Vietnam VMS Project Site Survey & Design Training
Material
2011.07.10
VMS Project Overview
TSS & Design Workflow
Typical Configuration
Equipment Introduction
RF Solution Scenario
Swap Principle
Cable Connection Specification
About TSSR Template
VMS Project Overview
TSS & Design Workflow
Typical Configuration
Equipment Introduction
RF Solution Scenario
Swap Principle
Cable Connection Specification
About TSSR Template
内部公开▲
3
SN Type Qty Vendor Remark
1 BSC 8 ZTE New
2 RNC 8 ZTE New
3 TC 8 ZTE New
4 OMC 2 ZTE New
5 OMCR 2 ZTE New
6 ZXCTN 24 ZTE New
7 ZXMP 32 ZTE New
4 BTS 608 ZTE 2G: 608 Swap+
New 174, 3G: New
5 BTS 400 Huawei/
Ericsson
Remove high
configure equip. to
new site
Work scope
1. These sites are located in Center IV: Ca Mau, Kien Giang; Center III: Khanh Hoa, Phu Yen; for more details, please refer to the site list.
VMS Uni-Ran Project Overview
内部公开▲
4
VMS Uni-Ran Project Overview
Notes: Total: 353 sites; Phase1: 254 sites; Phase2: 99 sites
BTS Configuration
Area BTS Type Number CE Antenna Function InterfaceOutput Power
Center III
Macro Indoor:G9 S444+US222
102 38403 dual band
GSM900/1800+03 broadband UMTS2100
HSDPA+ 21Mbps HSUPA 5.76Mbps
8E1+2GE/FE 15W/C
Macro Indoor:G9S444+G18 S444+US222
48 384
03 dual band GSM900/1800
+03 broadband UMTS21006 Combiners
(900M/1800 M )/Site
HSDPA+ 21Mbps HSUPA 5.76Mbps
8E1+2GE/FE 15W/C
Macro Outdoor:G9 S444 +U S222
120 384
110set : 03 dual band GSM900/1800
+03 broadband UMTS210010set : 900/1800/2100
triple-band integrated cluster antenna
HSDPA+ 21Mbps HSUPA 5.76Mbps
8E1+2GE/FE 15W/C
Distributed:G9 S444 +U S222
83 384
73set : 03 dual band GSM900/1800
+03 broadband UMTS210010set : 900/2100 Dual-band integrated cluster
antenna
HSDPA+ 21Mbps HSUPA 5.76Mbps
8E1+2GE/FE 15W/C
内部公开▲
5
VMS Uni-Ran Project Overview
Notes: Total: 429 sites; Phase1: 354 sites; Phase2: 75 sites
BTS Configuration
Area BTS Type Number CE Antenna Function InterfaceOutput Power
Center IV
Macro Indoor:G9 S444 +U S222
138 384
03 dual band GSM900/1800 two ports+03 broadband
UMTS2100
HSDPA+ 21Mbps HSUPA
5.76Mbps
8E1+2GE/FE
15W/C
Macro Indoor:G9 S444+G18 S444+U S222
12 384
03 dual band GSM900/1800 two ports+03 broadband
UMTS21006 Combiners
(900M/1800 M )/Site
HSDPA+ 21Mbps HSUPA
5.76Mbps
8E1+2GE/FE
15W/C
Macro Outdoor:G9 S444 +U S222
162 384
152sets : 03 dual band GSM900/1800 two ports+03 broadband
UMTS210010sets : triple-band
integrated cluster antenna
HSDPA+ 21Mbps HSUPA
5.76Mbps
8E1+2GE/FE
15W/C
Distributed:G9 S444 +U S222
117 384
107sets : 03 dual band GSM900/1800 two ports+03 broadband
UMTS210010sets : Dual-band
integrated cluster antenna
HSDPA+ 21Mbps HSUPA
5.76Mbps
8E1+2GE/FE
15W/C
内部公开▲
6
Survey&Design Workflow
TSSR&Drawings will provide 3 hardcopy and 1 softycopy to ZTE.
内部公开▲
7
Equippent Introducaiton
ZXSDR BS8800 (Indoor 2G GSM)
RRU(R8840 For 3G,R8860E For 2G)
ILPB
OLPB
Power System ZXDU68 B201 And Battery
RF Accessory
内部公开▲
8
ZXSDR BS8800
Main information
Main rack dimension (H*W*L) 950*600*450
Cable from up side
DC -48V Single Power input
Support stack install.
With BBU+RSU+Power Distributed Unit +Fan
For this project, RSU for 900 or 900/1800 RF module.
Weight/Rack : Less than 135Kg (Full configuration)
Maintenance requirement : front side>800mm,back side
>100mm,other side,100mm .
内部公开▲
9
ZXSDR BS8800
RF layer
Fan subrack
Baseband layer
Notes: In VMS Project Only 1 main Rack and 1 Base Band Unit is configured.
内部公开▲
10
ZXSDR BS8800-BBU Part
PM Fabric Switch ModuleBaseband
Processing Board
FAN ModuleCC Module SA Module
Notes: 1. In VMS Project Configures 1 BBU for per site.
2 U
2. 2G and 3G shares 1 BBU
3. SA support 8 Dry-Contact Alarm.
4. Abis interface suport E1, FE, Optical Fiber .
内部公开▲
11
ZXSDR BS8800 Installation
Internal Cable Connection External Cable Connection
内部公开▲
12
ZXSDR RRU(R8840)
R8840:320mm(W)×160mm(D)* 370 mm(H)
Weight<16.5 Kg
Power :– 48 V DC (-57 V DC~-40 V DC) Consumption : <300 W
160mm
370mm
320mm
内部公开▲
13
ZXSDR R8840-Interface
内部公开▲
14
ZXSDR RRU(R8860E)
R8860E:320mm(W)×197mm(D)* 370 mm(H)
Weight<20 Kg
Power :– 48 V DC (-57 V DC~-40 V DC) Consumption : < 330 W
197mm
370mm
320mm
内部公开▲
15
ZXSDR R8860E-Interface
内部公开▲
16
ZXSDR RRU-Installation- On Pole
321
Notes: In VMS Project, We only use the single RRU-pole installation
内部公开▲
17
ZXSDR RRU-Installation-Mounted on Wall
Outdoor Mount –on Wall Indoor Mount –on Wall
内部公开▲
18
Indoor Lighting Protection Box
Dimension
400mm(H)×450mm(W)×105mm (D)
Weight <8 kg
Support 3 Line output, 1 Line Input
Install >1m above the Ground
Use 25mm2 power cable to connectTo the Power System
SA board of BBU will use the cableTo connect to the ILPB for dry-contact Alarm.
Install on the Wall
Use 35 mm2 grounding cable Connected to the indoor or OutdoorGrounding Bar
内部公开▲
19
Outdoor Lighting Protection Box
Dimension:305mm ( H)×238mm(W)×106mm(D)
Install Type: Pole-Mounted
Weight:<3Kg
Front View without cover
Notes : 1. Support 2 RRU per one, but normal 1 OLPB for 1 RRU. 2. The distance between RRU and OLPB should less than 2 m due to the limited cable length
内部公开▲
20
Power System –ZXDU68 B201
1. Integrated chassis2. Power distribution unit front panel3. Input/output integrated socket4. Slot 15. Slot 26. Slot 37. Slot 58. Slot 4
1. Integrated chassis2. Power distribution unit front panel3. Input/output integrated socket4. Slot 15. Slot 26. Slot 37. Slot 58. Slot 4
•ZXD2400 Rectifier•ZXD2400 Rectifier
Notes : 1. This power system is configured for the BTS if not reuse the existing power system.
2. Every B201 configures 3 ZXD2400.
3. Support 3 phase AC input.
内部公开▲
21
Power System –Battery
Battery Bank (12 V 100Ah)Battery Bank (12 V 100Ah)
1. This battery bank will be configured together power system when necessary.
2. For Indoor site, will use 2*100Ah, and 2*135Ah for outdoor site.
3. 2*100Ah battery Installed in the DG-DJM12100-11 battery rack; 2*135Ah battery Installed in the PC8910A battery cabinet
Battery Bank (12 V 135Ah)Battery Bank (12 V 135Ah)
内部公开▲
22
UMTS Antenna- 2 Ports
RF Part-Antenna 1- UMTS ANT
Will be installed on 2m Pole of 76mm diameter
内部公开▲
23
RF Part-Antenna 2- GSM900&1800&UMTS triple-band ANT
GSM900&1800&UMTS triple-band Antenna- 4 Ports
Will be installed on 3m Pole with 76mm diameter
内部公开▲
24
RF Part-Antenna 3- GSM900 &1800 dual-band ANT
GSM900 &1800 dual-band Antenna- 2 Ports
Will be installed on 3m Pole with 76mm diameter
内部公开▲
25
RF Part-Antenna 5- Cluster dual-band ANT
Cluster decoration antenna dual-band antenna- 4 Ports
Will be installed on 4m Pole with 76mm diameter
TYPEMBCIJS900/3G6517/18DE10/8-VN
Electrical Specifications
(MHz) 870-960 1920-2170
Gain(dBi) 16.7 17.5
Polarization ±45° ±45°
Horizontal-3dB Beamwidth(°) 65 65
Vertical-3dB Beamwidth(°) 7.8 5.5
Electrical Downtilt(°) 0-10 0-8
First Suppression(dB) ≥16 ≥16
Cross polar ratioMaindirection 0°Sector ±60°
≥15≥10
Front-to-Back Ratio(dB) ≥28
V.S.W.R < 1.5
Isolation intrasystem(dB) ≥30
Isolation intersystem(dB) ≥30
PIM3(dBc) < -150
Impedance(Ω) 50
Lightning Protection Direct Ground
Maximum Input Power(W) 500 200
Integration Specifications
Radiating Element Material Aluminium
Connector Type 7/16DIN(F) ×4
Sector Number 3 ( Equispaced)
Radome Material FRP
Radome Color White/Custome-made
Weight(kg) 190
Dimension(mm) D540× H2800
Packing Size(mm) 750×630×2900
Heightening Pole Height(m) 1~15
Maximun Azimuth Angle (°) ± 15
Pole Diameter(mm) 165
Isolation Between Two Sectors(dB) ≥ 45
Maximun Wind Speed (km/h) 200
Operating Temperature(℃) -40~+70
Reposition Temperature( )℃ -55~+80
MTBF(H) 100000
内部公开▲
26
RF Part-Antenna 4- Cluster triple-band ANT
Cluster decoration antenna triple-band Antenna- 6 Ports
Will be installed on 3m Pole with 76mm diameter
内部公开▲
27
RF Part-Acceessory
C Andrew Combiner. Comba Combiner. Comba TMA
Remark: This will be used according to the requirement.
内部公开▲
28
RF Solution-Scenario 1
1. Where the RRU installed should accord with VMS’s standard.
2.When from ANT to RRU <20m will use ½ jumper to connect ,or will use 7/8 feeder cable
3.All the old GSM single-band antenna will be replaced by new dual-band antenna.
4. The feeder cable will be reused when swap if possible
5. Combiner will be installed for future expansion.
240 sites
BTS Type
Number
Antenna
G9 S444+U S222
102(III)+138(IV)Dual-band 900/1800MHz
(2 Ports/Combiner Integrated)
Broadband 2100MHz(2 Ports)
内部公开▲
29
RF Solution-Scenario 2
1. Where the RRU installed should accord with VMS’s standard.
BTS Type
Number
Antenna
G9 S444+G18 444+U S222
48(III)+12(IV)Dual-band 900/1800MHz
(2 Ports/Combiner Integrated)
Broadband 2100MHz(2 Ports)
2. Used to Coastal Coverage. The detail site refer to the site list.
3. TMA for enhancing signal, and combiner for future 1800 expansion.
60 sites
内部公开▲
30
RF Solution-Scenario 3
BTS Type
Number
Antenna
G9 S444+U S222
242
Dual-band 900/1800MHz
(2 Ports/Combiner Integrated)
Broadband 2100MHz(2 Ports)
1. Where the RRU installed should accord with VMS’s standard.
GSM 900
GSM 900
ANT900/1800(2 ports)
RF Category 2 - Outdoor Macro + RRU–Dual-band + Single-band Antenna
7/8 feeder
Ground Clamp
Feeder Clamp
½ Jumper
Fiber
Outdoor Macro
ANT2100
(2 ports)
UMTS2100
242 sites
内部公开▲
31
RF Solution-Scenario 4
BTS Type
Number
Antenna
G9 S444+U S222
10(III)+10(IV)Triple-band
900/1800/2100MHz(6 Ports)
1. Where the RRU installed should accord with VMS’s standard.
20 sites
GSM 900
GSM 900
ANT900/1800/2100
(6 ports)
7/8feeder
GroundClamp
FeederClamp
½Jumper
Fiber
Outdoor Macro
UMTS2100
内部公开▲
32
RF Solution-Scenario 5
BTS Type
Number
Antenna
G9 S444+U S222
10(III)+10(IV)900/2100 Dual-band
integrated cluster antenna
1. The RRU should be installed on the rooftop by mounting pole.
20 sites
GSM 900
GSM 900
Cluster ANT900/1800/2100
(6 ports)
7/8feeder
GroundClamp
FeederClamp
½Jumper
Fiber
Outdoor Macro
UMTS2100
2. The Antenna should be installed on the special 4m*Φ165 pole.
内部公开▲
33
RF Solution-Scenario 6
BTS Type
Number
Antenna
G9 S444 +U S222
73(III)+107(IV)Dual-band 900/1800MHz
(2 Ports)Broadband 2100MHz
(2 Ports)
1. This scenario is special for BS8700 system installation.
180 sites
Distributed (BBU is indoor)
GSM 900
ANT900/1800(2 ports)
Ground Clamp
Feeder Clamp
½ Jumper
Fiber
UMTS2100
ANT2100
(2 ports)
内部公开▲
34
RF Solution-Scenario 7
BTS Type
Number
Antenna
G9 S444+U S222
10(III)+10(IV) 900/2100 Dual-band integrated cluster antenna
20 sites Cluster ANT900/2100
(4 ports)7/8feeder
Ground ClampFeeder Clamp
½Jumper
Fiber
Outdoor Macro
UMTS 2100
GSM 900
1. This scenario is special for BS8700 system installation.
内部公开▲
35
Swap Principle
2. BTS Location: will pre-install in the new position before swap if sufficient space. will install the new BTS at the old BTS position if insufficient space.
1. Almost swap the existing site following 1: 1, to reduce the risk during the swap work
3. Power Supply: Try to reuse existing power if available capacity and battery status.
4. RF :Try to reuse the feeder and 2G ANT if its status is acceptable, but All 3G ANT will be add.
5. Cable & Cable Tray installation: Install new power cable and new ladder as less as possible.
Notes: The detail and final swap principle not confirmed with VMS.
内部公开▲
36
Cable Connection&Specification-BS8800
1. -48V &0 V power cable with 25 mm^2
2. Grounding cable with 35m^2
内部公开▲
37
Cable Connection&Specification-1 RRU8840
The Nearest Outdoor Grounding Point
R8840
Type D
16 mm2
35 mm2
25 mm2
Bl ue25 mm2
Bl ack
Outdoor Optical Cable
Dedicated Power Cable For R8840
16 mm2 Yellow green
16 mm2
B8200
16 mm
E1 Cable
16 mm2
Ethernet cable
Switch
2
16 mm 2
RNC orNODEB
16 mm2
Outdoor
Indoor
Outdoor Grounding Bar Closed to The Feeder Window
Antenna
Type N
Yellow green
Yellow green
Yellow green
Outdoor lightning arrester
Grounding Clip For R8840 Power Cable
Indoor lightning arrester
Yellow GreenYellow Green
Yellow Green
Yellow Green
35 mm2
Yellow Green
Power Distribution Cabinet
Grounding Clip For R8840 Power Cable
Monitor
2- cored Own LC/PC ConnectorLC
/PC
Co
nne
cto
rMonitor cable
Optical Fiber
Optical Fiber
Outdoor
Indoor
-Single Mode 0ptical Fiber
Select From the 3 Access Modes(Optical Fiber,E1 Cable,Ethernet cable)
DDF /Transmission
Equipment
ODF/ Optical Switch
E1 Cable
Ethernet cable
Indoor Grounding Bar
.
Note:1. It is applied to roof installation (single).
2. The outdoor lightning arrester is not needed when R8840 is installed outdoors.
3. The equipment is grounded at nearest places (like outdoor cabling rack).
-48V
Protection Gground
Working Ground
Optical Fiber
Cable Supplied by Customer
Cable Supplied by ZTE
Ethernet Cable
Diagram of equipment connection(single installation)
Connecting with power distribution
cabinet when indoors installing
R8840It is not used when
indoors installing R8840
内部公开▲
38
Cable Connection&Specification- 3 RRU8840
16mm2
Outdoor grounding bar(Near the feeder
window)
16 mm216 mm2 Yellow green
16 mm2 Yellow green
Yellow green
16 mm216 mm2 Yellow green
16 mm2 Yellow green
Yellow green
16 mm2 Yellow green16 mm2
Yellow green 16 mm2
Yellow green
Outdoor Grounding Bar Closed to R8840
Outdoor Grounding Point
R8840
Type D
Outdoor Optical Cable
Dedicated Power Cable For R8840
Antenna
Type N
Outdoor lightning arrester
Monitor
Connecting with power distribution
cabinet when indoors installing
R8840
It is not used when indoors installing R8840
16mm2
Outdoor lightning arrester
Monitor
Dedicated Power Cable For R8840 R8840
Type D
Antenna
Type N
Grounding Clip For R8840 Power Cable
Grounding Clip For R8840 Power Cable
Grounding Clip For R8840 Power Cable
Connecting with power distribution
cabinet when indoors installing
R8840
Outdoor Optical Cable
It is not used when indoors installing R8840
mm2
Outdoor lightning arrester
Monitor
Dedicated Power Cable For R8840 R8840
Type D
Antenna
Type N
Connecting with power distribution
cabinet when indoors installing
R8840
Outdoor Optical Cable
It is not used when indoors installing R8840
Grounding Clip For R8840 Power Cable
Outdoor
Indoor
OutdoorIndoor 35 mm2
25 mm2
Bl ue25 mm2
Bl ack
16 mm2
B8200
16 mm
E1 Cable
16mm2
Ethernet cable
Switch
2
16 mm 2
RNC orNODEB
Yellow green
Yellow GreenYellow Green
Yellow Green
Yellow Green
35 mm2
Yellow Green
Power Distribution Cabinet
2-cored Own Power Cable
LC/PC ConnectorOptical Fiber -Single Mode 0ptical Fiber
Select From the 3 Access Modes(Optical Fiber,E1 Cable,Ethernet cable)
DDF /Transmission
Equipment
ODF/ Optical Switch
E1 Cable
Ethernet cable
Indoor Grounding Bar
-48V
Protection Gground
Working Ground
Optical Fiber
Cable Supplied by Customer
Cable Supplied by ZTE
Ethernet Cable
Indoor lightning arrester
Monitor
Diagram of equipment connection(installation mode of over 2 sectors)
Note: 1. It is applied to tower installation, 2 sectors and 3 sectors pole installation modes.
2. The outdoor lightning arrester is unnecessary when R8840 is installed indoors.
3. When two R8840s are installed at one place, another independent R8840 is nearly grounded.
内部公开▲
39
Cable Connection Specification- Design Guideline
1. When do the site layout, should consider some fixed cable delivery from ZTE.
2. The cable specification should strictly follow ZTE delivered material specification.
3. The cable connection should follow VMS’s installation standard .
4. The cable layout will follow the cable re-used principle.
5. Some connector is special one, So the cable length will be limited.