trim isn’t compressed. Then add the ultraselect trim.

Having raised the masonry to its fi nished levels, lay the pre-formed GRP panels into position.

Fit the pre-cut 18mm plywood top panels and screw down to the noggins

6

A

Packer

ORANGERY INSTALLATION

2019

21 22

23 24

Page 7: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

7

The frames are now offered into position and the ‘Z’ brackets attached to the underside of the cassette - they should fi t neatly into the pre-rebated pockets in the soffi t of the cassette.

Now it is time to fi x the window frames into the masonry. Attach the ‘Z’ shaped brackets to the frames. Notch the frame rib extrusions fi rst to ensure ‘Z’ bracket seats correctly.

Now all the masonry is completed, trim the back edge of the hopper to hide the outlet. The outlet is fi tted with a capillary groove to prevent water tracking back.

If the primary cassettes are at 90° to the host wall, a pocket in the host wall is needed. Pack with slate to level and then make good.

ORANGERY INSTALLATION

2625

27

CASSETTE IS FIXED THROUGH THE HOST WALL

Page 8: Thank you for choosing the Ultraframe Orangery …...5 Dress the joint with lead. Screw fi x the box gutter down to the structural cassette using the brackets supplied. Screw fi

OIG

001

IW Q

1000

02/

11

It is

Ultr

afra

me’

s po

licy

to c

ontin

ually

see

k to

impr

ove

its p

rodu

cts,

pro

cess

es a

nd s

ervi

ces,

and

we

rese

rve

the

right

to c

hang

e sp

ecifi

catio

ns w

ithou

t prio

r not

ice.

Ultr

afra

me

is a

trad

ing

nam

e of

Ultr

afra

me

(UK

) Lim

ited