sustainable water harvesting and institutional strengthening in amhara, swhisa

40
Sustainable Water Harvesting and Institutional Strengthening in Amhara, SWHISA What, How, Where, and Status 20 th April 2007, Bahir Dar

Upload: sari

Post on 25-Jan-2016

40 views

Category:

Documents


4 download

DESCRIPTION

Sustainable Water Harvesting and Institutional Strengthening in Amhara, SWHISA. What, How, Where, and Status 20 th April 2007, Bahir Dar. SWHISA. is a six-year undertaking to be implemented by ANRS with support from CIDA through the CEA (Hydrosult-Agrodev-Oxfam Canada),. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

Sustainable Water Harvesting and Institutional Strengthening in

Amhara, SWHISA

What, How, Where, and Status

20th April 2007,

Bahir Dar

Page 2: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 2

SWHISA

• is a six-year undertaking –to be implemented by ANRS

–with support from CIDA

–through the CEA (Hydrosult-Agrodev-Oxfam Canada),

Page 3: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 3

SWHISA’s purpose

to strengthen the capacity of institutions involved in water harvesting to work together effectively to strengthen farmers’ associations, communities and families in planning, designing, implementing and managing sustainable water harvesting and use of water for irrigation.

Page 4: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 4

SWHISA will contribute to the ultimate goal of increasing food security of poor farmers through improved water management

Page 5: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 5

Key participating institutions

–BoARD

–BoWRD

–ARARI

–CPA – their representatives at the woreda level, (EB, WB,WI,GSE,DD,LM)

Page 6: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 6

Farmers will participate through

•water users associations and •other community organizations

• Other collaborating agencies will input to and benefit from the Project activities, (EPLAUA, WAB…)

Page 7: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 7

Project Design and Implementation Approach

• Design Phase completed by ANRS + CEA

• November 2002 to March 2004

• This work allowed for the definition of – Project organization and performance

measurement; – activities, outputs and outcomes; – resources and timing;

– training and procurement plans,

Page 8: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 8

work broken down into five outcomes

OC 1000 :

improved knowledge and skills of farm families and community-based organizations in household water harvesting, irrigated agriculture and watershed management;

Page 9: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 9

OC 2000 :

schemes owned and sustainably managed by

their owners;

Page 10: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 10

OC 3000:

strengthening the woreda and the development of integrated institutional platforms there;

Page 11: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 11

OC 4000:

strengthening the regional institutions and their

cooperation;

OC 5000

strengthening sector agency coordination and cooperation

Page 12: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 12

A total of 32 specific outputs and hundreds of activities

Work on the Implementation Phase started in late January

2005

Page 13: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 13

Major Achievements• OC 1000

Improved knowledge and skills of farm families and CBOs in household water harvesting,

irrigated agri culture and watershed management.

• OP 1100 Farmer Focus Group (FFG) formation

– 6 household water harvesting FFGs

– 6 irrigated agriculture FFGs– …

Page 14: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 14

OP 1200

Technology Development Team (TDT) formation and training

• TWO TDTS formed in the two woredas

• ….

Page 15: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

STATUS

Page 16: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 16

1. Water harvesting1.1 Household water harvesting

• 9 HHWHS (85 m3) completed at end June 2006. Most operational

• Drip irrigation facilities installed and training given to beneficiaries and DAs

– Crops are planted, some harvested, data being collected.

Page 17: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 17

Construction of new structures, including the third project woreda, is to begin soon (plan is to have 10 per woreda)

Page 18: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 18

1.2 Improving the efficiency of irrigation schemes

• PRAs conducted on six irrigation schemes

• PRA underway at Debremewi Exp Watershed

• Dry season cultivation underway on Six schemes

• Training of FFGs in EB by Woreda TDTs on irrigated agriculture.

Page 19: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 19

1.3 Underground dams

• Part of capacity building to BoWRD, a team of experts organized by the project from different bureaus to undertake the activity.

• Training organized for them by a private consultant

• Underground dam sites selected in East Bellesa woreda,

• geotechnical investigation and scheduling for construction to be undertaken

Page 20: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 20

1.4 The Gonj watershed study

– pre-feasibility study conducted. A learning-by-doing capacity building exercise. Almost everyone from the project was involved.

– Revised work plan for feasibility study prepared,

Page 21: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 21

1.5 Bathymetric surveys

• The surveys were done in four reservoirs in collaboration with experts from Ministry of Water resources. Report under preparation

It served as an excellent capacity building opportunity for BoWRD

Page 22: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 22

1.6 Installation of facilities for collection of data for rainfall-runoff modelling

• staff gauges and automatic and manual rainfall measuring devices are installed in four reservoirs, and daily data is being collected

Page 23: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 23

2. Agricultural Extension

2.1 Organization of FFGs and TDTs and training provided

• FFGs are established in E.Bellesa, Kobo, Mecha, Woreillu and Yimana Densa Goncha woredas.

• TDT in 5 woredas trained on irrigated agriculture, water harvesting systems, management of Drip systems and extension methodologies

Page 24: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 24

2.2 Provision of Diaries for DAs

• 500 diaries prepared, printed and distributed for all 6 project woredas..

Page 25: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 25

2.3 Provision of equipments for FTCs

A variety of equipments distributed.

( 360 wooden arm chairs, 6 black boards, 6 display boards, 18 office desks, 36 file cabinets, …)

Page 26: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 26

2.4 Design of an FTC with a built-in water saving structure at East

Bellesa

• A special design prepared by project staff under the leadership of the late Dr. Ramiro. BoARD had commented it, construction awaits budgetary decisions.

Page 27: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 27

3. Agricultural research

3.1 Running PRA surveys on selected irrigation schemes

• Six surveys conducted (traditional and modern).

• Short temers involved in some. • Bureau experts involved as part of a

capacity building effort.• Development plans prepared, action started

for the current irrigation season • PRA reports distributed to partners.

Page 28: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 28

3.2 Agricultural plan document prepared for HHWHS

3.3 Demonstration of low cost water lifting technology (Rope and washer pump) underway in East Bellesa Woreda.

Page 29: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 29

3.4 Publication and distribution of workshop proceeding

• Proceeding of ‘Irrigation water management research in Ethiopia, with particular emphasis on Amhara Region’

Page 30: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 30

3.5 Establishment of Experimental watershed

• SWHISA assisted ARARI in identifying broad agricultural water management research thematic areas to be the basis for strategic plan for the experimental work.

• A diagnostic PRA survey currently underway

Page 31: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 31

4. Organizational development activities

4.1 Situational analysis of Woreillu Woreda

• A full analysis of the organizational situation of the woreda successfully completed, discussed on a workshop

• Implementation work plan prepared with emphasis on Records Management

• Important regional institutions showed interest for further expansion

Page 32: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 32

4.2 Situational analysis of East Bellessa Woreda

– Field assessment work on data collection began

4.3 Assessment of the situation in the bureaus explored,

Detail studies and recommendations will follow

4.4 Top-It-Up: Empowering Women

Page 33: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 33

5. Community Development5.1 Establishment of Irrigation

cooperatives• 4 irrigation water users cooperatives

newly established in 3 woredas

• 3 coops legally registered at CPA

• Training provided to the cooperative leaders and Woreda cooperative experts by SWHISA.

Page 34: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 34

5.2 PRA surveys

5.3 Works on Gender and HIV/AIDS

• trainings conducted for Farmers, Woredas as well as for bureaus.

Page 35: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 35

6. Capacity building trainings Major trainings:

• 1652 Total No of participants• 70% Woreda + Kebele

• 30 % Region + Zone

• > 352 Training days

• Few International tours

• Msc thesises supported

Page 36: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 36

The ‘minor’ changes initiated by ANRS

• According to ANRS:

• An imbalance b/n Technical Assistance and physical development component of the project.

• Considerable changes in situation between the period of design of the project and the present,

Hence, the need to make some adjustment.

Page 37: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 37

ANRS wants to see some project fund allocated for :

More Water resources development including developing traditional irrigation schemes

Human resources development (long term local trainings, …)

Environment related

Page 38: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 38

• Project kept on hiatus until negotiations completed

• The issue was resolved after a long process of negotiation that involved the senior leadership at ANRS, at CIDA, and at CEA

Page 39: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 39

What next?Two plans to be produced:

1. A comprehensive plan reflecting the agreement. i.e. an addendum to the original PIP

2. An annual plan for the period July/07—June/07

Page 40: Sustainable Water Harvesting and Institutional Strengthening in Amhara,  SWHISA

SWHISA 19Apr07 40

THANK YOU