Page 1 of 22 Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon Table of Contents Software interface .............................................................................................................................. 2 TESTING PROCEDURE:....................................................................................................................... 22

Upload: iisp-shams

Post on 15-Jan-2016

51 views

Category:

Documents


10 download

DESCRIPTION

Testing OF ABB relay REJ525

TRANSCRIPT

Page 1: Testing of ABB REJ525

Page 1 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

Table of Contents

Software interface .............................................................................................................................. 2

TESTING PROCEDURE: ....................................................................................................................... 22

Page 2: Testing of ABB REJ525

Page 2 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

Software interface

1. Open software and click on “INSERT OBJECT”.

2. Click on “Protection and Control” and then in left window click on “REJ5xx...”.

Page 3: Testing of ABB REJ525

Page 3 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

3. Click on OK and put Object name and object title. Object Title appears on next processes so

give it a formal name.

4. Now go to EDIT and click on OBJECT PROPERTIES.

Page 4: Testing of ABB REJ525

Page 4 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

5. Click on ATTRIBUTES.

6. Now click on SELECT NEW, then select the desired model and select the REVISION

accurately.

Page 5: Testing of ABB REJ525

Page 5 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

7. Click on Communication to select communication properties.

8. If your SPA port is not configured, click on SYSTEM CONFIGURATION.

Page 6: Testing of ABB REJ525

Page 6 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

9. Click on ADD.

10. Now check your USB to Serial converter port no. From device manager. Lets suppose it is

“1”. Then write 1 and click on OK.

Page 7: Testing of ABB REJ525

Page 7 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

11. Select your baud rate which is normally by default 96000 on relay and in software.

Page 8: Testing of ABB REJ525

Page 8 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

12. Click on OK.

13. Click on YES.

Page 9: Testing of ABB REJ525

Page 9 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

14. Always keep an eye on SPA address. It should be your com port no. Sometimes it becomes

zero or any other no.

15. You are done with the settings but always have a look on ATTRIBUTES in communication tab.

Relay name will be appearing the same as was selected in GENERAL tab. But just in case or if

some problem is coming in communication then have a look on it.

Page 10: Testing of ABB REJ525

Page 10 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

16. It should be same as was selected previously in GENERAL tab.

Page 11: Testing of ABB REJ525

Page 11 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

17. Now double click on right window RELAY SETTINGS TOOL.

18. Click on TRANSFERS and then select UPLOAD (Read from the Relay).

Page 12: Testing of ABB REJ525

Page 12 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

19. Click on ALL and then OK.

20. It should start reading settings from the relay. But IMPORTANT thing that don’t forget to

make relay CONFIGURATION>COMMUNICATION>SPA PORT>FRONT PORT. After some time

it will automatically go back to REAR PORT. So always check this setting before transferring

any thing to the relay or from the relay.

21. Now when the reading process is completed it means that no error should come during

reading. If it comes SOME SETTINGS WERE NOT READ then try reading again. When you are

done with reading a window like the one below will appear.

Page 13: Testing of ABB REJ525

Page 13 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

22. Now first tab is measurement tab. That is the measuring unit of the relay.

Page 14: Testing of ABB REJ525

Page 14 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

23. 2nd

tab is RECORDED DATA which is same as fault recorder.

24. 3rd

tab is SETTINGS. It is the main settings window. In which you can configure time delayed

and instantaneous O/C and E/F functions. When you click on SETTINGS you will find 5 more

tabs.

Page 15: Testing of ABB REJ525

Page 15 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

a. Miscellaneous = Group Selection (imp.)

Page 16: Testing of ABB REJ525

Page 16 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

b. Protect Stages = O/C, E/F pick up and time settings.

Page 17: Testing of ABB REJ525

Page 17 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

c. SGB = Switch Group Binary Inputs.

Page 18: Testing of ABB REJ525

Page 18 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

d. SGF1 = O/P configuration for respective functions.

e. SGF2 = Configuration for O/C function

f. SGF3 = E/F configuration

g. SGF4 = O/C IDMT curve type

h. SGF5 = E/F IDMT curve type

Page 19: Testing of ABB REJ525

Page 19 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

i. SGR = Relay O/P configuration

Page 20: Testing of ABB REJ525

Page 20 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

25. In CONFIGURATION you can configure diff. Parameters.

Page 21: Testing of ABB REJ525

Page 21 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

26. INFO is about the relay serial no. N etc.

Page 22: Testing of ABB REJ525

Page 22 of 22

Prepared by Qaisar Wali Khan, Testing Engineer, ThyssenKrupp Xervon

TESTING PROCEDURE:

27. Connect your freja current O/P to the relay Current I/P of any phase current coil. Lets say,

connect to RED phase coil of relay to O/P of freja. Inject current n check the pick up of the

relay for O/C.

28. Now inject in all other phases to check the pick up and similarly measure time.

29. Now connect your freja with neutral coil of the relay and inject current and check the pick up

of the relay for residual over current i.e. E/F and check its pick up and measure its time of

trip.