Reingas SCR – Zementwerk RohrdorfAK-NOx Minderung 11.10.2011
Dr. Helmut LEIBINGERSPZ Rohrdorf
Tail-End SCR Technology for Mitigation of NOx and NH3 - Operational Experience at Rohrdorfer Zement
Dr. Helmut Leibinger, SPZ Rohrdorf7th International VDZ Congress, 25-27 September 2013, Duesseldorf
Contents
1. Introduction SPZ Rohrdorf
2. Initial Conditions & Considerations
3. Design & Realization
4. Operating Experience
5. Resume
2
Tail-End SCR Rohrdorf
private shareholder by the majority (HC 25 %) Company Foundation – 1930 Site Location – Rohrdorf/Bavaria/Germany
Nominal Clinker Production: 3.500 to/d 4 Stage PH Tower, No Precalciner (!) Pendulum Grate Cooler VR-Mill for Raw Meal Preparation WHR-Plant 4 Cement Mills
3
Tail-End SCR Rohrdorf Introduction SPZ Rohrdorf
Tail-End SCR Rohrdorf Initial Conditions & Considerations
*) Emission limit for Incineration- and Co-Incineration-Plants (200 mg/m³ STP dry @ 100 % AF-Rate) 4
NOx – ELV
475
295200
90 85 100
350
Kiln exhaust gas temperature > 425 °C(phase transition TiO2: Anatase Rutile; loss of active surface)
Mechanical wear(experience from AE&E at Gmunden site, 1999)
Chemical deactivation by heavy metals(thallium poisoning at Gmunden 1999 and Wopfing 2010)
Availability of heat (> 3 MWth)
5
Tail-End SCR
Tail-End SCR Rohrdorf Initial Conditions & Considerations
Main reactions at catalyst:
Undesired side reactions (Coating):
Poisoning
Thallium, Arsenic, …
6
OHNNHNOOHNONHNOOHNNHNOOHNONHNO
2232
22232
223
2223
12786634265466444
424233
44233
322
)(2
22
SONHOHSONHHSONHOHSONH
SOOSO
(ammonium hydrogen sulfate)(ammonium sulfate)
Tail-End SCR Rohrdorf Initial Conditions & Considerations
reversible
irreversible
Tail-End SCR Rohrdorf Initial Conditions & Considerations
7 Source: GEA Bischoff GmbHOperating Data: HHMV Stack (2012)
0
25
50
75
100
125
150
175
200
225
250
245 247,5 250 252,5 255 257,5 260 262,5 265 267,5
SO2-
conc
entr
atio
n[m
g/m
³ STP
dry
, ref
. 10
Vol-%
O2]
Temperature[°C]
BYPASS
OPERATION
BYPASS OPERATION247,5
8
Tail-End SCR Rohrdorf Design & Realization GEA Bischoff
Δp=24 mbar
Optimum Operation Temp.
1
Compensate Heat Transfer Losses4
Heat Recovery3
Minimum Temp. at Stack2
9
Tail-End SCR Rohrdorf Design & Realization
Clinker Cooler Raw Meal Silo
TG BuildingSCR-PlantRaw Mill
WHR-BoilerKiln
4 Stage PH-Tower
Clinker Silo
Stack
10
Producer of catalyst Haldor TopsøeLayers Installed 2Volume of catalyst 65,84 m³Active surface 58.300 m²Chem. composition V2O5 = 3 %
WO3 = 3 %
Tail-End SCR Rohrdorf Design & Realization
Tail-End SCR Rohrdorf Operation Experience // 2011 → 2013
11
12
-76,3 %
-76,0 %
-89,4 % -92,5 %
NOx-reduction NH3-reduction
*) Mass flows in relation to 6.500 hours of operation per year2012: exkl. Plant stop because of fire
Mass flow NOx Mass flow NH3
[t/year]
Tail-End SCR Rohrdorf Operation Experience
NOx before cat
NOx stack
NH3 before cat
NH3 stack
Clin
kerC
oole
r Con
vers
ion
Clin
kerC
oole
r Con
vers
ion
13
Tail-End SCR Rohrdorf Operation Experience
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0
0 2.000 4.000 6.000 8.000 10.000 12.000
K /K
0 [-]
Operating Hours [h]
Activity History of 1st Layer
Wood Chips*
Sub-bituminous Coal*
Bituminous Coal*
Light Fuel Oil*
Heavy Fuel Oil*
*Additional data based on Jensen‐Holm, Castellino, SCR DeNOx catalyst considerations when using biomass in power generation,Haldor‐Topsoe (2012)
Rohrdorfer Zement
14
Tail-End SCR Rohrdorf Operation Experience
Kiln Exhaust Gas
sp. el. Energy Consumption of SCR
Production of Clinker
15
Ecology
76 % abatement of NOx (setpoint 200 mg/m³ STP dry)
92 % abatement of NH3
40 % abatement of VOC
Operation Experience
90 % activity of catalyst after 2 years of operation
92 - 97 % availability of SCR-plant (start-up time excluded)
sp. electrical energy consumption: 5 - 6 kWh/tclinker
NH4OH injection at molar ratio < 1 (0,7 – 0,8)
Tail-End SCR Rohrdorf Resume
16
Many thanks to:
Shareholders of Südbayerisches Portland-Zementwerk Gebr. Wiesböck & Co. GmbH who have made this projectpossible and have financally supported it to a great extent
Federal Ministry for the Environment, Nature Conservationand Nuclear Safety which has supported this project givinggrants from the Environmental Innovation Programme (Umweltinnovationsprogramm)
Tail-End SCR Rohrdorf Acknowledgment
Thanksforyourkindattention