PRACTICAL ASPECTSOF DEVELOPING

 A CDM PROJECT

- Jinesh Amlani (Market Analyst)

- Nishikant Singh (Consultant)

- A DEVELOPER’S PERSPECTIVE

 W orksho p on Carbon Credits and The Sugar Industry 

1st

October, 2007

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 2/10

OVERVIEW OF THE CDM CYCLE

SelectingConsutant

Data Collection

6 weeks

Preparation of PCN/PDD

4 Weeks

Validation

14 weeks

Request forRegistration

8 weeks

Registered

Verification

(Every year)

4 weeks

Issuance

6 weeks

Trading

4 weeks

DNA Clearance – MoEF

8 weeks

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 3/10

HANDLING STEP ZERO – AN ESSENTIAL

• UNFCCC wants an official communicationthat the benefits from CDM were considered

• Best form of such an official communication isa ‘BOARD RESOLUTION’.

• The Board Resolution confirms that theProject Developer had seriously consideredthe CDM Revenue

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 4/10

 ADDITIONALITY – TECHNICAL & FINANCIAL

Financial Additionality 

Low Internal Rate of Return(IRR)

Difficulty in arranging finance

Technical Additionality:

Boiler above 90 kg/cm2 New Turbine design

 Additionality means ‘How the project is different’

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 5/10

MONITORING ASPECTS

SUGAR DISTILLERY  Quantity of Heat Generated Methane recovered using Flow Meters

Quantity of Electricity Generated Quantity of Heat / Electricity Generated

Quantity of Biomass Used COD of the spent wash before andafter treating

Should be robust &efficient

There should be a back-up for all

parameters

 Any possibility of aleakage should be

considered

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 6/10

 Villagers

Employees

State PCBReg. Com

Financial Inst.

LOCAL STAKEHOLDERS’ CONSULTATION

Phase I : Identifying and Inviting

Posters

Circulars

Letter

Phase II : The D Day 

 Attendance Sheet

Explain about CDM Invite/Take Comments

Phase III : Reviewing Comments and taking Actions

– Positive Comments : Most Welcome

– Negative Comments : Take remedial Actions

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 7/10

 VALIDATION & REGISTRATION

Executive Board registers the project for a small fee

 Validators validate the PDD (for a fee) and forward itto EB for registration

Four preferred Validators (DOEs) operating in India:

BVQi DNV SGS TUV-SUD

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 8/10

FINALLY !! REALIZING THE MONEY 

Trading of CERs

Spot Forward

CER Certificates are issued after verification is done

 Annual verification of the project has to be done by a DOE.

CER meter is down, once the project is registered.

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 9/10

LETS MAKE MOST OF

THE MOMENT…

8/9/2019 Sugar Conference Ahemdabad.gensOL Ppt

http://slidepdf.com/reader/full/sugar-conference-ahemdabadgensol-ppt 10/10

Data required for preparation of PIN & PDD Name of Project Promoters and Contact Details

Project Construction Start & Completion Date

 A copy of Detailed Project Report (DPR)

Copy of Power Purchase Agreement

Copies of All Clearances Required.

Financing Details of the Project.

Subsidy element in the Project.

Copy of EIA conducted.

The projects that have been taken up by the company to become anenvironment friendly organization.

Project Promoter’s Credentials.

Comments of Ministry of Environment & Forests (if any). Social Responsibilities fulfilled by the Company.

Details of the Monitoring Equipment, used to measure steamproduction, electricity generation and export, bagasse consumed.

Name and Designation of the person monitoring the Project