Page 1: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Superintendent’s Proposed Capital Improvement Plan

2009-2019

November 6, 2008

Page 2: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Does the school division have any capital needs for the 2009-

2019 planning period?

Page 3: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

How Are the School Division’s Capital Needs Outlined in the CIP?

• Projects listed by middle school planning area

• Project Summary Tables– Table 39 in current year dollars– Table 39A in inflation dollars (5.6%)– Major maintenance projects listed

by priority based on need (by project and by year)

Page 4: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

CIP Priority ProjectsYears 1-5 (2009-14)

Major Maintenance

Modernizations

New Schools

Page 5: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Why Are Major Mechanical/Maintenance Repairs

Needed?• Systems and parts have a finite life• Scarcity or unavailability of older

parts– Increased operational costs– Increased operational failures (example:

no heat more frequently and for longer periods)

• No temporary fix for failed roofs or HVAC systems

Page 6: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Why Are Modernization Projects Needed?

• Aging facilities that require updating– Replacement of interior finishes

(flooring, lighting, doors & hardware, lockers, paint, etc.)

– Installation of new technology– Replacement of exterior finishes

(parking lot surfaces, exterior lighting, canopies, etc.)

– Improve safety

Page 7: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Why are New School Projects Needed?

•Reduce reliance on portable classrooms•Provide additional permanent

classroom space•Ease overcrowding of core facilities at existing schools

It is important to note staff reviews enrollment/housing/population trends annually to determine new school needs and proposed timelines

Page 8: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 1: CIP Projects (2009-10)$19,102,300

Major Maintenance $18,180,400

95%

5%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Replace Roofs

Replace HVAC

CHT BMWGBP DCHIRM GBHRBW GRP

Re-Ed Ctr SEEPlanetarium TES

WBP

IRM*

IRH*

WBM**Mixing boxes only

Page 9: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 1: CIP Projects (2009-10)$19,102,300

Modern./Add./Renovate$0

New Schools $0

Other $921,900Repairs CASRepaving at DCH, DCE, & WBP

95%

5%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Page 10: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 1: CIP Projects (2009-10)Highlights

• 95% of costs are for major maintenance (HVAC & roof replacements)

• 5% of costs are for CAS repairs and repaving at 3 schools

• No modernization, addition and/or renovation projects

• No new school projects

Page 11: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 2: CIP Projects (2010-11)$27,862,500

Replace Roofs

ReplaceHVAC

BRP CARSRI CRESWE HESWBI ISC

School Plants

OSH

W & S PORTSWE

Major Maintenance $14,313,400

51%

21%

26%

2%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Page 12: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 2: CIP Projects (2010-11)$27,862,500

51%

21%

26%

2%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Modern./Add./Renovate$5,882,200

CWMS modernize (A/E)IRHS modernize (A/E)

New Schools $7,169,100

High School Elbow Rd./ Centerville Trpke. (A/E)

Other $497,800Repair auditorium ceiling IRHSInstall lighting GBHS softball field

Page 13: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 2: CIP Projects (2010-11)Highlights

• 51% of costs are for major maintenance (HVAC & roof replacements)

• No construction costs for facilities but does include A/E costs for: – modernization at 2 schools– the 8th high school (Elbow

Rd./Centerville Trpke.)

Page 14: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 3: CIP Projects (2011-12)$53,439,400

Replace Roofs

ReplaceHVAC

BRI DCMGBI CAMGRI WBI

GBM

Major Maintenance $9,291,100

17%

64%

13%

6%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Page 15: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 3: CIP Projects (2011-12)$53,439,400

17%

64%

13%

6%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Modern./Add./Renovate$33,938,700

IRHS modernize (C)CHTM add./renovate (A/E)

New Schools $6,993,300

Elem. School – BMW/CWI/ GRP/GRI area (A/E)Middle School – Relieve HMS (A/E)

Other $3,216,300Parking/storage school buses

Page 16: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 4: CIP Projects (2012-13)$230,627,900

Replace Roofs

ReplaceHVAC

SEE BRIGBI

GRI

TIS

HHS

Major Maintenance $6,243,100

3%

22%

75%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Page 17: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 4: CIP Projects (2012-13)$230,627,900

3%

22%

75%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Modern./Add./Renovate$51,790,100

CWMS modernize (C)IRMS modernize (A/E)CHTM add./renovate (C)

New Schools $172,594,700

Elem. School BMW/CWI/GRP/GRI area (C)High School Elbow Rd./Centerville Trpke. (C)Elem. School DCE/DCC area (A/E)Middle School relieve HMS (C)

Other $0

Page 18: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 5: CIP Projects (2013-14)$48,396,400

Replace Roofs

ReplaceHVAC

TES HMSCAM HOMSCWM NHPIRH WBM

TME

EWC

Major Maintenance $17,233,800

36%

3%52%

9%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Page 19: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Year 5: CIP Projects (2013-14)$48,396,400

36%

3%52%

9%

Maintenance

Modernize/Add./Renovate

New Schools

Other

Modern./Add./Renovate$1,626,200

GBP modernize (A/E)New Schools $25,095,700

Elem. School DCE/DCC area (C)

Other $4,440,700Repaving at GBHFood Services add./renovate (A/E/C)

Page 20: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

2009-2014 CIP Summary

1st Five Years

Total (CY $)

Yr. 1: (09-10)

$19,102,300

Yr. 2: (10-11)

$27,862,500

Yr. 3: (11-12)

$53,439,400

Yr. 4: (12-13)

$230,627,900

Yr. 5: (13-14)

$48,396,400

Total (09-14)

$379,428,500

• Most pressing funding needs are:– Major maintenance

projects • If not funded in a timely

manner, this portion of the CIP will increases as more needs arise

– Modernization of aging facilities

– 8th high school (Elbow Rd./ Centerville Trpke.) to provide relief to IRHS, OSHS, HHS & GBHS

Page 21: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

2009-2014 Five-Year Grand Total(Inflated Dollars)

Page 22: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Extended Public Hearing & Work Session Coverage

7:00PM at SAB

Monday, Nov. 24,

2008& Final Action

Monday, Nov. 10,

2008

Page 23: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Additional copies of the CIP are available:

•Planning & Development Dept.•www.cpschools.com

•All branches of the public libraryCIP 2009-19

Page 24: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

What Sources are Used to Assist with Student Enrollment Projections?

• Review enrollment/housing/population trends on a local, regional and national scale including:– CPS historical data– City Planning Dept. data (comprehensive plan)– Hampton Roads Planning District Commission– UVA’s Weldon Cooper Center– VA Dept. of Ed.– ODU State of Hampton Roads Annual Report– US Census – Surrounding school divisions

Page 25: Superintendents Proposed Capital Improvement Plan 2009-2019 November 6, 2008

Factors Affecting Enrollment

• Basics: economy, growth rate, birth rate, migration

• US Dept. of Ed.: VA school enrollment expected increase 13% (2005-17)

• UVA Weldon Cooper Center: VA enrollment will increase thru 2012– Grades K-7 increase– Grades 8-9 small increase– Grades 10-12 decline

HRPDC –Ches.

2000 2034

Employ. by res.

96,977 143,700

Households 69,900 114,600

Population 199,184 313,600

Census

VA Pop.

2005 7,324,000

2015 7,921,000

2025 8,466,000

VEC Ches. Pop.

Under 19

2000 62,462

2010 70,359

2020 76,567

2030 83,103