1 On Behalf of Susira Industries Ltd., Chennai. We Welcome the Delegates for the QCI – DL SHAH NATIONAL AWARDS ON ECONOMICS OF QUALITY QC STORY -32 FACTORY OVERVIEW 2 QC STORY -32 SUSIRA INDUSTRIES LTD Shop Floor view QC STORY -32 VISION To be the number one manufacturer of quality engine valve push rods in the country and to become one among the top five by volumes in the international market. To expand the product portfolio by manufacturing other precision auto components/aggregates for national and international customers and increase the revenue four fold by 2015. To explore new frontiers of technology to meet the new and emerging market requirements. In the process, build a company deeply rooted in values and beyond profits; a culture of Quality, respect for the individual and an environment of dependability and social responsibility – in short a company “built to last”. 4 QC STORY -32 SUSIRA INDUSTRIES LTD 5 QC STORY -32 SUSIRA INDUSTRIES LTD 6 QC STORY -32 SUSIRA INDUSTRIES LTD

Upload: piyush-mishra

Post on 02-Oct-2015

224 views

Category:

Documents


2 download

DESCRIPTION

Information about QC Story book

TRANSCRIPT

  • 1QC Story-1

    On Behalf of Susira Industries Ltd.,

    Chennai.

    We Welcome the Delegates

    for the QCI DL SHAHNATIONAL AWARDS

    ONECONOMICS OF QUALITY

    QC STORY -32 QC Story-1 FACTORY OVERVIEW

    2

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    QC Story-1 Shop Floor view QC STORY -32

    QC Story-1VISION

    To be the number one manufacturer of quality engine valve push rods in the country and to become one among the top five by volumes in the international market.

    To expand the product portfolio by manufacturing other precision auto components/aggregates for national and international customers and increase the revenue four fold by 2015.

    To explore new frontiers of technology to meet the new and emerging market requirements.

    In the process, build a company deeply rooted in values and beyond profits; a culture of Quality, respect for the individual and an environment of dependability and social responsibility in short a company built to last.

    4

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    QC Story-1

    5

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    !"

    #$%&'!( !#

    )

    )

    *'%*+'*!%$''*!%,$

    QC Story-1

    6

    QC STORY -32

    SUSIRA INDUSTRIES LTD

  • 2QC Story-1

    7

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    Indias 1st SME to win 16 National awards for Quality and BusinessExcellence Rajiv Gandhi National Quality Award for the year 1993 ACMA Quality Award 1994, 1998, 2000 Golden Peacock National Award for total Quality - 1995 NIQR-Bajaj Outstanding Quality Man of the year - 1994 ACMA Gold trophy for Export Excellence - 2005 MMA Award for Managerial Excellence 2005 ACMA Certificate of Merit for Excellence in Technology 2007-08- CII Exim Bank Business Excellence award Significant achievement commendation for the year 2007-08- MSME award for Outstanding Entrepreneur for the year 2007-08- ACMA award for Excellence in Quality and Productivity for the year 2008-09- Also won the 5S par excellent performance award (5 star performance award) from QCFI- Won the best QC story presentation by QCFI- Our team won the Outstanding and Excellent award in the 1st Poka yoke competition conducted by QCFI- Our MD, Mr. Seetharamaiah was awarded the Life Time Achievement award from Ambattur Industrial Estate Manufacturers' Association in the year 2010

    Awards and Recognitions QC Story-1

    8

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    -, ". &'

    %/001.//2

    3/000.//4

    %.200.1001

    .5/2/1002 %6".400.

    1005

    -"7+"+1005

    CertificationsQC Story-1

    Customers - Domestic

    9

    QC STORY -32

    SUSIRA INDUSTRIES LTD

    QC Story-1

    Customers - International

    Cummins Inc. (USA, UK, Brazil, China & Mexico) Scania, Sweden

    SAME Deutz-Fahr Group S.P.A., Italy

    Iveco, Italy

    John Deere, USA

    QC STORY -32

    SUSIRA INDUSTRIES LTD10

    QC Story-1

    11

    Customers - Prospective

    !"#$"%&

    "!%"!$"'(&")"#$"%&!$"

    &%%*''")

    %"%'+!&

    SUSIRA INDUSTRIES LTD 11

    QC Story-1 ProductsValve seat InsertsPush rod

    Tappets Piston Cooling Nozzle

    12

    QC STORY -32

    SUSIRA INDUSTRIES LTD

  • 3QC Story-1

    SUSIRA INDUSTRIES LTD

    Presentation on

    Reduction in Manufacturing costachieved in Induction Hardening operation through break through machine design Improvement.

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    INTRODUCTION

    SGA Name : PASSION

    Work Area : Induction Hardening

    Members : G.Ganesan Metallurgy

    R.Sivanesaselvan - Maintenance

    P.Dillibabu - Production

    P.V.Ganesan - Production

    Meeting Schedule : Every Monday 2.00pm

    Facilitator : B. Monikandan

    QC STORY -32 QC Story-1

    PLAN

    DOCHECK

    ACT

    1

    4

    3

    2

    Methodology

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    SGA-QA-26

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    1. Cup Offset

    2. Quenching Crack

    3. Control Length Under size

    4. Low productivity in Induction Hardening

    5. Ball Flat Over Size

    List of Problems Identified

    PLAN

    Tool : BRAINSTORMING

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    List of Problems Identified - Contd

    PLAN

    Tool : BRAINSTORMING

    6. Total Run out high in Cummins push rod

    7. Cup ID Black spot

    8. Cup ID pit marks

    9. Low Hardness

    10. Total Length Under size

    QC STORY -32

  • 4QC Story-1

    SUSIRA INDUSTRIES LTD

    11. Gap between Ball and Cup

    12. Cup OD Tool Mark

    13. Low Weld Strength

    14. Less yield in 961 Push Rod

    15. Induction Hardening Cost High

    16. Induction Hardening Through Put time high

    PLAN

    Tool : BRAINSTORMINGList of Problems Identified - ContdQC STORY -32 QC Story-1

    CATEGORISATION OF PROBLEMS

    Category DescriptionA Minimum involvement of other

    departments in solving themB Involvement of other department is

    necessary C Management approval and support

    needed

    PLAN

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    PLAN

    Categorization of problemsA Category Problems

    1. Cup Offset

    2. Quenching Crack

    3. Control Length Under size

    4. Ball Flat Over Size

    5. Total Run out high in Assembled

    Push Rod

    6. Cup ID Black Spot

    7. Cup ID Pit marks

    8. Low Hardness

    9. Total Length U/s

    10. Cup OD Tool Mark

    11. Gap between Cup and Ball

    12. Low Weld Strength

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    PLAN

    Categorization of problemsB Category Problems

    1. Low productivity in Induction

    Hardening.

    2. Less Yield in 961 Push rod

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    PLAN

    Categorization of problemsC Category Problems

    1. Induction hardening Through put

    time high

    2. Induction Hardening Cost High

    QC STORY -32 QC Story-1GUIDE LINES FOR RANKING

    Effect on customer Effect on productivity Effect on Cost Effect on delivery

    Note: Higher the severity lower the rank

    SUSIRA INDUSTRIES LTD

    QC STORY -32

  • 5QC Story-1

    RANKING METHODLOGY

    Score - 1 Very High Severity

    Score - 2 High Severity

    Score - 3 Medium Severity

    Score- 4 Low Severity

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1

    Effect at Customer

    Effect of Productivit

    y

    Effect of Cost

    Effect of Delay in delivery

    Total Score Ranking

    1 Cup Offset 1.0 1.0 2.0 1.0 5.0 2.0

    2 Quanch Crack 1.0 2.0 3.0 3.0 9.0 6.0

    3 C/L U/s 1.0 3.0 2.0 2.0 8.0 5.0

    4 Low Productivity in Induction Hardening 1.0 1.0 1.0 1.0 4.0 1.0

    5 Ball Flat O/S 1.0 3.0 3.0 3.0 10.0 7.0

    6 Total Run out high in Cummins push rod ( 100%) 1.0 2.0 1.0 2.0 6.0 3.0

    7 Cup Id Black spot 3.0 3.0 3.0 4.0 13.0 8.0

    8 Cup ID pit marks 3.0 4.0 4.0 4.0 15.0 10.0

    9 Low Hardness 1.0 3.0 3.0 3.0 10.0 5.0

    10 Total Length U/s 1.0 3.0 2.0 2.0 8.0 4.0

    11 Gap Between Cup & Ball 1.0 2.0 2.0 2.0 7.0 4.0

    12 Cup OD Tool Mark 1.0 1.0 2.0 3.0 7.0 4.0

    13 Low weld strength 1.0 2.0 3.0 3.0 9.0 4.0

    LIST OF QUALITY PROBLEMS

    SL# DEFECT

    RANKING

    Selection of problem through ranking

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1Top 3 Problems

    !"#$

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Define the selected problem

    1) Low Productivity in Induction Hardening Operation

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1Present method of Induction Hardening

    Vertical Scanner single end Induction HardeningSUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    To Increase Productivity in Induction Hardening Operation.

    THEME QC STORY -32

  • 6QC Story-1 MILE STONE CHARTTo increase Productivity in I/H Machine

    SGA-QA-32

    Monday

    Oct 6-11

    Oct 13-18

    Oct 20-25

    Oct 27-31

    Nov 3-8

    Nov 10-15

    Nov 17-22

    Nov 24-29

    Dec 1-6

    Dec 8-13

    Dec 15-20

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    p

    A

    P

    A

    P

    A

    P

    A

    CHECK

    8

    10

    Cause-effect analysis

    DO

    6

    7

    PLAN

    Root cause analysis

    Data analysis on the Root cause

    Identification of Problem(which are unsolved)

    SL# STEPS

    Planned Date of

    CompletionNo of

    Projects

    Follow up/Review and recurrence prevention

    11

    Trial implementation & checking performance

    9

    Regular implementatio

    Development of solution

    Manufaturing Cost Increase

    31.12.08

    25

    Selection of problem

    Definition of the problem

    Analysis of problem

    Project on

    Project No

    Meeting Day

    Reason for Selection

    Started on

    Time

    ACT

    06.10.08

    2.0 - 3.0 PM

    1

    2

    3

    4

    5

    WEEK year -2008PDCA

    QC STORY -32 QC Story-1

    Process Flow DiagramIncoming material inspection

    Bar shearing and Cup end Forging

    Ball end Forging

    CNC Machining

    Induction Hardening

    Tempering

    Inspection & Packing

    SUSIRA INDUSTRIES LTD

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Current situation

    6972 71

    3128 29

    0

    10

    20

    30

    40

    50

    60

    70

    80

    July'08 Aug'08 Sep'08

    Month

    %

    o

    f

    P

    r

    o

    d

    u

    c

    t

    i

    o

    n

    Subcontract Production

    In-house Production

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Current situation

    3.9 4.0 3.8

    3.2

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    Jun'08 July'08 Aug'08 Sep'08

    Month

    V

    a

    l

    u

    e

    i

    n

    L

    a

    k

    h

    In-house Production

    QC STORY -32 QC Story-1

    ANALYSIS OF PROBLEMThrough 4W & 1H

    WHAT - Low Productivity in I/H

    WHEN - Induction Hardening Operation

    WHERE - Induction Hardening Machine

    WHO - Passion Team

    HOW - By Systematic Analysis & causes

    SUSIRA INDUSTRIES LTD

    QC STORY -32 Analysis QC Story-1

    SUSIRA INDUSTRIES LTD

    BRAINSTROMING POINTS

    PLAN

    Low Productivity in Induction Hardening machine due to:1. Heating Time High 12. Process Time high

    2. Quenching time high

    3. Unskilled operator

    4. Heating Coil design to be changed

    5. Machine Design

    6. Insufficient power source

    7. I/H cost high at subcontracting

    8. Single end hardening

    9. Loading time & Unloading time high

    10.Quenching coil diameter more

    11.Low feed rate

    QC STORY -32

  • 7QC Story-1

    SUSIRA INDUSTRIES LTD

    Analysis Through Cause & Effect diagram

    !

    "#$!!

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    VALIDATION

    "#$!!

    #%&&'!!!( Significant Cause

    1.1

    1.1

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    2.12.3

    2.2

    2.1

    VALIDATION

    #

    2.4

    2.2 ")!

    2.3

    *)+!"2.4

    Significant Cause

    Significant Cause

    Insignificant Cause

    Insignificant Cause

    QC STORY -32

    QC Story-1

    QC Story - 11

    SUSIRA INDUSTRIES LTD

    3.1

    3.3

    3.2

    3.1

    VALIDATION

    3.5

    Significant Cause

    3.43.6

    "+

    3.2 )!

    Insignificant Cause

    3.3 )!

    Insignificant Cause

    3.4 )!

    Insignificant Cause

    3.5 +

    Significant Cause

    3.6 ,)!

    Insignificant Cause

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    ANALYSIS OF PROBABLE CAUSES

    !

    4.1 Insignificant Cause!"!

    4.1

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Vital Causes

    Action PlanAction PlanAction PlanVital Causes

    Less production (800 Nos) per shift at supplier end

    Machine Design

    Single end Hardening

    Problem

    Loading and Unloading Time high

    Cycle time high

    QC STORY -32

  • 8QC Story-1

    SUSIRA INDUSTRIES LTD

    Development Of Solution

    Less production at supplier end Cycle time high

    Single end I/HWHY? WHY?

    SOLUTION

    1.1

    Machine designed with single end

    Induction hardening facility

    Machine to be modified with double end

    induction hardening and additional features

    to reduce cycle time

    PROBLEM Low productivity in Induction Hardening

    WHY?

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Development Of Solution

    Machine Design

    No provision for double end

    Machine is designed for single end

    SOLUTION

    2.1

    Standard machine available with the

    manufacturer/market

    WHY?WHY?

    WHY?

    Machine to be modified with double end

    induction hardening and additional features

    to reduce cycle time

    PROBLEM Low productivity in Induction Hardening

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Development Of Solution

    Single end

    SOLUTION

    2.1

    Standard machine available with the

    manufacturer/market

    WHY?WHY?

    WHY?Machine to be modified

    with double end induction hardening

    and additional features to reduce cycle time

    No provision for double end

    Machine designed with single end facility

    PROBLEM Low productivity in Induction Hardening

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Development Of Solution

    Loading and Unloading Time High

    SOLUTION

    2.1

    Standard machine available with the

    manufacturer/market

    WHY?WHY?

    WHY?Machine to be modified

    with double end induction hardening

    and additional features to reduce cycle time

    loading one at a time Machine designed with single end facility

    PROBLEM Low productivity in Induction Hardening

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Development Of Solution

    Cycle Time High

    SOLUTION

    2.1

    Standard machine available with the

    manufacturer/market

    WHY?WHY?

    WHY?Machine to be modified

    with double end induction hardening

    and additional features to reduce cycle time

    Single end Hardening & loading one at a time

    Machine designed with single end facility

    PROBLEM Low productivity in Induction Hardening

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    SI.No.

    Solution Action to be Taken Responsibility & Target Status

    Action Plan

    1Machine to be modified

    with double end induction hardening

    and additional features to reduce cycle time

    1) Additional features for the new machine to be identified by CFT

    CFT

    Development Of Solutions

    2) New machine design with improved features such as conveyer type , drop quench, Channel type coil. will be finalized jointly with the machine manufacturer and action will be initiated for procurement.

    CFT

    QC STORY -32

  • 9QC Story-1

    SUSIRA INDUSTRIES LTD

    INTRODUCTION

    CFT

    B.Monikandan - QAG.Ganesan - MetallurgyR.Sivanesaselvan - MaintenanceP.Dillibabu - ProductionP.V.Ganesan - ProductionP.Muthaiah HF Technologies(Machine Supplier)S.Kruppaiah HF Technologies(Machine supplier)

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    1. Double end Induction Hardening

    done simultaneously

    2. Horizontal loading

    3. Continues feeding

    4. Conveyer type

    5. Drop quenching

    6. Cone type Coil

    7. Polymer quenching

    Tool : BRAINSTORMING TO DESIGN THE NEW MACHINE

    8. Poke Yoke system

    9. Required power source

    10. Adjustable Feed rate control

    QC STORY -32 QC Story-1IMPROVED FEATURES IN THE NEW MACHINE

    Both ends to be simultaneously Induction Hardened.

    Continuous feeding with adjustable feed rate. Drop quenching. Poka yoke system for power drop , power

    failure and heating station trip. Independent heating control for cup & ball end

    induction hardening. Cycle time the above features leading to

    reduce cycle time.SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1Machine Front View

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Poka -yoke sensor to ensure correct orientation of push rod while loading

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Conveyor Loading of the part

    SUSIRA INDUSTRIES LTD

    QC STORY -32

  • 10

    QC Story-1

    Poka yoke system ( pneumatic device ) for holding the components during power drop or power failure or heating station trip

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Poka yoke system ( pneumatic device ) for holding the components during power drop or power failure or heating station trip

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Stopper to avoid sudden fall in to the Quenching Tank

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Cone Type Coilfor Cup end Channel Type Coil

    for Ball endSUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Quenched Components are taken out through the collector which is placed in the Quenching tank.

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QUENCH MEDIA

    QC Story-1 Validation

    Various trials conducted and suitable Setting Parameters established for Regular Production and machine output is found to

    be consistently meeting the product specification requirements.

    Product Quality of the product depends on 3 variables

    1. Feed rate2. Power3. Polymer Concentration.

    SUSIRA INDUSTRIES LTD

    QC STORY -32

  • 11

    QC Story-1

    Sl# Trial Side Voltage Tab Feed rate

    Crack Test

    Hardness Specification

    Hardness Observed in HRC

    Case Depth Spec.

    Observed Case Depth

    Mould No Micro Structure Result

    1 Trial - 1 139 Cup 80 2&5 32 Ok 55 - 60 58 - 59 Min

    15.0mm 17.0 mm 2976Mainly Martensite with few retained austenite Accepted

    2 Trial - 2 139 Cup 80 2&5 33 Ok 55 - 60 58 - 59Min

    15.0mm 16.50 mm 2977Mainly Martensite with few retained austenite Accepted

    3 Trial - 3 139 Cup 80 2&5 32 Ok 55 - 60 58 - 59Min

    15.0mm 17.0 mm 2979Mainly Martensite with few retained austenite Accepted

    4 Trial - 4 139 Cup 80 2&5 33 Ok 55 - 60 57 - 58Min

    15.0mm 16.50 mm 2980Mainly Martensite with few retained austenite Accepted

    5 Trial - 5 139 Cup 80 2&5 33 Ok 55 - 60 57 - 59Min

    15.0mm 16.50 mm 2980Mainly Martensite with few retained austenite Accepted

    HF INDUCTION HARDENING MACHINE VALIDATION REPORT - CUP

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    Sl# Trial Side Voltage Tab Feed rate

    Crack

    Test

    Hardness Specificatio

    n

    Hardness Observed

    in HRC

    Case Depth Spec.

    Observed Case Depth

    Mould No Micro Structure Result

    1 Trial - 1 139 Ball 80 2&5 32 Ok 55 - 60 57 - 59 Min

    15.0mm

    16.50 mm

    2976Mainly Martensite with few retained

    austeniteAccepted

    2 Trial - 2 139 Ball 80 2&5 33 Ok 55 - 60 57- 59Min

    15.0mm

    16.50 mm

    2977Mainly Martensite with few retained

    austeniteAccepted

    3 Trial - 3 139 Ball 80 2&5 32 Ok 55 - 60 57 - 59Min

    15.0mm

    17.0 mm 2979Mainly Martensite with few retained

    austeniteAccepted

    4 Trial - 4 139 Ball 80 2&5 33 Ok 55 - 60 57 - 58Min

    15.0mm

    16.50 mm

    2980Mainly Martensite with few retained

    austeniteAccepted

    5 Trial - 5 139 Ball 80 2&5 33 Ok 55 - 60 57 - 59Min

    15.0mm

    16.50 mm

    2980Mainly Martensite with few retained

    austeniteAccepted

    HF INDUCTION HARDENING MACHINE VALIDATION REPORT - BALL

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Action PlanAction PlanAction PlanComparative study

    Before After

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Action PlanAction PlanAction PlanComparative study

    Before After

    Cycle time 48 Sec/1 no ( In-house ) & 36 Sec/ 1 no ( Subcontractor )

    In house 600 Nos Induction hardening per shift.

    Subcontractor end 800 Nos per shift Components Induction hardening cost

    Rs.4.00/no (In house) Rs.3.75/no(sub) Monthly total production in house and

    subcontractor 72800 Nos

    Cycle time 9.3 Sec/ 1no In house 3100 Nos Induction

    hardening per shift In house 3100 Nos Induction

    hardening per shift Component Induction hardening

    cost Rs.0.97/per no Monthly total production in house

    161200 Nos.

    Customer schedule 100% achieved with in house facility

    QC STORY -32 QC Story-1

    %&'

    ()

    )#&'()

    !"$"*

    '

    ) +,, ,,, ,,,

    -,, .,, ,,

    %()

    ,, -,, -,,

    " + /0 ,1/

    2""(1,,,,,3

    -,,,,, /0,,, ./,1-.

    ) /1,

    "

    SUSIRA INDUSTRIES LTD

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Comparative Graph for results obtainedProduction in Induction Hardening machine

    69 72 7176

    71 7481 83

    95100 100

    0102030405060708090

    100

    Jul'0

    8Au

    g'08

    Sep'0

    8

    Oct'0

    8No

    v'08

    Dec'

    08Ja

    n'09

    Feb'0

    9Ma

    r'09

    Apr'0

    9Ma

    y'09

    Month

    %

    o

    f

    P

    r

    o

    d

    u

    c

    t

    i

    o

    n

    In house Production

    Supplier Production

    QC STORY -32

  • 12

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Current situation

    3.9 4.0 3.8

    3.23.4

    3.13.4

    2.4

    0.760.35 0.35 0.35

    00.5

    11.5

    22.5

    33.5

    44.5

    Jun'

    08Ju

    ly'08

    Aug'0

    8Se

    p'08

    Oct'0

    8No

    v'08

    Dec'

    08Ja

    n'09

    Feb'0

    9Ma

    r'09

    Apr'0

    9Ma

    y'09

    Month

    V

    a

    l

    u

    e

    i

    n

    L

    a

    k

    h

    In-house Production

    QC STORY -32 QC Story-1 MILE STONE CHARTTo increase producivity in I/H

    SGA-QA-32

    Monday

    Oct 6-11

    Oct 13-18

    Oct 20-25

    Oct 27-31

    Nov 3-8

    Nov 10-15

    Nov 17-22

    Nov 24-29

    Dec 1-6

    Dec 8-13

    Dec 15-20

    Jan 1 - 30

    Feb 1 - 28

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    P

    A

    p

    A

    P

    A

    P

    A

    P

    A

    Follow up/Review and recurrence prevention

    11

    Trial implementation & checking performance

    9

    Regular implementatio10

    Development of solution

    8

    Selection of problem

    Definition of the problem

    Analysis of problem

    Cause-effect analysis

    Root cause analysis

    Data analysis on the Root cause7

    Date of Completion

    No of Projects

    WEEK year -2008

    Reason for Selection

    Started on

    Time

    26.02.2009

    25

    Manufaturing Cost IncreaseProject on

    Project No

    Meeting Day

    PDCA SL#

    Identification of Problem(which are unsolved)

    PLAN

    5

    STEPS

    CHECK

    ACT

    06.10.08

    2.0 - 3.0 PM

    1

    2

    3

    4

    DO

    6

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Action PlanAction PlanAction Plan

    (

    1. Productivity Increased from 1200 nos to 6200 nos Per day2. Push rod for Induction hardening Cost Rs.3.03 per push rod saved3. Rs. 227419.00 per month saving4. Rs .27,29,032.00 per year saving5. Subcontracting totally eliminated.

    Rs 27,29,032.00 per year

    1. This Machine is a concept machine jointly developed by our in house talent and with machine manufacturer expertise and their co-operation. This costed us Rs. 11 lakhs.

    QC STORY -32

    QC Story-1

    SUSIRA INDUSTRIES LTD

    Action PlanAction PlanAction Plan

    (

    1. Through put time reduced.2. Enhanced on time delivery.3. Increased Customer satisfaction. 4. Operator morale improved.

    STANDARDISATION:The PPAP documents - Process Flow diagram ,PFMEA

    Control Plan & SOPs have beenamended.

    QC STORY -32 QC Story-1

    SUSIRA INDUSTRIES LTD

    Horizontal Deployment

    1. Double end introduced in Scanner Induction Hardening machine.

    QC STORY -32

    2. New Induction hardening machine procured with the same concept and spray quench simultaneously

    QC Story-1

    SUSIRA INDUSTRIES LTD

    TOOLS USED

    1. Brain Storming

    2. Data Collection

    3. Flow Chart

    4. Cause & Effect Diagram

    5. Bar charts

    QC STORY -32

  • 13