thailand's feed-in tariffs for solar...

35
Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions Sopitsuda Tongsopit Energy Research Institute, Chulalongkorn University E3 System Modeling and Analysis of Energy and Environmental Policy Reform in Asia, Organized by the Energy Studies Institute, NUS, Singapore 14 February 2014

Upload: others

Post on 02-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Sopitsuda Tongsopit

Energy Research Institute, Chulalongkorn University

E3 System Modeling and Analysis of Energy and Environmental Policy Reform in Asia,

Organized by the Energy Studies Institute, NUS, Singapore

14 February 2014

Page 2: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Background

On Thailand’s Power Sector and Solar Power Policy

Adder Program

Policy

Limitations

Solar Rooftop

Scenarios

Fixed Feed-in Tariff

Program (for solar)

Potential

Policy Reform

Overview

Page 3: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Thailand’s Power Sector High Growth in Power Consumption; Limited Resources

0

20

40

60

80

100

120

140

160

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

2010

Bill

ion

KW

h

Total Electricity Net Consumption (Billion Kilowatt-Hours)

Thailand

Indonesia

Malaysia

Vietnam

Philippines

Singapore

Myanmar

Brunei

Cambodia

Laos

Source: EIA (2013)

Natural Gas

68%

Lignite Coal 22%

Oil 0.8%

Hydro 4%

Import & Others

5%

Source: EPPO (2013) based on Jan-Feb 2013 generation data

3

Page 4: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

0

10

20

30

40

50

60

70

80

90

1002

00

0

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

Year

Fuel Share in Thailand’s Power Production(2000-2012) (percent)

Imported & Others

Oil

Hydro

Coal &

Natural Gas

Page 5: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Thailand Power Industry Structure

Source: Tongsopit and Greacen (2013)

Page 6: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Thailand’s Alternative Energy Development Plan (AEDP 2012-2021)

Type of RE

REDP

(2008-2022)

(MW)

AEDP

(2012-2021)

Targets

(MW)

AEDP

updated

targets (MW)

Solar 500 2,000 3,000

Wind 800 1,200 1,800

Hydro 324 1,608 324

Biomass 3,700 3,630 4,800

Biogas 120 600 3,600

MSW 160 160 400

Hydrogen 3.5 0 1

Geothermal - 1 1

Tidal - 2 1

Total 5,608 9,201 13,927

Page 7: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

2006 2007 2008 2009 2010 2011 2012 2013

Biogas 5.87 6.77 12.52 43.04 61.33 98.69 146.66 158.452

0

20

40

60

80

100

120

140

160

180

MW Biogas

Trends in RE Power Growth: before & after ADDER

2006 2007 2008 2009 2010 2011 2012 2013

Solar 0.01 1.44 1.75 7.67 26.29 110.97 361.91 781.89

0

100

200

300

400

500

600

700

800

900

MW Solar

2006 2007 2008 2009 2010 2011 2012 2013

Hydro 0.00 0.06 0.06 0.54 0.86 13.28 12.50 13.28

0

2

4

6

8

10

12

14

MW Hydro

2006 2007 2008 2009 2010 2011 2012 2013

Biomass 454.53 508.14 564.75 637.14 666.07 724.72 876.42 1126.4

0

200

400

600

800

1,000

1,200

MW Biomass

2006 2007 2008 2009 2010 2011 2012 2013

Waste 1.00 1.60 2.60 10.82 29.82 37.33 40.81 42.81

0

5

10

15

20

25

30

35

40

45

MW Waste

2006 2007 2008 2009 2010 2011 2012 2013

Wind 0.00 0.00 0.08 0.38 0.38 0.38 90.38 188.78

0.00

50.00

100.00

150.00

200.00

MW

Wind

Page 8: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

THAILAND’S ADDER RATES

Type of RE

Unit: US Dollars per kWh

Years

Supported

2007

Adder

Rate

2009

Adder

Rate

2010

Addder

Rate

Special

Adder for

Diesel

Replacem

ent

Special

Adder for

Three

Southern

most

Provinces

Biomass

Installed Capacity ≤ 1 MW 0.010 0.017 0.017 0.033 0.033 7

Installed Capacity > 1 MW 0.010 0.010 0.010 0.033 0.033 7

Biogas

Installed Capacity ≤ 1 MW 0.010 0.017 0.017 0.033 0.033 7

Installed Capacity > 1 MW 0.010 0.010 0.010 0.033 0.033 7

Waste

Landfill and Digestor 0.083 0.083 0.083 0.033 0.033 7

Thermal Process 0.083 0.117 0.117 0.033 0.033 7

Wind

Installed Capacity ≤ 50 kW 0.117 0.150 0.150 0.050 0.050 10

Installed Capacity > 50 kW 0.117 0.117 0.117 0.050 0.050 10

Small/Micro Hydro

50 kW <Installed Capacity

< 200 kW 0.013 0.027 0.027 0.033 0.033 7

Installed Capacity ≤ 50 kW 0.027 0.050 0.050 0.033 0.033 7

Solar 0.267 0.267 0.217* 0.050 0.050 10

Page 9: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

2006 2007 2008 2009 2010 2011 2012 2013

Solar 0.01 1.44 1.75 7.67 26.29 110.97 361.91 781.89

0

100

200

300

400

500

600

700

800

900

MW Solar

Source: REN21 (2012) for 1995-2011 data and Shahan (2013) for 2012 data

Global Solar PV Installed Capacity (1995-2013), GW

Thailand’s Solar PV Installed Capacity (2006-2013), MW

Source: SPP and VSPP database (2013)

Page 10: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

There are two types of feed-in tariffs in Thailand,

distinguished by the rate structure

Fixed-price FiT: *Tariff rate independent of wholesale/retail grid tariffs *Constant over a fixed period of time

*Policy framework approved in June 2010

*July 2013: First Fixed FiT rates for Solar

Premium-price FiT: *Total tariff rate varies with Ft+base tariff *increases over time

*As of 2014, available for 5 types of RE:

biomass, biogas, waste, wind, small/microhydro

Page 11: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Thailand’s Solar Adder Program Thailand was one of the first Asian countries to implement a feed-in tariff (FiTs) program

o Streamlined interconnection regulations and avoided-cost tariffs adopted by the Thai Cabinet in 2002.

o Technology-specific renewable energy premium tariffs in 2006.

o Adder is additional payment to RE generators on top of the normal prices that power producers would receive when selling electricity to the power utilities.

Page 12: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

o Eligibility VSPP (0-10 MW) SPP (10-90 MW)

o Rate Structure Premium-price FiT (paid on top of wholesale cost)

o Rates Differ by technology & scale No degression

o Cost control mechanism: Cap and Deadline

2008 Deadline lifted in March 2009 Except for solar, all other types of RE are

accepted until an acceptable level of rate impact is reached.

o Approval Process and Criteria Screened by utilities and approved by Management Committee

Approval Criteria: feeder MW cap

o Contract Term 5 years with automatic renewal

o Support Period 10 years for solar and wind; 7 years for biomass, biogas, MSW,

small/micro hydro

o Financing Mechanism Pass-through to ratepayers

o Program Review Subject to ad hoc approval by NEPC

Thailand’s Adder program Basic Features of Thailand’s Adder Program

Page 13: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Four fundamental approaches for determining FiT rates, based on:

oActual levelized cost of electricity generation;

o The “value” of renewable energy generation, either to society or to the utility (the avoided cost of utility);

o Fixed price incentives that are unrelated to the actual levelized cost of electricity generation or the value of renewable energy generation; and

o the result of an auction or bidding process.

Thailand has used a combination of these approaches in determining the Adder rates.

Thailand’s Adder program How Adder Rates are Determined (1):

Page 14: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Capacity MW

Useful life Years

Project Cost

• machine & equipment

• construction

$

Construction Period Years

Operating Hours

• Peak period

• Off-peak period

% of total

Capacity Factor %

O&M Cost

• operating cost per year

• part replacement

$/year

$

Other technology-specific assumptions (e.g., degrade factor for solar; cost of fuel supply per year for biomass, degression rate, etc.)

Plant-specific Assumptions

Interest Rate %

Exchange Rate %

Debt Leverage %

Loan payback Years

Tax privilege details

CDM income $/year

Thailand’s Adder program How Adder Rates are Determined (2):

Financial Assumptions

Reasonable IRRs

Page 15: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Adder (FiT) Policy Process Policy, Implementation, and Rules Setting

Page 16: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

The Evolution of Thailand’s Adder Program (1)

1992-2009: laying the foundation for the ADDER

1992 -Regulations for Power Purchase from SPPs (10-90 MW) approved EGAT was

allowed to purchase power from SPPs using non-conventional energy (RE &

Cogeneration) as fuel.

2002

-VSPP Regulations drafted, based on net-metering regulation in the U.S.,

approved by Cabinet, applicable to generation sized <1MW.

-Applicable to renewable and co-generation facilities

-up to 1 MW contracted capacity

-Tariffs set at avoided cost (wholesale or retail tariff + Ft)

2006 -contracted capacity of VSPP extended from 1 MW to 10 MW

-Feed-inTariffs (“ADDER”) program approved by Cabinet

2007

-ADDER program implemented by utilities

-ADDER rate bidding for biomass SPPs, 7 biomass projects chosen

-ADDER rates for wind power projects increased and support period for wind &

solar projects extended from 7 to 10 years

-ADDER rates for three southernmost provinces introduced

2009 -ADDER rates adjusted to encourage smaller-scale installations and diesel offsets

-Some rules and regulations adjusted (bid bond, dispatch, and rooftop solar)

Page 17: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

2010-2012: ADDER Program Reviewed and Revised

2010

-Solar application acceptance temporarily closed

-Policy to focus solar FiTs on rooftop systems only

-Post-approval regulations become more stringent for

all technologies

-Rate structure to be changed from adder to fixed

feed-in-tariff

-”Managing Committee” established to coordinate,

regulate the program and approve projects

2011-2012

-The study of fixed feed-in tariffs for all technologies

in process

The Evolution of Thailand’s Adder Program (2)

Page 18: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

2013: Brief Market Opening for Rooftop Solar, Community Solar

introduced

2013

-Additional targets for solar power = 1,000 MW

(200 MW rooftop solar + 800 MW community solar)

-New FiT Rates released for rooftop & community solar

-Application process was opened briefly between Oct-Nov 2013 for rooftop solar FiT

-More stringent regulation reflects learning past lessons

The Evolution of Thailand’s Adder Program (3)

Page 19: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Trend of MW in the Pipeline (All Renewables)

“Healthy Pipeline?” 19

Oversubscription to the solar ADDER program has been followed by governance challenges

Page 20: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Rate Structure

• Simple and easy for investors to integrate into investment plans.

• Special rates for the three southernmost provinces and remote areas with diesel generation

• guaranteed payment period for 10 years

• Utilities have good track record of honoring contracts

• High enough to attract investment

• However, no degression led to windfall profits

Enforceable Contracts

Attractive Rates

• Standardized interconnection through grid code

Uniform Interconnection Standards

20

Thailand’s Solar Adder program: Strengths

Page 21: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

• Land Use

Weak Regulatory Framework

• 2007-2010 Frequent rule changing in response to problems as they arise; rule changing and implementation were ad hoc and non-transparent

• 2013 improved rooftop solar regulation BUT still complicated permitting process

• Lack of effective monitoring and evaluation

• Thai solar market is directly shaped by global market forces, including surplus inventories from manufacturing countries

• A need to study the value added to the Thai economy

• Major energy policies are not integrated into a coherent framework

• Solar support faces high policy uncertainty:

interruption of support between 2010-2013

Brief market opening between Oct-Nov 2013

Economic/Financial

Lack of a Unified Energy Plan

• Justification of the adder cost to ratepayers • Potential environmental impacts of modules disposal

Social and Environmental

21

Thailand’s Solar Adder program: Challenges

Page 22: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

July 16, 2013: NEPC approved two policy packages, which reopens support of solar power in Thailand and increased the total government target from 2,000 to 3,000 MW.

1) Rooftop solar FiT for three scales of installations:

The total quota: 200 MW. All projects must be installed by December 2013. The system owners will get paid for 25 years.

The administrator of the program will be the Energy Regulatory Commission (ERC)

2) FiT for Community ground-mounted solar (1 Tambon, 1 Megawatt).

Total quota: 800 MW. All projects must be installed by December 2014.

The administrator will be Thailand's Village Fund and the Ministry of Energy.

Scale FiT Rate (Baht/kWh) Quota

0-10kW 6.96 100 MW

>10-250 kW 6.55 100 MW

>250 kW-1 MW 6.16

Year FiT Rate (Baht/kWh)

1-3 9.75

4-10 6.50

11-25 4.50

22

Recent Development for Thailand’s Solar Power Policy:

July 2013’s FiT for Solar Power

Page 23: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

55 MW

609 MW

28 MW

106 MW

0

100

200

300

400

500

600

700

Residential (0-10 kW) Commercial and Industrial (>10 kW- 1MW)

MW

Total Capacity Proposed (MW) Total Capacity Approved (MW)

Feed-in-Tariffa for Rooftop Solar PV (2013) Proposed and Approved Status vs. Target

3518 projects

228 projects

1,481 projects

6,437 projects

Targets = 100 MW + 100 MW

55 MW 102 MW

507 MW

28 MW 16 MW

90 MW

0

100

200

300

400

500

600

Residential (0-10 kW) Commercial (>10 kW-250kW)

Industrial (>250 kW-1MW)

MW

Total Capacity Proposed (MW) Total Capacity Approved (MW)

Approval Status of Feed-in-Tariff for Rooftop Solar PV (2013)

FiT for Rooftop Solar PV (2013) Proposed and Approved Status vs. Targets

Page 24: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

462 projects

1.63 MW

522 projects

4.55 MW

MEA Accepted Residential-Scale Applications

0 - 5 kWP

32 projects

0.54 MW

5 projects 0.37 MW

9 projects 1.11 Mw

5 projects 0.91 MW

38 projects

9.16 MW

MEA Accepted Commercial-Scale Applications

10 - 50 kWP

50 - 100 kWP

100-150 kWP

150-200 kWP

200-250 kWP

8 projects 3.17 MW

8 projects 5.2 MW

29 projects 28.04 MW

MEA Accepted Industrial-Scale Applications

250 - 500 kWP

500 - 750 kWP

750 - 1000 kWP

FiT Approval Status for Rooftop Solar – MEA (Total Installed Capacity = 54.69 MW)

Page 25: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

137 Projects 0.56 MW

1394 Projects

13.21 MW

PEA Accepted Residential-Scale Applications

0 - 5 kWP 5 - 10 kWP

13 Projects

0.25 MW

3 Projects 0.19MW 2 Projects

0.25 MW

4 Projects 0.70 Mw

12 Projects

2.92 MW

PEA Accepted Commercial-Scale Applications

10 - 50 kWP

50 - 100 kWP

100-150 kWP

150-200 kWP

200-250 kWP

2 Projects 0.91MW

5 Projects 3.01 MW

51 Projects

49.43 MW

PEA Accepted Industrial-Scale Applications

250 - 500 kWP

500 - 750 kWP

750 - 1000 kWP

FiT Approval Status for Rooftop Solar – PEA

Page 26: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

• Megawatt cap to prevent oversubscription and high impact on ratepayers

• Strict COD deadline as a condition for receiving FiT – to prevent speculators from selling PPAs

Strengths:

26

Lessons from 2013 Rooftop Solar FiT program

Challenges

• Residential market is still developing and unheard of to many.

• Complex Permitting Process: Even though the new rooftop solar regulation was well-designed and effectively implemented, complicated permitting process remains due to other related regulations to which PV systems must comply.

Building Permits

Factory Permits

Inverter Certification: Type-testing vs. Single inverter testi

• Uncertainty over future policy:

Continuous support is needed to earn the benefits of a sustainable market (e.g., job creation and innovation)

To address the concerns on ratepayers’ impact, degression rates should be applied; degression rates can be tied to volume as in Germany.

Page 27: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

• The purpose of this analysis is to determine

the feasibility of residential rooftop solar

projects in Thailand under three scenarios:

• NEPC assumptions

• Current market

• Market Stimulation

Model Analysis

Page 28: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Scenario Description 1. NEPC assumptions assumptions used to craft the 2013

rooftop FiT policy

2. Current market system prices are based on a survey from 10 system integrators available in Bangkok during Oct-Nov 2013

Financial assumptions remain the same and reflect available financing options for residential consumers

Income tax is included

3. Subsidized market system prices are based on a survey from 10 system integrators available in Bangkok during Oct-Nov 2013

A 20% tax incentive is provided in addition to the FiT

Characteristics of the Three Scenarios

Page 29: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Solar Power Roof Co., Ltd 100.3 THB/W

Thai Solar Future 96.3 THB/W

Bangkok Solar Co., Ltd. 95.2 THB/W

DNA Power Co., Ltd. 89.34 THB/W

TSUS Excellent Engineering Co., Ltd. 87.2 THB/W

Solar d Simply Clean Energy 82.14 THB/W

Grenzone (Thailand) Co., Ltd. 82 THB/W

Renewable Energy for Thai People Co.,Ltd. 80.25 THB/W

Polytechnology Co., Ltd. 80 THB/W

National Energy Policy Commission (NEPC) 63.7 THB/W (Base case)

ERC Brochure 60 THB/W Smart Solar Cell 62.25 THB/W

2013 Residential Rooftop Solar Price Survey

Page 30: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Assumptions – System Characteristics

NEPC CURRENT MARKET

MARKET STIMULATION

1. System Size 3.73 kW 3.73 kW 3.73 kW

2. System Cost 2.12 USD/W (63.7 THB/W)

2.96 USD/W (88.8 THB/W)

2.96 USD/W (88.8 THB/W)

3. O&M Cost (% of investment cost pa.)

0.68% 0.68% 0.68%

4. Capacity Factor 14.84% 14.84% 14.84%

5. Degradation Rate (% per year)

1% 1% 1%

6.System Lifetime 25 years 25 years 25 years

Assumptions – Financial Parameters

NEPC CURRENT MARKET

MARKET STIMULATION

1. D/E ratio 1:1 1:1 1:1

2. Interest Rate 7% 7% 7%

3. Loan term 15 years 15 years 15 years

4. Income tax 0% 10% 10%

5. Income tax incentive None None 20% of investment cost

5. FiT rate 6.96 6.96 6.96

6. FiT term 25 years 25 years 25 years

Page 31: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

SCENARIOS NEPC CURRENT MARKET

MARKET STIMULATION

Project IRR 10.25% 4.76% 7.06%

Equity IRR 12.03% 2.78% 6.36%

NPV 3,016 USD (90,493 THB)

1,707 USD (51,209 THB)

467 USD (14,014 THB)

Payback Period

7.72 years 20.08 years 16.64 years

Energy Produced

103,355 kWh 103,355 kWh 103,355 kWh

Total Subsidy 23,978 USD (719,352 THB)

23,978 USD (719,352 THB)

26,270 USD (788,097 THB)

Model Results of 3 Scenarios

Page 32: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Scenario 1: NEPC Assumptions

Scenario 2: Current Market

Page 33: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

Scenario 2: Current Market

Scenario 3: Subsidized Market

Page 34: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

• Mature Market Scenario: taking into account of meeting some load in the post-FiT era:

Electricity tariff forecast

Increased targets to correspond to future demand

Exploration of various financing options

Current target of 100 MW Rooftop solar results in modest environmental benefits.

0

20

40

60

80

100

120

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

2014 2015 2016 2017 2018

CO

2 R

ed

uct

ion

(to

ns)

CO2 Avoided (tons) MW

Further refinement of the model

Page 35: Thailand's Feed-in Tariffs for Solar Poweresi.nus.edu.sg/docs/default-source/event/sopitsuda... · Thailand's Feed-in Tariffs for Solar Power: Calculation, Impacts, and Future Directions

• Residential rooftop solar market in Thailand is a nascent market and will need more campaign and stimulus.

• Solar power support needs “transparency, longevity, and certainty” for the investors (Fulton and Auer, 2012) in order to obtain the benefits of clean energy growth.

• Benefits and costs need to be quantified and communicated in order to shape the vision & strategies for supporting solar PV.

• Tax revenues and rate-payer pass-through costs of supporting solar (which is the most expensive type of RE) must be justified on the grounds that solar power will eventually deliver the benefits that policies promise at competitive prices.

Policy Lessons and Proposed Reform