Sylgard ® HVIC in Pictures Location: Kalpaka 400 kvSS, Visakhapatnam Client: APTRANSCO Duration: 60 days (2004-05) Quantity: 660 kgs Section: Bus Coupler 2 Bay Number of Equipments: 49

Upload: project-sales-corp

Post on 12-Jun-2015

514 views

Category:

Sports


3 download

TRANSCRIPT

Page 1: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Sylgard® HVIC in Pictures

• Location: Kalpaka 400 kvSS, Visakhapatnam

• Client: APTRANSCO• Duration: 60 days (2004-05)

• Quantity: 660 kgs • Section: Bus Coupler 2 Bay• Number of Equipments: 49

Page 2: Sylgard Hvic Application At Kalpaka 400 Kv Ss

A bird’s eye view of Bus Coupler 2 Bay at Kalpaka 400 kvSS

Note the Sylgard HVIC

coated equipments

in white, visible in

the evening at 1700

hours from the watch

tower

Page 3: Sylgard Hvic Application At Kalpaka 400 Kv Ss

A sectional view of the equipments coated with Sylgard HVIC at Kalpaka Bus Coupler 2 Bay

•Current transformers (6)•Circuit Breakers (3)•Support Post Insulators (13)•Pantograph isolators (6)•Pilot Strings (9)•Double Tension Insulators (12)

The figures in the brackets indicate the number of equipments of each type that were coated with Sylgard HVIC.

Page 4: Sylgard Hvic Application At Kalpaka 400 Kv Ss

A sectional view of the equipments coated with Sylgard HVIC at Kalpaka Bus Coupler 2 Bay

Support Posts

Double PilotsCTs in a row Double TensionCBsPentagraphs

Page 5: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Breathtaking View of Kalpaka Bus Coupler 2 Bay at 8.45 pm. Sylgard HVIC Application in progress

Sometimes, Sylgard HVIC application went on until 21.00 hours in the floodlights available at the site. In all, close to 50 equipments were coated with Sylgard by skilled painters trained for the job. Normal working hours for the application was 10.00 to 17.00 hours, but depending on line clear availability, the work was carried out until 21.00 hours to meet the deadline for completion of the job.

Page 6: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Sylgard HVIC on a Support Post A close-up

Page 7: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Sylgard HVIC on Double Pilots and Double Tension Strings at Kalpaka 400 kvSS

Page 8: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Sylgard HVIC on a CTA close-up

Page 9: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Safety at WorkAs the Sylgard HVIC application involved coating suspension and pilot insulators at a height of over 20 meters, full attention was paid to fall protection and safety training imparted by PN Safetech, Mumbai. A complete set of lanyards, fall arresters, organic Vapour masks, and lifelines were used to carry out the application of over 400 kgs of Sylgard HVIC on the pilot and tension strings over a period of one month.

Page 10: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Safety at Work

Muhammad Ali (L) and Dharma Rao (R), Painters underwent 24 hours of field training on the use of safety equipments from the safety trainers of PN Safetch, Fall Protection Specialists.

Page 11: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Pictures of Work-In-ProgressApplication of Sylgard HVIC at APTRANSCO

Kalpaka 400 kvSS Bus Coupler 2 Bay

Compressors 5 HP (2 Nos), EPCOAT GUNS with 2.2 nozzles, Hose pipes extending 50 metres long, ladders, safety equipments, etc alongwith painters, trained linemen, and coating supervisors were regular at the site for over a month. Kalpaka became their second home, with work extending upto 21 hours on some days.

Page 12: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Empty Pails of Sylgard HVIC in the Kalpaka Store

A total of 147 pails of 4.5 kg pails of Sylgard HVIC was used for the project. After the first few days, practical estimates of consumption per type of equipment was finalized and were matched with the initial estimates, and they were pretty close.

Page 13: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Lady in Sylgard white

Page 14: Sylgard Hvic Application At Kalpaka 400 Kv Ss

Special Thanks• Our special thanks goes to

– Mr. Nitin Kamat, Industry Sales Manager, Dow Corning India (P) Limited, Mumbai for his persistent support, without which the project could not have been started or completed.

– Mr. Venkatraman, Sales Manager, EEI, Dow Corning India (P) Limited, Mumbai

The Pentasafe Team of Mr. Nair and Tejus, Painters Dharma and Ali, Coating Supervisor Dilip Nair of Project Sales Corp, and all Kalpaka 400 kvSS staff-members.