Dt Texas Department of Tfansportation-
DEWTTT c. GREER STATE HtGHWAy BLDG, . t2s E. rlTH sTnEET. AUslN, TEXA$ 78701-2483'{512) 463-8585
REVISEDIADDITIONS
CERTIFICATION UNDER SECTION {511 OFTHE AMERICAN RECOVERY AND REINVESTMENT ACT
February 9, 2010
Pursuant to Title XV, Subtitle A, section 1511 of the American Recovery andReinvestment Act (Pub. L, 111-5 (Feb. 17, 2009)) ('ARRA"), l, Amadeo Saenz, herebycertify that the infrastructure investments funded with amounts appropriated by ARRAunder the headings: "Highway Infrastructure Investment" to the Federal HighwayAdministration, have received the full review and vetting required by law and that I
accept responsibility that such investments are appropriate uses of taxpayer dollars.
lfurther certify that the specific information required by section 1511 concerning eachsuch investment (a description of the investment, the estimated total cost, and lheamount of ARRA funds to be used) is provided on the attached list.
These projects are reflected in the STIP and can be viewed at:http :#www. dot. stAle. tx. uslbusinesslqqvg$mentslstips. htrl
I understand that my State or local agency may not receive ARRA infrastructureinvestment funding unless this certification is made and posted.
Sincerely, /)f)u(4r*l*'1"-- \Amadeo Saenz, Jr., P.E. IExecutive Director
IAttachment
'lllI i-i:XIIS Pl-AhlREDUC€ CONGESTION " ENHANCE SAFETY . EXPAND ECONOMIC OPPOHTUNITY ' IMPROVE AIR QUALITY
INCREASE THE VALUE OF OUR TRANSPOFITATION ASSETS
An Equal Opporlunity Employer
Form 1511 - Project List - American Recovery and Reinvestment Act
LineNumbef 3. County
4. CongrcssionalDi€trict
5. Federal-AidProiect NumbeI
Number orldentification
Number7. Project
8. Proiect Name 9, Proiect DescriDtion 10. Proiect I ARRA Funds11. Total Cost
Estimate
702 453 010, 021, 025, 031 2010710 09'1 4-00-317/A FT. VARIOUS LOUA I IONS IN AUs I IN IO, ,:VESSAGE SIGNS $ 1,000,000 $ 1,000,000
654 215 0't5 2010580 0039-04-080 I BU 83-S
lU 83-S Fr. FM 1015 lN WESLACO To. 0.7 Ml E SP 31N MERCEDES; RECONSTRUCT EXISTING 3 LANE TOI LANE DIVIDED URBAN
)3 - 4R Reconstruction,$ 4.144.355 s 4.246.261
617 251 017 2010558 0422-05-OO4 US 67
JS 6/ I-T. BU 67M IO. 0.6 IVIILES EAST OF FM 4;AiIDEN ROADWAY FROI\iI 2 LANE TO 4 LANE:ACII ITY
)3 - 4R Reconstruction,$ 17.260.421 1 8.428.036
30'1 113 030 0097253 0918-45-354 I
SANTA FE TRESTLEBRIDGE TRAIL
iANTA FE TRESTLE BRIDGE TRAIL Fr. EXISTINGIRAILHEAD AT MOORE PARK To. N. TRINITY RIVER-EVEE, DOWNTOWN: SANTA FE TRESTLE HIKE AND]IKE TRAIL
l8 - Facilities for)edestrians and Bicvcles $ 3.547.603 5,445,000
308 012 2002138 0902-38-049TOWN CREEK HIKE
AND BIKE TRAIL
|OWN CREEK HIKE AND BIKE TRAIL Fr. DOWNTOWNA/EATHERFORD To. SUBDIVISIONS, HOSPITAL)IHER FACILITIES; CONSTRUCT HIKE AND BIKETRAIL
l8 - Facilities fof)edestrians and Bicycles $ 2.803,339 $ 4.976.000
6't4 309 017 2010545 00'1 5-21-010 I Ftvl 3476
:[4 3476 Fr. TEXAS CENTRAL PKWY lN WACO To. FM1063 (SUN VALLEY BLVD) lN HEWITT; WIDEN FROlvlrWO TO FOUR LANES WITH CONTINUOUS LEFTIURN LANE
)3 - 4R Reconstruction,3.700,000 3.763.635
061 027 1'1081 0921-06-073 I WEST RAILruT5I KAILFT.U,U3 MI NOF USZUl IO, U5 ///U3:]ONSTRUCT NEW RR 14- Othef $ 7.809.328 $ '19.100.000
652 339 008 2010629 0675-08-09'l tH 45
H 45 Fr. AT LONGSTREET ROAD lN WILLIS To. .;]ONSTRUCT 1 NB ENTRANCE RAMP AND 1 SB EXITIAMP
)4 - 4R Reconstruction, Nos 418.723 $ 2.168.723
653 339 008 2010629 0675-08-101 tH 45H 45 Fr. AT CALVARY, LONGSTREET To. AND F[,]30: BRIDGE REPLACEMENTS
'11 - Bridge Replacement,No Added Capacitv 2.555.809 $ 3,591,1 19
215 0t5 2005982 0921-02-133 I CSlS Fr. ON SUGAR ROAD FROM SIOUX ROAD To)WASSA ROAD: WIDEN TO 4 LANES
)3 - 4R Reconstruclion,s 3.778.217 $ 3.965.409
671 201 029 2010674 0912-70-020 I CLINTON DRIVEILINTON DRIVE Fr. lH 610 To. FEDERAL ROAD:IEHAB AND OVERLAY 188.25( $ 3.641.29,
591 375 013 2010401 0904-02-035 SE 23Td AVE/A FI. ON GRAND SI AND SI 3RIJAVE IO.AI BNSFlR: CONSTRUCT RR OVERPASS
,o - Enoge, I
lonstruction $ 6,495,938 $ 6,495,938
615 309 017 2010546 2506-01-027 FM 1695
:[I 1695 Fr. 0.9 [Il N OF FM 21'13 To. WARREN ST;NIDEN ROADWAY TO FOUR LANES WITH]ONTINUOUS LEFT TURN LANE TO IIVIPROVEJAFETY AND REDUCE CONGESTION
)3 - 4R Remnstruction,\dde.l Cenrcifv $ 3,516,807 $ 3.516,807
692 329 011 2010705 0887-01-033 FM 307:[I 307 Fr. CR 1 1 50 To. CR 1 140; ROADWAYTEHABILITATION
)6 - 4R Restoration and?chahilitetinn $ 1.'155.000 $ 1.'t55.000
693 329 011 2D10724 1 7'1 8-07-035 SH 349SH 349 Fr. FM 1788 To. CR 60; NEW LOCATION NON-FREEWAY 1.933.847 2.344.324
700 1'1 1 013 2010707 0040-03-056 us 87US 87 Fr.8.19 MILES SE OF FM 1879 To.0.9S [4lLESNE OF FI\4 1727: REHABILITATION (SBL}
06 - 4R Restoration andRehabilitalion $ 1,540,937 $ 1,540.937
690 225 006 2004420 1854-01-031 LP 304LP 304 Fr. SH 7 (E) To. US 287 (E); ADD CONTINUOUSTWO-WAY LEFT TURN LANE e $ 410.000 $ 1.410.000
691 006 2010757 1854-01-O42 LP 304_P 304 Ff. US 2tsl (h) | o. 5H 19 (S); ADU]ONTINUOUS TWO-WAY LEFT TURN LANE
l4 - 4R Reconstructron, No\dded Caoacitv $ 3,105,000 $ 3,105,000
Printed: 21912010 4:00 PMPage 1 of 1