Page 1: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Siv Cullen

Big data & augmented realityExploring the possibilities

Page 2: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

We openopportunities with connected thinking.

Page 3: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017
Page 4: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

BackgroundBIMIndustry InformationLeveraging immersive

Page 5: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Background

Page 6: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

BackgroundWhat is data doing in the construction industry?

Siloed by sector/region.Institutionalised industry which lags in technology adoption.Change is generally ‘on project’.Slow to leverage the benefits of data.

Page 7: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

GFC bred rethinkData buzz is significant and client led.Massive projects enable technologies.BIM coming of age.

BackgroundHowever…

Page 8: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

BIM

Page 9: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Building Information Modelling (BIM)“A digital representation of physical and functional characteristics of a facility. A building information model is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.”

Introduction to BIMbuildingSMART Definition

Page 10: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

IKEA BIM

Page 11: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

2D lines

simplex geometry

L=

3D cableØ, length, material

Data vessel

3D tube 3D cableØ, length, material, resistance, system

L=

3D cableØ, length, material, resistance, system, relationships, calculations, datasets ++++

L=

Intelligent parametric objects

Øe

Smart objects

Page 12: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Data Value

Element ID C Clipsal EFX Single Pole 1Module Wide 250Vac 40A

Element type Miniature Circuit Breaker

Part No. MCB4-120

Manufacturer Clipsal – Schneider Electric.

Net weight 120g

Service interval 5,000 hours

O&M Ref SAP Number

Programme code Maintenance Code

Install date 27-02-2017

Commission date 15-05-2017

Residual risks 4a/d, 6, 7, 9b

Element data

Page 13: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

20/10/2017 13

nD

Page 14: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

BIM a multitasking graphical database

Data for record, design & O&M

Intelligent Object Data i.e. IFC & COBie

2D Drawings, Plans, Sections etc.

3D Coordination & Visualisations

Animations, Haz. Ops. Studies etc.

Export data to analysis, simulation and asset management

Page 15: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Industry information

Page 16: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

ISO19650BS/PAS1192

Page 17: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Shared WIP

Published Archived

Internal shared

External shared

BS/PAS1192 and ISO19650

WIP

Sh

Sh

P

Arc

Arc Arc

P01.01 P01 C01

Page 18: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

SUITABILITY ↑

APPROVAL STATE →

Work in Progress

Content Check

Technical Check Shared Coordination

CheckDelivery Approval

Client Authorisation Published

File is being edited

Consider which

suitability is required

Consider which

suitability is required

Incorrect. Why has this been

shared when it is marked as

not for sharing?

Incorrect. Why has this been

shared when it is marked as

not for sharing?

Incorrect. Why has this been

shared when it is marked as

not for sharing?

Incorrect. Why has this been

shared when it is marked as

not for sharing?

Incorrect. Why has this been

shared when it is marked as

not for sharing?

SUITABILITYS0

NOT FOR SHARING

Planning to issue for

coordination

Check the content is

suitable for coordination

Check file is ok to

coordinate with other disciplines

Shared across the design team for

coordination of ongoing design

Ready for Package Lead

sign-off as OK for coordination

with other contracts

Ready for Design Manager sign-off

as OK for coordination

with other contracts

Approved by the Design

Manager for coordination

with other contracts

Unlikely to occur. The client

accepted the file, perhaps as a

record of what was shared for coordination

SUITABILITYS1FOR

COORDINATION

Planning to issue for

information only

Check the content correct and suitable for the purpose of

issue

Check the file is technically

suitable for the purpose of

issue

Shared across the design team for information –

see accompanying

communications

Ready for Package Lead

sign-off for issue for

information

Ready for Design

Manager sign-off for issue for

information

Approved by the Design

Manager for issue for

information

Unlikely to occur. The client

accepted the file, perhaps as a

record of what was shared for

information

SUITABILITYS2

FOR INFO

Planning to issue for comment

Check the content is

correct and suitable for comment

Check the file is technically

ready for comment

Shared across the design team

for client (or other) review and comment

Ready for Package Lead

sign-off for client (or other) review

and comment

Ready for Design

Manager sign-off for client (or

other) review and comment

Approved by the Design

Manager for issue for review and comment

Unlikely to occur. The client

accepted the file, perhaps because

they had no comment

SUITABILITYS3FOR

COMMENT

Planning to issue for

milestone approval

Check the content is

correct and suitable for

approval

Check the file is technically

ready for approval

Shared across the design team

for client approval for this

milestone

Ready for Package Lead

sign-off for issue to client for approval

Ready for Design

Manager sign-off for issue to

client for approval

Approved by the Design

Manager for issue to client for approval

Client approved

SUITABILITYS4

FOR STAGE APPROVAL

Page 19: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

SharedWork in Progress Published Archived

Individual Coordinated Document Stored

Individual (i)

Production Cycle(s) Deliverables

Programme Relative (i)

Page 20: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

AUCKLAND

Page 21: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

?

SharedWork in Progress Published Archived

Page 22: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

SYDNEY

Page 23: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

SharedWork in Progress Published Archived

Page 24: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Leveraging immersive

Page 25: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Complex federated models Automated project deliverables

Page 26: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Automating Design

• Creating scripts which automate many tasks to reduce man hours.

• Integrating multiple platforms to a single output.

Page 27: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Clash Detection Design Resolution

Page 28: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Virtual Asset AM/FM Link

Page 29: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

The Northern Line Extension, UK

Digital Delivery | BIM Management

Virtual realityStakeholder engagement

Design negotiations

Induction and training

Page 30: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

The Northern Line Extension, UK

Digital Delivery | BIM Management

Augmented realityAdditional clarity

Reinforcement positioning

Services installation

Training and maintenance

Page 31: Suibhne Cullen - Big data & augmented reality – exploring the possibilities - FutureData 2017

Q & A