  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    1/31

    Central Electricity

    Regulatory Commission

    Capital Cost Benchmarking for Transmission Sub-

    Station

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    2/31

    CERCCapital Cost Benchmarking

    Formatting of Headers / Dividers

    Sheet Header 1 CERC SheetHeader1Sheet Header 2 Capital Cost Benchmarking SheetHeader2Sheet Header 3 Transmission Substations SheetHeader3

    Header 1 Header 1 Header1

    Header 2 Header 2 Header2

    Header 3 Header 3 Header3

    Inputs Divider Operational Assumptions Inputs_Divider

    Table Heading 2 Table Heading 2 Table_Heading2

    Table Heading 3 Table Headin 3Table Heading 4 Table Headin 4

    Individual Cell Assumptions

    Standard Assumption 100 Assumptions

    Offsheet Reference 100 Offsheet

    Flex Cell 100 Assumption_Flex

    Name Inputs Cost Type Technical_Input

    Technical Input 1,000.00 Input

    Empy Cell Empty_Cell

    Background for Flag 0 Flag

    Infrastructure

    Sub-Total Sub-Total Sub-Total

    Line Total 100.00 Line_Summary

    Units USD Unit

    Operation Line (Non-Addition) 100 Line_Operation

    Operation (Addition / Total) 100 Line_Total

    Closing Balance 100 Line_ClosingBal

    Key Line Line_Key

    Development Styles

    WIP W WIP

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    3/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    Choose the Type of Compensation Series Compensation -2- For S/C Line

    Total Cost of Sub-Station (INR Crore) 15.02

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    4/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    5/31

    Add 1

    Substract -1

    Series

    Compensation -

    1 - For D/C

    Line

    SeriesCompensation -

    2- For S/C Line

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    6/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    7/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    8/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    9/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    10/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    11/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    12/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    13/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    14/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    15/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    16/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    17/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    1 Please Select Computation_Sheet

    2Select the type of compensation to be provided from drop down list in cell D8.

    3 Final Output shall be available in cell D11

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    18/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    19/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    20/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    21/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    Ref No.

    C-14405-S162-3/P-

    154 & 155/LOA-

    I/2571

    DT: 10-07-2008

    Name of Sub-Station Ballabhgarh

    Name of Transmission lineBallabhgarh - Kanp

    D/C T/L

    % of Compensation 40%

    S.No. Name of Equipment Unit

    1 SF6 B ass Circuit Breaker -3-Ph INR Lakh 101.01

    2 Protective Spark Gap - forced triggered INR Lakh 172.85

    3 Damping Cirucit INR Lakh 70.33

    4 Series Capacitor Bank INR Lakh 366.39

    5Disconnecting and Bypass Isolators (Individual Pole operated) Double

    Break.INR Lakh

    a) 3-Ph, with one ear th switch INR Lakh 8.27

    b) 3-Ph, Without ear th switch INR Lakh 6.77

    6 Insulated platforms -3-Ph - Including Plot form & BPS Etc INR Lakh 83.36

    7 Metal Oxide Varistor, MOV includin 10% S are INR Lakh 83.51

    8 Control & Protection E ui ment excludin si nal column INR Lakh 172.19

    9 Current Transformer INR Lakh 3.58

    10 Platform to ground signal transmission system INR Lakh 21.26

    11 Power supply Cubicles including ACDB & DCDB INR Lakh 2.77

    12Power and Control cables including cables including cable

    accessories for both the banksINR Lakh 38.23

    13

    Bus bar material including post insulators, disc insulator strings,

    Hardwares, Conductor, Aluminium Tube, GI wire, clamps and

    connectors, Earthig materials etc. for 3 phases for both the banks

    INR Lakh 70.14

    14 Galvanised Steel Structures for 3 phases for both the banks INR Lakh 12.64

    15 Surge Arrrestor (390kV) for 400kV system INR Lakh 1.42

    16 Air conditioned kiosks for two banks INR Lakh 10.28

    17 Fire Protection S stem INR Lakh 11.96

    18 Mandator S ares INR Lakh 117.36

    19 Civil En ineerin Works INR Lakh 170.55

    20 Erection Charges INR Lakh

    a) SF6 Bypass Circuit Breaker (3-Ph) INR Lakh 5.30

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    22/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    S.No. Name of Equipment Unit Average Rates

    1 SF6 Bypass Circuit Breaker -3-Ph INR Lakh 81.52

    2 Protective Spark Gap - forced triggered INR Lakh 141.82

    3 Damping Cirucit INR Lakh 71.09

    4 Series Capacitor Bank INR Lakh 441.72

    5Disconnecting and Bypass Isolators (Individual Pole operated)

    Double Break.INR Lakh

    a) 3-Ph, with one earth switch INR Lakh 7.30

    b) 3-Ph, Without earth switch INR Lakh 5.93

    6 Insulated platforms -3-Ph - Including Plot form & BPS Etc INR Lakh 132.81

    7 Metal Oxide Varistor, (MOV) including 10% Spare INR Lakh 74.32

    8 Control & Protection Equipment excluding signal column INR Lakh 185.04

    9 Current Transformer INR Lakh 3.47

    10 Platform to ground signal transmission system INR Lakh 26.22

    11 Power supply Cubicles including ACDB & DCDB INR Lakh 3.15

    12Power and Control cables including cables including cable

    accessories for both the banksINR Lakh 46.59

    13Bus bar material including post insulators, disc insulator strings,Hardwares, Conductor, Aluminium Tube, GI wire, clamps and

    connectors, Earthig materials etc. for 3 phases for both the banks

    INR Lakh 127.63

    14 Galvanised Steel Structures for 3 phases for both the banks INR Lakh 36.13

    15 Surge Arrrestor (390kV) for 400kV system INR Lakh 1.41

    16 Air conditioned kiosks for two banks INR Lakh 11.60

    17 Fire Protection System INR Lakh 11.91

    18 Mandatory Spares INR Lakh 150.53

    19 Civil Engineering Works INR Lakh 185.99

    20 Erection Chargesa) SF6 Bypass Circuit Breaker (3-Ph) INR Lakh 5.15

    b) Protective Spark Gap (forced triggered) INR Lakh 4.36

    c) Damping Cirucit INR Lakh 0.92

    e) Series Capacitor Bank INR Lakh 8.01

    f) Disconnecting and Bypass Isolators (Individual Pole operated) Double Break. INR Lakh

    i 3-Ph, with one earth switch INR Lakh 1.21

    i i 3-Ph, Without earth switch INR Lakh 1.20

    g) Insulated platforms -3-Ph - Including Plot form & BPS Etc INR Lakh 5.71

    h) Metal Oxide Varistor, (MOV) including 10% Spare INR Lakh 3.17

    i) Control & Protection Equipment excluding signal column INR Lakh 4.54

    j) Current Transformer INR Lakh 0.82k) Platform to ground signal transmission system INR Lakh 2.20

    l) Power supply Cubictes including ACDB & DCDB INR Lakh 0.86

    P d C t l bl i l di bl i l di bl i f b th

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    23/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    BOQ & Cost for Series Compensation

    S.No. Name of Material & Equipment UnitRate

    (INR Lakhs)

    1 SF6 Bypass Circuit Breaker (3-Ph) Nos 81.52

    2 Protective Spark Gap (forced triggered) Set 141.82

    3 Damping Cirucit Set 71.09

    4 Series Capacitor Bank (as per Tech Specification)Set

    441.72

    5

    Disconnecting and Bypass Isolators (Individual Pole

    operated) Double Break.

    a) 3-Ph, with one earth switch No 7.30

    b) 3-Ph, Without eatth switch No 5.93

    6 Insulated platforms (3-Ph) Set 132.81

    a) Structures

    b) Platform Insulators including BPIs & String Insulators

    7 Metal Oxide Varistor, (MOV) including 10% Spare Set 74.32

    8

    Control & Protection Equipment excluding signal

    columnSet

    185.04

    9 Current Transformers Set 3.47

    10 Platform to ground signal transmission system Set 26.22

    11 Power supply Cubictes including ACDB & DCDB Set 3.15

    12

    Power and Control cables including cables including

    cable accessories for both the banksL/S

    46.59

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    24/31

    13

    Bus bar material including post insulators, disc

    insulator strings, Hardwares, Conductor, Aluminium

    Tube, GI wire, clamps and connectors, Earthig

    materials etc. for 3 phases for both the banks

    L/S

    127.63

    14

    Galvanised Steel Structures for 3 phases for both the

    banksL/S

    36.13

    15 Surge Arrrestor (390kV) for 400kV system No 1.41

    16 Air conditioned kiosks for two banks No 11.60

    17 Fire Protection System L/S 11.91

    18 Civil Works L/S 185.99

    19 Erection Chargers

    a) SF6 Bypass Circuit Breaker (3-Ph) Nos 5.15

    b) Protective Spark Gap (forced triggered) Nos 4.36

    c) Damping Cirucit Nos 0.92

    e) Series Capacitor Bank Nos 8.01

    f)

    Disconnecting and Bypass Isolators (Individual Pole operated)

    Double Break.-

    i 3-Ph, with one earth switch Nos 1.21

    ii 3-Ph, Without earth switch Nos 1.20

    g) Insulated platforms -3-Ph - Including Plot form & BPS Etc Sets 5.71

    h) Metal Oxide Varistor, (MOV) including 10% Spare Sets 3.17i) Control & Protection Equipment excluding signal column Sets 4.54

    j) Current Transformer Set 0.82

    k) Platform to ground signal transmission system Sets 2.20

    l) Power supply Cubictes including ACDB & DCDB Set 0.86

    m)

    Power and Control cables including cables including cable

    accessories for both the banksL/S

    5.69

    n)

    Bus bar material including post insulators, disc insulator strings,

    Hardwares, Conductor, Aluminium Tube, GI wire, clamps and

    connectors, Earthig materials etc. for 3 phases for both the

    banks

    L/S

    4.33

    o) Galvanised Steel Structures for 3 phases for both the banks L/S 3.38

    p) Surge Arrrestor (390kV) for 400kV system Nos 0.29

    q) Air conditioned kiosks for two banks Nos 0.00

    r) Fire Protection System L/S 5.29

    s)

    Dismantling and re-erection of overhead stringing including

    insulator string along with necessary hardware etc. over the

    proposed installation of the series capacitor

    L/S

    0.33

    20 Hard Cost

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    25/31

    21 Material Portion in Rs lakhs

    22 Interest on Materials / equipments at 10.4048 %

    23 Total cost of Series compensation in Rs Lakhs

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    26/31

    Quantity Amount - INR Quantity Amount - INR

    2 163.04 1 81.52

    2 283.64 1 141.82

    2 142.18 1 71.09

    2 883.45 1 441.72

    4 29.20 2 14.60

    2 11.86 1 5.93

    2 265.62 1 132.81

    2 148.63 1 74.32

    2 370.09 1 185.04

    2 6.95 1 3.47

    2 52.45 1 26.22

    2 6.30 1 3.15

    1 46.59 0.5 23.29

    Series Compensation -1 - For

    D/C Line

    Series Compensation -2- For

    S/C Line

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    27/31

    1 127.63 0.5 63.82

    1 36.13 0.5 18.06

    6 8.48 3 4.24

    1 11.60 1 11.60

    1 11.91 0.5 5.95

    1 185.99 0.75 139.50

    2 10.30 1 5.15

    2 8.72 1 4.36

    2 1.84 1 0.92

    2 16.01 1 8.01

    4 4.82 2 2.41

    2 2.41 1 1.20

    2 11.42 1 5.71

    2 6.35 1 3.172 9.08 1 4.54

    2 1.65 1 0.82

    2 4.41 1 2.20

    2 1.73 1 0.86

    1 5.69 0.75 4.27

    1 4.33 0.5 2.16

    1 3.38 0.75 2.53

    6 1.75 3 0.87

    1 0.00

    1 5.29 0.75 3.97

    1 0.33 1 0.33

    2891.25 1501.68

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    28/31

    2324.69 1308.67

    241.88 136.16

    3133.13 1637.84

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    29/31

    CERCCapital Cost Benchmarking

    Transmission Substations

    Alternates

    S.No. Unit

    Series

    Compensation -1

    - For D/C Line

    Series

    Compensation -2-

    For S/C Line

    1 INR Crore 28.91 15.02

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    30/31

  • 8/13/2019 Substation Model Series Compensation Public Comments 11th Jan-09

    31/31