synthetic turf project information...

3
43 Paoli Plz Suite 284, Paoli, PA 19301 P: (855) 296-3200 / F: (610) 983-9816 1 Limitless in Sport… Synthetic Turf Project Information Questionnaire School/Facility Name: Facility Address: A synthetic turf project consists of two parts; Excavation and Synthetic Turf Surface. Excavation and Free Draining Stone Base Construction: 1. Can we dispose of the excavated soils somewhere on the school campus? If so, how far away is dumpsite from the field? (The amount of soil excavated will be approximately 3000 +/- cubic yards. This could be used to crown a practice field on campus. The crown ON ONE FOOTBALL FIELD with this much soil would be at least 24 inches as a reference.) Designing Your Synthetic Surface: 2. List all sports that will be played on this surface: 3. Do you wish the field to be solid green or alternating green every five yards? (Alternating Panel Example) (Solid Green Example)

Upload: others

Post on 11-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Synthetic Turf Project Information Questionnaireblueskyturf.com/wp...Sky-Turf-Project-Information... · Synthetic Turf Project Information Questionnaire School/Facility Name: Facility

43 Paoli Plz Suite 284, Paoli, PA 19301 P: (855) 296-3200 / F: (610) 983-9816 1

Limitless in Sport…

Synthetic Turf Project Information Questionnaire

School/Facility Name:

Facility Address:

A synthetic turf project consists of two parts; Excavation and Synthetic Turf Surface.

Excavation and Free Draining Stone Base Construction:

1. Can we dispose of the excavated soils somewhere on the school campus? Ifso, how far away is dumpsite from the field?

(The amount of soil excavated will be approximately 3000 +/- cubic yards. This could be used to crown a practice field on campus. The crown ON ONE FOOTBALL FIELD with this much soil would be at least 24 inches as a reference.)

Designing Your Synthetic Surface:

2. List all sports that will be played on this surface:

3. Do you wish the field to be solid green or alternating green every fiveyards?

(Alternating Panel Example) (Solid Green Example)

Page 2: Synthetic Turf Project Information Questionnaireblueskyturf.com/wp...Sky-Turf-Project-Information... · Synthetic Turf Project Information Questionnaire School/Facility Name: Facility

43 Paoli Plz Suite 284, Paoli, PA 19301 P: (855) 296-3200 / F: (610) 983-9816 2

4. Would you like a logo at midfield? If so, please email an art file of the graphicyou wish to utilize when returning this document.

5. Do you desire colored end zones? If yes, what color(s)?

6. Do you wish to have any lettering in the end zones? If yes, how would you likescript to read and what color would you like the script to be? Anyoutlines/borders around the script? If so, please note color of theoutline/border. If you have a specific font, please email an art file with font(s)when returning this document.

7. “D-Areas” are the areas between the back of the end zone where the turf endsat the bend of track. These areas can either be paved, turf, natural grass,contain track and field events or bleacher pads. Which would you prefer?

Limitless in Sport…

Page 3: Synthetic Turf Project Information Questionnaireblueskyturf.com/wp...Sky-Turf-Project-Information... · Synthetic Turf Project Information Questionnaire School/Facility Name: Facility

43 Paoli Plz Suite 284, Paoli, PA 19301 P: (855) 296-3200 / F: (610) 983-9816 3

Limitless in Sport…

8. Please list any items you would like us to know about your project, for example:a. Any graphics or field details you would like to mention:

b. Potential time frame of project (Typical turf project takes 30-40 days):

c. Will this be private or publicly funded?

d. Please note we offer state purchase/consortium buying options.

e. We also install running tracks, lighting, bleachers, dugouts, press boxes, etc.

f. We also construct and renovate natural grass fields.

g. Please list any other important notes: