TABEL BESI ILMUSIPIL.COM BESI BETON POLOS & ULIR UKURAN BERAT (mm) (Kg) Beton Rasio 6 0.222 0 - 8 0.395 1 9 0.500 2 10 0.617 3 12 0.888 4 13 1.040 5 16 1.578 6 16 1.578 7 19 2.223 8 22 2.985 9 25 3.853 10 28 4.830 11 29 5.185 - 32 6.313 36 7.990 6p 0.22 8p 0.4 9p 0.5 10p 0.62 12p 0.89 13p 1.04 16p 1.57 16p 1.58 19p 2.23 22p 2.98 25p 3.85 28p 4.83 29p 5.19 32p 6.31 36p 7.99 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3 Kg/m 3

Upload: brant-akkan

Post on 27-Dec-2015

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tabelberatbesi

TABEL BESI ILMUSIPIL.COM

BESI BETON POLOS & ULIR

UKURAN BERAT(mm) (Kg) Beton Rasio

6 0.222 0 -8 0.395 19 0.500 2

10 0.617 312 0.888 413 1.040 516 1.578 616 1.578 719 2.223 822 2.985 925 3.853 1028 4.830 1129 5.185 -32 6.31336 7.9906p 0.228p 0.49p 0.5

10p 0.6212p 0.8913p 1.0416p 1.5716p 1.5819p 2.2322p 2.9825p 3.8528p 4.8329p 5.1932p 6.3136p 7.99

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Kg/m3

Page 2: Tabelberatbesi

PT. PEMBANGUNAN PERUMAHAN (Persero)DIVISI OPERASI IIDI HITUNG OLEH : Err:540NAMA PROYEK : Err:540START OF DATE Err:540FINISH OF DATE Err:540

NOUKURAN

JML VOL. BETONP L ( d ) T

CODE1 Pile Cap2 Beam3 Kolom4 Balok5 Pelat6 Pelat Basement7 Column Bulat8 Dinding9 Anak Tangga

10 Pelat Tangga11 Pile Cap Segi Enam

-

LANTAI DASAR - TIE BEAM -

2 -

2 - 2 - 2 - 2 - 2 - 2 - 2 - 2 -

- - - - - -

LANTAI ATAP - 3 KOLOM3 K1. C 0.6 0.6 4.73 13 22.14 3 K2. D 0.5 0.5 4.73 2 2.36 3 K3. C 0.3 0.5 4.73 7 4.97

3 0.6 0.6 0.73 13 3.42 3 0.5 0.5 0.73 2 0.37 3 0.3 0.5 0.73 7 0.77

Page 3: Tabelberatbesi

29.47 4 BALOK - 4 B1 -

as 8-9 / C-Gas 1-2 / C-B

4 G1 - 4 G1.A -

-

Page 4: Tabelberatbesi

BEKISTING LANTAI BEKISTING DINDING TOTAL BEKISTING TOTAL PEMBESIAN

- - -

- - - - - -

- - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- 147.58 147.58 - 18.92 18.92 - 52.98 52.98

- 22.78 22.78 - 2.92 2.92 - 8.18 8.18

Page 5: Tabelberatbesi

219.47 - - - - - -

- - - - - -

- - -

Page 6: Tabelberatbesi

RASIO BESI THD BETON GALIAN TANAH LANTAI KERJA PASIR URUG BATACO

- - - -

- - - - - - - -

- - - -

- - - - - - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- 4.68 0.47 -

- 0.50 0.05 -

- 1.05 0.11 -

Page 7: Tabelberatbesi

- - - - - - - -

- - - -

- - - -

- - - -

Page 8: Tabelberatbesi

LUAS BANGUNAN : Err:540NAMA PROYEK : Err:540DIHITUNG OLEH : 0TANGGA : 4/19/2023

TYPE NO. LOKASI NO. TUL TYPE D DIMENSION (cm)

aDia.

Plat Lantai Bs-2PK-A A 13 0PKA A 13 0PK-B A 13 0PK-B A 13 0

AS. 10-9/A-D PK-A A 13 65.9PKA A 13 2161.52PK-B A 13 65.9PK-B A 13 2161.52

AS. 9-8/A dan D PK-A A 13 31.4PKA A 13 47.1PK-B A 13 31.4PK-B A 13 47.1

AS. 9-8/B-A/C-D PK-A A 13 32.8PKA A 13 377.2PK-B A 13 32.8PK-B A 13 377.2

AS. 9-8/C-B PK-A A 13 29.2PKA A 13 64.24PK-B A 13 29.2PK-B A 13 64.24

asd PK-A A 13 31.15PKA A 13 46.725PK-B A 13 31.15PK-B A 13 46.725

AS. 9-8/C-B PK-A A 13 12.4PKA A 13 198.4PK-B A 13 12.4PK-B A 13 198.4

Plat Lantai Bs-1AS 9-10/C-D PK-A A 10 0

REFF. GAMBA

R

Page 9: Tabelberatbesi

TOTAL UNITDIMENSION (cm) R LENGTH NUMBER WEIGHT WEIGHT

b c d Hook (cm) (kg/m) (kg)

- - - 1 - - - 1 - - - 1 - - - 1 3.12 18,013 1,243,257 1 7.99 ### 94.12 550 1,240,602 1 7.99 ### 3.12 18,013 1,243,257 1 7.99 ### 94.12 550 1,240,602 1 7.99 ### 1.56 393 12,953 1 5.19 67,162.76 2.08 262 12,885 1 7.99 ### 1.56 393 12,953 1 5.19 67,162.76 2.08 262 12,885 1 7.99 ### 1.56 3,144 108,028 1 6.31 ### 16.64 274 107,912 1 7.99 ### 1.56 3,144 108,028 1 6.31 ### 16.64 274 107,912 1 7.99 ### 1.56 536 16,487 1 5.19 85,486.96 3.12 244 16,436 1 7.99 ### 1.56 536 16,487 1 5.19 85,486.96 3.12 244 16,436 1 7.99 ### 1.56 390 12,757 2 5.19 ### 2.08 260 12,689 2 7.99 ### 1.56 390 12,757 2 5.19 ### 2.08 260 12,689 2 7.99 ### 1.04 1,654 22,230 1 0.89 19,740.03 8.84 104 21,553 1 7.99 ### 1.04 1,654 22,230 1 0.89 19,740.03 8.84 104 21,553 1 7.99 ###

###

- - - 1

Page 10: Tabelberatbesi

Total REMARKS

L

E ca b

D aC

a

b

c

Aa

a

Ea

bc

F a

b

c

G

a

b

Ha

b

c

d

i

a

b

Page 11: Tabelberatbesi

Project : #REF!Dihitung Oleh : #REF!Tanggal : 4/19/2023

NO LOKASI URAIAN PEKERJAAN UKURAN

P L T

Page 12: Tabelberatbesi

UNIT VOLUME UKURAN

UNIT VOLUME TOTAL VOLUME P L T

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -