Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
i
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
ii
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
iii
Map of Bhutan
Political Map of Bhutan
Note: The shaded Dzongkhags are the five poorest
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
iv
List of Contents Map of Bhutan .................................................................................................................................... iii Executive summary .............................................................................................................................. x 1. Introduction .................................................................................................................................. 1
1.1 Development cooperation between Bhutan and Denmark ................................................... 1 1.2 Events leading to the SESP formulation .............................................................................. 1 1.3 Lessons from previous development collaboration ............................................................. 2
2. National and sector context .......................................................................................................... 3 2.1 The national and poverty context ......................................................................................... 3
2.2 The development context ..................................................................................................... 4 2.3 The environment context ..................................................................................................... 5 2.4 Climate change and natural hazards ..................................................................................... 8 2.5 Local government reforms ................................................................................................... 9 2.6 Public financial management and procurement ................................................................. 13
2.7 Cross-cutting issues and priority themes ........................................................................... 15 2.8 Donor coordination mechanisms ....................................................................................... 16
3. Agreed assistance ....................................................................................................................... 17 3.1 The proposed support ......................................................................................................... 17 3.2 Objectives........................................................................................................................... 17 3.3 Strategic Approach ............................................................................................................. 18
3.4 Technical assistance ........................................................................................................... 20 3.5 Cross-cutting issues and priority themes ........................................................................... 21
3.6 Development partner harmonisation and alignment .......................................................... 21 4. Components of SESP ................................................................................................................. 22
4.1 Component 1: Budget support for capital investments in Gewogs .................................... 22
4.2 Component 2: Support for capacity development for environmental mainstreaming ....... 25 5. Programme management and organisation ................................................................................ 27
5.1 Programme management.................................................................................................... 27
5.2 SESP Steering Committees ................................................................................................ 29
6. Programme budget and financial management .............................................................................. 31 6.1 SESP grant ......................................................................................................................... 31 6.2 Financial management ....................................................................................................... 32
7 Assessment of key risks ............................................................................................................. 35
8 Monitoring, reporting, reviews and evaluations ........................................................................ 38 8.1 National monitoring and evaluation framework ................................................................ 38 8.2 Reviews .............................................................................................................................. 40
9 Implementation .......................................................................................................................... 42 Annex A: Environment in the 10
th FYP ............................................................................................. 44
Annex B: Overview of Environmental related legislation in Bhutan ................................................ 47 Annex C: ToR for District Environmental Officers ........................................................................... 51 Annex D: External Development Partners in Environmental, Natural Resource and Climate Change
............................................................................................................................................................ 53 Annex E: Resource Allocation for the 205 Gewogs in Bhutan ......................................................... 55 Annex F: Draft Format for Gewog Environmental Expenditure Assessment (ex-post Output
Statement Study) ................................................................................................................................ 59
Annex G: Proposed State of Environment (SoE) Output and Outcome Gewog Indicators .............. 60
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
v
Tables:
Table 1: Annual sequence for grant instalments ................................................................................ 23 Table 2: SESP Budget Summary ....................................................................................................... 31 Table 3: SESP Budget according to Bhutan‟s financial year (DKK million) .................................... 31 Table 4: SESP Budget according to Denmark‟s financial year (DKK million) ................................ 32 Table 5: Flow of funds and financial management ............................................................................ 34
Figures:
Figure 1: Annual grants flow of funds ........................................................................................... 11 Figure 2: Flow of funds and NMES reporting and monitoring ................................................... 12
Text Boxes:
Box 1: Millennium Development Goals (MDG) .............................................................................. 4
Box 2: Environment as a cross-cutting theme in the 10th
FYP ...................................................... 6 Box 3: Evolution of local governance ............................................................................................. 10
Box 4: Bhutan and the Corruption Perception Index .................................................................. 13
Box 5: Proposed positive list for assessment of the environment contents ................................. 24
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
vi
List of Abbreviations
ADA Austrian Development Agency
APR Annual Programme Review
BAS Budget and Accounting System
BCCI Bhutan Chamber of Commerce and Industry
BPFFS Budget Policy and Fiscal Framework Statement
CBS Centre for Bhutan Studies
CEDAW Convention on the Elimination of all forms of Discrimination
Against Women
CEO Chief Executive Officer
CNR College of Natural Resources
CRC Convention on the Rights of the Child
CSO Civil Society Organisation
Danida Danish International Development Assistance
DDC District/ Dzongkhag Development Committee
DEC District/ Dzongkhag Environment Committee
DEO District/Dzongkhag Environment Officer
DKK Kroner (currency of Denmark)
DoA Department of Agriculture
DoF Department of Forests (MoA)
DoL Department of Livestock (MoA)
DPA Department of Public Accounts (MoF)
DPO District/Dzongkhag Planning Officer
DT Dzongkhag Tshogdu (District Committee)
DYT Dzongkhag Yargye Tshogdu (District Development Committee)
ECP Environment-Climate Change-Poverty
EFRC Environment-friendly Road Construction
EIMS Environmental Information Management System
ESPS Environment Sector Programme Support
EUSPS Environment and Urban Sector Programme Support (Danida)
FAO Food and Agriculture Organization of the United Nations
FRR Financial Rules & Regulations
FY Fiscal Year
FYP Five-Year Plan (of Bhutan)
GAO Gewog Administrative Officer
GCM Global Circulation Model
GDP Gross Domestic Product
GEF Global Environmental Facility
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
vii
GHG Greenhouse Gases
GIS Geographic Information System
GLOF Glacial Lake Outburst Flood
GNH Gross National Happiness
GNHC Gross National Happiness Commission (RGoB)
GT Gewog Tshogde (Block Committee)
GYT Gewog Yargye Tshogchung (Block Development Committee)
HDI Human Development Index
HRD Human Resources Development
ICBP Integrated Capacity Building Plan (for local governments)
ICDP Integrated Conservation and Development Programme
IMS Institute for Management Studies
INC Initial National Communication (to UNFCCC)
IPCC Intergovernmental Panel on Climate Change
JICA Japan International Cooperation Agency
JSP-SC Joint Support Programme Steering Committee
LDCF Least Developed Countries Fund
LDD Local Development Division (of GNHC)
LDPM Local Development Planning Manual
LG Local Government
LGSP Local Governance Support Programme
LOD Liaison Office of Denmark (in Thimphu, Bhutan)
MDGs Millennium Development Goals
MFA Ministry of Foreign Affairs (of Bhutan)
MoA Ministry of Agriculture (of Bhutan)
M&E Monitoring and Evaluation
MoEA Ministry of Economic Affairs (of Bhutan)
MoF Ministry of Finance (of Bhutan)
MoHCA Ministry of Home and Cultural Affairs (of Bhutan)
MoLHR Ministry of Labour and Human Resources (of Bhutan)
MoWHS Ministry of Works and Human Settlement
MSME Micro, Small and Medium Enterprises
MYRB Multi-Year Rolling Budget
MYRBF Multi-Year Rolling Budget Framework
NAPA National Adaptation Programme of Action (Climate Change)
NEC National Environment Commission (of Bhutan)
NECS National Environment Commission Secretariat
NEPA National Environment Protection Act 2007
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
viii
NGO Non-Government Organisation
NMEM National Monitoring and Evaluation Manual
NMES National Monitoring and Evaluation System
NPAG National Plan of Action for Gender
NSB National Statistics Bureau
Nu Ngultrum (Bhutanese currency)
PAR Poverty Analysis Report
PEER Public Environmental Expenditure Review
PEI Poverty Environment Initiative
PEMS Public Expenditure Management System
PlaMS Planning and Monitoring System
PMCD Plan, Monitoring and Coordination Division (of GNHC)
PMG Programme Management Group
PPD Policy and Planning Division
PSC Programme Steering Committee
RAA Royal Audit Authority
RDTC Rural Development Training Centre
REAP Rural Economic Advancement Programme
REDD Reducing Emissions from Deforestation and Degradation
RGoB Royal Government of Bhutan
RIM Royal Institute of Management
RNR Renewable Natural Resources
ROACH Results-oriented Approach to Capacity Development and Change
RSPN Royal Society for Protection of Nature
RTC Royal Thimphu College
SAARC South Asian Association for Regional Cooperation
SDC Swiss Agency for Development and Cooperation
SDGs SAARC Development Goals
SESP Sustainable Environment Support Programme (Denmark)
SLMP Sustainable Land Management Project (World Bank/GEF)
SNV Netherlands Development Organization
SoE State of Environment
TA Technical Assistance
TD Thromde Tshogde
TYD Thromde Yenlag Tshogde
ToR Terms of Reference
UNCDF United Nations Capital Development Fund
UNDP United Nations Development Programme
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
ix
UNEP United Nations Environment Programme
UNFCCC United Nations Framework Convention on Climate Change
UWICE Ugyen Wangchuck Institute for Conservation and Environment
WB World Bank
WTO World Trade Organisation
WWF World Wide Fund for Nature
List of Bhutanese Terms
Chathrim Law, statute
Chiwog Territorial constituency for the election of
Tshogpas to the Gewog Tshodge
Dzongdag District Administrator
Dzongkhag District
Dzongkhag Tshogdu District Council
Dzongkhag Yargye Tshogchung District Development Committee
Gewog A county, smallest geographical unit for public
administration, made up of a group of villages
Gewog Tshogde County Committee
Gewog Yargye Tshogchung County Development Committee
Gup Elected head of a county
Gyalyong Tshogdu National Assembly
Mangmi Elected deputy head of a county
Thromde Municipality
Thromde Tshogde Municipal Committee
Thromde Yenlag Tshogde Municipal Committee for a satellite town
Tshogpa Elected representative of a Chiwog
Exchange rate October 2009: BTN 100 = DKK 10.9; DKK 1.0 = BTN 9.1760
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
x
Executive summary
Introduction
Danish development cooperation with Bhutan began in 1978. Bhutan has since 1989 been one of
the Danish programme cooperation countries. Denmark and Bhutan have had development
cooperation on environment for more than 15 years. The initial cooperation was on land-use
planning as well as support to the National Environmental Commission Secretariat (NECS) and
various activities related to watershed management, environmental management and legislation.
The Danish country strategy for development cooperation with Bhutan is the “Bhutan-Denmark
Partnership - Strategy for Development Cooperation (2008-2013)”. The priority sectors for the
Danish development assistance are: the social sector; environment and urban development; and
good governance.
The Royal Government of Bhutan (RGoB) and the Government of Denmark have agreed to prepare
and implement the four-year Sustainable Environment Support Programme (SESP). The SESP will
commence early 2010 and be finalised at the end of 2013. The SESP will be aligned with the last
three years of the 10th
Five-Year Plan (FYP) (2010/11-2012/13). It is noted in the Partnership
Strategy that the Danish assistance will be gradually phased out after 2013. The SESP will be the
last phase of cooperation between Denmark and Bhutan on environment applying the grant funding
modality. Future cooperation could continue with civil society and the private sector.
National and sector context
The 2008 Constitution of the Kingdom of Bhutan introduced a Democratic Constitutional
Monarchy. Free and universal elections were held to the National Council and National Assembly
in December 2007 and March 2008 respectively. The first elected parliamentary government was
formed on 11 April 2008. Local government elections are planned to be held in 2010 following the
enactment of the Local Governments‟ Act 2009 on 11 September 2009. Bhutan is known
worldwide for its philosophy of „Gross National Happiness‟ (GNH) as the guidance for
development in Bhutan. The development policy emphasises balanced economic development and
poverty reduction.
Protection of the environment and dependency on natural resources is deeply ingrained in Bhutan‟s
culture and economy. However, environmental conservation is becoming increasingly challenging
as the country opens up to meet the new development needs of a growing and modernizing
population. Pollution of air and water; reduced water resources; land degradation due to
unsustainable agriculture, deforestation and overgrazing; infrastructure development and mining;
solid waste; and biodiversity loss due to conversion of forest habitats are key challenges that
currently confront the country.
Climate change is a potential risk to development and livelihoods in Bhutan. The climate change
related natural hazards such as glacial lake outburst floods (GLOF), monsoon flash floods, and
landslides from heavy rainfall disrupt the livelihoods, access (transportation) and other parts of the
economy including agriculture, hydropower systems, industrial estates, and human settlements. The
pressures of land-use change, habitat degradation and infrastructure development compound the
threat of climate change further.
Protection of the environment and the dependency on natural resources is deeply enshrined in the
culture, and there is recognition that the environment and natural resources is important for all parts
of society and development in Bhutan. Environment is one of the four pillars of GNH. Environment
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
xi
is included as Article 5 of the National Constitution. Environment is included as a crosscutting
theme in the 10th
FYP, but environment is not defined as a sector.
Agreed assistance
The SESP will provide support to local governments (Dzongkhags and Gewogs) in two parallel sets
of interventions: 1) provision of investment capital to Gewogs; and 2) capacity development for
mainstreaming of environment, climate change and poverty concerns in policies, plans and
programmes – with the intent that the developed capacity will influence the way in which local
governments will plan and implement their development activities. SESP has been formulated in
accordance with the Bhutan-Denmark Partnership (2008 – 2013) and Bhutan‟s national
development framework. The SESP comprises two components:
1. Budget support for capital investments in Gewogs. Budget support will be provided to all
205 Gewogs through the Annual Capital Grant mechanism for funding of the Gewogs‟
development plans.
2. Support for capacity development for mainstreaming of environment, climate change and
poverty concerns. Support will be provided for mainstreaming of environment, climate change
and associated poverty (ECP) concerns in national policies, plans and programmes and in all
local development plans and programmes.
Component 1 is fully aligned with RGoB‟s Local Governance Support Programme (LGSP); and
Component 2 is the Joint Support Programme (JSP), formulated and to be implemented jointly with
UNDP/UNEP‟s Poverty Environment Initiative (PEI) Phase 2.
The SESP development objective is directly linked to the national development objective of poverty
reduction.
The development objective of Component 1 is similar to that of LGSP which is “effective and
transparent financing mechanism for local government service delivery established and in operation
with annual capital grants to all Gewogs”.
The development objective of JSP is: sustainable development planning and implementation
undertaken at national and local levels that contribute to: alleviation of climate change impacts;
conservation, protection and sustainable use of natural resources; and poverty reduction.
The immediate objectives are: 1) adequate level of investments in Gewogs to sustain economic and
social development (for Component 1); (and for JSP) 2) strengthened national level capacity that
facilitates national and local level five-year planning and implementation by mainstreaming
environment, climate change and poverty concerns in policies, plans and programmes; and 3)
strengthened local level capacity to formulate and implement five-year development plans and
annual plans in which environment, climate change and poverty concerns are mainstreamed.
The main strategies are to: 1) inject investment capital to enable the lowest level of government to
adequately cope with development needs in a sustainable manner; 2) develop national capacity for
ECP mainstreaming into national policies, plans and programme, especially those of relevance for
local governance; and 3) based on the national ECP framework, develop local capacity for
mainstreaming ECP into all local development plans and programmes, and for monitoring and
evaluation of planning and implementation cycles in order to enhance the responsiveness to ECP
challenges.
The principles of aid effectiveness are pursued with alignment to RGoB‟s development framework
and operational procedures, and harmonised with UNDP/UNEP‟s Poverty Environment Initiative
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
xii
(PEI). The SESP will be coherent with other Danish supported programmes, especially the Local
Governance Support Programme (LGSP) and the Social Sector Support Programme (SSPS).
Harmonisation with similar development partner programmes is pursued.
Programme management and organisation
GNHC will be the executing agency for the SESP. GNHC has no implementation mandate and does
not, therefore, take direct part in the actual implementation, but will undertake the overall
coordination functions.
Component 1: The budget support will be provided through the same procedures as those of LGSP
and the RGoB “Guidelines for Annual Grants for Local Governments”. The programme manager
for LGSP from Local Development Division (LDD) of GNHC will also function as the Programme
Manager for the SESP Component 1.
Component 2: The Development Cooperation Division (DCD) of GNHC together with PMCD and
LDD will have the overall coordination function in relation to sector ministries, national agencies
and local governments. The relevant sectors and local government councils (Dzongkhags and
Gewogs) will be the implementing agencies. A senior GNHC officer will be appointed as the
programme manager. Each sector ministry/national agency involved in the SESP will appoint a
senior officer, who will act as the focal point and coordinate activities within their respective
ministry/ agency. At the Dzongkhag level, it will be the District Planning Officer (DPO) and the
District Environmental Officer (DEO) who will jointly act as the focal point. The focal points will
be responsible for programme implementation in their respective central and local government
units. A Programme Management Group (PMG) will be established, which will be made up of
members from RGoB and development partners.
Steering committees: The existing LGSP Outcome Board/ Steering Committee (LGSP-SC) will
serve as the Steering Committee for the SESP Component 1. For Component 2, a Joint Support
Programme Steering Committee (JSP-SC) will be established, which will be made up of members
from RGoB and development partners. In order to oversee overall implementation, cooperation
issues, etc. for the SESP‟s two components, the Secretary GNHC and the Head of the LOD will
form a high-level coordination body having a mandate similar to a Programme Steering Committee
(PSC).
Programme budget and financial management
The programme budget is DKK 70.0 million and is allocated as follows:
Components DKK mn Percentage
Component 1: Budget support for capital investments in Gewogs 40.0 57 %
Component 2: Capacity development for environmental mainstreaming 20.0 29 %
Outcome 1: ECP mainstreamed in policies, plans and programmes 6.8 10 %
Outcome 2: ECP mainstreamed in all development plans and
programmes
11.2 16 %
Technical Assistance 2.0 3 %
Other: 10.0 14 %
Joint Reviews 2.0 3 %
Unallocated 7.0 10 %
Contingency 1.0 1 %
Total 70.0 100 %
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009
xiii
The financial management of the SESP will follow the RGoB procedures for budgeting, flow of
funding and accounting. Procurement of equipment and services will be the responsibility of the
implementing agencies and procurement will follow ordinary RGoB procurement in accordance
with the Procurement Rules and Regulation (2009). If requested by RGoB, procurement of TA
could be undertaken by LOD in line with current Danish procurement procedures.
Monitoring and reporting
The SESP monitoring system and associated indicators will be based on the RGoB indicators and
M&E system. The SESP will be monitored through the LGSP for Component 1 and the Joint
Support Programme for Component 2. The Joint Support Programme includes an outline of a
performance monitoring system that has been prepared in accordance with the GNHC Planning and
Monitoring System (PlaMS). However, during the formulation of the SESP, gaps were identified in
the national indicators and monitoring: i) the structure of the planning and financial monitoring
system – National Monitoring and Evaluation System (NMES) – is still being developed; ii) the
Gewog output and outcome indicators were not available, and iii) there is no comprehensive
environmental indicator system for the environment in place that applies at the Gewog level.
In order to estimate the actual environment expenditures of the Gewog annual plans, ex-post
assessments of implemented activities based on financial statements from the Department of Public
Accounts are planned to be carried out as separate studies and – if feasible – in cooperation with
and as an follow-up on the 2009 Public Environmental Expenditure Review (PEER) that is
undertaken by the PEI. The ex-post environment expenditure assessment will not be part of the
general monitoring system.
Financial and physical progress reporting shall comply with the formats in the RGoB PlaMS and
the Financial Rules & Regulations (FRR). Financial reports and accounts shall be submitted to MoF
through the Budget and Accounting System (BAS) and physical progress reports to GNHC through
PlaMS.
Reviews and evaluation
Annual Programme Reviews (APR) will be carried out jointly with RGoB and preferably other
development partners in the environment, climate change adaptation & mitigation and natural
resource management sectors. Joint reviews could as well be carried out with the LGSP. The APR
could coincide with the September sessions of the LGSP-SC and JSP-SC. A joint mid-term review
will be conducted during the third quarter of 2011 prior to launching the preparation of the 11th
Five-Year Plan, which will take stock of the local governance context and the performance of
SESP, LGSP and PEI Phase 2. An exit strategy will be elaborated during the third year of
implementation by taking ongoing and planned programmes into consideration. A “terminal
review” of lessons learned from the SESP will be undertaken towards the end of 2013.
Implementation
The programme duration is four years with an inception phase of six months (January to June
2010), three financial years (FY 2010/11 – FY 2012/13), and six months for Programme completion
(July to December 2013).
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 1
1. Introduction
1.1 Development cooperation between Bhutan and Denmark
Danish development cooperation with Bhutan began in 1978. Bhutan has since 1989 been one of
the Danish programme cooperation countries. The main areas of development cooperation have
been: health, education, good governance as well as environment and urban development. Denmark
has for several years been among the larger providers of development assistance to Bhutan.
The Danish country strategy for development cooperation with Bhutan is the „Bhutan-Denmark
Partnership - Strategy for Development Cooperation (2008-2013)‟. The priority sectors for the
Danish development assistance are: the social sector; environment and urban development; and
good governance. The strategy is guided by five interrelated strategies:
1. Promotion of private sector development – emphasising diversification of the economy and
hence continued growth and poverty reduction;
2. Support to the social sectors to reduce poverty – emphasising the quality of service delivery
of the health and education sectors;
3. Support to the transition to parliamentary democracy, good governance, rule of law, and
safeguarding of human rights;
4. Promotion of sound and sustainable management of natural resources with a direct impact
on reducing poverty; and
5. Improvement of quality of services and basic infrastructure, amongst other by ensuring the
availability of district level capacity.
The Royal Government of Bhutan (RGoB) and the Government of Denmark have agreed to prepare
and implement the four-year Sustainable Environment Support Programme (SESP). The SESP will
commence early 2010 and be finalised at the end of 2013. The SESP will be aligned with the last
three years of the 10th
Five-Year Plan (FYP) (2010/11-2012/13).
It is noted in the Partnership Strategy (p.5) that “based on the positive macro-economic trends in
Bhutan, it is expected that the Danish assistance will be gradually phased out after 2013”. The SESP
will be the last phase of cooperation between Denmark and Bhutan on environment applying the
grant funding modality. Future cooperation could continue with civil society and the private sector.
1.2 Events leading to the SESP formulation
Denmark and Bhutan have had development cooperation on environment for more than 15 years.
The initial cooperation was on land-use planning as well as support to the National Environmental
Commission Secretariat (NECS) and various activities related to watershed management,
environmental management and legislation. A programmatic approach was initiated with the
Environment Sector Programme Support (ESPS) from 1998 to 2004, the Urban Sector Programme
Support (USPS) from 1999 to 2004, and the Environment and Urban Sector Programme Support
(EUSPS) from 2004 to 2009. The SESP will build on lessons learned from the previous
collaboration between RGoB and Denmark on environment.
Events leading up to the preparation of the SESP include the high level consultations (March 2007
and March 2009) and the joint environment programme review with UNDP and GEF (September
2008). A concept paper was prepared by the Liaison Office of Denmark (LOD) in consultation with
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 2
the Gross National Happiness Commission (GNHC) end of 2008, and endorsed by the Programme
Committee of the Ministry of Foreign Affairs of Denmark (MFA) on February 6, 2009.
A climate change screening of Denmark‟s development cooperation with Bhutan was carried out in
May 2008 and resulted in support to short-term climate change activities. It is the aim of the SESP
to include „climate change adaptation‟ in order to address emerging challenges from climate change
variability and erratic weather patterns, and to reduce risks of natural disasters.
The Danish SESP Component 1 will be implemented as part of the Local Governance Support
Programme (LGSP), and Component 2 and the UNDP/UNEP PEI Phase 2 have been jointly
designed to constitute the Joint Support Programme (JSP).
1.3 Lessons from previous development collaboration
Lessons learned of the EUSPS components on decentralised natural resource management and
urban environmental management have been prepared (September 2008)1. Among the lessons were
that the institutional arrangement and responsibility could be more aligned to the existing and
emerging RGoB structures. New opportunities for planning and financial management have
emerged with the local government reform and decentralisation. Most of the previous support to
environment was directed at central level with limited collaboration at local level beyond some pilot
activities.
The lessons learned assessment pointed to the need for capacity development and technology
transfer to harness the full potential of the environment and natural resources at local level. In some
cases, there is also scope for adding value on existing investments by linking marketing,
environmental mainstreaming and production technology packages with investments in irrigation
and rural roads. In the case of larger investments in urban settings, the solutions should be based on
appropriate technologies that consider efficiency and sustainability.
The SESP marks a logical shift in the emphasis from the previous project and programme approach
that focussed on central level activities. The direct lessons from ESPS and EUSPS that can be
carried over into the SESP for local government and budget support are few. The reasons are that
the SESP is more aligned to the local government reform with a shift in the focus from the central
to the local level. The previous experience in ESPS and EUSPS with local level implementation
was scattered and not systematic. Through ESPS and EUSPS, contributions have been made for the
establishment of the national framework legally and operationally for environmental management.
EUSPS supported the establishment of the District Environmental Officer positions in 2007. The
sustainability of the endeavours of EUSPS is yet to be assessed in the EUSPS completion report
expected by the end of 2009. A comprehensive Outcome Study of the EUSPS is undertaken
(August-October 2009), the result of which will provide input to the inception of the SESP.
There are lessons of budget support from the Health and Education Sector Programme Support, and
the Social Sector Programme Support (SSPS) that will be applied in the SESP. The Local
Governance Support Programme (LGSP) is providing support for local government financial
management and the provision of some budget support for the Annual Capital Grants (ACG) for
local government.
1 MFA/Danida, Lessons Learned from Decentralised Natural Resource Management Component: Gewog level
experiences on the planning and regulatory frameworks, September 2008; and MFA/Danida, Lessons Learned from
Support to Five District Towns: Municipal level experiences on planning and regulatory frameworks, October 2008.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 3
2. National and sector context
This Chapter summarises findings of the sector assessments, and includes an overview of the
development and planning context, as well as sections on environment, climate change and natural
hazards, local government reform, public financial management, and cross-cutting issues.
2.1 The national and poverty context
Bhutan is a land-locked Least Developed Country with a land area of 38,394 km2 located
strategically between China and India. Only about 7.8 % of the land area of Bhutan is arable.2 It is a
constitutional commitment to maintain forest cover above 60 %. The population of Bhutan is
estimated at 671,083 (in 2008).3 Around 70 % of the population lives in rural areas. The population
is growing at a rate of 1.3 % p.a. at which rate the population could be doubled by around 2060. The
Poverty Analysis Report (PAR) from 2007 found that the poverty incidence in Bhutan was 23.2 %.4
The poverty rate was more severe in rural areas (30.9 %) compared with urban areas (1.7 % poverty
incidence). The depth of poverty is low, i.e. few citizens of Bhutan are facing extreme poverty. But
about 8 % of the rural population are subsistence poor consuming less than the food poverty line.5
The next PAR is expected published in 2012 based on household surveys to be conducted in 2011
by the National Statistics Bureau (NSB). According to NSB, the next PAR is expected to have
sampling sizes sufficiently large to disaggregate the poverty analysis at Gewog level.
In 2007, the then Planning Commission (now GNHC) undertook a nationwide survey of 1,200
households to assess the effectiveness of past development interventions and their impacts on rural
livelihoods. With a consistently high share of development expenditures for health and education,
Bhutan has steadily improved on the Human Development Index (HDI) scale. The 2009 ranking for
Bhutan is 132 out of 182 countries (UNDP, 2009). It appears that more than 80% of people have
access to basic facilities in health, education, water and sanitation and agriculture. Less progress has
been made in terms of access to income generating activities. RGoB‟s efforts to stimulate
enterprises are not widespread in rural areas. Some 35% of respondents reported food shortages
during the year, and this large segment of the population is caught in a cycle of borrowing and
repayment to meet food requirements.
The total Gross Domestic Product (GDP) was BTN 51.521 billion in FY 2007/08 and USD 1,770
per capita (current prices) in 2007. The economy of Bhutan has had a steady growth of an average
of 7.5 % since the 1980s. The relative contribution to the economy of industry and services has
grown while agriculture has gone from contributing to about half of the economy to about one-fifth
(18.6 % in 2006). Hydropower is the main contributor to national revenues and there is a large
economic potential for further development of hydropower for energy exports.
2 MoA: Compendium of RNR Statistics (2008)
3 Estimate by National Statistics Bureau (NSB). In the first census of Bhutan (the „Population and Housing Census of
Bhutan‟, 2005) the total population at the end of 2005 was estimated at 672,425.
4 In the PAR (2007) the total poverty line is set at a household consumption of BTN 1,096.94 per month (in 2007)
(about DKK 129 per month). This budget includes food and non-food consumption.
5 The food poverty line is the minimum food basket containing 2,124 Kcal. It was estimated at BTN 688.96 (in 2007)
(about DKK 81 per month).
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 4
2.2 The development context
Bhutan was established as a monarchy in 1907, unifying the country under the control of the
Wangchuck family. The Fourth King, Jigme Singye Wangchuck introduced multi-party
parliamentary democracy. The Fifth King Jigme Khesar Namgyel Wangchuck was crowned 1
November 2008. The Constitution of the Kingdom of Bhutan (ratified July 18, 2008) introduced a
Democratic Constitutional Monarchy. Free and universal elections were held to the National
Council and National Assembly in December 2007 and March 2008 respectively. The first elected
parliamentary government was formed on April 11, 2008. Local government elections are planned
to be held in 2010 following the enactment of the Local Governments‟ Act 2009 on 11 September
2009.
Bhutan is known worldwide for the philosophy of „Gross National Happiness‟ (GNH) as the
guidance for development in Bhutan.6 The development policy emphasises on balanced economic
development and poverty reduction. This is reflected in Bhutan‟s strong commitment to the
Millennium Development Goals (MDGs) to which Bhutan has made good progress (see Box 1). It
is also in line with the similar South Asian Association for Regional Cooperation (SAARC)
Development Goals to which Bhutan has also expressed its commitment. Bhutan has already
achieved the targets of halving the proportion of people without access to safe drinking water and
sanitation, and halving the percentage of underweight children under five years of age. Bhutan may
be on track to meet all national MDG targets.
Box 1: Millennium Development Goals (MDG)
Among the top priorities of the RGoB is the achievement of the MDG Goal to „Eradicate Extreme Poverty and
Hunger by Year 2015‟. The base line for MDG was the PAR (2000) when an estimated 36 % of the population
lived under the then poverty line of BTN 740 per capita per month. The PAR in 2007 produced a national
poverty figure of 23 %, i.e. a reduction by 36 %. The objective of the 10th FYP is to reduce poverty to below
15 % by 2013, which will be more than halving poverty since the PAR (2000) baseline.
The poverty reduction strategy of the RGOB is to first build road access to remote communities, then to
support social facilities, such as schools and hospitals, and power supplies (Bhutan Poverty Reduction Strategy
Paper, 2003). A needs assessment and costing exercise was carried out in 2006 to estimate the costs of
achieving the MDGs by 2015.7 The assessment also included non-MDG sectors such as transport, energy and
good governance as they are expected to contribute to the realisation of the core MDGs. Climate change issues
are discussed in the context of environmental sustainability (MDG 7), including carbon sequestration and
greenhouse gas emission reductions.
Bhutan may need to invest USD 2.5 billion at 2005 prices between 2006-2015 to achieve the MDGs, including
reducing the national poverty rate 15%. Education and health are the most demanding sectors, requiring 46 %
of investments, followed by agriculture with 17 %, and water supply and sanitation with 7 %.
6 Gross National Happiness (GNH), developed by the Fourth King Jigme Singye Wangchuck, embodies the country‟s
pursuit of development in broader aspects than just material well-being, notably spiritual development. GNH is deeply
rooted in Buddhist values. GNH is an attempt to add more dimensions to measure of development than found in the
one-dimensional measure of „Gross National Income‟. GNH is based on four pillars: a) the promotion of equitable and
sustainable socio-economic development, b) the preservation and promotion of cultural values, c) the conservation of
the natural environment, and d) the promotion of good governance
7 Planning Commission (2007): “Bhutan Millennium Development Goals – Needs Assessment and Costing Report”,
RGoB, Thimphu, Bhutan.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 5
The 10th
Five Year Plan (FYP) provides the development framework for the financial years 2008/09
to 2012/13. The reduction of poverty in pursuit of the GNH vision is the overarching objective of
the plan, with the emphasis to reduce the proportion of the population living below the national
poverty line from 23.1% to less than 15%. The 10th
FYP can be viewed as Bhutan‟s poverty
reduction strategy.
Six key interrelated strategies have been identified to achieve poverty reduction in the 10th
FYP.
These are: 1) vitalizing industry, 2) national spatial planning (including sustainable urban
development and housing), 3) synergizing integrated rural-urban development, 4) expanding
strategic infrastructure, 5) investing in human capital and 6) fostering an enabling environment
through good governance.
The 10th
FYP features several policy and planning innovations compared to previous FYPs. Some
of the highlights are:
Introduction of a „Results Based Planning Framework’. Based on the recommendations of
the Mid-Term Review of the 9th
FYP and the Good Governance Plus report (2005), a new
planning approach is introduced with clearly defined planning objectives and results. The
aim is to measure progress on results achievements and impact rather than processes,
products and services.
In order to create a dynamic planning and budgeting process, the planning process is
embedded in a multi-year rolling budget framework (MYRB) spanning over three years,
meaning that plans and budgets will be updated annually for three next years.
The resource envelope will be based on projections determined by the Budget Policy and
Fiscal Framework Statement (BPFFS) and accounts for all available resources to central and
local government. Development funds for local government (Dzongkhags and Gewogs)
consist of earmarked central government grants as well as Annual Grants (capital and
recurrent).
The progress and results achievements of the 10th
FYP will be monitored through the
National Monitoring and Evaluation System (NMES), which is closely connected to the
results indicators of the plan. Data will be collected through the Planning Monitoring System
(PlaMS) and the Public Expenditure Management System (PEMS).8
The devolution of functions, powers and finances play a key role in the 10th
FYP but it is
also recognised that low capacity at local level, particularly in the Gewogs, is a challenge to
the achievement of plan objectives.9
2.3 The environment context
Bhutan is rich in pristine natural resources and the environment features high in national policies
and plans. Protection of the environment and the dependency on natural resources is deeply
8 The NMES with PlaMS, MYRB and PEMS is developed as a web-based system to include all levels of government. It
is estimated that currently 45 out 205 Gewogs now have internet access through the Community Information Centres,
e.g. at post offices.
9 In order to encounter the capacity needs, an Integrated Capacity Building Programme (ICBP) has been funded and
piloted by JICA. The ICBP covers general and crosscutting aspects of local government in administration, management
and accounting. The target groups are elected positions, administration in local government and Dzongkhag sector
heads. The ICBP does not include training in technical topics like environmental management, which should be done by
technical agencies such as MoA and NECS. Hence there are no modules on environmental mainstreaming.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 6
enshrined in the culture, and there is recognition that the environment and natural resources is
important for all parts of society and development in Bhutan. Environment is one of the four pillars
of GNH. Environment is included as Article 5 of the National Constitution (see Box 2), and one of
the constitutional obligations is to maintain a minimum forest cover of 60%.
Environment is included as a crosscutting development theme in the 10th
FYP (see Box 2) but
environment is not defined as a sector (see Annex A).
Box 2: Environment as a cross-cutting theme in the 10th
FYP
Mainstreaming environment in rural road construction: Aim to implement environment friendly road
construction (EFRC) methods. The additional costs to the already high investments required to
implement these EFRC requirements may prove to be long-term cost-efficient.
Sustainable land management: The rural environment concerns are soil degradation due to over grazing
by livestock, loss of scarce agricultural lands due to urbanization, and non-sustainable use of forest
resources.
Climate change vulnerability: Climate change risks increase the proneness to flash floods, glacial lake
outbursts and landslides due to excessive rain.
Air and water quality: The ambient environment status is still relatively good but with emerging
problems of air pollution in and around industrial sites and deteriorating water quality near urban
centres, the air and water quality will deteriorate without effective environmental interventions.
Awareness and capacity: Bhutan is faced with limited human capacity and expertise to manage the
environment. Environmental awareness, education and sound practices can also be furthered.
Protection of watershed: The vast hydropower resources are Bhutan‟s comparative advantage, but
require management and protection of the critical watersheds. This provides not just an environmental
benefit but also has an economic justification and thus a high development priority.
In the institutional functions of the environment, the NECS has the mandate to support
mainstreaming of environment in the 10th
FYP. NECS also has the mandate to set environmental
standards, for environmental monitoring and state of the environment reporting and the
coordination and implementation of Multilateral Environmental Agreements (MEA). NECS also
has the mandate for policy and coordination of water resources (NEPA 2007).
NECS has designated the Dzongkhag Administrations as „competent authorities‟ under the
Environmental Assessment Act (2000) for issuing „environment clearances‟ for projects within
certain thresholds (e.g. farm roads less than 5 km). For larger projects NECS has the mandate or the
authority is delegated to the environmental unit of line ministries (e.g. in Ministry of Economic
Affairs but none in Ministry of Agriculture). The functional mechanism for environmental
mainstreaming and coordination at Dzongkhag level is the Dzongkhag Environmental Committee
(DEC). In order to deal with the low of capacity at Dzongkhag level to deal with issues related to
environment there are recent positions filled as District Environmental Officers (DEO).10
The DEO
is the focal point for the DEC on all environmental matters. The DEOs shall monitor the
10
The National Assembly at its session in June 2005 directed NECS to appoint the Dzongkhag Environmental Officers
(DEO). The DEOs were posted in each Dzongkhag from 2007. The DEOs according to their ToR shall assist the
Dzongkhag Environment Committees (DEC) in implementing and monitoring the Environmental Assessment Act
(2000) and the Regulation for Environmental Clearance of Projects (2002) as well as all environmental guidelines and
standards issues by NEC. The DEOs also have a role in monitoring environment at Dzongkhag and Gewog level.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 7
environment at Dzongkhag and Gewog level and ensure that environmental concerns are
incorporated into the FYP development plans of the Gewogs and Dzongkhags. The DEO acts as the
member secretary and technical backstopping for the DEC.
The functional roles of environmental management are changing with the decentralisation to local
government. The local government already has designated roles related to environment, but the
implementation in practice is variable. This is due to other priorities with limited financial resources
and capacity at Dzongkhag and not least Gewog level. Environment in various ways appears
directly or indirectly in the local government development plans.
Environment is not identified as a sector in the development plans. But with a high visibility and
priority of environment in the GNH philosophy, the Constitution and the 10th
FYP, environment is
also reflected as a high priority in the specific development activities. This may appear in two
ways:11
Through a high priority and visibility of environment (mainstreaming) in the local
government development plans (demand side)
Through a sizeable budget allocation for environment in the local grant allocations (supply
side)
The direct capital investments related to „environment‟ falls in two main groups. One group is the
„green‟ investments mainly related to some (but not all) of the Renewable Natural Resources (RNR)
investments within the mandates supported by MoA, e.g. in forestry and other land conservation. A
large part of the agriculture investment is for rural infrastructure like farm roads and irrigation
canals that are not directly „environment‟ investment, but with a high potential for poverty
alleviation using available productive natural resources, e.g. from improved access to markets and
water security. The other group is the „brown‟ investments related mainly to „health development‟
and „towns and human settlement‟ investment, e.g. waste management, sanitation and safe water, in
towns and larger villages.
There are elements from different sectors that are relevant for the environmental agenda. In the
RNR sectors in the Ministry of Agriculture (MoA) there are some but not all activities that may be
considered as environment. A Watershed Management Division in the Department of Forests of the
MoA has been created with the mandate to link, coordinate and engage in broader water policy
agenda of the country to collaborate with relevant agencies at all levels to incorporate watershed
management objectives into the sectoral plans, programmes and activities. The mandate and
functions will be executed in consultation and coordination with all agencies that have a mandate to
produce area based management plans, and particularly at the Dzongkhag and Gewog levels.
Similarly, there are topics under the urban sector under the Ministry of Works and Human
Settlement (MoWHS), health sector under the Ministry of Health, land management under the
National Land Commission (NLC), and industries under Ministry of Economic Affairs (MoEA) are
linked to the environmental agenda. Hydro-power development and climate change (meteorology)
are under the MoEA, and natural disaster management under Ministry of Home and Cultural Affairs
(MoHCA).
Environment is not defined as a sector in the 10th
FYP. Some areas that could be characterised as
environment includes watershed management, protected areas, forest management and
11
The Poverty and Environment Initiative (PEI) by UNEP/UNDP will carry out a public expenditure review of the
environment (expected end of 2009). The public expenditure review is likely to provide relevant analysis and
information for an assessment of the budget priority of the environment in Bhutan in the public expenditure.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 8
conservation, water and sanitation, waste management, and other activities. Some sectors like
forestry may all be termed environment, but environment is more than forestry.
Mainstreaming of environment into key development sectors is RGoB‟s response to comply with
the high priority given to environment in the GNH philosophy, the Constitution, and the 10th
FYP.
GNHC and NECS have prepared guidelines for mainstreaming environment in policies and
programmes for MoA, MoEA and MoWHS and will pilot these in Dzongkhags. The current
environment mainstreaming guidelines do not yet include implementation of development plans by
local government. A first step in the mainstreaming of environment is to follow the laws, rules and
regulation that concerns environment directly or indirectly. An overview of the key legislation for
environment and natural resources in Bhutan is included in Annex B.
Impacts of environmental investments will be attained through mainstreaming of environment in all
the development activities – centrally as well as locally. Guidelines on Environmental Friendly
Road Construction (EFRC) are one example, where the environmental concern comes with an
additional price tag. Mainstreaming of environment may not always result in increased investment
costs, but may rather be a question of having adequate capacity and skills to address environmental
issues in planning, implementation and operation of development interventions.
2.4 Climate change and natural hazards
Climate change is a potential risk to development and livelihoods in Bhutan. The climate change
related natural hazards such as glacial lake outburst floods (GLOF),12
monsoon flash floods and
landslides from heavy rainfall disrupt the livelihoods, access (transportation) and other parts of the
economy including agriculture, hydropower systems, industrial estates, human settlements, and
historical and cultural monuments. The pressures of land-use change, habitat degradation and
infrastructure development compound the threat of climate change further.13
Bhutan ratified the United Nations Framework Convention on Climate Change (UNFCCC) in
August 1995 and the Kyoto Protocol in August 2002. The Initial National Communication (INC)
submitted in November 2000 covered numerous topics, including: national circumstances related to
climate change; a Greenhouse Gas (GHG) emission inventory; assessment of vulnerability and
adaptation to climate change; policies and other measures to address climate change; education,
training and public participation; and recommended research. Because of data constraints, the INC
did not conduct any mitigation analysis, GHG emission projections, or temperature and
precipitation projections under different Intergovernmental Panel on Climate Change (IPCC)
emission scenarios using Global Circulation Models (GCM). The preparation of the Second
National Communication began in August 2007 and is still under preparation.
NECS is the national focal point for UNFCCC. MoHCA has the mandate for coordination of
disaster management. MoEA has the mandate for meteorological services in charge of monitoring
the climate, weather forecasting and possibly future early warning. The National Adaptation
Programme of Action (NAPA) was prepared with a grant from the Least Developed Countries Fund
for Adaptation to Climate Change (LDCF) and published in May 2006. Bhutan‟s NAPA includes
nine priority adaptation projects selected among 55 projects originally identified. The projects are
ranked according to four criteria: (1) human life and health saved by the intervention; (2) arable
12
There are 24 glacial lakes identified with GLOF potential and other potentially unstable glacial lakes may be forming
in the coming decades.
13 Further information on climate change in Bhutan is included in the „climate change screening of Denmark‟s
development cooperation with Bhutan‟ (May 2008).
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 9
land saved by the intervention; (3) essential infrastructure; and (4) estimated costs. The budget for
the identified nine priority projects for urgent and immediate action is USD 7.9 Million. One project
of reduced risks and impacts of Glacial Lake Flood Outburst (GLOF) has been funded by LDCF.
The NAPA is a tool to attract external funding, not only from the LDCF, but also from development
partners.
The National Disaster Management Framework was published in 2006. The key objectives of the
Framework are to: i) Promote a disaster risk management approach with an emphasis on prevention,
mitigation and preparedness, instead of an ad hoc reactive approach to dealing with disasters; ii)
Recognise the respective roles of different organizations in disaster risk management and provide
all possible support to their work within the national framework for disaster risk management; and
iii) Establish linkages between disaster risk management and the activities in different development
sectors.
Adaptation to climate change and disaster risk reduction may become one of the areas where
interventions may be required in Bhutan on a larger scale. Skills and procedures can be developed
to address today‟s climate variability as an adaptation strategy to be ready for tomorrow‟s climate
change.
2.5 Local government reforms
2.5.1 Evolution of local governance
The process of decentralization will move steadily from deconcentration (where centrally defined
tasks have been assigned to Dzongkhags and Gewogs through Chathrims), to a steady and
incremental devolution of some powers, functions and responsibilities to the Dzongkhags and
Gewogs. The 10th FYP identifies decentralization as one of five crosscutting development themes –
environment is another – that are critical for the achievement of the national development and
poverty reduction objectives.
Article 22 of the Constitution of Bhutan enshrines local self-governance. The National Assembly
passed the new Local Governments‟ Act of Bhutan (LGAB) 2009. The LGAB specifies the concept
of democratic and decentralized governance with the overall objective to “facilitate direct
participation of the people in the development and management of their own social, economic and
environmental well being through decentralization and devolution of power and authority”.
The LGAB thus provides the overall legal framework for local governance to which the SESP will
be aligned14
. Local government elections are anticipated to take place in 2010 – resulting in elected
councils being established as follows:
Dzongkhag Tshogdu (DT)
Gewog Tshogde (GT)
Thromde Tshogde (TT)
The Dzongkhag Tshogdu will – in its area of jurisdiction – comprise two elected representatives
from each Gewog (Gup and Mangmi), one elected representative from the Thromde Tshogde, and
one elected representative from the Thromde Yenlag Tshogdes15
. The LGAB provides increased
powers and expanded functions to the local governments, which, among others, include: promotion
of holistic and integrated area-based development/ land use planning; conservation and
14 The Parliament passed the Local Governments‟ Bill at its extraordinary session on 11 September 2009. 15 Minor urban settlements – today only Thimphu and Phuntsholing have the status as autonomous municipal
corporations/bodies.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 10
enhancement of the environment; regulation of natural resource uses; regulation of pollution; and
organisation of relief measures in case of natural disasters and emergencies. The local government
functions are operationalised through five-year plans and annual plans and budgets, which
respectively are accumulated in RGoB‟s five-year plan and annual plans and budgets. The
Dzongkhag Tshogdu will monitor and evaluate the Gewogs‟ implementation performance, whereas
the Thromdes will conduct their own monitoring and evaluation.
Box 3: Evolution of local governance
Since the 5th FYP in 1981, the RGoB had a proactive policy of devolving institutional powers to govern and
promote participatory development at local levels. The major milestones in implementing decentralization
in Bhutan to date include:
The formation of the DYT and GYT (Dzongkhag (district) and Gewog (block) development
committees) in 1981 and 1991. The Dzongkhags and Gewogs have been headed by the DYTs and
GYTs since 2001.
Ratification of the DYT and GYT regulations (Chathrims) in 2002.
The creation of autonomous municipal city corporation‟s (Thromde) in Thimphu and Phuentsholing
in 2003 and 2006 respectively, under the Municipal Act from 1999.
Election of Gups (Mayors) based on adult franchise and their appointment as chair persons of GYTs
in 2002, repeated in 2005, and with an extended mandate until the election of new local
governments.
Gewog based participatory planning approach introduced as pilot in the 9th FYP and applied for all
with the 10th FYP.
GNHC coordinates the local government reform and guidelines for implementation. The Ministry
of Finance (MoF) monitors the Annual Grants and budgets to local government and sector agencies.
Ministry of Home and Cultural Affairs (MoHCA) previously had the mandate for local government.
The mandate of LDD and Department of Local Government (DLG) of MoHCA will be clarified
with the LGAB 2009.
Gewog Administrative Officers (GAO) and Gewog Accountants are being recruited for all Gewogs.
From FY 2010/11 there will be Gewog Accountants in all 205 Gewogs. There are Gewog
Accountants in 123 Gewogs, and some accountants currently cover more than one Gewog. The
remaining 82 posts will be filled with personnel trained by Royal Institute of Management (RIM)
by August 2010. The Gewog Accountants may in some cases not be based in the Gewog but at the
Dzongkhag administration. Services such as planning and engineering are supported by the
Dzongkhag administrations.
2.5.2 Annual grants to local governments
During the 9th
FYP period there has been an incremental move towards fiscal decentralisation and it
continues with the 10th FYP‟s focus on poverty reduction and local development. The budget for
implementation of the 10th
FYP is BTN 148 Billion of which around BTN 74 billion is for the
capital expenditures and BTN 73 billion is for current expenditures. RGoB‟s own revenue roughly
covers 50% of total 10th
plan outlay, meaning the other half of the plan outlay has to be covered by
external funding sources (primarily through grants and loans from the development partners). The
expected capital expenditure budget for local governments (Dzongkhags, Gewogs and Thromdes) is
BTN 12.0 Billion. The local government development grant is split 60/40 between Dzongkhags and
Gewogs.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 11
From the fiscal year 2009/2010, the Gewog Annual Capital Grant will be split 80/20 with up to
20% being allocated as untied grant. This implies that 80% of the grant is tied and has to be spent
within the 10th
FYP, while the GTs have full discretionary power over the remaining 20% that could
be spent over and above the 10th
FYP within a list of eligible expenditures.16
. It should also be taken
into account that the full five year plan period covers two local election terms, which would imply
that any newly elected GTs inevitably are going to inherit development plans adopted by its
predecessors and would like to change it to some extent. This should of course be possible in order
to safeguard the dynamics of local self-governance.
Figure 1: Annual grants flow of funds17
Source: GNHC (2009): „Guidelines for annual grants for local Government (Dzongkhags and Gewogs)„
The introduction of Annual Grants for Dzongkhags and Gewogs is embedded in the newly
developed intergovernmental fiscal transfer mechanism mentioned in the subsection on the 10th
FYP, which aims at transferring development grants to local government in a fairer, poverty-
oriented manner reflected in the emphasis on poverty in the Annual Grant allocation formula.
Increased predictability of fund flows for local government is another objective of the new
mechanism. Until now, Gewogs have struggled with late transfer of funds, which has caused delay
in implementation. In many areas of Bhutan the construction period, e.g. for roads is short due to
climatic reasons and delayed transfer of funds and the added time for tendering leave a short
16
The untied grant still needs to be spent within the positive list of the Annual Grant Guidelines. 17
Tied grant: Flow of funds from DPA to the Gewog within the Gewog plan
Untied grant: Flow of funds from DPA to the Gewog not tied to the Gewog FYP plan
Earmarked grant: Flow of funds from DPA via sector agency (and Dzongkhag) to Gewog
Annual Grants
(total of all
resources
Annual
Current
Grants
Annual
Capital
Grants
„Earmarked‟
Grants (sectors)
Criteria
determined by
DNB
„Tied‟ Capital
Grants > 80%
„Untied‟
Capital Grants
< 20%
From Sector
Ministries to
Local Govt.
Annual Capital
Grant allocation
formula:
- Population: 70%
- Poverty: 25%
- Land area: 5%
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 12
window left for implementation, sometimes causing scheme cancellations and unspent budgets,
which needs to be transferred back to the MoF if not spent within the fiscal year.18
The developed budget allocation formula has three criteria with the following weights: Gewog
population (70%), Dzongkhag poverty (25%) and Gewog area (5%). There is no disaggregated
poverty assessment for the Gewog level so the Dzongkhag poverty is applied until the next PAR.
Figure 2 is an overview of the flow of funds and reporting system.
Figure 2: Flow of funds and NMES reporting and monitoring
2.5.3 The linkage between local government and environment
An assessment of the current functional assignments of Dzongkhags and Gewogs concerning
environment is included in Annex C. The linkage between local government and environmental
management emerges in three ways:
The decentralisation shifts the planning and implementation of development activities to
local government. The inclusion of environmental assessment and other mainstreaming of
sustainable environment should be addressed locally.
Mandates for regulation, implementation and monitoring of the environment increasingly
shifts towards local government. In particular monitoring environment outcomes is a new
18
The problem of delayed fund transfers and other important local governance issues like capacity constraints have
been analysed in detail in major reviews and evaluations, e.g. the joint Decentralisation Outcome Evaluation
(UNDP/UNCDF/Danida 2006), the DSP midterm review (UNDP/UNCDF, 2006) and the Capacity Development
Outcome Evaluation of Selected Organisations in Bhutan (Danida, 2006).
DPA / MoF DNB / MoF GNHC / LDD
Denmark
NMES
(MYRB, PEMS, PlaMS)
Outcome Outputs
Dzongkhags
SESP PSC
Annual
Budget
Approval
Reporting
RGoB
Sector
Agencies
Gewogs
Donors
Budget
allocation and plan
targets Flow
of
Funds
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 13
area for local government. Adaptation to climate change and reduction of risks of natural
hazards will also be addressed locally.
Financing will be channelled directly as Annual Capital Grants (ACG) to local government
at whose discretion activities including environmental related will be initiated locally
according to local development plans. Capacity to address environment as a cross-cutting
issue may be a priority area in order to avoid that short term development priorities do not
carry long term costs.
The local government reform opens for new opportunities for financing and capacity development
to address environmental issues closer to the sources.
2.6 Public financial management and procurement
Several international assessments have concluded that Bhutan has made good progress with its PFM
system, although improvements are still needed to meet international standards. The RGoB has
initiated reforms in order to meet international review recommendations on shortcomings still
present in the PFM system.19
The PFM achievements are matched by: an overall favourable macro-economic situation (although
the consequences of the global financial crisis remains to be seen in Bhutan); appropriate national
and sector priorities in terms of poverty reduction (outlined in the five year plans); sound progress
in development of good governance and democracy; and a positive development within capacity
and quality of management in the public sector, including the management of the public finances.
In the context of a developing economy, public financial management is relatively strong in Bhutan.
Core PFM processes of budget formulation, procurement, accounting, and expenditure reporting
operate largely in accordance with an updated set of Financial Rules & Regulations (FRR, 2001).
The quality of external auditing provided by the Royal Audit Authority (RAA) is good and recent
developments to expand its scope and coverage in the areas of final accounts certification and
performance auditing have strengthened its function. 20
The overall level and quality of public
information on the budget and public accounts and the operations of particular Departments (e.g.
Revenue and Customs and the Royal Monetary Authority) is also of good standard compared with
other developing countries.
Box 4: Bhutan and the Corruption Perception Index
In 2006, Bhutan featured in Transparency International‟s Corruption Perspective Index (TI CPI). Bhutan came out as
an overall no. 32 on the global index, while it was ranked no. 7 in the Asia-Pacific region and the least corrupt in South
Asia. In 2008, the ranking slid somewhat to an overall no. 45 on the global index and to no. 9 on the Asia Pacific
regional index. Still, this is well above average and a good ranking, particularly in a regional context. The apparent
slide downwards between 2006 and 2008 may have been caused by the RGoB‟s additional focus on corruption and the
establishment of the Anti-Corruption Commission, which has made complaints about perceived irregularities easier
and monitoring more systematic.
19
Important PFM review documents include the World Bank Country Financial Accountability Assessment (2002) as
well as the joint Public Sector Accounting and Auditing: A comparison to International Standards Bhutan Country
report. The World Bank, November 2006.
20 Refer to the studies above as well as the RAA section of the Danida Capacity Development Outcome Evaluation of
Selected Organisations in Bhutan (2006) and the positive report by the Danish Auditor General and the Public Accounts
Committee (2008).
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 14
However, it was found that programming of capital investments is weak, therefore in terms of
budget formulation; the major challenge is to improve the quality of forecasting contained in
original and revised estimates, both on the revenue side (non-tax and foreign aid) and on the
expenditure side. The recent adoption of the Multi Year Fiscal Framework (MYRB) and the Budget
Policy and Fiscal Framework Statement (BPFFS) should allow for more realistic planning and
avoid unrealistic estimates in the annual budget. The Department of National Budget (DNB) is
promoting spending agency discretion and reduction of budget changes.
A related task of the Ministry of Finance (MoF) is to articulate a longer-term public finance
management strategy. While some elements of it are clear (such as the introduction of MYRB and
BPFFS), other elements, such as the role of internal audit, are not. Equally important will be the
need to develop the capacity of finance officers to operate the Budget and Accounting System
(BAS). While there has been substantial training of finance officers under the 9th
FYP, the relevance
of some training has been questioned. The recent decision of the MoF to place the National Finance
Service, as a subordinate division of the Department of Public Accounts (DPA) should help to
improve the relevance of training, as should the new Masters Degree programme at the RIM, which
was launched with support from the previous Danida Good Governance programme.
The November 2006 assessment of Bhutan‟s public sector accounting and auditing by the World
Bank compared practices in Bhutan with international standards.21
The assessment revealed that the
then draft Public Finance Act (enacted by the National Assembly in June 2007) provides a sound
framework for PFM, but that there is a need to improve: the current budget and accounting
computerised system (BAS) to provide reporting in accordance with the requirements suggested in
the Act; and the reliability and consistency of reporting is mentioned. The assessment also revealed
that financial statements are not in accordance with international standards. The assessment
suggests the establishment of a formal board to advise on accounting and audit standards for both
the public and private sector, and points to the need for human resource development in accounting.
With regard to audits, the assessment states that the auditing standards of Bhutan are in line with
international auditing standards, but also in this field, there is a need for further human capacity
development and a need for alignment of new audit manuals with international standards.
In 2006, the World Bank and RGoB produced a draft roadmap to universal reliance on the national
system with focus on PFM in general, and procurement in particular as an important part of the
overall PFM. On PFM, the roadmap suggested the following improvements: more clear structure
and mandate of the internal audit function; updating of the Financial Rules and Regulations, 2001
(FRR), establishment of adequate networking facility for the BAS; and timely release of funds to
the central and local implementing agencies (electronic release of funds to Dzongkhags is now
functioning). According to analysis of the EC NRM identification mission in March 2009, it
appears that most of the draft roadmap has been implemented although not all was formally
adopted. The Procurement Manual from 1998 has been revised into the Procurement Rules and
Regulation (March 2009). A new Public Procurement Policy Division has been set up in the MoF
and a capacity development project is being implemented with support from the WB.
21
The Public Expenditure and Financial Accountability (PEFA) Secretariat of the World Bank carried out the
assessment with the use of the internationally recognized monitoring framework referred to as the Public Financial
Management Performance Measurement Framework.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 15
2.7 Cross-cutting issues and priority themes
The Danida AMG includes cross-cutting issues and priority themes to be addressed in development
cooperation. Cross-cutting themes is also included by RGoB in the development plans, and Chapter
5 of the 10th
FYP describes cross cutting development themes, which are critical to the attainment
of national development objectives. These are: decentralized governance, employment, women in
development, information and communications technology, environment, and HIV/AIDS.
2.7.1 Cross-cutting issues
Gender equality: In Bhutan, gender relations have traditionally been based on equality and
reciprocity. The RGoB has ensured that women issues are incorporated in planned development
initiatives. Bhutan has acceded to the CEDAW (Convention on the Elimination of all forms of
Discrimination Against Women). However, women are still disadvantaged especially in
participation in governance at all levels, tertiary education, economic and employment activities.
Other pertinent women issues to be addressed are to: enhance awareness among women on
HIV/AIDS; address the growing incidence of domestic violence; and trafficking and prostitution.
The 10th
FYP sees gender as a cross-cutting issue to be mainstreamed by all sectors/ministries in
policies, strategies and legislation. As a response, the National Plan of Action for Gender 2008-
2013 (NPAG) has been developed by the National Commission for Women and Children in
cooperation with GNHC.22
The recommendations in the NPAG are incorporated into the 10th
FYP.
The NPAG will be monitored using the results-based action with indicators, baselines and targets at
all levels. The government will strengthen gender awareness and sensitisation and improve
information collection, analysis and dissemination.
Environment: Article 5 (Environment) of the Constitution of Bhutan treats every Bhutanese as a
trustee of the Kingdom‟s natural resources and environment. Environment is one of the four pillars
of Gross National Happiness philosophy. Accelerated economic development, infrastructure
development, urbanisation and population expansion and changing consumption patterns will
require more attention to environmental protection and management in the coming years. RGoB has
promulgated the National Environment Protection Act of Bhutan (2007) and has regulation for
Environmental Assessment (EA) including Strategic Environmental Assessment (SEA).
Democratisation and respect for human rights: The Constitution of Bhutan guarantees
fundamental rights to all Bhutanese citizens providing equality before the law, equal and effective
protection of the law, as well as a number of other rights in accordance with international norms23
.
“However, Bhutan still faces the challenge of translating constitutional rights and intentions into
reality. Equal access and opportunities for all Bhutanese will continue to be of importance” (source:
Bhutan – Denmark Partnership – Strategy for Development Cooperation 2008-2013, p.16). Land topics
including resettlement and provision of land for the land-less are also a governance issue. A
nationwide cadastral survey is being undertaken, which will support land allocation and ownership
rights, and a National Land Policy is being drafted with support from Denmark. The first
democratic elections held in the spring of 2008 – based on universal adult franchise with 80 % voter
22
GNHC carries the overall role of gender focal point for the RGoB and there are also gender focal points in each
RGoB institution/ministry. 23
There are several groups of people from different cultures and religions in Bhutan. Among them, the Doyas and
Lhops living in Samtse Dzongkhag and the Monpas residing in a few villages in Trongsa are considered to be
indigenous people of Bhutan following their distinct culture, dress and language.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 16
turnout – brought the Druk Phuensum Tshogpa party to power. Gradual decentralisation over the
last two decades will culminate with the enactment of the LG Act – providing increased autonomy
to Dzongkhags, Gewogs and Thromdes local government entities.
2.7.2 Priority themes
HIV/AIDS: National response to the threat of AIDS became evident after the first AIDS infection
case was detected. Till date, 144 people have been infected with the virus of which 24 have
succumbed to the disease. Activities under the National Strategic Plan (NSP) for the Prevention and
Control of STIs and HIV and AIDS 2009 are being implemented. A National HIV/AIDS
Commission and Multi-sectoral Task Force in all the Dzongkhags are active in advocating
preventive measures, creating awareness and preparing for outbreaks of the disease.
Children and youth: Traditionally, children have been cared for through parental protection and
their extended families. With increasing modernization, more children and youth have increasingly
come into conflict with the law. Child labour has also become more noticeable with many working
in restaurants, automobile workshops, shops and homes. Many girls are domestic workers and are
vulnerable to abuse and exploitation.24
Over the next seven years approximately 63,000 young
people educated at secondary level will enter into the labour market. The RGoB recognises the need
to provide employment opportunities as essential to promoting social stability. An increasing
problem is lack of employment opportunities for the educated youth in the Gewogs, resulting in a
situation where many leave for urban areas in search of income and better living conditions.
Private sector: Trade, industry/ manufacturing and services are at the heart of the 10th
FYP‟s
development strategy to promote economic development and thereby contribute to poverty
reduction. Strategies have been conceived to increase private sector participation with a view to
stimulating rural and urban economies. Bhutan submitted an application for accession to the World
Trade Organisation (WTO) in 1999, and a Memorandum on the Foreign Trade Regime in February
2003. The bilateral market access negotiations are ongoing. A draft Working Party Report was
circulated in December 2007.
2.8 Donor coordination mechanisms
There are relatively few international donors in Bhutan and the donor coordination from the RGoB
side is carried out by the GNHC. There is no formal donor coordination in environment or natural
resources, but there is some informal coordination. There is a MoU and a joint review and shared
Steering Committee of EUSPS and the GEF and UNDP land-use projects.
The Round Table Meeting (RTM) is the highest level of coordination between RGoB and
development partners. The 10th
RTM was held in Thimphu in February 2008 and included delegates
from 14 countries and 20 multilateral organisations. The RTM is co-chaired by RGoB and UNDP.
24
The Constitution of Bhutan (in articles 9.17 and 9.18) spells out clauses for the protection of women and children
against all forms of discrimination and exploitation, including trafficking, prostitution, abuse, violence, harassment,
intimidation, degrading treatment and economic exploitation. Further, the Penal Code of Bhutan has provisions on
offences against children such as abandonment, child abuse, paedophilia, trafficking and endangerment of children. The
Ministry of Education has also banned corporal punishment in schools, which has helped in retaining children though
the practice has not been entirely eliminated. Labour laws in the country stipulate the minimum age for employment but
application and monitoring is low owing to capacity constraints with concerned agencies to enforce regulations.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 17
3. Agreed assistance
3.1 The proposed support
The SESP will provide support to local governments (Dzongkhags and Gewogs) in two parallel sets
of interventions: 1) provision of investment capital to Gewogs; and 2) capacity development for
mainstreaming of environment in policies, plans and programmes – with the intent that the
developed capacity will influence the way in which local governments will plan and implement
their development activities. The SESP comprises two components:
3. Budget support for capital investments in Gewogs. Budget support will be provided to all
205 Gewogs through the Annual Capital Grant mechanism for funding of the Gewogs‟
development plans. The budget support will be provided in accordance with RGoB‟s financial
management and reporting procedures. The Danish funding is a cost-sharing arrangement of the
Annual Capital Grant budget and will be utilised consistently with the “Guidelines for Annual
Grants for Local Governments”.
4. Support for capacity development for mainstreaming of environment, climate change and
poverty concerns. Support will be provided for mainstreaming of environment, climate change
and associated poverty concerns (ECP) in national policies, plans and programmes and in all
local development plans and programmes. Guidelines will be developed to assist all local
governments and targeted assistance will be provided to selected Dzongkhags and Gewogs
based on vulnerability criteria.
The programme grant is DKK 70.0 million. The programme duration is four years with an inception
phase of six months (January to June 2010), three financial years (FY 2010/11 – FY 2012/13), and
six months for Programme completion (July to December 2013).
SESP has been formulated in accordance with the Bhutan-Denmark Partnership (2008 – 2013) and
Bhutan‟s national development framework.25
. The rationale of the chosen aid modality and sector
approach is first, to provide budget support to the government‟s local government reform (further
supplementing the LGSP), and secondly, to go beyond the existing RNR sector managed only by
the MoA, as it is assessed to be too narrow an approach to address mainstreaming environment,
climate changes adaptation and poverty concerns (ECP).
The principles of aid effectiveness are pursued with alignment to RGoB‟s development framework
and operational procedures. The SESP will be coherent with other Danish supported programmes.
Especially the Local Governance Support Programme (LGSP) and the Social Sector Support
Programme (SSPS). SESP‟s Component 2 is the Joint Support Programme (JSP), formulated and
implemented jointly with UNDP/UNEP‟s PEI Phase 2. The SESP/JSP is to be harmonised with
other development partners‟ programmes of similar nature.
3.2 Objectives
In the 10th
FYP, the RGoB has adopted poverty reduction as the overarching theme and primary goal
consistent with the country‟s long-term development vision of GNH and the Constitution. The
overall national development objective of the 10th
FYP is: Reduction of poverty from the estimated
25
The Denmark-Bhutan Partnership (2008) notes for the environment programme that “the support to natural resource
management will be based on the development plans worked out at decentralised level, which will also help ensure
accountability for the sustainable use of natural resources” and that “the support will be in the form of budget support
directly to the decentralised level funding of the Gewogs‟ and town‟s own plans for development” (p.34).
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 18
national poverty figure of 23.2% to less than 15%. The aim of the SESP is to contribute to the
reduction of poverty in Bhutan.
The SESP development objective is directly linked to the national development objective of reduced
poverty.
The development objective of Component 1 is similar to that of LGSP which is “effective and
transparent financing mechanism for local government service delivery established and in operation
with annual capital grants to all Gewogs”.
The development objective of JSP is: sustainable development planning and implementation are
undertaken at national and local levels that contribute to: alleviation of climate change impacts;
conservation, protection and sustainable use of natural resources; and poverty reduction.
The immediate objectives are: 1) adequate level of investments in Gewogs to sustain economic and
social development (for Component 1); (and for JSP) 2) strengthened national level capacity that
facilitates national and local level five-year planning and implementation by mainstreaming
environment, climate change and poverty (ECP) concerns in policies, plans and programmes; and 3)
strengthened local level capacity to formulate and implement five-year development plans and
annual plans in which environment, climate change and poverty concerns are mainstreamed.
3.3 Strategic Approach
The main strategies are to: 1) inject investment capital to enable the lowest level of government to
adequately cope with development needs in a sustainable manner; 2) develop national capacity for
ECP mainstreaming into national policies, plans and programmes, especially those of relevance for
local governance; and 3) based on the national ECP framework, develop local capacity for
mainstreaming ECP into all local development plans and programmes, and for monitoring and
evaluation of planning and implementation cycles in order to enhance the responsiveness to ECP
challenges. The preparation of the local governments‟ 11th
FYP will provide a specific opportunity
to address ECP challenges in the medium-term. Bhutanese public and private training institutions
will be the main providers of training to national and local governments. The main thrust of the
capacity development interventions will be on the corporate performance of the different units of
local governments and how they interact with central government. Corporate competence depends
on skills and attitudes of each individual officer in the local government units. The results-oriented
approach to capacity development and change (ROACH) will be pursued.26
The SESP outcomes
will be as follows:
Programme Outcomes and Indicators
Outcome
1.1 Effective and transparent financing mechanism
for local government service delivery established
and in operation with annual capital grants to all
Gewogs
90% of local governments receive and
report capital budgets on time and
schedule
Outcome
2.1:
ECP mainstreamed in national policies, plans
and programmes.
New policies and existing programmes
mainstream ECP
Outcome
2.2:
ECP mainstreamed in all development plans and
programmes at the local level.
70% of local government development
plans and programme mainstream ECP
26 Reference is made to “MFA/Danida, A Result-Oriented Approach to Capacity Change, February 2005.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 19
The tangible impacts will be assessed in terms of: living standards and poverty profiles27
, as well as
direct livelihood benefits, e.g. sustainable agricultural production and harvesting of forest products,
increased accessibility to economic, social and environmental services; and changes in the state of
the environment at the local level.
The Danish budget support will augment RGoB‟s annual grants for local governments.28
The
budget support will target the Annual Capital Grants to all 205 Gewogs and will be channelled
through the MoF. Danida is already applying the budget support modality in the SSPS and the
LGSP. Granting of budget support is justified as the experience gained with this funding modality
in health, education and local governance support programmes of all of the ten criteria for granting
budget support are positive. Briefly, decentralised governance, to which SESP is providing budget
and capacity development support, is one of the six development themes in the 10th
Five-Year Plan,
which is Bhutan‟s Poverty Reduction Strategy. Specific strategies towards enhancing decentralised
governance are discussed in the Volume 1 of the 10th
Five-Year Plan and were reviewed during the
LGSP technical review in September 2009. Similarly, the latest poverty reduction results have been
discussed under 2.1 (national and poverty reduction context). The manual for the results based
national monitoring system and the indicators and targets have been reviewed for central/sectoral
and local levels during July to September 2009.
As described under 2.6 (Public Financial Management and Procurement), Public Financial
Management and Procurement based on the Public Finance Act 2007 followed by the Public
Procurement Rules and Regulations and Standard Bidding Documents 2009, quality and capacity in
PFM has been improving towards strengthening of accountability and transparency; continued
improvement in public procurement through institutional capacity building and conduction of
increased number of performance audits by the independent and constitutional body represented by
the Royal Audit Authority; furthermore, an assessment of public finance management and risks was
undertaken for the LGSP.
Finally, this SESP budget support arrangement builds on the successful joint financing arrangement
under the Local Governance Support Programme.
EC is considering providing sector support to MoA.29
RGoB is conducting a new Public
Expenditure and Financial Accountability (PEFA) review later in 2009 with support from the World
Bank that will be peer reviewed by Denmark and EC.
The interventions to receive funding from the Annual Capital Grants will be decided by the elected
Gewogs Tshogdes, mainly in connection with the annual budget preparation process that is
undertaken within the framework of the Gewogs‟ 10th
FYP, but also in connection with the
27 The National Statistics Bureau is currently conducting a “Living Standard Survey and Poverty Analysis”, which will
be concluded during 2009. 28
According to OECD/DAC, budget support is defined as donor funds being channelled to the partner government‟s
national treasury, and thereafter managed in accordance with the partner‟s own budgetary procedures. The definition
encompasses general as well as sector budget support. Under both categories, funds are integrated into the national
budget and handled according to national procedures. However, the two differ in the kind of dialogue conducted
between development partners and governments. In the case of general budget support, focus is on overall policy and
budget priorities, whereas in the case of sector budget support, it is on sector-specific concerns. Budget support is,
however, more than the mere transfer of funds. It is a package consisting of several inputs, whose combination is the
key to achieving the envisaged results: the funds itself, continuous policy dialogue on critical development issues,
conditions regarding policies and reforms as well as resource allocation, support for capacity development, and
monitoring of performance and progress, including progress in poverty reduction.
29 The EC is considering support to MoA only for the RNR sector, a decision on which is yet to be taken, probably as a
commitment in 2011.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 20
Gewogs‟ preparation of the 11th
FYP. A concern is the extent to which the Annual Capital Grant
will finance environmental interventions. The SESP will not be tied to environmental interventions,
but it is assumed that the capacity development activities under Component 2 will influence the
environmental dimension in plan preparation and implementation. Environment is not identified as
a sector in the development plans, which makes environmental monitoring a challenge. 30
The only
control measure is to assess ex-post how the funds were used in the Gewogs and/or through the
Public Environmental Expenditure Reviews. In Chapter 4, it is outlined how an ex-post review can
be developed to assess the share of the Annual Capital Grant that was actually used for
environmental investments. The direct capital outlay related to environment falls in three main
groups:
The „green‟ capital outlay related to some (but not all) of the RNR activities, e.g. watershed
management. A large part of the agriculture investment is rural infrastructure for farm roads
and irrigation canals that are not directly „environment‟ investment, but with a high potential
for poverty alleviation;
The „brown‟ investments related mainly to „health development‟ and urban investments, e.g.
waste management, sanitation and safe water supply.
The environmental mainstreaming where environmental impacts are assessed and mitigated
in all other sector activities, e.g. environmental friendly rural roads.
The Annual Grant mechanism does not include grants to the towns (Thromde). Funding for the
Thromde is to begin with not provided through Component 1 as budget support. Budget support
may be feasible for secondary and tertiary municipalities through the Annual Grant mechanism.
Once towns are part of the Annual Grant budget support, Component 1 may also include the
districts towns. Part of the SESP unallocated funds may be spent on budget support for Thromdes.
3.4 Technical assistance
SESP has provisions for international, regional and national short-term TA that can be applied
during inception, implementation, and completion of the Programme. TA can be applied within the
following areas:
Environment and natural resource management, climate change adaptation and disaster risk
reduction, e.g. ECP mainstreaming guidelines and impact monitoring and assessment;
Capacity development – including on-the-job training – of central and local government
units and staff members for mainstreaming ECP in policies, plans and programmes;
Support to training institutions‟ curricula development related to the various target groups
and staff training;
Support to development of area-wide development plans;
Reviews and lessons learned – including public expenditure reviews;
30
LDD has estimated using the forestry sector as a proxy for environment that the capital outlay for activities proposed
in the development plan for the 20 Dzongkhag is BTN 214 Million and for the 205 Gewogs it is BTN 203 Million. This
is a lower estimate for environment in the local government development plans as other activities than forestry can be
considered as environment. In an example from Nangkor Gewog in Zhemgang Dzongkhag the „green‟ investments
were assessed to be 3 % and the „brown‟ investments to be 6% of the total budget. If this is extrapolated to all Gewogs
the potential direct investment in environment in the 10th
Plan Gewog budgets could be around 10 %. Such assessment
is rather uncertain and does not capture the full extent of the additional costs of environmental mainstreaming.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 21
Central or local government executing agencies will recruit TA. The need for TA will be further
explored during the Inception Phase. TA will not be engaged for management tasks. The budget
ceiling for TA will be less than 10 % of the total SESP grant. The assessment of RGoB‟s capacity
suggests that there is no need for long-term TA to support the SESP implementation. Short-term
international, regional or national technical assistance (TA) can be accessed to assist with
programme implementation in cases where adequate resources in the government system are not
available to undertake special tasks. ToR will be prepared for each assignment that clearly specifies
activities and reporting requirements.
3.5 Cross-cutting issues and priority themes
Democratisation and respect for human rights: One aim of the SESP – as it relates to the new
concept of benefit sharing – is to investigate ways in which poor villages can be given rights over
and access to the resources (land, forests and water) that they are responsible for managing. The
upcoming National Forest Policy 2009 will support this aspect.
Good governance: The SESP will contribute to good governance as regards public financial
management in relation to the Annual Grant system, e.g. planning and budgeting, accounting, and
auditing.
Environment: Clearly, a significant aim of the SESP is to lead to improved consideration of the
environment in local development planning. Most previous donor assistance to the environment has
focused at building national level capacity (although the establishment of DECs and DEOs is an
exception to this). This new programme moves to the local level, where there is much to be done to
build capacity and improve environmental management and climate change adaptation.
Gender equality: Two of the aims of the SESP will be to: enhance women‟s participation in the local
planning processes to promote that women‟s priorities are adequately reflected; and encourage the
development of “generic” mainstreaming guidelines, which could provide a template for other “sector-
specific” mainstreaming guidelines, including those related to gender. The SESP will ensure collection,
analysis of disaggregated gender data, e.g. of those receiving capacity development support under the
JSP and number of male and female beneficiaries of the local capital investments.
Employment and private sector development: One of the most significant international responses to
the recent global credit crisis has been initiatives aimed at supporting the development of “green
jobs”. This is now a major plank of the work of UNEP and UNESCAP31
. The SESP will
investigate ways in which green jobs might be encouraged through specific, village-oriented benefit
sharing initiatives in poor Gewogs, amongst other by promoting agro-processing and market access
in the local development planning.
3.6 Development partner harmonisation and alignment
The development partners assisting in the fields of environment, natural resources, integrated rural
development and local governance are mainly the UN, EC, WB and Denmark (see Annex D for an
overview). In September 2008, RGoB, Denmark, World Bank, and UNDP carried out a joint
programme review of the Sustainable Land Management Project (SLMP) and EUSPS and a joint
31 The United Nations Economic and Social Commission for Asia and the Pacific is the regional development arm of
UN in the Asia-Pacific region. UNESCAP seeks to overcome of the region‟s challenges related to: poverty reduction;
managing globalisation; and tackling emerging social issues.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 22
Review Aide Memoire (RAM) was subsequently prepared. The SLMP and EUSPS share the same
PSC.
There are opportunities for future donor harmonisation. Aid effectiveness can be enhanced by joint
financing arrangements, and joint analytical work, steering committee and reviews. This may be
formalised through a MoU between the RGoB and relevant development partners in environment
and natural resource management.
Component 2 has been formulated in full harmonisation and coordination with the UNDP/UNEP
Poverty Environment Initiative (PEI) by formulating the Joint Support Programme, which
comprises the SESP Component 2 and the UNDP/UNEP PEI Phase 2. The continued collaboration
with the WB/ GEF Sustainable Land Management Project (SLMP) will continuously be pursued.
The initial observation of the EC identification mission was that environment in the FYP is not a
defined sector, unlike the Renewable Natural Resources (RNR) sector, managed by MoA. However,
the EC is still considering their programme approach, and commitment will probably only be
committed in 2011 with funding support to begin by 2012.
4. Components of SESP
This chapter describes the SESP‟s two components. Component 1 is fully aligned with the LGSP,
the further details of which are found in the LGSP Programme Document. Component 2 is – as
mentioned above –the Joint Support Programme (JSP), the Programme Document of which
constitutes the Component Description (see the separate document). The overall Programme
management, monitoring, reviews and evaluation, risks, budget and implementation are included in
the subsequent chapters.
4.1 Component 1: Budget support for capital investments in Gewogs
The planning process
The purpose of Component 1 is to provide support to the implementation of the 205 Gewogs‟ 10th
FYP through budget support targeting the Annual Capital Grant transfer mechanism. The RGoB
procedures and conditions for grant transfers are outlined in the GNHC Guidelines for Annual
Grants for Local Governments (Dzongkhags and Gewogs).32
The investments included in the Gewogs‟ 10th
FYP are identified through participatory approaches
and reflect the locally identified needs to improved livelihoods and reduced poverty. The 10th
FYP
are operationalised through the preparation of annual work plans and budgets. The LGAB provides
increased powers and expanded functions to the local governments, which among others include:
promotion of holistic and integrated area-based development/ land use planning; conservation and
enhancement of the environment; regulation of natural resource uses; regulation of pollution; and
organisation of relief measures in case of natural disasters and emergencies.
The local planning process is dynamic and may also cater for new priorities during the planning
period as the Annual Grant facility provides some flexibility. This is important, not least because
local government elections are held during the five-year planning period,33
and therefore GTs
should be able to review the plan and make changes as deemed necessary. The system of Annual
32 The Annual Grant Guidelines were revised in July 2009 and may be subject to further revisions following enactment
of the Local Governments‟ Act of Bhutan 2009.
33 The next local elections are planned to take place in 2010.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 23
Grant transfers is expected to provide increased predictability and effectiveness in achieving the
10th
FYP targets. The main challenge is sufficiency of funds and local capacity.
There is at this point no environmental parameter in the local government budget allocation
formula. The Annual Grant allocation formula for local government had in earlier versions a proxy
for environment (forest cover) that would be used to distribute 10% of the ACG. The environment
factor in the budget allocation was later abandoned, and the allocation of ACG for local government
does not take Gewog-specific environmental status and vulnerability into consideration.
Release of SESP budget support
The minimum access conditions and „triggers‟ for releasing the payments for the SESP budget
support from LOD to MoF are following the LGSP procedures. The procedure for the grant
application and release of budget support instalments for the local government will follow the
sequence and timeline outlined below:
Table 1: Annual sequence for grant instalments
Year Annual Grant: 2nd
instalment
Gewog Work Plan
and Budget
Annual Grant
allocation: 1st
instalment
Ex-post
environmental
expenditure
assessment
Monitoring and
Audit
January March July December December
2010 SESP begins Work Plan and
Budget for FY
2010/11
1st instalment
subject to work
plan and budget for
FY 2010/2011.
- -
2011 2nd
instalment for
FY 2010/2011.
Work Plan and
Budget for FY
2011/12
1st instalment
subject to work
plan and budget for
FY 2011/2012.
Ex-post
environmental
expenditure
assessment for FY
2010/11
Financial statement
from DPA; Audit
report from RAA
for FY 2010/2011
2012 2nd
instalment for
FY 2011/2012 -
subject to
satisfactory
financial reporting
from previous year.
Work Plan and
Budget for FY
2012/13
1st instalment
subject to work
plan and budget for
FY 2012/2013.
Financial statement
from DPA; Audit
report from RAA
for FY 2011/2012
2013 2nd
instalment for
FY 2012/2013 -
subject to
satisfactory
financial reporting
from previous year.
10th
FYP ends Ex-post
environmental
expenditure
assessment for FY
2012/13
Financial statement
from DPA; Audit
report from RAA
for FY 2012/2013
SESP ends
*) Instalments are from DPA to Gewogs. The Instalments from LOD to MoF follow a similar pattern.
The planned capital budget outlay for the 10th
FYP for the 205 Gewogs is included in Annex E. The
average annual budget for a Gewog is BTN 4.4 Million but with variation subject to the allocation
criteria used. The budget is allocated to each Gewog using the local government Annual Grant
budget allocation formula. Annex E shows how the budget will be allocated for each Gewog when
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 24
the budget allocation formula is applied. The planned SESP budget support allocation to
Component 1 is DKK 40.0 Million.34
Ex-post environment expenditure assessment
The current Gewog five-year plans are basically a long-list of investments, some of which could be
classified as environmental investments. The effect of the capacity development of ECP
mainstreaming will at the earliest effect the FY 2010/11 annual plans, but more likely the FY
2011/12 annual plans. In order to estimate the actual environment expenditures of the Gewog
annual plans, ex-post assessments of implemented activities based on DPA financial statements are
planned to be carried out as separate studies and – if feasible – in cooperation with and as follow-up
on the 2009 Public Environmental Expenditure Review that is undertaken by the PEI. Some of key
findings of the PEER 2009 are (i) the average Public Environmental Expenditure (PEE) during the
9th FYP, as a proportion of total public expenditure, was 7.4 percent with a declining trend of PEE
during the plan period; (ii) the average PEE as a percentage of GDP was estimated at 2.8; (iii) four
institutions of the Department of Forestry, Council of RNR Research for Bhutan and the National
Biodiversity Centre under the Ministry of Agriculture and the Department of Energy under the
Ministry of Economic Affairs accounted for about 50 percent of the total PEE of Bhutan; (iv)
environmental domain classification revealed that lowest level of expenditure incurred in “soil and
water conservation” sector which is an important concern for Bhutan where more than 80 percent of
the land consisted of mountains with steep slopes and (v) donor financing accounted for
approximately 34 percent of the total PEE during the 9th Plan period.
The assessment could be based on a „positive list‟ (see Box 5).
Box 5: Proposed positive list for assessment of the environment contents
Watershed and water resource management to protect and maintain a water flow;
Adaptation to climate variability and natural disaster risk reduction;
Locally based forest management and tree planting with environmental purpose and supply of local produce for
construction and fuel;
Land use management and soil conservation that benefits community groups;
Water supply using appropriate and cost-efficient technologies;
Local waste management in areas using appropriate and cost-efficient technologies;
Environmental Friendly Road Construction (EFRC) (only estimate for additional costs of environmental
mainstreaming);
Adding value to natural products, e.g. medicinal plants, handicrafts based on non-timber forest products, and
organic farming;
Community based development of eco-tourism facilities;
Fencing against wildlife to avoid crop damages and other means to reduce damages from wildlife on crops.
Items outside the „positive list‟ would be:
Farm roads, bridges, paths, irrigation systems, and other rural infrastructure;
Crop and livestock production system including horticultural production, pasture
improvements, all commercial crops and greenhouses, and agro-industry development;
34
The share of the capital budget outlay for 205 Gewog plans in the 10th
FYP is BTN 4.8 Billion of which BTN 4.5
Billion are allocated as Annual Grants. The SESP Component 1 grant of DKK 40 Million is equal to 7.5 % of the 10th
FYP plan budget for the Gewog Annual Grants (capital outlay) of the 205 Gewogs. Since the SESP will support 3 and
not 5 years of the 10th
FYP the annual share from SESP for those three years is 12.5 %.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 25
Establishment and refurbishment of RGoB facilities like Gewog RNR centres and facilities
located at these premises such as technology parks.
The ex-post environment expenditure assessments will not be part of the general monitoring, which
will follow the agreed existing and planned RGoB monitoring and reporting systems for the LGSP.
The financial reporting on budget performance will include monthly expenditure reports prepared
by the Gewog accountants and compiled by the Dzongkhag administration.
4.2 Component 2: Support for capacity development for environmental mainstreaming
The Danish SESP Component 2 and the UNDP/UNEP PEI Phase 2 have been designed to
constitute the Joint Support Programme (JSP) for ECP mainstreaming. The capacity development
will target the central level and the local level, but with a relative greater emphasis on the local
level. The national level capacity development is mainly aimed at creating a national framework
that will facilitate the local level ECP mainstreaming. The aim is to improve the local planning and
implementation processes so that annual development and recurrent grants are used most
effectively. The results framework of the JSP outcomes and outputs and the relative emphasis of the
two development partners will be as follows:
Outcomes and Outputs SESP PEI 2
Outcome 1: ECP mainstreamed in national policies, plans and programmes
1.1 ECP Mainstreaming Guidelines and Indicators Available for use by
sectors
Medium High
1.2 Poverty Environment linkages demonstrated and benefit sharing
policies, strategies and guidelines developed
Medium High
1.3 Staff and training modules available for ECP mainstreaming
trainings at all levels in relevant educational and training institutes
Medium Medium
1.4 Competent staff available in all sectors including the Help Desk to
mainstream ECP
Medium Medium
1.5 Competent staff available in other sectors to mainstream ECP Medium Medium
Outcome 2: ECP mainstreamed in all development plans and programmes at local level
2.1 Revised Local Development Planning Manual is available for use
by Local Governments
High High
2.2 Benefit sharing mechanisms applied to selected conservation
projects
Low High
2.3 Competent staff available at the local levels to mainstream ECP High High
2.3 Local Plans monitored for integration of ECP concerns High Medium
In order to achieve its socio-economic development goals as defined in the 10th
Five Year Plan, pro-
poor environmental considerations and climate change adaptation responses need to be
systematically integrated into development planning processes in Bhutan. The initiation of the
concept of national level environmental mainstreaming can be traced back to the Guidelines for the
Preparation of the 10th
Plan (2007-2012), which states that:
“Environment is a cross-cutting issue that is intimately intertwined with poverty reduction. Therefore, all sectors,
agencies, Dzongkhags and Gewogs should mainstream environmental issues in all their policies, plans, programmes
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 26
and projects and build adequate mitigation measures to minimize any adverse impact on the environment”. (Clause
2.3(iv))
This requirement led to environmental awareness training undertaken by NEC under the EUSPS
programme for all sector agencies during the second half of 2006. It also encouraged other donors,
most notably UNDP, to consider supporting the government‟s attempts to build ECP mainstreaming
capacity. Evidence from EUSPS and PEI Phase I indicates that there is still work to be done at the
national level to support overall policy development, which will provide the framework for
development of local ECP guidelines and capacity development that will facilitate local level
planning, implementation and monitoring.
Five-Year Plans for the 10th
year plan period have been prepared for all Dzongkhags and Gewogs
based on guidelines and budget ceilings issued by GNHC. These 10th
FYPs form the basis for
preparation of annual plans according to the yearly planning cycle – the implementation of which is
funded by the Annual Capital Grants and the Annual Recurrent Grants. It is this planning process
that the capacity development interventions intend to influence with a view to incorporating ECP
concerns. The preparation of the 11th
FYP will start during FY 2011/12 and therefore provides an
important opportunity for ECP mainstreaming. Anticipating the passing of the draft LG Act with its
requirement of „holistic and integrated area-wide development Dzongkhag plans, the planning
process will become substantially more complex, but will also offer increased opportunities for ECP
mainstreaming. The DPO and the DEO assist the Gewog administrations with the preparation and
monitoring of the Gewog-level development plans and annual plans.
Currently, the planning and environmental issues are dealt with in the District Development
Committee (DDC) and District Environmental Committee (DEC) respectively. The DPO and DEO
and other senior officers are members of the two committees. The LG Act of Bhutan 2009 legalises
the formation of committees for purpose of specific functions but does not specify the committee
structure. The elected councillors will be members of the committees, including co-opted members
from amongst officials from any national agency, ministry, department and regional office or the
voters of the Thromde/Gewog.
Results-based monitoring will include an assessment of environmental outcomes. The outcome
monitoring will be incorporated as part of the RGoB M&E system and will be shared with
Component 2. The environmental outcome monitoring will be based on core environmental
indicators. Initial baseline assessments will be conducted in a number of Gewogs during the
Inception Phase. Output and outcome monitoring is further elaborated in Chapter 8. The purpose of
the output and outcome monitoring of Component is to assess how the environmental dimension
evolves in the annual plans and what the associated benefits will be.
The Dzongkhag DEOs and DPOs will assist the Gewog administrations with progress reporting as
regards the environmental outcomes and the environmental outcome statements. A proposal for a
simple draft format for the output statement reporting on expenditures for the environment is
attached as Annex F. This draft format can be further developed during the Inception Phase and
aligned to the expected requirements of RGoB output and outcome monitoring in NMES.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 27
5. Programme management and organisation
5.1 Programme management
GNHC will be the managing agency for the SESP. GNHC has no implementation mandate and does
therefore not take directly part of the actual implementation, but will undertake the overall
coordination functions.
Component 1
The budget support will be provided through the same procedures as those of LGSP and the RGoB
“Guidelines for Annual Grants for Local Governments”. The LDD will monitor the local
governments‟ overall performance as regards the implementation of the annual plans. As regards
grant management, the following agencies have specific roles:
The Department of National Budget will report on budget inputs and budget performance;
The Department of Public Accounts will release funds and endorse annual financial
statements;
The Royal Audit Authority (RAA) will conduct the necessary audits according to the RAA
Act.
The LDD Programme Manager for LGSP will also function as the Programme Manager for the
SESP Component 1.
Component 2
Component 2 will be implemented as part of the Danish-UNDP/UNEP Joint Support Programme
with LDD having the overall coordination function in relation to sector ministries, national agencies
and local governments. The local government councils (Dzongkhags and Gewogs) will be the
executing agencies at the local level and implement the JSP according to local governance
procedures – as mandated by the Local Governments‟ Act 2009 – in due coordination. The main
sector agencies are NECS, MoA and MoHCA, which will provide the policy framework and
strategic directions to the local governments according to their mandated roles.
A senior officer in GNHC Secretariat will be appointed as the programme manager, who will
coordinate and oversee overall progress and intervene if delays and other problems occur. NECS,
MoA and MoHCA will each appoint a senior officer who will act as the focal point and coordinate
activities within their respective ministry/ agency. At the Dzongkhag level, it will be the DPO and
the DEO who will jointly act as the focal point. The focal points will be responsible for programme
implementation in their respective central and local government units.
A Programme Management Group (PMG) will be established, which will be made up of members
from RGoB and development partners. Alternatively, the proposed The RGoB member will be the
GNHC Programme Manager and the focal points in NECS, MoA/ SLMP and MoHCA. The
development partner members will be UNDP/UNEP and Denmark. The PMG will meet at least
once every three months to review progress, discuss the way forward, and address important
strategic issues. Representatives from other national agencies, training institutions, civil society and
private sector will be invited on an ad-hoc basis when these representatives can contribute to the
issues being discussed. The GNHC Programme Manager will act as secretary to the PMG.
Short-term international, regional or national technical assistance (TA) will be provided to advice
with programme implementation in cases where adequate resources in the government system are
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 28
not available to undertake special tasks. ToR will be prepared for each assignment that clearly
specifies activities and reporting requirements. The PMG will prepare these ToR, which will be
endorsed by the JSP-SC.
Role of central government
The primary role of central government is to mainstream ECP into policies, plans and programmes
and to ensure that the outcomes of this activity are effectively communicated to the concerned
stakeholders. The mainstreaming of ECP will impact on national level plans and local government
policy guidelines that will inform the local level plan preparation and implementation. Another
important aspect will be to mainstream ECP into the secondary and tertiary education institutions‟
curricula to ensure that the future professional cadres possess the competence to address
environment, climate change and poverty reduction challenges. The GNHCS and NECS will
assume the following functions:
Gross National Happiness Commission Secretariat
Overall coordination and management of the Joint Support Programme.
Management of capacity development of DPOs and GAOs.
Policy and planning guidance and backstopping to the PPDs of sector line ministries and
non-ministerial central government agencies.
National Environment Commission Secretariat
Management of capacity development of DEOs.
Technical guidance and backstopping to the environmental units of sector line ministries for
environmental assessment and monitoring.
Role of local government
The primary role of local governments is to mainstream ECP into their development and annual
plans based on planning and policy guidelines from line ministries/ central agencies. The two most
relevant committees35
in relation to the Programme are: 1) District Development Committee (DDC)
that will be responsible for the planning aspects; and 2) District Environmental Committee (DEC)
that will be responsible for environmental and natural resources management concerns. The
interface between the two committees is ensured because most senior district officers are members
of both committees, including the DPO and the DEO. The argument for maintaining the two
committees is that DECs have a regulatory function as well as a developmental function. The two
committees will be the main fora for discussing and agreeing on actions to be taken on planning and
ECP mainstreaming – and thus ensure that the combined expertise of senior district officers come in
play. The LG Act stipulates that council members will constitute the membership of the
committees, but that these can be expanded as warranted with the necessary sector expertise.
35 The Local Government Act does not contain clauses on the committee structures, but it is assumed that District
Development Committees – with somewhat similar functions as the current DYT – will be established as a „committee‟
that will report to the full Council.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 29
5.2 SESP Steering Committees
Component 1
The existing LGSP Outcome Board/ Steering Committee36
(LGSP-SC) will serve as the Steering
Committee for the SESP Component 1. The LGSP-SC has been established to oversee overall joint
programme activities. The LGSP-SC will meet twice a year in February and September respectively
to discuss component progress and endorse the overall direction of component implementation. The
LGSP-SC comprises the following members:
Secretary of the GNHC (chairperson)
Head of Policy and Planning Division, Ministry of Home and Cultural Affairs
Directors of DNB and DPA under MoF
One Dzongda
Two DT Chairpersons
Development partner representatives
Reference is made to the LGSP Programme Document for further details on the LGSP-SC.
Component 2
A Joint Support Programme Steering Committee (JSP-SC) will be established as the formal
mechanism for decision-making concerning the Joint Support Programme. The JSP-SC will meet
half-yearly in February and September to decide on major strategic directions and resolve
conflicting issues – and in due consultation with other ministries if such issues relate to their
mandated responsibilities. The JSP-SC comprises the following members:
GNHC:
o Secretary of GNHC (chairperson)
o Head of PMCD/GNHC
o Head of LDD/GNHC
o Head of DCD/GNHC (member secretary)
Sector agencies:
o NECS Head of PCD or DG
o Chief Planning Officer of PPD/MoA
o Head of Department of Local Government/MoHCA
Local Government level:
o One local Government representative (Gup). LDD will request a nomination at the
annual meeting of Gups.
o One representative of District Environmental Officers (DEO). The representative
will be nominated at the annual symposium for DEOs organised by NECS.
Development partners
o Head of LOD
o Head of Environment and Energy Unit of UNDP
o Others
36 The LGSP Outcome Board/ Steering Committee is abbreviated as OB/SC in the LGSP Programme Document
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 30
The development partner members will initially be UNDP/UNEP and Denmark, but will be
expanded if other development partners embark on compatible programmes. The Secretary of the
GNHC will chair the JSP-SC, and the Programme Manager will act as secretary to the JSP-SC.
Reference is made to the separate JSP Programme Document for further details on the JSP-SC.
Overall Programme steering
In order to oversee overall implementation, cooperation issues, etc. for the SESP‟s two components,
the Secretary GNHC and the Head of the LOD will form a high-level coordination body. This body
will have a mandate similar to a Programme Steering Committee (PSC) and will consequently be
responsible for and mandated to reallocate funds between Programme components and allocation of
unallocated funds consistently with the SESP‟s objectives. The PSC is formed with a view to
establishing a flexible and efficient mechanism. All decisions of the PSC will be recorded in
minutes of meeting that will be jointly endorsed and signed by its two members.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 31
6. Programme budget and financial management
6.1 SESP grant
The SESP grant from Denmark is DKK 70.0 Million. The budget will cover the two components,
technical assistance and reviews as well as unallocated and contingency funding as shown in Table
2, Table 3 and Table 4.
Table 4 include the budget flow in both the financial years of RGoB and of Denmark. Reallocation
between the budget lines of each component can be decided by LGSP-SC and the JSP-SC
respectively, whereas the SESP PSC will decide reallocation between components.
Table 2: SESP Budget Summary
Components DKK mn Percentage
Component 1: Budget support for capital investments in Gewogs 40.0 57 %
Component 2: Capacity development for environmental mainstreaming 20.0 29 %
Outcome 1: ECP mainstreamed in policies, plans and programmes 6.8 10 %
Outcome 2: ECP mainstreamed in all development plans and
programmes
11.2 16 %
Technical Assistance 2.0 3 %
Other: 10.0 14 %
Joint Reviews 2.0 3 %
Unallocated 7.0 10 %
Contingency 1.0 1 %
Total 70.0 100 %
Note: Exchange rate October 2009: BTN 100 = DKK 109 ~ 1 DKK = BTN 9.2; 1USD = DKK 5.5
The main emphasis of the SESP Component 2 part of the Joint Support Programme will be at the
local government level and thus a major part of the budget will be allocated for capacity
development of Dzongkhags and Gewogs administrations. The Danish grant will be monitored in
DKK and transfers to the Programme will be based on the current DKK-Nu exchange rate. The
main purpose of capacity development at the national level will be to establish national level
frameworks that facilitate development of local governments‟ corporate capacity.
Table 3: SESP Budget according to Bhutan’s financial year (DKK million)
Components
2nd
half
FY
2009/10
FY
2010 /11
FY
2011/12
FY
2012/13
1st half
FY
2013/14
Total
Component 1: Budget support for capital
investments in Gewogs
- 10.0 15.0 15.0 0.0 40.0
Component 2: Capacity development for
environmental mainstreaming
2.1 5.1 5.9 4.9 2.0 20.0
Other - 2.5 3.0 3.0 1.5 10.0
Programme Reviews - 0.5 0.5 0.5 0.5 2.0
Unallocated - 2.0 2.0 2.0 1.0 7.0
Contingency - - 0.5 0.5 0.0 1.0
Total 2.1 17.6 23.9 22.9 3.5 70.0
Bhutan‟s Financial Year (FY) is from July to June.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 32
Table 4: SESP Budget according to Denmark’s financial year (DKK million)
Components FY 2010 FY 2011 FY 2012 FY 2013 Total
Component 1: Budget support for
capital investments in Gewogs 5.0 12.5 15.0 7.5 40.0
Component 2: Capacity development
for environmental mainstreaming 4.2 6.0 5.8 4.0 20.0
Other 1.5 2.5 3.0 3.0 10.0
Programme Reviews 0.5 0.5 0.5 0.5 2.0
Unallocated 1.0 2.0 2.0 2.0 7.0
Contingency - - 0.5 0.5 1.0
Total 10.7 21.0 23.8 14.5 70.0
Denmark‟s Financial Year (FY) is from January to December.
The SESP unallocated funds will be used for interventions that will contribute to the overall scope
of the SESP, but which have not yet been specified as specific outputs or activities. One such option
could be support to urban towns which small rural towns that are highly interlinked with the
neighbouring Gewogs. Such support would also be a logical continuation of the support provided
under the Danish EUSPS. Other options could be:
Actions concerning climate change adaptation and disaster risk reduction that are identified
from the ongoing pilot activities or post-COP15 initiatives;
Emerging specific strategic interventions that are identified during the SESP implementation
related to environment with high policy relevance for local level applications.
The use of the unallocated budget is subject to satisfactory progress reporting and approval by the
SESP PSC. Recommendations about the unallocated budget can be done during the annual
programme review. The contingency budget allows for any budgetary uncertainties due to currency
fluctuations and emerging priorities. The SESP PSC will decide how the contingency budget will be
used.
6.2 Financial management
The financial management of the SESP will follow the RGoB procedures for budgeting, flow of
funding and accounting. Procurement of equipment and services will be the responsibility of the
implementing agencies and procurement will follow ordinary RGoB procurement in accordance
with the Procurement Rules and Regulation (2009). If requested by RGoB, procurement of TA
could be undertaken by LOD in line with current Danish procurement procedures.
Flow of funds for Gewog development plans (Component 1): The flow of SESP funds will be
channelled through the Gewog Annual Capital Grant (ACG) facility. The procedures of budgeting
and flow of funds to the Gewogs will follow the regulations of the MoF according to the practice
established with the Financial Management Arrangement of the LGSP. Denmark will transfer funds
to the Budget Fund Account operated by the Department of Public Accounts (DPA). Release of
budget support from LOD to DPA is subject to disbursement triggers. The transfer will be made in
two annual instalments. The SESP funding will be fungible with funds from the RGoB and other
development partners contributing to LGSP. Gewogs need to comply with the requirements
outlined in the Guidelines for ACG for Local Governments (Dzongkhags and Gewogs) in order to
access the ACG.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 33
The RGoB have triggers for the release of the Annual Grant to each Dzongkhag and Gewog. The
release of tranches from the SESP budget support requires that the LGSP triggers be met. The 80%
annual tied grants will be accessed through the current practice of annual planning, budget release
and accounting procedures. Normal documentary requirements like detailed work plans,
procurement papers, cost estimates and technical design are endorsed and submitted by the Dzongkhag and Gewog administrations. The release of the 20% untied grants is subject to
fulfilment of three additional minimum access conditions:37
Annual Dzongkhag and Gewog Plans and budgets are in accordance with the functional and
financial assignments of the Dzongkhags and Gewogs endorsed by DTs and GTs. The
format for annual plans will be provided from the PlaMS, and the budget format from MoF.
Monthly accounts as per the Financial Rules and Regulations, 2001 (FRR) and existing
guidelines of MoF.
Minutes of GTs and DTs related to annual plans (to confirm the work plan and budget is
endorsed by the GT).
DPA produces an annual financial statement and a list of all Gewogs with status of work plans,
expenditure reports and audits for the LGSP SC. The material produced by DPA for the LGSP will
also be used as statements for SESP. In case of non-fulfilment of required reporting and budget
release triggers, the LOD will request the SC to address the issue, while also reserving the right to
reduce disbursements for the budget support.
Flow of funds for capacity development (Component2): Lead agencies for each of the JSP outputs
representing the local governments and relevant national agencies (GNHC, MoA, NECS and
MoHCA) will prepare annual work plans and budgets aligned to the 10th
FYP and capacity
development activities proposed under the various outputs of the JSP. The education and training
institutions will be contracted by GNHC or a national agency as relevant. Similarly, support to PS
and CSO capacity development could be provided through the Board for CSO fund currently under
consideration. PMCD and LDD will each compile a comprehensive annual work plan and budget at
Outcome level for prioritisation and approval by JSP-SC. Funding from the Joint Support
Programme is included as earmarked support with funds transferred to and accounted for by the
relevant agency. The GNHC will coordinate the programme and monitor the tasks according to
annual work plans.
The RGoB procedures for financial management and procurement will be applied. Subject to
decision by the JSP-SC, procurement of some services may be managed by LOD/UNDP in line
with standard Danish/UNDP procurement procedures.
Accounting: Dzongkhags and Gewogs will prepare quarterly expenditure reports to DPA on the
finances and activities according to the procedures developed by the MoF and GNHC. DPA will
prepare annual financial statements. The Budget and Accounting System (BAS) has been applied so
far, but Multi-Year Rolling Budgets (MYRB) and Public Expenditure Management Systems are in
the process of being introduced.
Auditing: The RGoB auditing procedures will be applied. In accordance with the Audit Act, the
Royal Audit Authority (RAA) will audit the accounts of public institutions including the
Dzongkhags on an annual basis and for Gewogs at least every second year. Each Gewog is an
independent accounting entity. An annual audited financial statement shall be submitted to LOD
and UNDP/UNEP once it is endorsed by Parliament.
37
Guidelines for Annual Grants for Local Governments (Dzongkhags and Gewogs)
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 34
Table 5: Flow of funds and financial management
SESP component / output Financial flow Budget and Accounting Reporting and Auditing
Component 1: Budget
Support for Annual Capital
Grants (DKK 40 Million)
From Denmark to Treasury
as budget support included
in the budget for all Gewogs.
From DPA to Letter of
Credit Accounts of the
Gewogs. Annual Grant
approach will be applied as
defined in LGSP.
Budget as approved by the
Parliament. Allocations to
Gewogs as defined in the
Gewog Budget Allocation
Formula. Annual allocation
defined by DNB.
Accounting by Gewog
Accountants.
Reporting through the
PEMS and MYRB as well
as PlaMS.
Summary progress and
status reporting to SESP
PSC by GNHC.
Auditing by RAA.
Component 2: Capacity
Development to
Mainstream Environment
(DKK 20.0 Million)
From Denmark to Treasury.
From Treasury to:
Dzongkhag account for
DEO activities.
Relevant sector agency
and to sector agency to
local government as
„earmarked‟ grants
Budget to be agreed in
annual work plan
coordinated by GNHC and
endorsed by the JSP-SC.
Accounting by the
concerned agencies
according to RGoB
regulation.
Reporting on outcomes to
GNHC from relevant
sector agency.
Reporting on finances to
MoF.
Reporting to SESP SC by
GNHC.
Auditing by RAA.
APR, unallocated and
contingency budget (DKK
10.0 Million)
As for Component 2 or SC
request for LOD
procurement
As for Component 2 As for Component 2
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 35
7 Assessment of key risks
There are a number of risks associated with the implementation of the SESP. The extent to which
the risks will materialise will be assessed during the Annual Programme Reviews. The risks are
summarised below:
Risks Likelihood Potential
Impact
Risk mitigation measures
Environmental Outcomes
1. Environment is not integrated in
the development planning #)
Medium High GNHC will sensitise the Gewogs on the relevance
of environment and natural resources for the
secured livelihoods and local economic
development. Environmental mainstreaming
guidelines by NECS and GHNC.
2. Mainstreaming ECP into local
level annual and five-year
planning may not happen due to
low local level capacity
Possible High Programme management should stress local level
capacity development for mainstreaming ECP
above all others
3. ECP mainstreaming guidelines
may not become part of GNHC
11th
Plan Guidelines
Possible High GNHCS has considerable ability to determine the
content of the 11th
Plan Guidelines. As long as
ECP guidelines are produced in a timely fashion,
this risk should be minimized.
4. Environmental outcomes are
unknown and cannot be
measured.
Medium Low Improved environmental monitoring locally, for
example through core environmental indicators.
Establishment of baselines and core indicators.
Integration of the environmental outcome
monitoring in the NMES.
Local Government and Planning
5. The implementation of the
Local Governments‟ Act
encounters difficulties
Possible Medium Joint Programme should have an input to the
writing of regulations under the new law.
6. Local Government Elections
are not held by October 2009 #)
Low High Develop interim measures until a new elected Gup
and other local government is in office. Emphasis
on capacity development of Gewog administrative
staff.
7. Several Initiatives on
elaboration of new planning
guidelines for the Gewogs may
send conflicting signals and
overload the weak capacity of
the Gewogs
Medium Medium Elaboration of one consolidated, integrated
planning guideline for Gewogs, which will address
all cross-cutting issues and themes and major
sector issues where relevant. Strong coordination
of these issues in the LGSP-SC.
8. Local Government
Development Plans for the
Gewogs are not available #)
Low Medium Support to Multi-Year Rolling Budget (MYRB)
process at Gewog level and continuous update of
the focus areas of the Gewog plans.
9. Indigenous peoples‟ rights and
involuntary translocation of
people due to construction of
new infrastructure are not
tackled
Medium Medium These issues should be addressed in the planning
guidelines and awareness raising and training
should encompass sufficient activities and
measures to mitigate this risk.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 36
Risks Likelihood Potential
Impact
Risk mitigation measures
10. Lack of technical support for
implementation at local level
Possible High Annual work plans need to ensure adequate
application of technical assistance during the
course of the Joint Support Programme.
11. Uncertain policy and capacity at
the central level may hamper
the proposed main focus on
local level capacity building
Possible Medium Initial Joint Support Programme work should
focus on completing mainstreaming awareness
raising and policy development at the central level.
12. Lack of human resources at
central level for oversight and
coordination
Likely High The Joint Support Programme will require full-
time project management from the GNHCS (either
based in LDD or DCD). The RGoB needs to work
with the two donors to ensure that daily, full-time
project management is sourced from GNHCS.
13. National M&E not adequate for
monitoring local level
implementation and impact of
such
Possible Medium The RGoB is currently revising the NMES and the
PLaMS. The Joint Support Programme needs to
ensure that this system takes local-level indicators
into account. Lessons learned regarding M&E
from previous decentralization projects will also
be taken into account.
Public Financial Management
14. Weak budgeting, monitoring
and reporting at the Local
Government level #)
Medium High Action from LGSP and ICBP to enhance capacity
for administration, management and accounting.
These core skills are outside the SESP activities.
15. The untied Annual Grant
system is not operational
Low Low An alternative to untied Annual Grant funding is
continued allocation of Gewog grants 100%, tied
to the 10th
FYP. This is as practised now in the
fiscal year 2008/09.
16. Delays in transfer of funds and
implementation of activities
Low High Emphasis on streamlining procedures for funding
and implementation to ensure that there is no spill
over of budget due to implementation delays
17. The funds are not used in a
transparent matter
Low Medium Emphasis on application on auditing and financial
reporting procedures. Zero tolerance for
misappropriation of development funds. Focus
area of the LGSP.
18. Corruption and misuse of funds
at local level
Possible Medium ADB/WB is supporting nationwide capacity
building on the use of the new procurement
manual 2007, as well as support to update the
existing Financial Rules and Regulations. Quite
strong audit procedures are in place and the Royal
Audit Authority performs audit of Gewog accounts
at least every second year.
Institutional Issues
19. Unclear division of tasks
between the core agencies
within the support to Gewogs,
including the Ministry of Home
and Cultural Affairs and the
GNHC, within areas such as
M&E and capacity
development
Medium Medium The new LG Act should address these issues and a
strong coordination between the various agencies
should be pursued throughout the implementation.
It should be made very clear for the Gewogs and
Dzongkhags who they refer to in which cases.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 37
Risks Likelihood Potential
Impact
Risk mitigation measures
Other Impacts
20. Demographic changes in rural
Bhutan and urban migration of
economic productive population
Medium Medium Develop opportunities in rural areas for
employment and improved livelihoods.
21. Impacts of climate change and
climate variability
High High Improved capacity for adaptation to climate
change and variability. Inclusion of seasonal
forecasting, early warning and vulnerability
reduction. Climate change proofing of
infrastructure projects like roads and irrigation.
#) Risks that were included in the Concept Paper
The sustainability of the capacity development activity will to a large extent be dependent on civil
servants remaining in their posts for a reasonable period of time, or that they at least are transferred
to positions where the acquired competence will remain useful. The sustainability aspect is
enhanced by the fact that the training is provided by Bhutanese educational and training institutions
and could in future be provided on a continuing basis. The sustainability aspects are, furthermore,
enhanced by guidelines being prepared and policies being mainstreamed – both of which will
capture the main thrust of the Programme.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 38
8 Monitoring, reporting, reviews and evaluations
8.1 National monitoring and evaluation framework
The SESP monitoring system and associated indicators will be based on the RGoB indicators and
M&E system. The SESP will be monitored through the LGSP for Component 1 and the Joint
Support Programme for Component 2. The Joint Support Programme includes an outline of a
performance monitoring system that has been prepared in accordance with the PlaMS. However,
during the formulation of the SESP, gaps were identified in the national indicators and monitoring:
i) the structure of the planning and financial monitoring system (NMES) is still being developed; ii)
the Gewog output and outcome indicators were not available, and iii) there is no comprehensive
environmental indicator system for the environment in place that applies at the Gewog level.
National monitoring and evaluation framework
The 10th
FYP moves away from traditional process monitoring, to a results-oriented monitoring and
evaluation system, which places greater emphasis on assessment of outcomes. The GNHC will
review the performance of plans through Mid-Term and Terminal Reviews. It will also conduct
periodic evaluations based on new indicators such as the Gross National Happiness Index and
various plan targets in collaboration with relevant stakeholders. The lessons and recommendations
of these evaluations will then be used as guidance for the prioritization of the 11th
FYP and updating
long-term plans.
The National Monitoring and Evaluation Manual 2006 (NMEM) is the guidance for M&E of the
10th
FYP. A revision and update of the Manual is forthcoming (expected September 2009). The
manual is a guideline for the NMES. The NMES is a results-based monitoring system. The
monitoring system is expected to become operational during FY 2009/2010.
The M&E system takes place at four levels (national, sector, Dzongkhag, Gewog) and integrates:
The Planning and Monitoring System (PlaMS). This is reporting to GNHC on the impacts,
outcomes and outputs of programme implementation. The PlaMS is a database system
established to monitor results, but it is only as good as the data and indicators included from the
programmes. Indicators used in PlaMS are due to be completed in late 2009.
The Multi-Year Rolling Budget (MYRB). This is the budget planning and reporting to DNB on
the budget outputs of the plan implementation.
The Public Expenditure Management System (PEMS). This is the reporting to DPA of MoF on
the expenditures.
Efforts are being made to fully integrate the financial management systems into the NMES –
especially to integrate the existing accounting system into PlaMS. PlaMS has been revised to enable
collection of financial data to allow reporting on output-based expenditure. For the time being, the
two systems are separate. There have also been delays in the MYRB implementation, as the line
ministries and agencies are not yet fully involved. In principle, all Dzongkhags and Gewogs plans
should be in the PlaMS and should also include expected outcomes from the five-year plan – in
practice this is not happening yet. The draft revision of the “Organisation of M&E in NMES” is
shown in Table 8.1.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 39
Table 8.1: Organisation of M&E in NMES
Source: National M&E Manual (draft revision, 2009) and 10th
FYP
PlaMS is a centralized data collection and management system. It will enable real time online data
entry, analysis, data storage, and report generation of development programs and projects.
Currently, many Gewogs are yet to get Internet access, which prevents them from being directly
linked up to PlaMS. As an intermediate measure, the Gewogs will report the monitoring data to the
Dzongkhag DPO in hard copy, who will then enter these into the system. The current Dzongkhag
plans have limited outcome information, as the LDP Guidelines are very project and activity
focussed, which is correspondingly the case for Gewogs.
An M&E Coordinator or focal point at each level is to be appointed for undertaking monitoring and
evaluation at the designated levels and supporting the review committees. The concept of a Mobile
M&E Team is introduced in the 10th FYP whereby the GNHC in collaboration with the line
ministries and agencies will form a multi-disciplinary team. The team will undertake regular field
visits to monitor and assess the implementation of development programs and projects and
recommend solutions for reorientation and reprioritization of plans to the Government.
State of the Environment Reporting
In addition to monitoring the results of the 10th FYP, it is relevant to assess outcomes in terms of
changes in the state of environment at the Dzongkhag and Gewog levels. NECS has developed an
EIMS (Environmental Information Management System), which is just about to go “online”. The
EIMS captures national level aggregated data but does not yet include local or core environmental
indicators. The most developed source of local level data on natural resources is the RNR census
produced by MoA. A new RNR census has been prepared and is expected published at the end of
2009.
M&E Level M&E Review
Committee
Review Members M&E
Coordinator/
Focal Point
Focus of M&E Frequency
of Review
National GNH
Commission
GNH Commission members,
chaired by Prime Minister
GNH
Commission
Secretariat
Outcomes
Impacts
Budget
performance at
output level
Annual
Mid-term,
End of plan
Ministry and
Agency
GNH
Committee
Heads of Departments or
equivalent, chaired by
Minister or Head of
Autonomous Agency
Policy and
Planning
Division
Activities
Outputs
Outcomes
Semi-annual
Annual
Dzongkhag GNH
Committee/
Dzongkhag
Tshogdu
Dzongkhag Tshogdu
Members, Dzongdag,
Planning Officer & Sector
Officers. Chaired by DT
Chairperson
Dzongkhag
Planning Unit
Activities
Outputs
Outcomes
Semi-annual
Annual
Gewog GNH
Committee/
Gewog
Tshogde
Gewog Tshogde Members,
Gewog Sector Staff. Chaired
by GT Chairperson
Gewog
Administrative
Officer
Activities
Outputs
Semi-annual
Annual
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 40
The conclusion based on an analysis of potential core indicators is that there is very little data
available to establish Gewog-level indicators for monitoring the state of environment. This was also
confirmed by GNHC when existing sources of potential environmental indicators for PlaMS were
assessed. GNHC is preparing a socio-economic profiling for Dzongkhags and Gewogs, which will
be available during 2009. Data for gender-disaggregated indicators are not available unless
specified as such in the indicators of the development plans (no example was identified). The
MDGs are an important system of core development indicators for Bhutan. Goal 7 focuses on
environmental sustainability, with target 9 addressing land use and climate change, and target 10
addresses water and sanitation.
Reporting
Dzongkhags and Gewogs will follow the guidelines prescribed in the NMEM of GNHC for
monitoring of the implementation of activities funded under the Annual Grants. Financial and
physical progress reporting shall comply with the formats in PlaMS and FRR. Financial reports and
accounts shall be submitted to MoF through the Budget and Accounting System (BAS) and
physical progress reports to GNHC through PlaMS. The Dzongkhag administrations will play a
lead role in consolidating financial and progress reports for Gewogs that do not report directly to
DPA and GNHC.
M&E procedures and indicators relevant for the SESP
The SESP M&E procedures will follow the procedures established by the NMES, and its guidance
manual (the NMEM). Additional M&E capacity development related to the environment and links
to poverty reduction are part of the Programme. The Programme will provide support to strengthen
Gewog-level M&E on environment under the guidance of the DEOs and sector agencies such as
NECS and MoA. This includes development of environment output and outcome core indicators.
The indicators should provide information about the environmental performance of the 10th FYP
and the state of the environment in the individual Gewogs. A tentative proposal of SoE outcome
and output indicators for Gewogs is shown in Annex G. Reporting of Programme implementation
performance is done twice annually in progress reports to the LGSP-SC and the JSP-SC. The
progress reports will be compiled by LDD.
8.2 Reviews
Annual Programme Reviews
Annual Programme Reviews (APR) will be carried out jointly with RGoB and preferably other
development partners in the environment, climate change and natural resource management sectors.
Joint reviews could be carried out with the LGSP. The APR could coincide with the September
sessions of the LGSP-SC and JSP-SC.
Mid-term review
A joint mid-term review will be conducted in 2011 prior to launching the preparation of the 11th
Five-Year Plan, which takes stock of the local governance context and the performance of SESP,
LGSP and PEI Phase 2 – based on which general recommendations will be made for the 11th
FYP
plan preparation, the remaining annual plans of the 10th
FYP, and the exit strategy. A multi-
stakeholder workshop will be conducted before, or in connection with, the mid-term review to share
experiences on the performance of various approaches to ECP mainstreaming with a view to
converge these into a unified approach for a nationwide rollout.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 41
Exit strategy
At the end of the four year period it is anticipated that adequate capacity has been developed in
training institutions, national agencies and local governments to sustain the further capacity
development. An exit strategy will be elaborated during the third year of implementation by taking
ongoing and planned programmes into consideration. A “terminal review” of lessons learned from
the SESP will be undertaken towards the end of 2013.
An evaluation of capacity development was carried out in 2006. The evaluation of outcomes is
forthcoming in 2009/10 and the evaluation of impacts will be after 2013. These evaluations will
also cover the Denmark-Bhutan development cooperation on environment.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 42
9 Implementation
Since the capital development grants will be made available to all Gewogs, it is found pertinent to
disseminate information to all 20 Dzongkhags and their respective Gewogs and Thromdes on the
ECP Guidelines once they have been finalised in order to influence the annual planning process and
the preparation of the 11th
five-year plans. A limited number of Dzongkhags and Gewogs will
initially be selected based on poverty and vulnerability criteria in order to provide more intensified
capacity development support. It is anticipated that two to three batches of intensified support will
be provided to Dzongkhags and Gewogs during the four-year period. The first batch will be selected
during the Inception Phase38
. The experience from the intensified support will be fed into general
information that will be provided to all Dzongkhags with a particular attention to the preparation of
the 11th
five-year plans.
Inception Phase (January to June 2010)
The inception phase will run from January to June 2010. The purpose of the Inception Phase is to
prepare for the next three financial years and in particular for the FY 2010/11, which is the third FY
of the 10th
FYP. Task of the Inception Phase will include:
Functional analysis of the institutions in environment and natural resources relevant for local
government in order to further clarify mandates, responsibilities and capacity needs for
coordination, implementation and M&E.
Final selection of Dzongkhags and Gewogs for capacity development support – based on
vulnerability criteria.
Preparation of MoU or similar on improved harmonisation of external programme support,
e.g. with World Bank GEF/SLMP, EC, IFAD, SNV and Helvetas, for sharing of experiences
and technical assistance, joint programme reviews and similar contributions to aid
efficiency.
Further development of environment M&E and core indicators under the guidance of NECS
and GNHC for possible inclusion on PlaMS. Development of procedure for monitoring and
evaluation of environment outputs and outcomes in selected districts.
Strategies for local environmental mainstreaming and sensitization of key staff at the target
Dzongkhags. Consultations with DPOs and DEOs in selected Dzongkhags. Planning of
capacity development activities to elected DT and GT councillors for mainstreaming
environment in the FY 2010/11 annual plan.
Management related outputs from the Inception Phase include:
Detailed work plans and budget for FY 2010/11 and outline work plans for FY 2011/12 to
FY 2012/13.
Procurement of short-term TA (national and international) as process consultants to assist
with preparatory tasks.
38 Currently, there is no Dzongkhag/Gewog specific environment vulnerability data and there is limited human
resources capacity as well. The initial consideration has been to select the five poorest Dzongkhags and their Gewogs
for more intensified capacity development support. In case the more elaborate vulnerability selection criteria are not
ready during the Inception Phase for the first batch of Dzongkhags and Gewogs, the poverty selection criteria will
apply.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 43
Preparation of the 1st SC meetings to be held in February 2010, including finalisation of
ToR and standard meeting agenda.
Preparation of draft ToR for 1st Annual Programme Review (inception review).
Preparation of Inception Report.
Implementation Phase (July 2010 to June 2013)
The implementation will follow the RGoB planning and budget cycle, implementation and
reporting procedures. The implementation should be aligned with the expected RGoB Mid-Term
Review of the 10th
FYP by the end of 2011. Contributions will be made to the development of the
11th
FYP with the aim to have environment output and outcome M&E further developed.
The JSP PMG should draft a work plan for Component 2 by May each year. SC meetings may be
held in February and September and could coincide with the APR. At the September meetings the
financial reporting, RAA audits and other RGoB institutionalised outcomes will be available. The
Component 2 work plan and budget should be available for discussion and final endorsement at the
September SC meeting.
The End of Programme (July to December 2013)
The SESP will conclude with the end of the 10th
FYP in 2013. This will also coincide with the
termination of Denmark‟s support to the environmental sector in Bhutan. GNHC and LOD will
prepare an exit plan for the SESP. The exit activities will be further detailed during the
implementation and be subject to further discussion at the February 2013 SC meeting. The issues to
be included in the phasing out are:
Reallocation of remaining funds to secure sustainability of SESP supported activities.
External review or internal lessons-learned assessment of the SESP.
A completion report will be prepared within six months after the termination of the 10th
FYP.
Closing the accounts (may take up to one year after the final disbursal)
An impact evaluation of Denmark‟s development cooperation with Bhutan including the
environmental sector is planned undertaken after 2013.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 44
Annex A: Environment in the 10th FYP
“Chapter 5: Cross-cutting Development Themes
This chapter outlines the centrality of the following cross-cutting development themes in the attainment of
national development objectives. While there are several other critical themes that could also be considered,
these are regarded to be particularly pertinent for the Tenth Plan period in view of their all-round importance
and relevance across all sectors and given the context of the introduction of democracy in the country. The
important cross-cutting development themes identified through the consultative planning processes were
decentralized governance, employment, women in development, information and communications
technology, environment and HIV/AIDS. The Chapter highlights the specific relevance of these themes,
assesses their general policy environment, identifies the particular constraints and challenges and outlines the
various strategic initiatives that the Royal Government will undertake to address these pressing issues over
the plan period.”
Source: 10th FYP, vol.1, p.69.
“5.6: Environment
Environmental conservation constitutes an important part of national spatial planning strategic framework
and has always enjoyed a high priority in the country‟s development agenda. Conservation of the
environment has been robustly pursued even as Bhutan, a least developed country, is compelled to make
enormous short term sacrifices to serve the long term interests of not just the country alone but the region
and world at large. It is this unwavering commitment that has brought widespread global recognition for
Bhutan‟s efforts to protect its environment and natural resources.
The strong emphasis on protecting and conserving the environment will not diminish in any way over the
Tenth Plan. Indeed, the environment sector will require more attention than before in view of the accelerated
pace of economic and development activities accompanied by increased expansion of infrastructure
development, urbanization, industrialization, population expansion and consumption patterns that are likely
to put an even greater burden and stress on the natural environment.
Additionally, environmental conservation imperatives will be increasingly challenged by the need to balance
it judiciously against the urgency of sustaining and improving rural livelihoods and ameliorating poverty.
Close attention will be required to ensure that the costs of environmental conservation do not fall
disproportionately on the poor through crop loss or limited access to forest resources or cultivable land.
Some of these important environmental opportunities and challenges that the country must address over the
Tenth Plan are highlighted in the section below.
5.6.1: Opportunities and Challenges
There are significant factors that make environmental conservation more and more challenging each year
given the rapid pace of development and modernization in the country that places increasing pressures on
natural resources and compromises their sustainable utilization. On the other hand, the opening of global and
regional markets to local high-value herbal, horticultural and niche products and the harnessing of hydro-
power potential provide special opportunities for the country to enhance living conditions and eradicate rural
poverty. The natural environment thus presents significant opportunities that the country could capitalize on
in a sustainable manner and concurrently also poses significant environmental conservation and management
challenges that need to be addressed.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 45
Enhancing rural accessibility primarily through road access is an important consideration that cannot be
denied. However, in a mountainous country like Bhutan, road construction activities do have serious
environmental consequences that scar and degrade the environment irreparably. A major challenge will be to
effectively implement environment friendly road construction (EFRC) methods. While this will certainly add
extra costs to the already high investments required to implement these EFRC requirements, they will
ultimately prove to be much more cost-effective in the long run. Some of the other rural environment
concerns pertain to over grazing by livestock, inefficient use of forest resources, high levels of fuel wood
consumption and the loss of prime agricultural lands to urbanization and development. Another major
concern is the country‟s high vulnerability to climate change brought about by global warming such as
proneness to flash floods, glacial lake outbursts and landslides due to excessive rain.
While the air and water quality in the country are still relatively good there are emerging problems of air
pollution in and around industrial sites and deteriorating water quality near urban centers. Tackling these
issues at such an incipient stage will be essential to prevent them from becoming major public health
problems in the future. Similarly, the effective management of solid waste disposal in urban areas is proving
to be a major challenge due to the acute shortage of landfill sites.
In addition to the above constraints, Bhutan is faced with limited human capacity and expertise to manage
and implement environmental conservation activities. Environmental awareness, education and sound
practices within Bhutanese society are also nowhere near desired levels and will require to be promoted
further. Meeting all of the above challenges and addressing these important environmental concerns is likely
to be notably constrained by the future availability of resources.
The rich environment naturally confers significant opportunities and in Bhutan‟s context it is linked to the
rich water resources available in the country. The vast hydro-power resources are Bhutan‟s natural
comparative advantage, the sustainable exploitation of which depends on the health and quality of the
country‟s watersheds. The management and protection of the critical watersheds thus provides not just an
environmental benefit but immense economic rewards and hence is accorded a high development priority.
Additionally, as a net sequester of greenhouse gases and user of clean energy, Bhutan could benefit from the
new international regimes permitting emission trading under the Kyoto protocol.
5.6.2: Environment Policies and Strategies
The objectives of the environment sector for the Tenth Plan are to:
Ensure sustainable development in conservation of environment;
Disseminate environmental information and raise awareness among the general public;
Move towards a cleaner environment;
Mainstream environment issues into development policies, plans and programs;
Develop appropriate environmental legislation;
Develop environmental standards; Fulfilling country‟s obligations of Multilateral Environment
Agreements;
Enforcement of Environmental laws/Acts; and
Coordination for water resources management.
The above objectives for the environment sector will be addressed through the following strategies and
initiatives:
Development of appropriate policy and legal frameworks;
Compliance monitoring;
Provision of environmental services;
Decentralizing environmental governance and networking;
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 46
Strengthening environmental information management system to support and improve decision making
(SOE, EIMS, etc);
Public education and awareness on environmental issues;
Utilizing environmental assessments as a tool for sustainable development;
Building and strengthening institutional capacity;
Mainstreaming environmental issues in sectoral plans, projects and programs of all government agencies;
and
Development of appropriate legal and policy framework for water resources management.”
Source: 10th FYP, vol.1, p.84-86.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 47
Annex B: Overview of Environmental related legislation in Bhutan
Title Salient features
Constitution of
Bhutan (2008) The Constitution awards the trusteeship of the environment of Bhutan to each
Bhutanese citizen making it a fundamental duty of each citizen to contribute to
environmental conservation.
The Constitution also directs the government to protect and conserve the environment,
prevent pollution and environmental degradation to secure ecologically balanced
sustainable development while promoting justifiable economic and social development
The government is also directed to maintain a minimum of sixty percent of Bhutan‟s
total land under forest cover for all time to come
The Parliament is empowered to enact environmental legislation to ensure sustainable
use of natural resources and maintain intergenerational equity and reaffirm sovereign
rights of the State over its own biological resources.
National
Environment
Protection Act
(2007)
This Act provides for the establishment of an effective system to conserve and protect
environment through the National Environment Commission or its successors,
designation of Competent Authorities and constitution of other advisory committees, so
as to independently regulate and promote sustainable development in an equitable
manner
The Act enunciates several environmental principles such as fundamental rights and
duties to the environment, inter-generational equity, middle path strategy, precautionary
principle, 3-Rs (reduce, reuse and recycle) principle, Polluter pays principle, Right to
information, Access to justice, Sovereign rights principle and Payment for
environmental services.
The Act also sets out the institutional arrangements in implementation of the Act
namely the NEC, its Secretariat and Competent Authorities, terms and conditions and
tenure of members, roles and responsibilities of members; powers and functions and
meeting schedules
The Commission is entrusted to prevent environmental harm and regulates handling of
hazardous substances, discharge of environmental pollutants, environmental standards
of products, technologies and management practices, waste management and
environmental emergencies
The Act also calls for protection of forest, biodiversity and ecosystem integrity by
emphasizing on stewardship of the environment, forest coverage, protected areas and
vulnerable ecosystems, protection of genetic resources and research and monitoring
Sufficient funds will be allocated to all authorities mentioned under this Act to enable to
carry out their mandate. The Commission can also provide for incentives as well as
taxes to entities that promote or diminish the quality of the environment
All citizens and agencies have the right to access environmental information. The
Commission will also to the extent possible disseminate information and make it
available in the public domain Commission staffs are also empowered to set procedures
for inspections and verifications to investigate premises and with prior notice take
samples. The Commission may also establish environmental laboratories
Appropriate enforcements, offences and penalties are stipulated by the Act for
environmental compliance
Citizens also are empowered to participate in environmental decisions in public debates
and consultations. Citizens‟ rights vis-à-vis the environment will also be addressed
through a procedure of appeal and review procedure
National
Environmental
Assessment Act
This Act establishes procedures for the assessment of potential effects of strategic plans,
policies, programs and projects on the environment, and for the determination of
policies and measures to reduce potential adverse effects and to promote environmental
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 48
Title Salient features
(2000) benefits.
Regulations for
Environmental
Clearance of
Projects
These regulations formulated to operationalise the Environmental Assessment Act
(2000)
Aims to provide opportunities for public review of potential environmental impacts and
to ensure projects are implemented in line with sustainable development policy of the
government
Ensures impacts are considered, feasible alternatives are considered and mitigation
measures are instituted
Regulations for
the Strategic
Environmental
Assessment
These regulations formulated to operationalise the Environmental Assessment Act
(2000)
Provides broad guidelines for governmental agencies while formulating, renewing,
modifying or implementing any policies, plans, programmes and Five Year
developmental plans which may have significant impacts on the environment;
Directs agencies to perform a Strategic Environmental Assessment of policies, plans
and programmes before the proposal is adopted
Land Act (2007) Supersedes the Land Act 1979
The Act aims to facilitate the management, regulation and administration of the
ownership and use of land for socio-economic development and environmental well-
being of the country through efficient and effective land administration, security of land
tenure, equal opportunity to land, facilitation of operation of land market, effective use
of land resources and conservation of the ecosystem.
Trees, either grown naturally or planted, in a registered land belongs to the landowner.
Transportation and commercial use of timber from these trees shall be subject to the
Forest and Nature Conservation Act or any other law that shall govern the transportation
and commercial use of such timber in future.
The declaration of Thromde (urban), industrial, and protected agricultural areas shall
aim at the best use of land by:
- Assessing present and future needs by evaluating the land‟s capability to supply them;
- Identifying and resolving conflicts between competing uses, between the needs of
individuals and those of community, and between the needs of the present generations
and those of future generations; and
- Seeking sustainable options and choosing those that bring about the desired economic,
social and environmental well-being of the citizens of Bhutan.
Landowners can apply to through the Local Authority for conversion of wet land to
other uses for verification of the proposed conversion and submit to the Ministry of
Agriculture which shall assess the feasibility based on the technical criteria including
availability of water, soil and environmental conditions. For other types of agricultural
land, landowners can request for conversion to residential land the Local Authority
which can verify and demarcate the land.
All Tsamdro (pasture) and Sokshing (woodlots leased out for leaf litter) rights
maintained in the Thram prior to enactment of this Act shall be deleted from the Thram.
Upon deletion, the Tsamdro land shall be reverted and maintained as the Government
land in Thromde or the Government Reserved Forests land in rural areas.
The reverted Tsamdro and Sokshing in rural areas shall be converted to leasehold and
those in Thromde shall be maintained as the Government land.
Grazing and pasture development on Tsamdro shall be permitted based on a Tsamdro
management plan. The Department of Forests, Department of Livestock, and the lessee
shall be responsible to prepare Tsamdro management plan. The same applies to
Sokshing.
Forest & Nature The Act is comprehensive in regulating use of forest and forest products in Bhutan
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 49
Title Salient features
Conservation Act
(2005) The Act stipulates management of forests through Management Plans.
A set of rules and regulations are described for Government Reserved Forests, use with permits and leasing of forest land
Permits and management plans for community forests established on government reserved forests and private forestry schemes under the concept of social forestry is elaborated
The Act also has explicit rules on designation of forests as protected areas conservation of wild life and soil and water conservation
Rules have been framed on transport and trade of forest produce and adequate safeguards have been put in place for enforcement and penalties
Biodiversity Act
(2003) Applies to all the genetic and biochemical resources including wild, domesticated and
cultivated species of flora and fauna, both in-situ and ex-situ conditions found within the
territory of Kingdom of Bhutan
Ensures the conservation and sustainable use of the biochemical and genetic resources
and promotes the equitable sharing of benefits derived from the use of genetic resources
and to promote technology transfer and capacity building at the national and local
levels.
Regulates and facilitates processes by which collectors may legally obtain genetic
resources. As a result, illegal access to genetic and biochemical resources and associated
Traditional Knowledge is prevented.
Provides legal recognition of varieties which are not protected under the internationally
existing patent and/or plant breeders rights laws and thereby recognize farmers‟ plant
variety improvements and innovations and provide a means of sharing benefits derived
from the use of farmers‟ or traditional varieties as breeding material for commercial
purposes.
The Government land or Government Reserved Forests land may be leased to a juristic person. Application to lease Government land or Government Reserved Forests land for any purpose shall be governed as per the existing rules and regulations. There shall be no ceiling for the Government land or Government Reserved Forests land on lease for the purposes of economic activity.
DYT (District Development Committees)
Chathrim (2002)
This Act stipulates legislation for the functioning of the District Development Committees
In terms of environmental and natural resources management, the DYT has the administratively empowered to give directions and approval on forest management plans including extraction, conservation and forest road construction in accordance with the Forest & Nature Conservation Act
It is also empowered to give direction and approval on protection of forests, tsamdro (pasture) and all types of government and community lands from illegal house and similar constructions and other encroachments
It can also control construction of structures, whether on national, communal or private lands, within 50 feet of highways falling within the Dzongkhag
GYT (Block Development Committees)
Chathrim (2002)
This Act stipulates legislation for the functioning of the Block Development Committees
In terms of environmental and natural resources management, the GYT has the administratively empowered to conserve and protect water sources, lakes, springs and rivers
It is also empowered to take custody and care for communal lands, community forests including sokshing and nyekor tsamdo, medicinal herbs and accordingly prevent illegal house construction and all other types of encroachments in such community lands as well as on government lands and forests
It can also control construction of structures, whether on national, communal or private lands, within 50 feet of highways falling within the Dzongkhag
The GYT can adopt and enforce regulations in the gewog in regard to control and
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 50
Title Salient features prevention of pollution of air, soil and water; depredation of crops by livestock and wildlife, in accordance with the provisions of the Forest and Nature Conservation Act; protecting and harvesting of edible forest products in the local area in accordance with the Forest and Nature Conservation Act
Plant Quarantine Act of Bhutan (1993)
The Act aims to prevent the introduction of pest not already present or widespread in the country and to control those pests in the country from spreading by eradication and to provide facilities for services for import and export of plant products.
The Act also aims to extend cooperation in prevention of movement of pests in international trade and traffic.
Road Act (2004) The aims to ensure balanced socio-economic development to promote social equity and justice and general welfare.
The Act also stipulates the adoption and promotion of environment friendly techniques in implementation of road activities.
Further, the Dzongkhags are directed to carry out survey, design and construction of feeder roads, farm roads and power tiller roads within the Dzongkhags in accordance with guidelines issued by Department of Roads and NEC.
In addition to technical standards for road construction and maintenance, all road agencies must conform to environmental considerations and geological stability.
The Department of Roads and road related agencies have priority for the use of natural resources available within the roads‟ right-of-way and road control area over other organisations for road related purposes.
Civil Society Organisations Act (2008)
The Act aims to strengthen civil society by developing human qualities and rendering humanitarian activities.
Public Benefit Organisations by the Act are permitted to serve or supplement or complement the efforts of the government to, among others, assist in the protection of the natural environment.
Thromde Act (2007)
The purpose of the Act is to frame and enforce rules for protecting the health, safety and well being of residents, preserving and promoting the quality of the thromde (urban) environment.
Among others, the role of the thromde is to preserve and promote the quality of the thromde environment through environmental control, protection and conservation
Draft Bhutan Water Act (2002)
The draft Bhutan Water Act aims at, among others, to control water pollution and to preserve and protect the environment so that future generations of Bhutanese have assured access to adequate, safe and affordable water to maintain and enhanced quality of life.
Under management of water resources management, water resources conservation, development and management is to be done in an integrated manner. Activities like water shed conservation, water source protection and water resource development is to be carried out in an environmentally sustainable and economically feasible manner.
Mines & Mineral Act 1995
Aims to fulfil national goals of exploitation of natural resources namely minerals in a manner compatible with the social and economic policies of the government within the framework of sustainable development, protection of the environment and preservation of religious and cultural heritage. The Act will be supported by regulations and standards for environmental protection, effluent discharges, noise levels and use of explosives.
Conventions and Treaties
Ratification of or Accession to the Montreal Supplementary Protocol of 1998; UN Convention to Combat Desertification (UNCCD); Convention on International Trade of Endangered Species of Wild Fauna and Flora; International Treaty on Plant Genetic Resources for food and Agriculture; Basel Convention on the Control of Transboundary Movement of Hazardous Waste and Disposal; Vienna Convention for the Protection of the Ozone Layer and the Montreal Protocol on Substances that Deplete the Ozone layer.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 51
Annex C: ToR for District Environmental Officers
Background
The National Environment Commission Secretariat (NECS) held annual meetings with Dasho
Dzongdags since 2001 to discuss the possibility of designating Dzongkhags as “Competent
Authorities” under the EA Act 2000 and its related regulations. One of the points repeatedly raised
by Dasho Dzongdags during all the meetings was the lack of capacity at the Dzongkhag level to
deal with environmental related issues. Further, it was mentioned that the environmental clearance
process will be more efficient if branch offices were established by the NECS in each Dzongkhag.
In view of the above constraints, suggestions were made to NECS to field
representatives/Dzongkhag Environment Officers in the Dzongkhags, to assist and guide the
District Environmental Committees (DECs). It may be mentioned that establishment of DEC is in
line with Government‟s Decentralization Policy.
The need for Dzongkhag Environment Officers was also raised during the mid-term review of the
9th
Five Year Plans of the NECS, Dzongkhags and Gewogs. Finally, this year, one of the resolutions
of the 83rd
session of the National Assembly was to depute a representative from the NECS to each
Dzongkhag. The Terms of Reference for the Environmental Officer is as follows:
Duties
The Dzongkhag Environment Officers will primarily function as an advisor to the District
Environment Committee (DEC) on all environmental related issues. The duties shall include, but
not limited to:
1. The environmental officer shall assist DEC in implementing and enforcing the
Environmental Assessment Act 2000, the Regulation for Environmental Clearance of
Projects 2002, all environmental guidelines and standards published/issued by the NEC and
environment monitoring in their respective Geogs and Dzongkhags;
2. Shall act as a focal person of DEC on environment related issues;
3. Ensure that environmental concerns are incorporated into the Five Year Development Plan
of the Geogs and Dzongkhag;
4. Support Dzongkhag in the preparation of the annual work plan and progress reporting,
related to environment;
5. Shall assist the Chairperson of DEC in discharging the routine responsibilities related to the
environmental issues;
6. Shall function as a Member Secretary on the DEC;
7. Shall provide technical backstopping to the DEC on environmental related issues;
8. Shall coordinate DEC meetings and maintain records;
9. Shall review and screen all the reports, papers and cases related to the environment,
including applications for environmental clearance and submit to the DEC for its direction;
10. Shall maintain all records of applications received for environmental clearances and actions
taken;
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 52
11. Shall be responsible for coordinating site visits for applications received by the Dzongkhag
for environmental clearances;
12. Shall assist the DEC in issuing environmental clearances of the listed activities;
13. Shall ensure that the environmental terms and conditions stated in the Environmental
Clearances are implemented by the applicants;
14. Shall keep record of problems encountered during implementation of the listed activities and
suggest amendments, if required, through DEC to the NEC on the basis of lessons learnt;
15. Shall liaise with the NECS on issues related to environment;
16. Shall compile information on environmental monitoring conducted by the DEC and submit
to the NEC, periodically;
17. Attend relevant trainings and workshops related to the environment;
18. Shall conduct environmental awareness campaigns within the Dzongkhag; and
19. Shall be the custodian of common seal of the DEC, records of the Committee proceedings
and correspondence.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 53
Annex D: External Development Partners in Environmental, Natural Resource and Climate Change
Development
Partner
Support Area Geographical
focus
Coordinating
and
Implementing
Agency
Commitment
Denmark Environment and
Urban Environment
Programme (EUSPS)
(2004 – 2009)
National. RNR with
pilot Gewogs in 12
Gewogs in 12
districts. Urban
infrastructure in 5
towns.
NEC, MoA,
MoW&HS
DKK 110 million
Denmark Sustainable
Environment Support
Programme (2010 –
2013)
National – all 205
Gewogs (but with
initial emphasis on
field support
activities in Samtse,
Zhemgang,
Mongar, Lhuentse,
Samdrup Jongkhar)
GNHC, NEC
and MoA, and
local
government
DKK 70 million
Denmark Adaptation to Climate
Change (follow up on
climate screening)
National (no local) GNHC with
NEC, MoEA
and MoA
DKK 5.0 Million
Denmark
(and
UNDCF,
UNDP, SDC,
Austria)
Local Government
Support Programme
(LGSP) (2008 – 2013)
National and
nationwide
GNHC,
MoHCA
DKK 25.0 Million
UNDP,
UNEP,
UNESCAP,
UNESCO,
UNICEF,
WFP
Environment and
disaster risk
management (2008 –
2012)
National (no local) DMD/MoHCA Regular resources: USD
1.57 million; Other
resources: USD 11.7
million
EC Agriculture Sector
Support Project (2005
– 2009)
Samtse, Chhukha,
Dagana, Tsirang,
Sarpang, Wangdue
Prodang and
Punakha (6
Gewogs in each;
total of 42
Gewogs). Some
activities on
organic agriculture
in Gasa and
Bumthang
MoA € 5.0 Million
EC Natural Resources The identification MoA € 5.3 Million (to be
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 54
Development
Partner
Support Area Geographical
focus
Coordinating
and
Implementing
Agency
Commitment
Management
programme (2010 –
2013)? Formulation is
forthcoming.
Identification was
done in March/April
2009
mission identified
possible budget
support to MoA for
all the MoA
programmes in the
10th FYP
confirmed)
World
Bank/GEF
Sustainable Land
Management (2006 –
2012). Denmark co-
financing (EUSPS)
Chhuka,
Zhemgang and
Trashigang (one
Gewog in each
Dzongkhag until
2009, additional
two Gewogs from
2009) (9 Gewogs)
MoA, National
Soil Service
Centre
USD 7.6 Million
(EUSPS Component 2 is
co-financing).
IFAD Agriculture, marketing
and enterprise
promotion
programme. SNV co-
financing (2006-2012)
Lhuentshe,
Mongar,
Pemagatshel,
Samdrup-Jongkhar,
Trashigang and
Yangtse (22.000
house holds)
MoA USD 19.7 Mio.; IFAD
loan USD. 13.9 Mio.
UNDP/UNEP Poverty-Environment
Initiative (PEI) (2007-
2009)
National (no local) GNHC with
MoA, MoF,
NEC,
USD 387,975
Helvetas Rural Livelihoods
Programme (2008-
2011)
Zhemgang,
Trongsa, Sarpang
and Bumthang
MoA CHF 2,150 million
Helvetas Participatory Forest
Programmes (2007-
2012)
Nation wide from
an initial 7
Dzongkhags
Social Forestry
Division, DoF
of MoA
CFH 3.230 million
SNV Small-Holder Cash
Crops (2006), forest
products (NTFP),
prop-poor tourism
UNDP / GEF
(LDCF)
GLOF project (NAPA
implementation)
Asian
Development
Bank
Under the non-lending
programme – clean
energy initiatives
within CDM
framework (2009 –
2011)
National USD350,000
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 55
Annex E: Resource Allocation for the 205 Gewogs in Bhutan Resource Allocation for Gewogs
Indicator % Amount
Population 70 3162.04
Total Area 5 225.86
Poverty Index 25 1129.30
TOTAL 100 4,517.20
Data (from GNHC): Gewog Budget allocation: SESP (205 Gewogs in 20 Dzongkhags)
Dzongkhag/Gewog Rural population Land area Below Poverty
Line
Population Land Poverty Total
Allocation
Per Cap. Total Grant Share of
capital grant
Per cap
Number km² % Million BTN Million BTN Million BTN Million BTN BTN Million BTN % BTN
Bumthang
1 Chhoekhor 4,553.00 1,526.31 10.90 32.80 8.93 4.93 46.67 10,250 3.51 7.5% 771
2 Chhumey 3,591.00 403.63 10.90 25.87 2.36 3.87 32.10 8,939 2.42 7.5% 673
3 Tang 1,816.00 511.31 10.90 13.08 2.99 1.96 18.03 9,929 1.36 7.5% 747
4 Ura 1,953.00 267.22 10.90 14.07 1.56 2.10 17.74 9,082 1.34 7.5% 684
Total 11,913.00
Chhukha
1 Dala 8,861.00 144.54 20.30 63.84 0.85 17.77 82.46 9,306 6.21 7.5% 700
2 Sampheling 7,310.00 73.58 20.30 52.67 0.43 14.66 67.76 9,269 5.10 7.5% 698
3 Bongo 6,870.00 396.78 20.30 49.50 2.32 13.78 65.60 9,548 4.94 7.5% 719
4 Phuntsholing 5,183.00 135.66 20.30 37.34 0.79 10.39 48.53 9,363 3.65 7.5% 705
5 Bjapcho 3,583.00 140.65 20.30 25.82 0.82 7.18 33.82 9,440 2.55 7.5% 711
6 Chapcha 3,248.00 128.95 20.30 23.40 0.75 6.51 30.67 9,442 2.31 7.5% 711
7 Logchina 2,672.00 70.44 20.30 19.25 0.41 5.36 25.02 9,364 1.88 7.5% 705
8 Geling 1,856.00 218.70 20.30 13.37 1.28 3.72 18.37 9,900 1.38 7.5% 745
9 Getena 903.00 239.55 20.30 6.51 1.40 1.81 9.72 10,763 0.73 7.5% 810
10 Dungna 731.00 199.51 20.30 5.27 1.17 1.47 7.90 10,807 0.59 7.5% 813
11 Metap 539.00 134.02 20.30 3.88 0.78 1.08 5.75 10,665 0.43 7.5% 803
Total 41,756.00
Dagana
1 Gozhi 2,187.00 20.36 31.10 15.76 0.12 6.72 22.59 10,331 1.70 7.5% 778
2 Drujegang 2,121.00 57.32 31.10 15.28 0.34 6.52 22.13 10,435 1.67 7.5% 785
3 Kana 1,964.00 193.12 31.10 14.15 1.13 6.03 21.31 10,852 1.60 7.5% 817
4 Lhamoizingkha 1,581.00 106.32 31.10 11.39 0.62 4.86 16.87 10,670 1.27 7.5% 803
5 Tsendagang 1,729.00 96.71 31.10 12.46 0.57 5.31 18.33 10,604 1.38 7.5% 798
6 Trashiding 1,636.00 39.48 31.10 11.79 0.23 5.03 17.04 10,418 1.28 7.5% 784
7 Tseza 1,106.00 592.30 31.10 7.97 3.47 3.40 14.83 13,411 1.12 7.5% 1,009
8 Tsangkha 1,352.00 36.70 31.10 9.74 0.21 4.15 14.11 10,436 1.06 7.5% 785
9 Deorali 1,315.00 92.94 31.10 9.47 0.54 4.04 14.06 10,691 1.06 7.5% 805
10 Gesarling 1,340.00 36.81 31.10 9.65 0.22 4.12 13.99 10,438 1.05 7.5% 786
11 Khibisa 1,212.00 96.37 31.10 8.73 0.56 3.72 13.02 10,742 0.98 7.5% 809
12 Lajab 863.00 108.90 31.10 6.22 0.64 2.65 9.51 11,015 0.72 7.5% 829
13 Dorona 754.00 106.50 31.10 5.43 0.62 2.32 8.37 11,104 0.63 7.5% 836
14 Nichula 479.00 140.49 31.10 3.45 0.82 1.47 5.74 11,993 0.43 7.5% 903
Total 19,639.00
Gasa
1 Lunana 693.00 1,717.31 4.10 4.99 10.05 0.28 15.32 22,111 1.15 7.5% 1,664
2 Laya 949.00 964.83 4.10 6.84 5.65 0.38 12.87 13,559 0.97 7.5% 1,021
3 Goenkhamey 906.00 148.90 4.10 6.53 0.87 0.37 7.77 8,572 0.58 7.5% 645
4 Goenkhatoe 166.00 286.71 4.10 1.20 1.68 0.07 2.94 17,717 0.22 7.5% 1,334
Total 2,714.00
Haa
1 Bji 2,901.00 745.85 13.20 20.90 4.36 3.78 29.05 10,013 2.19 7.5% 754
2 Uesu 2,575.00 64.74 13.20 18.55 0.38 3.36 22.29 8,656 1.68 7.5% 652
3 Sama 1,750.00 198.45 13.20 12.61 1.16 2.28 16.05 9,172 1.21 7.5% 690
4 Gakidling 1,116.00 336.39 13.20 8.04 1.97 1.46 11.46 10,273 0.86 7.5% 773
5 Katsho 1,115.00 42.37 13.20 8.03 0.25 1.45 9.74 8,731 0.73 7.5% 657
6 Sangbey 793.00 509.37 13.20 5.71 2.98 1.03 9.73 12,268 0.73 7.5% 923
Total 10,250.00
Lhuentse
1 Gangzur 2,690.00 535.71 43.00 19.38 3.13 11.43 33.94 12,618 2.55 7.5% 950
2 Menbi 2,528.00 88.86 43.00 18.21 0.52 10.74 29.47 11,658 2.22 7.5% 877
3 Tsenkhar 2,142.00 129.70 43.00 15.43 0.76 9.10 25.29 11,807 1.90 7.5% 889
4 Khoma 1,819.00 653.59 43.00 13.11 3.82 7.73 24.66 13,555 1.86 7.5% 1,020
5 Kurtoe 1,005.00 949.35 43.00 7.24 5.56 4.27 17.07 16,980 1.28 7.5% 1,278
6 Minji 1,382.00 137.60 43.00 9.96 0.81 5.87 16.63 12,035 1.25 7.5% 906
7 Metsho 1,210.00 216.81 43.00 8.72 1.27 5.14 15.13 12,501 1.14 7.5% 941
8 Jarey 1,143.00 135.83 43.00 8.24 0.79 4.85 13.88 12,148 1.05 7.5% 914
Total 13,919.00
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 56
Data (from GNHC): Gewog Budget allocation: SESP (205 Gewogs in 20 Dzongkhags)
Dzongkhag/Gewog Rural population Land area Below Poverty
Line
Population Land Poverty Total
Allocation
Per Cap. Total Grant Share of
capital grant
Per cap
Number km² % Million BTN Million BTN Million BTN Million BTN BTN Million BTN % BTN
Mongar
1 Mongar 3,421.00 73.95 44.40 24.65 0.43 15.00 40.08 11,717 3.02 7.5% 882
2 Drametse 2,130.00 48.25 44.40 15.35 0.28 9.34 24.97 11,723 1.88 7.5% 882
3 Chaskhar 2,376.00 51.23 44.40 17.12 0.30 10.42 27.84 11,717 2.10 7.5% 882
4 Saleng 2,110.00 464.52 44.40 15.20 2.72 9.25 27.17 12,879 2.05 7.5% 969
5 Ngatshang 2,109.00 71.23 44.40 15.20 0.42 9.25 24.86 11,788 1.87 7.5% 887
6 Kengkhar 1,996.00 99.72 44.40 14.38 0.58 8.75 23.72 11,883 1.79 7.5% 894
7 Sherimung 1,830.00 300.15 44.40 13.19 1.76 8.03 22.97 12,551 1.73 7.5% 945
8 Thangrong 1,863.00 68.37 44.40 13.42 0.40 8.17 21.99 11,805 1.66 7.5% 889
9 Narang 1,239.00 33.50 44.40 8.93 0.20 5.43 14.56 11,749 1.10 7.5% 884
10 Tsakaling 1,596.00 87.61 44.40 11.50 0.51 7.00 19.01 11,912 1.43 7.5% 897
11 Chali 1,620.00 24.57 44.40 11.67 0.14 7.10 18.92 11,679 1.42 7.5% 879
12 Silambi 1,458.00 159.95 44.40 10.50 0.94 6.39 17.84 12,233 1.34 7.5% 921
13 Jurmey 1,449.00 55.89 44.40 10.44 0.33 6.36 17.12 11,816 1.29 7.5% 889
14 Gongdue 1,329.00 185.32 44.40 9.58 1.08 5.83 16.49 12,407 1.24 7.5% 934
15 Tsamang 1,204.00 143.06 44.40 8.67 0.84 5.28 14.79 12,286 1.11 7.5% 925
16 Drepong 1,094.00 51.66 44.40 7.88 0.30 4.80 12.98 11,867 0.98 7.5% 893
17 Balam 1,092.00 28.30 44.40 7.87 0.17 4.79 12.82 11,742 0.97 7.5% 884
Total 29,916.00
Paro
1 Wangcha 6,425.00 18.61 3.90 46.29 0.11 2.48 48.88 7,607 3.68 7.5% 573
2 Tsento 5,253.00 581.89 3.90 37.85 3.41 2.02 43.28 8,238 3.26 7.5% 620
3 Shaba 4,319.00 81.42 3.90 31.12 0.48 1.66 33.26 7,700 2.50 7.5% 580
4 Lamgong 3,336.00 47.35 3.90 24.04 0.28 1.29 25.60 7,673 1.93 7.5% 578
5 Naja 3,007.00 139.18 3.90 21.67 0.81 1.16 23.64 7,861 1.78 7.5% 592
6 Dopshari 3,180.00 36.71 3.90 22.91 0.21 1.23 24.35 7,658 1.83 7.5% 576
7 Lungnyi 2,543.00 76.36 3.90 18.32 0.45 0.98 19.75 7,766 1.49 7.5% 585
8 Doga 1,866.00 106.23 3.90 13.44 0.62 0.72 14.78 7,923 1.11 7.5% 596
9 Hungre 1,250.00 11.87 3.90 9.01 0.07 0.48 9.56 7,646 0.72 7.5% 575
10 Doteng 1,149.00 193.60 3.90 8.28 1.13 0.44 9.85 8,576 0.74 7.5% 646
Total 32,328.00
Pemagatshel
1 Shumar 3,568.00 95.56 26.20 25.71 0.56 9.23 35.50 9,950 2.67 7.5% 749
2 Norbugang 2,023.00 183.91 26.20 14.58 1.08 5.24 20.89 10,325 1.57 7.5% 777
3 Nanong 2,351.00 83.18 26.20 16.94 0.49 6.08 23.51 10,000 1.77 7.5% 753
4 Dechenling 2,072.00 136.00 26.20 14.93 0.80 5.36 21.09 10,177 1.59 7.5% 766
5 Chokhorling 959.00 129.68 26.20 6.91 0.76 2.48 10.15 10,584 0.76 7.5% 797
6 Khar 1,846.00 115.13 26.20 13.30 0.67 4.78 18.75 10,158 1.41 7.5% 765
7 Zobel 1,697.00 64.04 26.20 12.23 0.37 4.39 16.99 10,014 1.28 7.5% 754
8 Dungme 1,470.00 108.37 26.20 10.59 0.63 3.80 15.03 10,224 1.13 7.5% 770
9 Yurung 1,313.00 28.26 26.20 9.46 0.17 3.40 13.02 9,919 0.98 7.5% 747
10 Chongshing 934.00 30.99 26.20 6.73 0.18 2.42 9.33 9,987 0.70 7.5% 752
11 Chimung 749.00 54.92 26.20 5.40 0.32 1.94 7.66 10,222 0.58 7.5% 769
Total 18,982.00
Punakha
1 Guma 4,288.00 33.94 15.60 30.89 0.20 6.61 37.70 8,792 2.84 7.5% 662
2 Dzoma 1,350.00 22.01 15.60 9.73 0.13 2.08 11.94 8,841 0.90 7.5% 665
3 Baap 3,326.00 25.58 15.60 23.96 0.15 5.13 29.24 8,791 2.20 7.5% 662
4 Toebesa 2,421.00 97.89 15.60 17.44 0.57 3.73 21.75 8,983 1.64 7.5% 676
5 Kabjisa 2,361.00 209.80 15.60 17.01 1.23 3.64 21.88 9,266 1.65 7.5% 697
6 Chhubu 1,991.00 90.13 15.60 14.35 0.53 3.07 17.94 9,011 1.35 7.5% 678
7 Talo 1,594.00 30.62 15.60 11.48 0.18 2.46 14.12 8,858 1.06 7.5% 667
8 Toewang 1,363.00 418.22 15.60 9.82 2.45 2.10 14.37 10,541 1.08 7.5% 793
9 Shengana 1,257.00 61.69 15.60 9.06 0.36 1.94 11.35 9,033 0.85 7.5% 680
10 Goenshari 622.00 83.91 15.60 4.48 0.49 0.96 5.93 9,535 0.45 7.5% 718
11 Lingmukha 597.00 34.46 15.60 4.30 0.20 0.92 5.42 9,084 0.41 7.5% 684
Total 21,170.00
Samdrupjongkhar
1 Orong 3,023.00 65.96 38.00 21.78 0.39 11.35 33.51 11,086 2.52 7.5% 834
2 Gomdar 2,751.00 81.69 38.00 19.82 0.48 10.33 30.62 11,132 2.31 7.5% 838
3 Martshalla 2,596.00 308.49 38.00 18.70 1.81 9.74 30.25 11,654 2.28 7.5% 877
4 Lauri 2,803.00 273.40 38.00 20.20 1.60 10.52 32.32 11,529 2.43 7.5% 868
5 Dewathang 3,113.00 197.89 38.00 22.43 1.16 11.68 35.27 11,331 2.65 7.5% 853
6 Phuntshothang 3,177.00 139.14 38.00 22.89 0.81 11.93 35.63 11,215 2.68 7.5% 844
7 Serthi 2,004.00 299.13 38.00 14.44 1.75 7.52 23.71 11,832 1.78 7.5% 891
8 Wangphu 1,932.00 77.59 38.00 13.92 0.45 7.25 21.63 11,194 1.63 7.5% 843
9 Pemathang 1,504.00 65.96 38.00 10.84 0.39 5.65 16.87 11,215 1.27 7.5% 844
10 Langchenphu 934.00 225.96 38.00 6.73 1.32 3.51 11.56 12,374 0.87 7.5% 931
11 Samrang 106.00 46.53 38.00 0.76 0.27 0.40 1.43 13,527 0.11 7.5% 1,018
Total 23,943.00
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 57
Data (from GNHC): Gewog Budget allocation: SESP (205 Gewogs in 20 Dzongkhags)
Dzongkhag/Gewog Rural population Land area Below Poverty
Line
Population Land Poverty Total
Allocation
Per Cap. Total Grant Share of
capital grant
Per cap
Number km² % Million BTN Million BTN Million BTN Million BTN BTN Million BTN % BTN
Samtse
1 Pugli 5,057.00 103.57 46.80 36.44 0.61 23.38 60.42 11,948 4.55 7.5% 899
2 Tendu 4,587.00 132.24 46.80 33.05 0.77 21.21 55.03 11,997 4.14 7.5% 903
3 Dorokha 4,419.00 102.96 46.80 31.84 0.60 20.43 52.87 11,964 3.98 7.5% 901
4 Tadhing 4,115.00 110.44 46.80 29.65 0.65 19.02 49.32 11,985 3.71 7.5% 902
5 Chengmari 3,877.00 115.47 46.80 27.93 0.68 17.92 46.53 12,002 3.50 7.5% 903
6 Bara 3,403.00 185.45 46.80 24.52 1.09 15.73 41.34 12,147 3.11 7.5% 914
7 Samtse 3,263.00 117.19 46.80 23.51 0.69 15.08 39.28 12,038 2.96 7.5% 906
8 Sibsoo 3,170.00 28.27 46.80 22.84 0.17 14.65 37.66 11,880 2.83 7.5% 894
9 Chargharey 3,155.00 39.17 46.80 22.73 0.23 14.59 37.55 11,900 2.83 7.5% 896
10 Biru 3,026.00 49.70 46.80 21.80 0.29 13.99 36.08 11,924 2.72 7.5% 897
11 NamgyeCholing (Lahereni)2,811.00 127.08 46.80 20.25 0.74 12.99 33.99 12,092 2.56 7.5% 910
12 Yoeseltse 2,809.00 19.52 46.80 20.24 0.11 12.99 33.34 11,868 2.51 7.5% 893
13 Dumtoe 1,326.00 46.97 46.80 9.55 0.27 6.13 15.96 12,035 1.20 7.5% 906
14 Ugyentse 1,536.00 21.74 46.80 11.07 0.13 7.10 18.29 11,911 1.38 7.5% 896
15 Denchukha 2,310.00 104.29 46.80 16.64 0.61 10.68 27.93 12,092 2.10 7.5% 910
Total 48,864.00
Sarpang
1 Gelephu 3,975.00 54.12 19.40 28.64 0.32 7.62 36.57 9,201 2.75 7.5% 693
2 Dekiling 3,835.00 115.72 19.40 27.63 0.68 7.35 35.66 9,298 2.68 7.5% 700
3 Jigmecholing 3,504.00 503.26 19.40 25.25 2.94 6.71 34.91 9,962 2.63 7.5% 750
4 Hiley 2,517.00 140.25 19.40 18.13 0.82 4.82 23.78 9,447 1.79 7.5% 711
5 Chuzargang 2,426.00 21.56 19.40 17.48 0.13 4.65 22.25 9,173 1.68 7.5% 690
6 Dohban 2,064.00 219.75 19.40 14.87 1.29 3.96 20.11 9,744 1.51 7.5% 733
7 Sershong 2,045.00 78.68 19.40 14.73 0.46 3.92 19.11 9,346 1.44 7.5% 703
8 Umling 1,546.00 122.50 19.40 11.14 0.72 2.96 14.82 9,585 1.12 7.5% 721
9 Bhur 1,517.00 55.88 19.40 10.93 0.33 2.91 14.16 9,337 1.07 7.5% 703
10 Shompangkha 1,130.00 22.42 19.40 8.14 0.13 2.17 10.44 9,237 0.79 7.5% 695
11 Singye 742.00 216.87 19.40 5.35 1.27 1.42 8.04 10,832 0.60 7.5% 815
12 Taklai 72.00 109.28 19.40 0.52 0.64 0.14 1.30 18,003 0.10 7.5% 1,355
Total 25,373.00
Thimphu
1 Mewang 5,916.00 223.46 2.40 42.62 1.31 1.40 45.33 7,663 3.41 7.5% 577
2 Chang 3,137.00 160.17 2.40 22.60 0.94 0.74 24.28 7,741 1.83 7.5% 583
3 Kawang 2,582.00 307.01 2.40 18.60 1.80 0.61 21.01 8,138 1.58 7.5% 613
4 Dagala 1,497.00 202.34 2.40 10.79 1.18 0.35 12.32 8,233 0.93 7.5% 620
5 Geyni 918.00 61.58 2.40 6.61 0.36 0.22 7.19 7,835 0.54 7.5% 590
6 Lingshi 495.00 382.70 2.40 3.57 2.24 0.12 5.92 11,966 0.45 7.5% 901
7 Naro 189.00 276.97 2.40 1.36 1.62 0.04 3.03 16,018 0.23 7.5% 1,206
8 Soe 183.00 171.35 2.40 1.32 1.00 0.04 2.36 12,921 0.18 7.5% 973
Total 14,917.00
Trashigang
1 Lumang 4,754.00 102.95 29.30 34.25 0.60 13.76 48.61 10,226 3.66 7.5% 770
2 Kanglung 4,749.00 63.33 29.30 34.22 0.37 13.74 48.33 10,177 3.64 7.5% 766
3 Shongphu 3,463.00 92.50 29.30 24.95 0.54 10.02 35.51 10,255 2.67 7.5% 772
4 Radhi 3,303.00 28.65 29.30 23.80 0.17 9.56 33.53 10,150 2.52 7.5% 764
5 Udzorong 3,148.00 102.17 29.30 22.68 0.60 9.11 32.39 10,289 2.44 7.5% 774
6 Khaling 3,046.00 154.55 29.30 21.95 0.90 8.82 31.67 10,396 2.38 7.5% 782
7 Samkhar 2,681.00 90.96 29.30 19.32 0.53 7.76 27.61 10,298 2.08 7.5% 775
8 Phongme 2,427.00 100.87 29.30 17.49 0.59 7.02 25.10 10,342 1.89 7.5% 778
9 Thrimshing 2,435.00 55.01 29.30 17.54 0.32 7.05 24.91 10,231 1.88 7.5% 770
10 Kangpara 2,217.00 341.99 29.30 15.97 2.00 6.42 24.39 11,002 1.84 7.5% 828
11 Yangnyer 2,315.00 72.36 29.30 16.68 0.42 6.70 23.80 10,282 1.79 7.5% 774
12 Sakteng 2,072.00 431.37 29.30 14.93 2.52 6.00 23.45 11,317 1.77 7.5% 852
13 Bidung 1,929.00 47.67 29.30 13.90 0.28 5.58 19.76 10,244 1.49 7.5% 771
14 Merak 1,621.00 465.12 29.30 11.68 2.72 4.69 19.09 11,778 1.44 7.5% 887
15 Bartsham 1,807.00 35.14 29.30 13.02 0.21 5.23 18.45 10,213 1.39 7.5% 769
Total 41,967.00
Trashiyangtse
1 Khamdang 3,297.00 44.49 14.30 23.75 0.26 4.66 28.67 8,696 2.16 7.5% 655
2 Bumdeling 1,988.00 847.36 14.30 14.32 4.96 2.81 22.09 11,112 1.66 7.5% 836
3 Toetsho 2,128.00 45.79 14.30 15.33 0.27 3.01 18.61 8,743 1.40 7.5% 658
4 Yalang 1,705.00 86.63 14.30 12.28 0.51 2.41 15.20 8,915 1.14 7.5% 671
5 Yangtse 1,546.00 266.49 14.30 11.14 1.56 2.18 14.88 9,626 1.12 7.5% 725
6 Tongmijangsa 1,555.00 67.56 14.30 11.20 0.40 2.20 13.80 8,872 1.04 7.5% 668
7 Ramjar 1,275.00 21.81 14.30 9.19 0.13 1.80 11.11 8,718 0.84 7.5% 656
8 Jamkhar 1,228.00 47.64 14.30 8.85 0.28 1.73 10.86 8,845 0.82 7.5% 666
Total 14,722.00
Trongsa
1 Langthel 2,637.00 508.39 22.20 19.00 2.98 5.78 27.76 10,526 2.09 7.5% 792
2 Nubi 2,466.00 554.34 22.20 17.77 3.24 5.41 26.42 10,713 1.99 7.5% 806
3 Drakteng 2,697.00 84.79 22.20 19.43 0.50 5.91 25.84 9,582 1.95 7.5% 721
4 Tangsibji 1,848.00 371.63 22.20 13.31 2.17 4.05 19.54 10,575 1.47 7.5% 796
5 Korphu 1,001.00 288.13 22.20 7.21 1.69 2.20 11.09 11,082 0.83 7.5% 834
Total 10,649.00
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 58
Data (from GNHC): Gewog Budget allocation: SESP (205 Gewogs in 20 Dzongkhags)
Dzongkhag/Gewog Rural population Land area Below Poverty
Line
Population Land Poverty Total
Allocation
Per Cap. Total Grant Share of
capital grant
Per cap
Number km² % Million BTN Million BTN Million BTN Million BTN BTN Million BTN % BTN
Tsirang
1 Kikhorthang 2,869.00 17.86 13.90 20.67 0.10 3.94 24.71 8,614 1.86 7.5% 648
2 Tsholingkhar 1,670.00 13.77 13.90 12.03 0.08 2.29 14.41 8,626 1.08 7.5% 649
3 Mendregang 1,510.00 15.60 13.90 10.88 0.09 2.07 13.04 8,638 0.98 7.5% 650
4 Rangthangling 1,447.00 24.50 13.90 10.43 0.14 1.99 12.56 8,677 0.95 7.5% 653
5 Patale 1,352.00 137.63 13.90 9.74 0.81 1.86 12.40 9,174 0.93 7.5% 690
6 Goseling 1,428.00 9.90 13.90 10.29 0.06 1.96 12.31 8,619 0.93 7.5% 649
7 Semjong 1,318.00 14.54 13.90 9.50 0.09 1.81 11.39 8,643 0.86 7.5% 651
8 Beteni 1,203.00 170.97 13.90 8.67 1.00 1.65 11.32 9,410 0.85 7.5% 708
9 Phuentenchu 1,157.00 136.50 13.90 8.34 0.80 1.59 10.72 9,268 0.81 7.5% 698
10 Tsirangtoe 1,153.00 30.32 13.90 8.31 0.18 1.58 10.07 8,732 0.76 7.5% 657
11 Dunglagang 1,135.00 46.00 13.90 8.18 0.27 1.56 10.01 8,815 0.75 7.5% 663
12 Barshong 759.00 21.20 13.90 5.47 0.12 1.04 6.63 8,741 0.50 7.5% 658
Total 17,001.00
Wangduephodrang
1 Sephu 1,996.00 1,105.96 15.80 14.38 6.47 3.12 23.97 12,008 1.80 7.5% 904
2 Gwom 722.00 207.85 15.80 5.20 1.22 1.13 7.55 10,450 0.57 7.5% 787
3 Nyisho 2,304.00 115.51 15.80 16.60 0.68 3.60 20.87 9,059 1.57 7.5% 682
4 Thedtsho 2,222.00 20.87 15.80 16.01 0.12 3.47 19.60 8,821 1.48 7.5% 664
5 Bjena 2,110.00 121.73 15.80 15.20 0.71 3.29 19.21 9,103 1.45 7.5% 685
6 Phobji 1,929.00 145.71 15.80 13.90 0.85 3.01 17.76 9,208 1.34 7.5% 693
7 Rupesa 1,709.00 158.28 15.80 12.31 0.93 2.67 15.91 9,308 1.20 7.5% 701
8 Kazhi 1,284.00 622.54 15.80 9.25 3.64 2.00 14.90 11,603 1.12 7.5% 873
9 Ggom 2,241.00 28.71 15.80 16.15 0.17 3.50 19.81 8,841 1.49 7.5% 665
10 Daga 1,347.00 343.63 15.80 9.71 2.01 2.10 13.82 10,258 1.04 7.5% 772
11 Dangchu 1,299.00 171.13 15.80 9.36 1.00 2.03 12.39 9,537 0.93 7.5% 718
12 Athang 808.00 790.59 15.80 5.82 4.63 1.26 11.71 14,491 0.88 7.5% 1,091
13 Phangyue 1,127.00 32.75 15.80 8.12 0.19 1.76 10.07 8,936 0.76 7.5% 673
14 Nahi 823.00 64.71 15.80 5.93 0.38 1.28 7.59 9,226 0.57 7.5% 694
15 Gangtoe 1,677.00 99.05 15.80 12.08 0.58 2.62 15.28 9,111 1.15 7.5% 686
Total 23,598.00
Zhemgang
1 Trong 3,314.00 358.38 52.90 23.88 2.10 17.32 43.29 13,063 3.26 7.5% 983
2 Nangkor 2,527.00 494.09 52.90 18.21 2.89 13.20 34.30 13,575 2.58 7.5% 1,022
3 Nangla 2,017.00 214.33 52.90 14.53 1.25 10.54 26.33 13,052 1.98 7.5% 982
4 Bardo 1,997.00 209.16 52.90 14.39 1.22 10.44 26.05 13,043 1.96 7.5% 982
5 Shingkhar 1,546.00 309.10 52.90 11.14 1.81 8.08 21.03 13,600 1.58 7.5% 1,024
6 Phangkhar 1,367.00 541.32 52.90 9.85 3.17 7.14 20.16 14,748 1.52 7.5% 1,110
7 Goshing 1,533.00 98.92 52.90 11.05 0.58 8.01 19.63 12,808 1.48 7.5% 964
8 Bjoka 949.00 195.65 52.90 6.84 1.14 4.96 12.94 13,637 0.97 7.5% 1,026
Total 15,250.00
438,871.00 38,596.45 25.90 3162.04 225.86 1129.30 4517.20 10,617 340.00 799
Average
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 59
Annex F: Draft Format for Gewog Environmental Expenditure Assessment (ex-post Output Statement Study)
Gewog: ____________________________
Dzongkhag: ____________________________
Financial Year: ____________________________
10th
FYP
Activities:
Annual
Grant
according
to Plan
Budget:
Annual
Grant:
actual
expenditure:
Environment
related
expenditure *)
Ex-post
Environmental
Expenditure
Assessment
Optional
location
(GPS
coordinates):
Watershed
protection
(afforestation)
100,000 82,000 100 % 82,000 xxyyzzvv
Rehabilitation
of school
building
300,000 300,000 0% 0 -
Farm road
(EFRC)
1,500,000 1,400,000 20 % 280,000 xxyyzzvv
Environmental
assessment of
farm road
30,000 30,000 100% 30,000 -
Etc.
SUM Σ
1,930,000
Σ 1,812,000 - Σ 392,000 -
21.6 %
*) According to the ‘Positive List’; 100% for direct expenditure and 10-25% for co-financing of the
additional costs of environmental mainstreaming.
Sustainable Environment Support Programme (SESP), Bhutan
Programme Document
31 October 2009 60
Annex G: Proposed State of Environment (SoE) Output and Outcome Gewog Indicators
The proposed selection of core environment indicators may be considered in the further
development of the environmental monitoring at Gewog level in PlaMS. These core indicators
can be used as proxies for environmental monitoring relevant for SESP and in general for RGoB
until it is feasible for the PlaMS to provide reports on environmental output and outcome
indicators at Gewog level. Indicator level Code Indicators Sources of Data Remarks
Theme A: Land
Output A1.1 Area under sustainable land management
(agriculture land and pasture)
Geog RNR
A1.1.1 Acres of agricultural land under improved land
management (terracing, bunding, bio-engineering,
check-dams)
Geog RNR
A1.1.2 Acres of land under organic farming Geog RNR Also in PlaMS
A1.1.3 Acres of land under improved pasture Geog RNR Also in PlaMS
Outcome A2(i) Level of farm productivity (paddy) Geog RNR
A2(ii) Level of farm productivity (maize) Geog RNR
Theme B: Water resources
Output B1.1 Number of households with access to safe
drinking water
DHS, DE
B1.2 Environmental assessment carried out for
irrigation schemes
DAO, DE, DEnvO
Outcome B2.1 Number of months of drinking water shortage Geog RNR, BHU
B2.2 Number of days water shortage faced during
paddy transplantation
Geog RNR
Theme C: Forests
Output C1.1 Sustainable management of forest resources Geog RNR
C1.2 Acres of land under Social Forestry schemes Geog RNR Also in PlaMS
C1.3 Acres of land under Community Forestry schemes Geog RNR Also in PlaMS
C1.4 Number of households with electricity Geog RNR
C1.5 Number of farmers stall-feeding cattle Geog RNR
Outcome C2 Area under forest cover RNR Census
Theme D: Rural Access
Output D1 Kms of farm roads constructed DAO, DE, DEnvO
Outcome D2 Proportion of Gewog's population living more
than one hour's walk from road head
Geog RNR Also in PlaMS
Theme E: Rural Waste Management
Output E1.1 Number of waste disposal facilities established at
community level
GAO, DEO
(environment)
E1.2 Community Waste Management Committees
established
GAO, DEO
Outcome E2 Incidence of communicable diseases BHU