surveying principles 1 tooele valley groundwater change application guidelines s. ross hansen p.e.,...
TRANSCRIPT
Surveying principles1
Tooele Valley Groundwater Change Application Guidelines
S. Ross Hansen P.E., L.S.
Region Engineer9/7/2011
Tooele Water Users Workshop
2Surveying principles
OverviewOverviewHistory of the Groundwater Change App.
Policy.What is the Tooele Valley Groundwater
Change Application Policy.Conceptual Future Groundwater Flow.Future Change App. Administration.
3Surveying principles
VocabularyVocabulary
Acre-foot - An acre of land 1’ deep water CFS - Cubic Feet per Second G.W. – Groundwater POD – Point of Diversion S.E. – State Engineer State Engineer’s Office a.k.a. Division of Water
Rights UGS - Utah Geological Survey USGS – United States Geological Survey
Surveying principles4
Tooele MapTooele Map
5Surveying principles
History of the Groundwater History of the Groundwater Change PolicyChange Policy In 2007 we were inundated with cross valley
change application filings Meeting were held on:
– August 28, 2007 S.E. expressed concern that moving multiple paper rights to the East side of the valley could cause future interference issues.
– April 24, 2008 to propose a change application policy be implemented
Comments were submitted pursuant to the meeting
– July 22, 2008 to implement the policy. Effective date of policy April 16, 2008
6Surveying principles
Understanding the Tooele Understanding the Tooele Valley Groundwater Change Valley Groundwater Change Application PolicyApplication Policy
How it was derived Policy summary What it does What it doesn’t
Surveying principles7
Hydrologic ConnectionHydrologic ConnectionRecharge / DischargeRecharge / Discharge
Erda
Tooele
Lincoln
Marshall
Lake Point
Grantsville
Surveying principles8
Water Right DistributionWater Right Distribution
Recharge: 15,226Permitted Use: 7,970 Difference: 7,257Percent under: 48%
Recharge: 43,160Permitted Use: 48,595Difference: -5,435Percent over: 13%
Recharge: 16,910Permitted Use: 27,404Difference: -10,494Percent over: 62%
Total Recharge: 75,297Total Permitted Use: 83,969Total Difference: -8,672Percent over: 12%
9Surveying principles
Tooele Valley Groundwater Tooele Valley Groundwater Change Application PolicyChange Application Policy Policy Summary
– Can’t Cross Into Eastern Zone– Buffer 3 Miles East Perpendicular to Flow Path
Change App. Specifics– Multiple Water Rights
Each Water Right Will Be Evaluated Individually Most Restrictive Water Right Will Govern
– Multiple Points of Diversion Based On Eastern Most Well
– Applications Will Still Be Considered On Their Own Merit
Surveying principles10
Map graphically showing 3 mile Map graphically showing 3 mile buffer and East zonebuffer and East zone
3 mile
11Surveying principles
Understanding the Tooele Understanding the Tooele Valley Groundwater Change Valley Groundwater Change Application PolicyApplication Policy
What the policy does: Creates some semblance of order and certainty
– Allows WR holders to predict outcome before filing
– Allows the S.E. to make more timely decisions on change application
Protects the East side from further over- appropriation
– Stops future interference issues
12Surveying principles
Understanding the Tooele Understanding the Tooele Valley Groundwater Change Valley Groundwater Change Application PolicyApplication Policy
What the policy does not: It does not “divide” the valley into 3 sections
– The SE continues to administer the valley as one hydrologic system
It is not the “end all” answer when considering change applications
– Each application is considered on its own merits
Surveying principles13
Water Right DistributionWater Right Distribution
Recharge: 15,226Permitted Use: 7,970 Difference: 7,257Percent under: 48%
Recharge: 43,160Permitted Use: 48,595Difference: -5,435Percent over: 13%
Recharge: 16,910Permitted Use: 27,404Difference: -10,494Percent over: 62%
Total Recharge: 75,297Total Permitted Use: 83,969Total Difference: -8,672Percent over: 12%
Surveying principles14
Hydrologic ConnectionHydrologic ConnectionFuture conceptual drawingFuture conceptual drawing
Erda
Tooele
Lincoln
Marshall
Lake Point
Grantsville
15Surveying principles
Future of Change Application Future of Change Application AdministrationAdministration
Continue to administer and make decisions based on current policy
If data is brought before us we will consider it and incorporate if need be
16Surveying principles
Where to Get More Policy Info.Where to Get More Policy Info. Water Rights web site
– http://waterrights.utah.gov/
17Surveying principles
QUESTIONS??QUESTIONS??
Thank you