superintendent or project manager or foreman

3
*** RESUME(tm) ***  Name; Charles D. Stanley Age; 59 Race; White/M DOB; 9/8/51 Martial Status; Married, 39 Years Address; 720 W. Walton Rd., Lumberton, Texas 77657 No. Yrs.. At this address; 40 Phone No.; (409) 751-3651, Cell (409) 926-1624 Dwain <[email protected]> Best Access Education;  High School, Nederland High School, Nederland, Texas, 1970, T15 Tulane University, New Orleans, LA. AD/Eng., 2 Semesters. Carpenters Union, Lamar University, Beaumont, Texas. 1972. Electronic Repair Training, ACAD Construction App., OSHA 30 Construction Management  Work History; 2010-2011. Employed Temp by Hallmark-Group LLC, Owner Jason Freeman, Project M anager David Kunze, Houston, Texas. Hired as Job Superintendent by 2n d ti er G e n. Contractor on one of several New School Projects in Beaumont, Texas. Duties included working in conjuncture with project manager with subcontractors, suppl iers and logistics of materials, City officials and inspectors in the constructi on of a new Martin Elementary School in Beaumont Texas. Sitework, Foundation, un derground utilities, Structural Steel Building, Masonry, Electrical, Plumbing, C old water piping system and wet fire suppress ion system, Metal Drywall and fini shes, Painting, Flooring, ACT ceilings, Data Com. Systems including station cont rolled Environmental, Communication, Building Security. Finalization crafts: 2008-2009. Employed by White Oak Builders- USA, Owner Tom Stienhoff, Houston, Te xas. Work consisted of Job Superintendent on new LaQuinta motel in Bridge City, Texas. Duties included working in conjuncture with project manager with subcontr actors, suppliers and logistics of materials, City officials and inspectors in t he construction of a new LaQuinta motel, Site work, Wood frame, interior/exterio r finishes including EIFS, Roofing, Electrical, Plumbing, HVAC, wall/ceiling fin ishes, Furnishings, Landscape etc for complete turn-key project, daily progress reports, weekly safety meetings, Contract and MSDS application. 2007-2008. Employed by N.C. Sturgeon, Owner Chuck Sturgeon, Midland, Texas. Work consisted of Job Superintendent on NEF site in Eunice, New Mexico. Duties inclu ded, but not limited to working with crafts and owners to meet Plan and Specific ation requirements within changing owner applied requirements, coordinating mate rial deliveries and times and applicable paper work. 2002-2007. Employed by Petron Inc., Owner Dick & Steve Ayres, Alexandria, LA.. W ork Included Pre-bid estimates on jobs, Commercial, light industrial and remodel ing, Sub-contractor and supplier Contracts, material ordering and scheduling, Ti me sheets, Daily and Progress logs and pre-estimate, pay request. Supervision of employees and Sub-contractors on Job sites. Main areas of work were in Louisian a, Alexandria, Camp Beauregard, Vinton, Lake Charles, Kentwood, New Orleans, New Iberia, and Lafayette. These jobs involved all stages of construction and some

Upload: api-121401591

Post on 06-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Superintendent or Project Manager or Foreman

8/3/2019 Superintendent or Project Manager or Foreman

http://slidepdf.com/reader/full/superintendent-or-project-manager-or-foreman 1/3

*** RESUME(tm) *** 

Name; Charles D. StanleyAge; 59Race; White/MDOB; 9/8/51Martial Status; Married, 39 YearsAddress; 720 W. Walton Rd., Lumberton, Texas 77657No. Yrs.. At this address; 40Phone No.; (409) 751-3651, Cell (409) 926-1624

Dwain <[email protected]> Best Access

Education; High School, Nederland High School, Nederland, Texas, 1970, T15Tulane University, New Orleans, LA. AD/Eng., 2 Semesters.Carpenters Union, Lamar University, Beaumont, Texas. 1972.Electronic Repair Training, ACAD Construction App., OSHA 30Construction Management

 

Work History;

2010-2011. Employed Temp by Hallmark-Group LLC, Owner Jason Freeman, Project Manager David Kunze, Houston, Texas. Hired as Job Superintendent by 2nd tier Gen. Contractor on one of several New School Projects in Beaumont, Texas. Dutiesincluded working in conjuncture with project manager with subcontractors, suppliers and logistics of materials, City officials and inspectors in the construction of a new Martin Elementary School in Beaumont Texas. Sitework, Foundation, underground utilities, Structural Steel Building, Masonry, Electrical, Plumbing, Cold water piping system and wet fire suppression system, Metal Drywall and finishes, Painting, Flooring, ACT ceilings, Data Com. Systems including station controlled Environmental, Communication, Building Security. Finalization crafts:

2008-2009. Employed by White Oak Builders- USA, Owner Tom Stienhoff, Houston, Texas. Work consisted of Job Superintendent on new LaQuinta motel in Bridge City,Texas. Duties included working in conjuncture with project manager with subcontractors, suppliers and logistics of materials, City officials and inspectors in the construction of a new LaQuinta motel, Site work, Wood frame, interior/exterior finishes including EIFS, Roofing, Electrical, Plumbing, HVAC, wall/ceiling finishes, Furnishings, Landscape etc for complete turn-key project, daily progressreports, weekly safety meetings, Contract and MSDS application.

2007-2008. Employed by N.C. Sturgeon, Owner Chuck Sturgeon, Midland, Texas. Workconsisted of Job Superintendent on NEF site in Eunice, New Mexico. Duties included, but not limited to working with crafts and owners to meet Plan and Specific

ation requirements within changing owner applied requirements, coordinating material deliveries and times and applicable paper work.

2002-2007. Employed by Petron Inc., Owner Dick & Steve Ayres, Alexandria, LA.. Work Included Pre-bid estimates on jobs, Commercial, light industrial and remodeling, Sub-contractor and supplier Contracts, material ordering and scheduling, Time sheets, Daily and Progress logs and pre-estimate, pay request. Supervision ofemployees and Sub-contractors on Job sites. Main areas of work were in Louisiana, Alexandria, Camp Beauregard, Vinton, Lake Charles, Kentwood, New Orleans, NewIberia, and Lafayette. These jobs involved all stages of construction and some

Page 2: Superintendent or Project Manager or Foreman

8/3/2019 Superintendent or Project Manager or Foreman

http://slidepdf.com/reader/full/superintendent-or-project-manager-or-foreman 2/3

outside the main line, such as Haz-Mat on chemical spills and recovery.

2001-2002-Feb. Employed by KL Construction, Owner Larry Davis, Beaumont, Texas.Work Included Supervision of Concrete work, Residential/Commercial foundationsand access drives and parking. Blueprint Layout, Elevations, getting materials to site, organizing employees & time keeping.

1990-2001 Employed by J.A. Honeycutt DBA Commercial Contractors, Owner: John A.Honeycutt, Parent Company: BudJac Construction Inc., Owner: Jack Honeycutt, Beaumont, Texas. Work Included: Government Projects, Estimated projects ranging from100K to 16Mil, including contacting prospective subcontractors/suppliers/vendors, quantity take-offs, compiling to bid cost, completing and submitting material/supplier/subcontr. Submittals, index and complete subcontractor contracts and supplier purchase orders, scheduling for government and suppliers for proposed completion dates. Produced and submitted Bi-Monthly Progress Schedules/Reports, along with weekly Payroll reports and Monthly Progress Payment Submittals. On siteProject Manager/Superintendent during work hours. Dealt directly with the Contracting Officers, Architects, Engineers and Subcontractors on Change Orders anddiscrepancies in plans, specifications and existing site conditions too the endof any monetary changes. Jobs were located in..Fort Polk, LA., Fort Chaffee, AR., Fort Stewart, GA., Fort Sill, OK., Dyess AFB, TX. and Fort Riley, KS. Types: Reroofing, 22K sq(tm)s- 1 job, Remodeling and New Barracks, Warehouse and Supportbuildings, Steel Siding, Doors/Windows,Metal Roofs, VCT, Sheet Vinyl, Paint, Carpet, Wall-coverings, ACT, Metal/Wood framework, HVAC, Electrical, Plumbing, Spr

inkler Sys. Wet/Dry, Concrete, Sitework, Surveying, Abatement, Pre-Fab Metal Buildings, Landscaping, Masonryetc. I have been involved in every possible phase ofconstruction with hands on experience in 99%.

1984-1990 Employed by C.S. Associate Contractors, Owner: C.G. Stanley/C.D. Stanley (Partnership) Lumberton, Texas. Work Included: TurnKey Homes 75K-400K in Atlanta GA., Jacksonville, FL., Mobile AL. and Fredrick, MD. Majority of the homes were from the site up, including subcontractors and suppliers.

1982-1984 Employed by First Mortgage Investment, Nederland, Texas. Owner: Vincent Salvagio, Houston Texas. Work Included: In-house Cost estimations of New homes, Cost estimates of HUD projects, and Company owned Condominium Project, Scheduling of subcontractors and suppliers on all projects and scheduled project inspe

ctions. Co-Designed and built small shopping mall and strip mall with company owners.

1978-1982 Employed by Allied Equipment, Owner: Dexter Atkinson, Beaumont, Texas.Work included: Job estimates, installing fuel storage tanks, underground pipin

g and pump installation and maintenance at various businesses (mostly convenience stores), running said jobs. Helped with the payroll and keeping the books. Ran heavy equipment, Backhoe, Trac-Hoe and Dozers on the jobs.

Working Knowledge of;

All hand and Power Tools relevant to Residential/Commercial/Light Industrial, Foundation, Concrete, Wood/Metal Framing, Electrical, HVAC, Security Sys., Fire Prevention, Insulation, Sheetrock, Painting, Trim work, Cabinets, Flooring, Roofing, Doors/Windows Hardware.Sitework instrument grading, Dozer/Backhoe work, Arc & Mig welding, Exterior/Interior rough through finish, Wood- Metal-Concrete Building Erection, Computer Skill: Word-Perfect, ACAD, Lotus 123, PowerPoint, Word, Excel, Internet-Netscape and Explorer and Adobe .

Page 3: Superintendent or Project Manager or Foreman

8/3/2019 Superintendent or Project Manager or Foreman

http://slidepdf.com/reader/full/superintendent-or-project-manager-or-foreman 3/3

Have been in construction and involved in all phases of construction from planning to completion. On my previous jobs, I was responsible to order plans/specs for prospective project to bid, Take-off materials and labor cost, contact subcontractors, submit technical questions concerning plans/specs, assemble bid, submit, assemble job material/data submittals, attend pre-job meetings, order materials, issue contracts to subcontractors, stock/inventory and distribute materials,coordinate subs and hourly personnel, make progress reports, pay estimates andweekly payrolls, submitted to project owner and Employer.

Reason for leaving previous Employment;

Lack of Work, Economy, several projects on hold due to financing.

Physical Capabilities;

Good to Excellent health. I(tm)m 59 and Alive.

Preference in work;

I would prefer to stay close to the construction trades, General Construction, Supervision/Management, Estimating, and Carpentry.

Required Pay;

Depending on Job Requirements.

Notes;

I am willing to relocate for steady work, I have a home in Texas and will keep that no matter the circumstances, however I have been traveling around the country for the past 20 + years and been away from Texas for as much as 5 years without returning. I do like to touch home-base on occasion.

Should further information be required, please contact me at your convenience ateither the above address or phone (409) 751-3651, Cell (409) 926-1624 or E-MailDwain [email protected]

.

Respectfully Submitted

Charles D. Stanley