Page 1: Team Big Green  SpaceGasm Pre-Critica l Design Review

Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong

05 October 2010

Page 2: Team Big Green  SpaceGasm Pre-Critica l Design Review

Mission objective: Take measurements of the concentrations of carbon monoxide, carbon dioxide, and methane gases

Expectations: Stagnant to slightly increased levels of each gas

Hypothesis: Concentrations have increased during the course of the year ◦ Not enough time to see effects of transition◦ Effects of Fourmile Canyon, Loveland, and Grand County

fires

2

Page 3: Team Big Green  SpaceGasm Pre-Critica l Design Review

Purpose of Mission: The team’s interest in the quality of air and changes that were recently experienced over the past few years◦ World’s recent transition to more environmentally

sustainable resources and fuels◦ Recent forest fires in Colorado◦ Document any measured changes◦ Data retrieved from this flight will provide

standard

3

Page 4: Team Big Green  SpaceGasm Pre-Critica l Design Review

Level Number Requirements

1Payload must ascend to an altitude of approximately thirty kilometers with a balloon provided by the Edge of Space Sciences

2Payload must collect and store science data related to the mission objective

3 The internal temperature of the payload must remain above -10°C4 The total mass of the payload must not exceed 850 grams

5The payload must allow for a HOBO H08-004-02 and the provided external temperature cable

6The payload must allow for a Canon A570IS Digital Camera with two AA lithium batteries

7 The payload must carry an active heater system8 The payload must be constructed from foam core

9The payload must have contact information written on the external of the payload, alongside an United States flag

10The team will be ready to launch on November 6, 2010, at Windsor, Colorado, at 6:50 AM.

11The team shall adhere to all safety procedures outlined in the proposal

4

Page 5: Team Big Green  SpaceGasm Pre-Critica l Design Review

5

Level Number Requirements

1

1 Payload must remain attached to the flight string during the mission

2The payload will carry carbon monoxide, carbon dioxide, and methane gas sensors to record the concentrations of each gas at different altitudes

3The entire payload, including all electrical components and structural materials, shall weigh 760 grams

4The HOBO H08-004-02 shall measure and record measurements of internal and external temperature and relative humidity with the provided external temperature cable during the mission.

5The Canon A570IS Digital Camera will take and store images during the flight.

6Program the Arduino microcontroller with the integrated development environment using the Java programming language

7a Interface the carbon monoxide gas sensor to the Arduino microcontroller7b Interface the carbon dioxide gas sensor to the Arduino microcontroller7c Interface the methane gas sensor to the Arduino microcontroller

7d

Test the functionality of the gas sensors individually and then test the functionality of the sensors integrated together on the Arduino microcontroller by placing the sensors behind the exhaust pipe of a running automobile that belongs to a member of the team.

8Provide the necessary power to each electrical component and ensure that the recorded data is being properly stored

9Create a structure that can withstand the forces and extreme temperatures experienced during flight

Page 6: Team Big Green  SpaceGasm Pre-Critica l Design Review

Basic Circuit Structure & Implementation of Sensors◦ CH4, CO, CO2

◦ Calibration Writing Arduino Based IDE Software (Java) Testing of hardware and software (together) Analyzing Data

◦ Functions (ppm vs. altitude)◦ Colorado Department of Public Health and

Environment

Page 7: Team Big Green  SpaceGasm Pre-Critica l Design Review

Equipment overview:◦ Provided:

Foam core, digital camera, HOBO and external temperature probe, resistors, non-metal flight tube

◦ Purchased: Arduino microcontroller, carbon monoxide sensors, carbon

dioxide sensors, methane sensors, microSD card, breakout board, prototype board

Additional hardware will require approximately three days to arrive

◦ Not purchased: Dry ice, additional batteries, desiccants These can be purchased at a local store and can be

purchased within a day

7

Page 8: Team Big Green  SpaceGasm Pre-Critica l Design Review

8

Page 9: Team Big Green  SpaceGasm Pre-Critica l Design Review

9

Page 10: Team Big Green  SpaceGasm Pre-Critica l Design Review

10

Page 11: Team Big Green  SpaceGasm Pre-Critica l Design Review

Materials & DeviceBudgeted

CostSource

Budgeted Weight

Structure

Foam Core Provided Gateway 20gInsulation Provided Gateway 10g

Desiccants $10 SilicaGelPackets.com 12g

HardwareCanon Camera Provided Gateway 220gHOBO Provided Gateway 30gHeater System Provided Gateway 100g

Arduino (2) $59.90 SparkFun 20g

ProtoBoard (2) $9.00 SparkFun 15g

Methane Gas Sensor (2)

$9.90 Sparkfun 30g

CO2 Gas Sensor (2) $33.98 Parallax 30g

CO Gas Sensor (2) $9.90 SparkFun 30g

Wiring Provided Gateway 20g Switches Provided Gateway 10g

1GB MicroSD $10 Sparkfun 3g

Batteries $50 Safeway 210gTOTAL $192.58 N/A 760g

11

Page 12: Team Big Green  SpaceGasm Pre-Critica l Design Review

12

Date ScheduleSeptember 10, 2010 Team meeting (5:00pm – 8:00pm)September 12, 2010 Team meeting (3:00pm – 5:00pm)September 14, 2010 Complete Request for Proposal (RFP)September 15, 2010 Complete Conceptual Design Review (CoDR)September 16, 2010 Turn in RFP and give presentation on CoDRSeptember 19, 2010 Team meeting (4:00pm – 5:00pm)September 21, 2010 Turn in order form for electrical components and spare partsSeptember 21, 2010 Receive electrical components

October 4, 2010Begin programming the Arduino on the integrated development environment (IDE); code, interface with the Arduino, and test CO sensor; begin communications tests; begin power tests

October 5, 2010Design Document Revisions A/B and Critical Design Review due at 7:00amPre-Critical Design Review presentation (CDR)

October 6, 2010 Drop, roll, and whip testOctober 8, 2010 Code, interface with the Arduino, and test the carbon monoxide sensorOctober 10, 2010 Cooler testOctober 11, 2010 Code, interface with the Arduino, and test the carbon dioxide sensorOctober 18, 2010 Code, interface with the Arduino, and test the methane sensor

October 22, 2010Integrate electrical components and structures and perform all of subsystem tests to assess the functionality of the system as a whole

October 25, 2010 Final testing completed; final satellite completedOctober 26, 2010 Pre-launch inspectionOctober 28, 2010 In-class mission simulation testNovember 2, 2010 Design Document Revision C and Launch Readiness Review (LRR) dueNovember 5, 2010 Final satellite weight-in and turn-inNovember 6, 2010 Launch day (5:00am – 4:00pm)

November 30 – December 2, 2010 Final team presentations and reportsDecember 4, 2010 Integrated Technology and Learning Laboratory (ITLL) Design Exposition

Page 13: Team Big Green  SpaceGasm Pre-Critica l Design Review

Must be able to measure concentrations of carbon monoxide, carbon dioxide, and methane gases◦ Retrieve and store data on external memory

source Take and store images

13

Page 14: Team Big Green  SpaceGasm Pre-Critica l Design Review

Using three individual sensors that independently measure the three prescribed gases◦ Store retrieved data on microSD card◦ Embedded by insulation and heated by heater

system, since directly exposed to atmosphere Images will be taken by the provided digital

camera Images will be stored on the camera’s microSD card

HOBO ◦ Store data recorded by external temperature cable

14

Page 15: Team Big Green  SpaceGasm Pre-Critica l Design Review

Two major aspects to testing:◦ Structural tests◦ Hardware tests

Individual subsystem tests Integration of entire system

◦ Repeat tests performed for subsystem tests to ensure full system functionality and integration

15

Page 16: Team Big Green  SpaceGasm Pre-Critica l Design Review

First test will be performed on Wednesday, October 6◦ Drop, roll, and kick test for preliminary model of

stucture Future tests and testing schedule will be

discussed later

16

Page 17: Team Big Green  SpaceGasm Pre-Critica l Design Review

Structures Subsystem:◦ Drop, roll, and kick tests◦ Cooler test

Software Subsystem:◦ Test individual sensors◦ Interface sensors together and test using the 1-2-3 method◦ Test functionality with mission simulation test

Communications and Power Subsystems:◦ Interface power sources with HOBO, AVR, and heater◦ Test to see data retrieved is properly stored on microSD card

Entire system:◦ Repeat tests mentioned above

17

Page 18: Team Big Green  SpaceGasm Pre-Critica l Design Review

In reference with the schedule shown earlier:◦ October 4: Begin programming the microcontroller on the

integrated development environment (IDE); code, interface, and test CO sensor; begin

communications tests; begin power tests◦ October 6: Drop, roll, and kick tests◦ October 10: Cooler test◦ October 11: Code, interface, and test CO2 sensor; continue

communications tests◦ October 18: Code, interface, and test CH4 sensor; continue

communications tests◦ October 22: Integration of entire system and repeat tests◦ October 25: Final testing completed; final satellite

constructed

18

Page 19: Team Big Green  SpaceGasm Pre-Critica l Design Review

Carbon monoxide, carbon dioxide, and methane gas levels are within the normal range (good air quality and healthy)

Rise in levels of gases since Fourmile Canyon, Loveland, and Grand County fires

During mission flight, cut off of data after about sixteen kilometers

19

Page 20: Team Big Green  SpaceGasm Pre-Critica l Design Review

20

Edward Lowe, JuniorElectrical System Engineer

University of Colorado at Boulder9202 Hallett Hall, Boulder, Colorado, 80310

[email protected]

 

Edward CrawfordSoftware Engineer

University of Colorado at Boulder9071 Libby Hall, Boulder, Colorado, 80310

[email protected]

Emily ProanoStructural System Engineer

University of Colorado at Boulder9119 Andrews Hall, Boulder, Colorado, 80310

[email protected]

Kevin WongProject Manager

University of Colorado at Boulder9041 Aden Hall, Boulder, Colorado, 80310

[email protected]

Hillary BeltranStructural System Engineer

University of Colorado at Boulder9071 Andrews Hall, Boulder, Colorado, 80310

[email protected]

Nicole HarrisElectrical System Engineer

University of Colorado at Boulder9019 Cockerell Hall, Boulder, Colorado, 80310

[email protected]

Page 21: Team Big Green  SpaceGasm Pre-Critica l Design Review

Integration of the electrical components

with power subsystem

Storage of data

Heating our electrical components

Stable readings from the sensors

21