  • 8/2/2019 Tcodes in PP Module

    1/5

    Commonly Used Tcodes in PP Module Part 1MATERIAL

    CREATE-GENERAL MM01 IMMEDIETELYMM11 SCHEDULE

    CHANGE MM02 IMMEDIETELYMM12 SCHEDULEMM13 ACTIVATE

    FLAG FOR DELETION MM06 IMMEDIETELYMM16 SCHEDULE

    DISPLAY MM03 DISPLAY CURRENTMM19 DISPLAY AT KEY DATE

    DISPLAY CHANGES MM04 ACTIVE CHANGESMM14 SCHEDULE CHANGESMM17 MASS MAINTENANCEMMAM CHANGE MATERIAL TYPE

    OTHER MMBE STOCK OVERVIEWMMPV CLOSE PERIOD

    MMRV ALLOW POSTING TOPREVIOUS PERIODMM50 INSTANT MATERIAL VIEWMMSC ENTER STORAGE LOCATIONSMM60 MATERIAL LIST

    ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETEMM72 DISPLAY ARCHIVE

    BILL OF MATERIAL (MATERIAL BOM)CS01 CREATECS02 CHANGECS03 DISPLAY

    EXTRAS CS28 ARCHIVINGCS20 MASS CHANGES

    EVALUATION/BOM CS11 BOM MULTILEVELEXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVELBOM CS13 SUMMURISED BOM

    WORK CENTRESCR01 CREATECR02 CHANGECR03 DISPLAYCA85 REPLACE

    CAPACITY CR11 CREATECR12 CHANGECR13 DISPLAY

    HIERARCHY CR21 CREATECR22 CHANGE

    CR23 DISPLAYLINE HIERARCHY LDB1 CREATELDB2 CHANGELDB3 DISPLAY

    REPORTING CR60 W/C INFORMATION SYSTEMCR05 W/C LISTCR06 COST CENTRE ASSIGNMENTCR07 W/C CAPACITIESCR08 W/C HIERARCHY

    WHERE USED CA80 WORK CENTRECR15 CAPACITYCR10 CHANGE DOCUMENTS

    EXTRAS CR09 STD. TEXTS TASK LIST

    CR41 ARCHIVINGROUTINGSTAD. ROUTING CA01 CREATE

  • 8/2/2019 Tcodes in PP Module

    2/5

    CA02 CHANGECA03 DISPLAY

    REF. OPERATION SETS CA11 CREATECA12 CHANGECA13 DISPLAY

    RATE ROUTING CA21 CREATE

    CA22 CHANGECA23 DISPLAYREF. RATE ROUTING CA31 CREATE

    CA32 CHANGECA33 DISPLAY

    EXTRAS CA85 REPLACE W/CMASS CHANGES CA95 REPLACE REF. OP. SET

    CA75 REPLACE PRTDELETE TASK LIST CA99 WITH ARCHIVING

    CA98 W/O ARCHIVINGREPORTING CA80 WORK CENTREWHERE USED LIST CA90 REF. OP. SETS

    CA70 PRODUCTION RESORCE TOOLS

    COST CENTRE OKKP MAINTAIN CONTROLLING AREAKS01 CREATE COST CENTREKZS2 CREATE COSTING SHEETKA01 CREATE PRI. COST ELEMENTKA06 CREATE SEC. COST ELEMENTKL01 CREATE ACTIVITY TYPEKP26 ACTIVITY TYPE/PRICE PLANNING

    Commonly Used Tcodes in PP Module Part 2SALES AND OPERATIONS PLANNINGPRODUCT GROUP MC84 CREATE

    MC86 CHANGEMC85 DISPLAYGRAPHIC MC91 PRODUCT GROUP

    MC92 OVERVIEWPLANNING MC81 CREATEFOR PRODUCT GROUP MC82 CHANGE

    MC83 DISPLAYMC75 TRANSFER PG TO PLANNING

    FOR MATERIAL MC87 CREATEMC88 CHANGEMC89 DISPLAYMC74 TRANSFER MATERIALS TO DMMC9K MATERIAL AVAILABILITY

    VERSION MANAGEMENT MC78 COPYMC80 DELETE

    FLEXIBLE PLANNING MC93 CREATEPLANNING MC94 CHANGE

    MC95 DISPLAYMC9K MATERIAL AVAILABILITY

    TOOLS/PLANNING TYPE MC8A CREATEMACRO MC8B CHANGE

    MC8C DISPLAYEVENT MC64 CREATE

    MC65 CHANGEMC66 DISPLAY

    ROUGH CUT PLANNING MC35 CREATEPROFILE MC36 CHANGE

    MC37 DISPLAYENVIRONMENT MC90 TRANSFER MATERIALS TO DM

  • 8/2/2019 Tcodes in PP Module

    3/5

    ACTIVITY REQT. KSPP TRANSFER TO COST CENTREKSBL COST CENTRE OLANNING REPORTKSOP TRANSFER TO ACTIVITY BASED COSTINGCPBL PLANNING REPORT PROCESSESMC9C REPORTING

    SETTINGS MC96 FORECAST PROFILE

    DISSAGGRIGATION MC76 BREAKDOWN PG PLANMC77 DISPLAY PG PLANMC75 TRANSFER PG TO PLANNINGMC74 TRANSFER MATERIALS TO DM

    FORECASTINGINDIVIDUAL FORECAST MP30 EXECUTE

    MP31 CHANGEMP32 DISPLAY

    TOTAL FORECAST MP38 EXECUTEMP33 REPROCESSMP39 PRINTMPBT EXECUTE BACKGROUNDMPDR PRINT BACKGROUND

    DEMAND MANAGEMENTPIR MD61 CREATE

    MD62 CHANGEMD63 DISPLAYMD65 REQTS. FOR SCINARIOMD66 COPY SIMULATED DEPENDENT REQT.MD70 COPY TOTAL FORE CAST

    EVALUATION MD73 DISPLAY TOTAL REQT.MD79 EXCELL INTERFACEMD4C ORDER REPORTMD72 CHARECTERISTICS PLANNING

    CUSTOMER REQT. MD81 CREATEMD82 CHANGE

    MD83 DISPLAYREPETITIVE MANUFACTURINGMASTER DATA C223 PRODUCTION VERTIONPRODUCT COST PLANNINGCOSTING RUN CKMATSEL CREATESELECTION LIST CKMATCON Edit

    CK40N EDIT COSTING RUN

    Commonly Used Tcodes in PP Module Part 3

    Material Requirement Planning Menu Nodes TransactionActivity

    Master Data MD25 Create planning calendar

    MD26 Change planning calendarMD27 Display planning calendarMDSA Display BOM explosion numberMDSP Edit BOM explosion numberMEQ1 Maintain quota fileOPPP Explode BOM by dateMDUS Display project assignmentMDUP Process project assignmentMDL1 Create production lotMDL2 Change production lotMDL3 Display production lot

    Planning MD20 Create planning file entryMD21 Display planning file entry

    MDAB Set up planning file entry in backgroundMDRE Check planning file entryMD01 Total planning online

  • 8/2/2019 Tcodes in PP Module

    4/5

    MDBT Total planning in backgroundMD03 Single-item, single-level planningMD02 Single-item, multi-level planningMD43 Interactive single-item planningMD50 Multi-level, make-to-order planningMD51 Multi-level project planning

    MF52 Display planning tableMF50 Change planning tableMF57 Planning table by MRP listsMF51 Planning table by production list

    Evaluations MD04 Stock/requirements listMD07 Collective access of stock/requirements lisMD05 MRP listMD06 Collective access of MRP listsMDLD Print MRP listMD45 Planning resultMD46 Collective access of planning resultMD44 Planning situation for a materialMD47 Planning situation for a product group

    MD48 Cross-plant planning situationMD4C Order reportMD09 Pegged requirementsCO46 Order progress

    Planned Order MD11 Create planned orderMD12 Change planned orderMD13 Individual access of planned orderMD16 Collective access of planned ordersMD14 Individual conversion of planned order intoMD15 Collective conversion of planned orders intMDUM Convert planned order into purchase requisiCO40 Convert individual planned order into produCO41 Collective conversion of planned orders int

    CO48 Partial conversion of planned order into prCOR7 Individual conversion of planned order intoCOR7_PC Collective conversion of planned orders intCOR8 Partial conversion of planned order into prMDVP Collective availability checkMDAC Execute action for planned order

    LONG TERM PLANNINGPALNNING SCENARIO MS31 CREATE

    MS32 CHANGEMS33 DISPLAY

    PLANNING RUN MS01 ON LINEMSBT SA BACKGROUND JOBMS02 SINGLE ITEM - MULTI LEVEL

    MS03 SINGLE ITEM - SINGLE LEVELMS50 SINGLE ITEM - SALES ORDERMS51 SINGLE ITEM PLANNING, PROJECTMFSO PLANNING TABLE

    EVALUTIONS MS05 MRP LIST MATERIALMS06 MRP LIST COLLECTIVE DISPLAYMSLD PRINT MRP LISTMS04 STOCK/REQUIREMENTS LISTMS07 STOCK/REQUIREMENT LIST COLLECTIVE DISPLAYMS44 PLANNING SITUATION MATERIALMS47 SITUATION PRODUCT GROUP

    MPS-MASTER SCHEDULE ITEMSTOTAL PLANNING MD40 ON LINE

    MDBS SA BACKGROUND JOBMD41 SINGLE ITEM - MULTI LEVELMD42 SINGLE ITEM - SINGLE LEVEL

  • 8/2/2019 Tcodes in PP Module

    5/5

    MD43 SINGLE ITEM - INTERACTIVEMD50 SINGLE ITEM - SALES ORDERMD51 SINGLE ITEM PLANNING, PROJECT

    *** EVALUTION IS SIMILAR TO MRP

    PRODUCTION CONTROLORDER - CREATE CO01 WITH MATERIAL

    CO07 WITHOUT MATERIALCO40 FROM PLANNED ORDERCO41 COLLECTIVE CONVERTION OF PLANNED ORDERCO08 FOR SALES ORDERCO10 FOR PROJECTCO02 CHANGECO03 DISPLAY

    CONTROL MD04 STOCK/REQUIREMENTS LISTCOHV MASS PROCESSINGCOMAC COLLECTIVE AVAILABILITY CHECKCO05N COLLECTIVE RELEASECO04N PRINTCO09 AVAILABILITY OVER VIEW

    GOODS MOVEMENT MF65 STOCK TRANSFER FOR RESERVATIONMATERIAL STAGING MF68 LOGMB1A GOODS ISSUEMB31 GOODS RECEIPTCOWBPACK PACK MATERIAL

    CONFIRMATION CO1V TIME TICKETFOR OPERATION CO14 DISPLAY

    CO13 CANCELCO1L REQUESTED CONFIRMATIONSCO1P PREDEFINED PROCESSES

    TOOLS-ARCHIVING CO78 ORDERKOAA SETTELMENT DOCUMENTS

    CAPACITY PLANNING

    EVALUTION CM01 LOAD

    WORK CENTER VIEW CM02 ORDERSCM03 POOLCM04 BACKLOGCM05 OVERLOADCM07 VARIABLE

    EXTENDED EVALUTION CM50 WORK CENTER VIEWCM51 INDIVIDUAL CAPACITY VIEWCM52 ORDER VIEW

    LEVELLING CM21 PLANNING TABLE (GRAPHICAL)WORK CENTER VIEW CM22 PLANNING TABLE (TABULAR)INDIVIDUAL CAPACITY VCM27 PLANNING TABLE (GRAPHICAL)

    CM28 PLANNING TABLE (TABULAR)ORDER VIEW CM31 PLANNING TABLE (GRAPHICAL)CM32 PLANNING TABLE (TABULAR)

    AVAILABLE CAPACITY CR12 CHANGECAPACITY CR13 DISPLAY

    OP4A SHIFT SEQUENCEOP43 FACTORY CALENDER