  • 8/7/2019 switch maintanence

    1/33

    1

    O & M

    OF220 KV

    SUB-STATIONS

  • 8/7/2019 switch maintanence

    2/33

    2

    SUB-STATION

    SWITCH YARDCONTROL & RELAYPANELS / CIRCUITS

    AUXILLARIES

  • 8/7/2019 switch maintanence

    3/33

    3

    SWITCH YARD

    TRANSFORMER

    CIRCUIT BREAKER

    CURRENT TRANSFORMER

    CAPACITIVE VOLTAGE TRANSFORMER LIGHTNING ARRESTER

    ISOLATOR

    WAVE TRAP BUS BAR & JUMPERS

    STRUCTURES

  • 8/7/2019 switch maintanence

    4/33

    4

    TRANSFORMER

    BUSHINGS MAIN TANK, INCLUDING PROTECTIVE

    DEVICES

    TAP CHANGER COOLING SYSTEM

    MARSHALLING BOX

    WHEELS LOCKING

    EARTHING

    RTCC

  • 8/7/2019 switch maintanence

    5/33

    5

    BUSHINGS

    OIL LEVEL OF BUSHINGS / LEAKAGE CLEANLINESS & FREE FROM CRACKS,

    CHIPS & GRIME ETC

    PERFECTNESS FOR CONNECTIONS

    PROPER DISTANCE OF ROD GAPARRESTORS

    PROPER EARTHING OF CONDENSOR

    UNIT TIGHTNESS OF BUSHING, TERRETS,

    TERRET CTs ETC

  • 8/7/2019 switch maintanence

    6/33

    6

    MAIN TANK, INCLUDING

    PROTECTIVE DEVICES OIL LEVEL / LEAKAGE

    PROPER TIGHTENING OF TANK COVER /BELL / PIPINGS / WHEELS / CONSERVATORETC

    PROPER MOUNTING OF PRV / SPR /BUCHHOLZ RELAY / WTI CT CHAMBERS /OTI OIL POCKETS / MOG / AIR CELL ETC

    PROPER INCLINATION OF AUXILLARYPIPING & MAIN PIPE

    PROPER WORKING OF THERMOSYPHON

  • 8/7/2019 switch maintanence

    7/33

    7

    TAP CHANGER

    OIL LEVEL / LEAKAGE MOUNTING OF OLTC CONSERVATOR

    WORKING OF OIL SURGE RELAY

    PROPER WORKING OF OLTCMECHANISM

    ELECTRICAL & MANUAL OPERATIONS

    OF TAP CHANGER

  • 8/7/2019 switch maintanence

    8/33

    8

    COOLING SYSTEM

    LEAK FREE RADIATORS / HEADERS /PUMPS ETC

    THERMAL BEHAVIOUR OF RADIATORS

    PROPER FUNCTIONING OF PUMPS /COOLING FANS

    BEHAVIOUR OF FLOW METER

    FIRMNESS OF SUPPORTINGSTRUCTURE FOR VIBRATION FREEOPERATION OF COOLING SYSTEM

  • 8/7/2019 switch maintanence

    9/33

    9

    MARSHALLING BOX PROPER FUNCTIONING OF OTI & WTIs

    PROPER WORKING OF COOLING FANSTARTERS, CONTACTORS, OVERLOADRELAYS, SINGLE PHASE PREVENTERS

    PROPER FUNCTIONING OF SWITCHES,FUSE, LINKS

    KINK LESS / DAMAGE FREE CAPILLIARYTUBES

    VERMAIN PROOF CUBICLE

    PROPER CABLING & WIRING

  • 8/7/2019 switch maintanence

    10/33

    10

    EARTHING

    PROPER EARTHING OF ALLNEUTRALS

    PROPER EARTHING OF TANK BODY,SUPPORTING STRUCTURES, COOLINGFANS, MARSHALLING BOX, OLTC,

    RTCC ETC

  • 8/7/2019 switch maintanence

    11/33

    11

    RTCC

    PROPER WORKING OF OTI &WTIREPEATERS

    PROPER WORKING OF TPI

    PROPER WORKING OF ALARMS &INDICATIONS

    PROPER WORKING OF COOLINGSYSTEM & TAP CHANGER FROM

    REMOTE PARALLEL OPERATION, IF PROVIDED

    AVR, IF REQUIRED / FUNCTIONAL

  • 8/7/2019 switch maintanence

    12/33

    12

    ROUTINE TESTS

    MEASUREMENT OF IR - AC / PI

    MEGNATISING CURRENT

    MEGNATIC BALANCE

    TURN RATIO / VOLTAGE RATIO WINDING RESISTANCE

    SHORT CIRCUIT TEST

    TERRET CT / WTI CT RATIO DC LOGIC TEST

    BDV OF OIL

    EARTH RESISTANCE

  • 8/7/2019 switch maintanence

    13/33

    13

    SPECIAL TEST

    OIL

    DGA OF INSULATING OIL

    MOISTURE CONTENT

    INTERFACIAL TENSION TAN DELTA

    RESISTIVITY

    THERMAL BEHAVIOUR OF TANK & BUSHINGS CAPACITANCE & TAN DELTA MEASUREMENT

    OF BUSHINGS AND WINDINGS

  • 8/7/2019 switch maintanence

    14/33

    14

    LIFE ASSESSMENT TESTS

    FRA

    RVM

    FURAN / FURFURAL (FFA) ANYLYSIS

    PARTIAL DISCHARGE METHOD

    THERMOVISION

    BUCHHOLZ GAS ANALYSIS

    DOMINO

  • 8/7/2019 switch maintanence

    15/33

    15

    CIRCUIT BREAKERS

    CHECK MEDIUM OF EXTINGUISHING CHAMBER

    FOR LEAKAGE & REQUIRED PRESSURE / LEVEL

    OIL / GAS / AIR

    MEASURE CONTACT RESISTANCE TO ENSURE

    HEALTHINESS OF CONTACTS

    CHECK TIMINGS FOR PERFECT OPERATION

    C O CO

    AVOID SLUGISH / DELAYED OPERATIONS

    ENSURE PERFECTNESS OF AUXILIARY

    CONTACTS AND INTERLOCKS

    ENSURE DUTY CYCLE OF CB

  • 8/7/2019 switch maintanence

    16/33

    16

    CHECK CLAMPS / CONNECTORS

    PERFORM DC LOGIC TEST

    INSULATION RESISTANCE MEASUREMENT- MAIN CB

    - AUXILIARY WIRING

    MEASUREMENT OF EARTH RESISTANCE

    SPECIAL TESTS LIKE MEASUREMENT OF( WITH CB ANALYSER ) -

    - WIPE / TRAVEL / OVERTRAVEL / BOUNCES

    - VELOCITY- OPERATING TIMINGS OF AUXILIARY CONTACTS

    - AMPERES TAKEN BY CLOSING / OPENING COILS

    DEW POINT MEASUREMENT ( OF GAS ) *

  • 8/7/2019 switch maintanence

    17/33

    17

    FOR MOCBS & BOCBS

    - OIL LEVEL / LEAKAGES- BDV OF OIL

    - SILICA GEL

    - AIR VENT / VALVE

    - MEASUREMENT OF TRAVEL H

    - RESIDUE & SLUDGE

    - CONDITION OF GASKETS

  • 8/7/2019 switch maintanence

    18/33

    18

    OPERATING MECHANISM

    OPERATION OF SPRING CHARGING MOTOR WORKING OF COMPRESSOR AND ITS MOTOR

    FUNCTIONING / CALIBRATION OF PRESSURESWITCHES / LIMIT SWITCHES / INTERLOCKS

    EMERGENCY TRIP

    VERMAIN PROOFING

    FIRMNESS / TIGHTNESS

    LUBRICATION - OIL, GREASE WORKING OF DAMPING DEVICES

  • 8/7/2019 switch maintanence

    19/33

    19

    CURRENT TRANSFORMERS

    CHECK FOR OIL LEVEL AND LEAKAGES

    TIGHTNESS OF PRIMARY & SECONDARY

    TERMINALS

    PERFORMANCE OF BELLOW / DIAPHRAGM

    / VENT PLUG

    PRESENCE OF NITROGEN

    CONDITION OF INSULATORS (Main & Auxiliary) CRACKS IN GASKETS

    CLAMPS AND CONNECTORS

  • 8/7/2019 switch maintanence

    20/33

    20

    BDV OF OIL

    INSULATION RESISTANCE( KEEP A TRACK RECORD )

    RATIO TEST

    EARTHING

    CAUTION : ENSURE THAT

    -CT (LIVE) TANK HAS NOT BECOME ,

    AFTER REPAIRS , A CONDUCTOR

    - UNUSED CORES ARE SHORT CIECUITED- SECONDARY CIRCUITS ARE NOT OPEN CKTD

    - BALANCE LOADING OF SECONDARY CIRCUITS

  • 8/7/2019 switch maintanence

    21/33

    21

    POTENTIAL TRANSFORMER

    OIL LEVEL AND LEAKAGE

    PRIMARY AND SECONDARY TERMINALS

    GASKETS FOR CRACKS

    CLAMPS AND CONNECTORS

    VOLTAGE RATIO

    BALANCED LOADING OF SECONDARY CKTS

    BDV OF OIL

    CHECK BURDEN ON SECONDARY CIRCUITS

    EARTHING

  • 8/7/2019 switch maintanence

    22/33

    22

    CAPACITIVE VOLTAGE

    TRANSFORMER OIL LEVEL AND LEAKAGE

    PRIMARY AND SECONDARY TERMINALS

    GASKETS FOR CRACKS

    HARDWARES

    VOLTAGE RATIO

    BALANCED LOADING OF SECONDARY CKTS

    BDV OF OIL

    MEASUREMENT OF CAPACITANCE AND TAN DELTA HF TERMINAL

    CHECK BURDEN ON SECONDARY CIRCUITS

  • 8/7/2019 switch maintanence

    23/33

  • 8/7/2019 switch maintanence

    24/33

    24

    LIGHTNING ARRESTER

    EARTHING

    CLAMPS AND CONNECTORS SURGE COUNTER

    ENSURE FLOW OF LEAKAGE CURRENT

    COMPARATIVE STUDY OF IR

  • 8/7/2019 switch maintanence

    25/33

    25

    ISOLATORS

    ALIGNMENT OF FIXED AND MOVING

    CONTACTS / JAWS

    CONTACT RESISTANCE

    MECHANICAL AND ELECTRIC INTERLOCKS

    EARTH BLADES

    SMOOTH OPERATION OF MOVING PARTS

    CLAMPS AND CONNECTORS

    EARTHING

  • 8/7/2019 switch maintanence

    26/33

    26

    ISOLATOR MOM

    HEALTHINESS OF GEARS / WHEELS / SHAFT

    OPERATION OF LIMIT SWITCHES

    WORKING AND ALIGNMENT OF AUXILIARY

    CONTACTS

    MOTOR

    CONTACTOR AND OVERLOAD RELAY

    OILING AND GREASING EARTHING

  • 8/7/2019 switch maintanence

    27/33

    27

    BUS BAR , SCREEN WIRE ,

    HARDWARES & JUMPERS

    PROPER COVERAGE BY SCEEN WIRE

    DAMAGE TO HARDWARE , CLAMPS ,

    CONNECTORS , SPACERS TOO LONG JUMPERS BE PROPERLY

    SUPPORTED

    BI METALLIC EFFECT

    BINDING WIRE

    KINKS AND DAMAGED BUS BAR / JUMPERS

  • 8/7/2019 switch maintanence

    28/33

    28

    STRUCTURES

    PROPER TIGHTNESS

    MISSING MEMBERS

    EARTHING

    NESTS

  • 8/7/2019 switch maintanence

    29/33

    29

    CONTROL & RELAY

    PANELS / CIRCUITS CONTROL PANELS

    RELAY PANELS

    COMBINATION OF CONTROL AND RELAYPANELS

    CONTROL CABLES

    CONTROL AND PROTECTION CIRCUITS TKS

    SPACE HATERS

  • 8/7/2019 switch maintanence

    30/33

    30

    AUXILLARIES

    LOCAL AC NET WORK

    DC NETWORK

    COMMUNICATION SYSTEM

    DG SET CONTROL ROOM BUILDING AND

    ASSOCOATED INFRASTRUCTURE

    FIRE FIGHTING EQUIPMENTS

    SUMP PUMP

    BASIC AMENITIES

  • 8/7/2019 switch maintanence

    31/33

    31

    PAINTING

    OF

    EQUIPMENTSAND SUPPORTING

    STRUCTURES

  • 8/7/2019 switch maintanence

    32/33

    32

    SAY GOOD BYE TO

    RUST

    DUST

    MOISTURE

    LOOSECONTACT

    BI METALLIC EFFECT

  • 8/7/2019 switch maintanence

    33/33

    33

    THANK YOU