tf_list
TRANSCRIPT
-
7/28/2019 TF_list
1/5
CHECK LIST PROJECT ACTIVITY
Activity Name : Lac Split RNC Kayun3
PIC NPO NSN : JANGKUNG
PIC OSS NSN : GNIC
PIC INDOSAT :
NIW : Attached
PES CREATION
PES Creation Date : 2-Aug-12
PES Verification Date : dd-mmm-yy
No OK/NOK PES File:
1
2
ADJI ( DEL/ADD)
ADJG (DEL/ADD 2G) JANGKUNG
ADJW/ADJG UPDATE 3G JANGKUNG
3
Inner Cell
Outer Cell
Outer/ External LAC
4
POST ACTIVITY - PERFORMANCE
No Time Frame K/N Remark
1
After BSS Dbase creationIf there are discrepencies, revise the
dbase ASAPJANGK
After BSS Dbase creation If there are discrepencies, revise thedbase ASAP
JANGK
2
After BSS Dbase creationIf there are discrepencies, revise the
dbase ASAPJANGK
3
After SWAP Cutover
performedCheck BTS Manager JANGK
2 hours After SWAP Cutover
performedZAHP,ZAHO JANGK
After SWAP Cutover
performedCheck CS Traffic and PS Traffic JANGK
After SWAP Cutover
performed
Run RSRAN 000, RSRAN 084, RSRAN
073 and RSRAN 079JANGK
3 Hours after Cutover
performed (assume all
activities finished at 5 am)
Submit and summarize report JANGK
1. WBTS Status
5. Update Performance (OSS Statistic) at 8 am
1. WBTS Status (with new LAC if applicable)
Creation (List)
BILLING
Inner Cell, Outer Cell & External LAC Creation
Creation Confirm
3. WBTS Traffic
Item
WBTS
ADJS ( DEL/ADD)
MSC
2. WBTS Alarm
PIC
JANGKUNG
LUTFI
LUTFI
LUTFI
4. WBTS/RNC Performance Check
BSS Database Consistency Check against PES sent
Item
NSS Database Consistency Check
Site Status and Performance Audit
2. ADJx
-
7/28/2019 TF_list
2/5
F=10713
1
ok
ok
ok
ok
ok
ok
2 ok
ok
ok
ok
ok
4 ok
ok
ok
ok
ok
ok
ok
8 ok9 ok
10 ok
11 ok
12 ok
13 ok
14 ok
6 ROUTING AREA UPDATE3G - 2G (BORDER CLUSTER)
2G - 3G
HSDPA DOWNLOAD
7 CELL RESELECTION
HO INTRA SYSTEM CSHO INTRA SYSTEM PS
UPLOAD
VIDEO 3G - 3G
2G - 3G
HSDPA
3G - 3G
FUNCTIONALITY TEST BEFORE
RNC NAME: RNC KAYUN3
#Success
TEST CALL SUMMARY (22 ITEM TEST C
3G - 2G
#Fail #Not T
3
3G - 3G
RAB SERVICE TYPE
5 LOCATION UPDATE3G - 2G (BORDER CLUSTER)
2G - 3G
3G - OTHER OPERATOR
DATA (HTTP)
3G - PSTN
3
OTHER OPERATOR - 3G
PDP CONTEXT ACTIVATION
1st carrier
2G - 3G
3G - OTHER OPERATOR
NO
1 VOICE
3G - 3G
SMS
3G - 3G
3G - 2G
3G - 2G (BORDER CLUSTER)
2G - 3G
HSDPA PDP CONTEXT ACTIVATION
3G - 2G
HO INTER SYSTEM PS 3G - 2G
HO INTER SYSTEM CS
-
7/28/2019 TF_list
3/5
-
7/28/2019 TF_list
4/5
F=10713
1 2 3
ok ok ok
ok ok ok
ok ok ok
ok ok ok
ok ok ok
ok ok ok
2 ok ok okok ok ok
ok ok ok
ok ok ok
ok ok ok
4 ok ok ok
ok ok ok
ok ok ok
ok ok ok
ok ok ok
ok ok ok
ok ok ok
8 ok ok ok
9 ok ok ok
10 ok ok ok
11 ok ok ok
12 ok ok ok
13 ok ok ok
14 ok ok ok
FUNCTIONALITY TEST AFTER
RNC NAME: RNC KAYUN3
TEST CALL SUMMARY (22 ITEM TEST CALL)
#Success #Fail #Not Test yet Total
1st carrier
NO RAB SERVICE TYPE
3G_TERMINAL
1 VOICE
3G - 3G
3G - 2G
2G - 3G
3G - OTHER OPERATOR
3G - PSTN
OTHER OPERATOR - 3G
VIDEO 3G - 3G
3 SMS
3G - 3G
3G - 2G
2G - 3G
3G - OTHER OPERATOR
DATA (HTTP) PDP CONTEXT ACTIVATION
5 LOCATION UPDATE3G - 2G (BORDER CLUSTER)
2G - 3G
6ROUTING AREA
UPDATE
3G - 2G (BORDER CLUSTER)
2G - 3G
7 CELL RESELECTION3G - 2G (BORDER CLUSTER)
2G - 3G
HO INTRA SYSTEM CS 3G - 3G
HO INTRA SYSTEM PS 3G - 3G
HO INTER SYSTEM CS 3G - 2G
HSDPA UPLOAD
HO INTER SYSTEM PS 3G - 2G
HSDPA PDP CONTEXT ACTIVATION
HSDPA DOWNLOAD
-
7/28/2019 TF_list
5/5
NOTE: USIM requirement:
- Matrix
- IM3
- Mentari