technical briefing work on the rÉseau express … · occasional dm or ma train users (weekend)...
TRANSCRIPT
![Page 1: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/1.jpg)
TECHNICAL BRIEFING
WORK ON THE RÉSEAU EXPRESS
MÉTROPOLITAINAPRIL 25, 2018
![Page 2: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/2.jpg)
Project progress
• Contract signed with the winning consortia on April 12, 2018
• Project office set up for the REM
• NouvLR is at the intensive planning stage
• Design-build
• Preparatory work has been carried out in the field since March 2018
• Summer 2018: work will actively start on all branches
2018-2019 SCHEDULE
![Page 3: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/3.jpg)
Québec’s largest public transit
project in the last 50 years
2018-2019 SCHEDULE
• A linear project – a 67-km route
almost as long as the Montréal metro
• Many different trades – nearly 34,000
jobs during the construction
• Coordination with 11 municipalities,
8 boroughs and 5 public transit
organizations – project
office with more than
1 000 experts
![Page 4: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/4.jpg)
A project involving several partners
• Infrastructure engineering,
procurement and construction
Project Realization
Project Integration
• Rolling stock, systems and operation
and maintenance services
Mobilité Montréal
committees
Work impact
management
committees
Coordination
committees
– government
departments,
municipalities and
partners
Coordination
committees –
ARTM and
transit authorities
More than 20 work planning and monitoring committees
2018-2019 SCHEDULE
![Page 5: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/5.jpg)
• Implementation of a new technology: automated electric light rail on fully dedicated lines
(dedicated corridor)
• Construction of Rive-Sud, airport and Sainte-Anne-de-Bellevue branches
• Conversion of the route to accommodate a light rail on the Deux-Montagnes line
• Crossings closed
• Modernization of the Mont-Royal Tunnel
• Construction of three connections to the metro (McGill, Édouard-Montpetit and
Bonaventure) and an intermodal station (Correspondance A40)
• Construction of 26 REM stations
• Enclosed and weatherproof station buildings, and designed for universal access
Overview of the work
2018-2019 SCHEDULE
![Page 6: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/6.jpg)
Ground-level station
2018-2019 SCHEDULE
![Page 7: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/7.jpg)
Elevated station
2018-2019 SCHEDULE
![Page 8: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/8.jpg)
![Page 9: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/9.jpg)
3
4
1
2
![Page 10: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/10.jpg)
1. SOUTH SHORE
![Page 11: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/11.jpg)
Legend
CALENDRIER 2018-2019
Work in progress in the indicated period
Work continuing in the indicated period
Work with significant impacts
![Page 12: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/12.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Reconfiguration of Highway 10
Construction of the elevated structure on Highway
10, the terminal station and De Rome Blvd.
Preparatory work on Marc-
Cantin Street
Preparatory work along the entire route
• Geotechnical surveys
• Location and relocation of public and municipal
services
Construction of
structure above
CN/Malo/Leduc
Preparatory work on
Highway 10 median
![Page 13: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/13.jpg)
Summer 2018 Reconfiguration of Highway 10
Target area
2018-2019 SCHEDULE
![Page 14: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/14.jpg)
Future Du Quartier Station
Summer 2018 Reconfiguration of Highway 10
Maintaining two lanes in each direction
2018-2019 SCHEDULE
![Page 15: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/15.jpg)
Summer 2018 CN/Malo/Leduc construction
Target area
2018-2019 SCHEDULE
Leduc Blvd.DIX30
![Page 16: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/16.jpg)
REM WORK
Summer 2018 Construction of a structure above the CN track (Malo/Leduc)
Coordination with Ville de Brossard
![Page 17: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/17.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Construction of
structure above
CN/Malo/Leduc
Construction of
Lachine Canal bridge
Construction of
temporary Panama
terminal
Set up an exit ramp
from Highway 10 to
Taschereau Blvd.
Construction of
temporary access ramp
at Lapinière Blvd.
Construction of
Du Quartier Station
Construction of the elevated structure on Highway
10, the terminal station and De Rome Blvd.
Preparatory work on
Highway 10 median
Relocation
of Marc-Cantin Street
Construction of
elevated Pointe-
Saint-Charles
structure
![Page 18: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/18.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Construction of REM
Panama terminalDemolition of
Chevrier tunnel
Construction of
structure above
CN/Malo/Leduc
Preparatory work on
Highway 10 median
Construction of Station
Du Quartier
Construction of the elevated structure on Highway
10, the terminal station and De Rome Blvd.
Construction of
Lachine Canal
bridge
Construction of
De la Commune
bridge
Relocation
of Marc-Cantin Street
Construction of
elevated Pointe-
Saint-Charles
structure
![Page 19: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/19.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Construction of REM
Panama terminal
Construction of
Montée Gobeil
artwork
Prep. work
on Gare
Centrale
Construction of Île-
des-Sœurs Station
Construction of bridge
over Île-des-Sœurs
ChannelConstruction of
Station Panama
Construction of REM structures and tracks
in Highway 10 median
Construction of Station
Du Quartier
Construction of the elevated structure on Highway
10, the terminal station and De Rome Blvd.
![Page 20: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/20.jpg)
Mila
n B
lvd.
Taschere
au B
lvd.
Leduc Blvd.
Lapinière Blvd.
Chevrier
terminalPanama
terminal
Pelle
tier
Blv
d.
Summer 2018
Temporary
terminal
Maintenance of preferential bus accesses
Small stretch of reserved lane removed
To Champlain
Bridge
To South Shore
![Page 21: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/21.jpg)
Mila
n B
lvd.
Taschere
au B
lvd.
Pelle
tier
Blv
d. Chevrier
terminal
Leduc Blvd.
Lapinière Blvd.
Temporary
terminal
Future REM
terminal
Several scenarios under study for the trip home
2019 New access ramp for Chevrier terminal
Chevrier tunnel closure
To Champlain
Bridge
To South Shore
![Page 22: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/22.jpg)
Mila
n B
lvd.
Taschere
au B
lvd.
Pelle
tier
Blv
d.
Lapinière Blvd.
Temporary
terminal
Several scenarios under study for the trip home
New access ramps for the Chevrier and Panama terminals
Highway 10 middle lane closed off for the work2019
To Champlain
Bridge
To South Shore
Leduc Blvd.
Future REM
terminal
![Page 23: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/23.jpg)
2. MCGILL AND
ÉDOUARD-MONTPETIT
![Page 24: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/24.jpg)
REM WORK
Summer 2018 Excavation and construction of future REM entrance structure
Coordination with Ville de Montréal and Université de Montréal
![Page 25: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/25.jpg)
REM WORK
Fall 2018 Construction of future connection – obstruction on McGill College
Coordination with Ville de Montréal and the STM
![Page 26: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/26.jpg)
3. DEUX-MONTAGNES
LINE
![Page 27: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/27.jpg)
Construction of a temporary
workshop for the Deux-
Montagnes trains
Reconfiguration of
Cornwall bridge
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Preparatory work along the entire route:
• Geotechnical surveys
• Location and relocation of public and municipal
services
![Page 28: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/28.jpg)
Construction of a temporary
workshop for the Deux-
Montagnes trains
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Construction of a temporary
garage for the Mascouche trains
Construction of
Mont-Royal Station
Construction of
Station Canora
Excavation of
Édouard-Montpetit
Station
Reconfiguration of
Cornwall bridge
![Page 29: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/29.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Construction of a
temporary
garage for the
Mascouche trains
Construction of
Canora Station
Excavation of
Édouard-Montpetit
Station
Reconfiguration of
Cornwall bridgeReconstruction of
Côte-Vertu bridge
(summer 2019)
Construction of
temporary
platforms at
Du Ruisseau
Reconstruction of
Henri-Bourassa bridge
(summer 2019)
Construction of
Mont-Royal Station
Construction of
Correspondance A40
Station
Excavation of
Station McGill via
McGill College
Avenue
Reconstruction
of CP bridge
Switch
installation in
Mont-Royal
tunnel
![Page 30: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/30.jpg)
Construction of two new
railway bridges
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
![Page 31: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/31.jpg)
April 2018 Work mainly done on weekends (Friday night to Monday morning)
Alternative service for some stations (Friday evening to Monday morning)
![Page 32: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/32.jpg)
Construction of
south portionConstruction of
Station A40
Construction of south
portion of Stations
Canora and Mont-Royal
June 2018
Construction of
Stations Édouard-
Montpetit and McGill
Work during the week – south segment closed offChange to Deux-Montagnes and Mascouche schedules Deux-Montagnes: two departures in the morning / one departure in the evening removed
(from or to the stations on the Island of Montréal)
![Page 33: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/33.jpg)
Construction of
south portion
Spring 2019 Work during the week – north segment closed off
New
switch to
be built
Construction of
A40 Station
Construction of south
and north portions of
Canora and Mont-Royal
Stations
Construction of
Édouard-Montpetit
and McGill Stations
Change to Deux-Montagnes and Mascouche schedules Deux-Montagnes: two departures in the morning / one departure in the evening removed
(from or to the stations on the Island of Montréal)
![Page 34: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/34.jpg)
Construction of
south portion
Construction
of A40 Station
Construction of south
and north portions of
Canora and Mont-Royal
Stations
Construction of Édouard-
Montpetit and McGill
Stations
Fall 2019 Work during the week – north segment closed off (extension)
Change to Deux-Montagnes and Mascouche schedules Deux-Montagnes: two departures in the morning / one departure in the evening removed
(from or to the stations on the Island of Montréal)
![Page 35: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/35.jpg)
Early 2020 Intensive work – stretch from Du Ruisseau to Central Station closed off
Alternative transit solutions required
![Page 36: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/36.jpg)
4. AIRPORT AND
WEST ISLAND
![Page 37: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/37.jpg)
Geotechnical
investigations and
studies
Surveying
Demolition of
Doney branch
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Preparatory work along the entire route
• Geotechnical surveys
• Location and relocation of public and municipal
services
Relocation of public
utilities
(Alfred-Nobel Blvd.)
![Page 38: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/38.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Excavation at the
Technoparc
Preparatory work along the entire route
• Geotechnical surveys
• Location and relocation of public and municipal
services
Lay foundation for continuous
elevated structure
(on the whole branch)
![Page 39: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/39.jpg)
2018 2019
Jan. to
April
May to
Aug.
Sept. to
Dec.
Jan. to
April
May to
Aug.
Sept.
to Dec.
Installation of
superstructure
Installation of
superstructure
Work at the
Technoparc
Boring of Airport
tunnel
Lay foundation for continuous
elevated structure
(on the whole branch)
![Page 40: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/40.jpg)
TECHNICAL
DETAILS
![Page 41: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/41.jpg)
REM WORK
Elevated structure – prefab parts
Image for information
purposes only
![Page 42: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/42.jpg)
REM WORK
Airport tunnel
Image for information
purposes only
![Page 43: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/43.jpg)
MAINTAINING
MOBILITY
![Page 44: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/44.jpg)
Process for coordinating public transit mitigation measures
ARTM MITIGATION MEASURES
Approval and
communication
Strategic
component
TechnicalDesign and
implementation of
technical solutions
Steering CommitteeREM / MTMDET / ARTM
Vehicle
acquisitionsRail serviceService planning
Customer
communication
and experience
Priority bus
measures
Terminal
facilities
Coordination
CommitteeARTM / REM / RTL / RTM /
STL / STM
MTMDET / Cities
![Page 45: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/45.jpg)
Public transit mitigation measures for Phase 1-a (April 27, 2018)
ARTM MITIGATION MEASURES
Description des mesures
RTM • Express 400 bus “Grand-Moulin / Deux-Montagnes / Montmorency”
• Friday evenings and weekends
STL • Addition of a collective taxi line to serve Île-Bigras train station, to line 26 and
Montmorency metro station
STM • “Trainbus 968” temporary shuttle between Côte-Vertu metro station and Sunnybrooke
and Roxboro-Pierrefonds train stations
• Line “470 Express Pierrefonds”, between Côte-Vertu metro station and Fairview
Terminus
In addition to the existing STL and STM services in the areas of the affected stations.
These services will be offered on Friday evenings, as well as Saturdays and Sundays.
![Page 46: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/46.jpg)
ARTM MITIGATION MEASURES
Customer Before After
A
Took the DM train Friday evening and/or on
the weekend from Deux-Montagnes to
downtown Montréal
RTM bus – Laurentides (or RTM
shuttle) + Montmorency metro
B
Took the DM train Friday evening and/or on
the weekend from Laval to downtown
Montréal
STL bus + Montmorency metro
C
Took the DM train Friday evening and/or on
the weekend from the West Island to
downtown Montréal
STM bus + Côte-Vertu metro
D
Took the MA train Friday evening to go
back to the North Shore
Took the MA train Friday evening to go
back to the east part of Montréal Island
Metro + RTM bus – Les Moulins or
l’Assomption
Metro + STM bus
Public transit mitigation measures for Phase 1-a (April 27, 2018)
![Page 47: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/47.jpg)
48
Ste
-Do
roth
ée
Île-B
igra
s
Ro
xb
oro
-Pie
rrefo
nd
s
Su
nn
yb
roo
ke
Deu
x-M
on
tag
nes
Gra
nd
-Mo
ulin
Bo
is-F
ran
c
Du
Ru
isseau
Mo
ntp
ellie
r
Mo
nt-
Ro
yal
Can
ora
Gare
Cen
trale
Measures description
RTM 400 Serving the Deux-Montagnes and Grand-Moulin stations to the Montmorency metro station
STL Collective
taxi
Serving Île-Bigras train station to line 26 and Montmorency metro station
STM 968 Serving Roxboro-Pierrefonds and Sunnybrooke train stations to Côte-Vertu metro station
Ex
pre
ss
400
Co
lle
cti
ve
ta
xi
Tra
inb
us
968
Exis
tin
g
se
rvic
es
Existing services
Côte-vertu
Terminus Fairview STM 470 Line
![Page 48: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/48.jpg)
OPUS+ membership Monthly Occasional
Target
clientele
Holders of an annual DM
and MA TRAIN pass
Customer already has a
pass
Holders of a monthly DM
and MA TRAIN pass
Customer already has
a pass
Occasional DM or MA train
users (weekend)
Customer has not yet
purchased a pass
Solution
“TRAM 8 multi-month unlimited weekend” pass valid
until September 30 at no additional cost
on a chip card
“TRAM 8 unlimited
weekend” pass
valid for one weekend only
on an occasional chip card
($13.75)
Fare measures for Phase 1-a (April 27, 2018)
ARTM MITIGATION MEASURES
![Page 49: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/49.jpg)
NEXT STEPS
![Page 50: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/50.jpg)
Objective: Regularly and proactively provide complete information before the work
• Community Relations Office in place and in the field as of May 2018
For residents affected by the work:
• Neighbourhood campaigns to inform residents affected by the upcoming work
• Targeted meetings
• Neighbourhood committees
For public transit users:
• Information campaign
Approach with the public
2018-2019 SCHEDULE
Ongoing public information activities
![Page 51: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/51.jpg)
2018-2019 SCHEDULE
![Page 52: TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS … · Occasional DM or MA train users (weekend) Customer has not yet purchased a pass Solution “TRAM 8 multi-month unlimited weekend”](https://reader034.vdocuments.site/reader034/viewer/2022050718/5e1720016864bd273c460e43/html5/thumbnails/52.jpg)
Solutions for the Deux-Montagnes line
2018-2019 SCHEDULE
Innovation forum
with mobility partners
FALL 2018
Focus groups to find solutions
Objective: Find innovative solutions together with all the actors concerned