student union project

6
STUDENT UNION PROJECT

Upload: mliss

Post on 14-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

STUDENT UNION PROJECT. Phase 1 - May 17, 2010 site work begins Phase 2 - August 2010 to November 2011 building construction period Phase 3 - November 2011 to April 2012 Davies deconstruction Phase 4 - April 2012 to August 2012 completion of project site work and landscaping - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: STUDENT UNION PROJECT

STUDENT UNION PROJECT

Page 2: STUDENT UNION PROJECT

PROJECT TIMELINE

•Phase 1 - May 17, 2010 site work begins •Phase 2 - August 2010 to November 2011 building construction period•Phase 3 - November 2011 to April 2012 Davies deconstruction •Phase 4 - April 2012 to August 2012 completion of project site work and landscaping

During the various phases of construction the amount of available parking will fluctuate, but the amount should not drop below 189 available spaces. There are currently 441 spaces available.

Page 3: STUDENT UNION PROJECT

EXISTING SITE

Page 4: STUDENT UNION PROJECT

CONSTRUCTION SITE

Page 5: STUDENT UNION PROJECT

IMPACTS OF CONSTRUCTION•This will reduce the available parking, but we have considerable parking that is not being utilized•We should all consider alternative transportation methods to campus•We can get through this without much pain if we work together•The administration is pursuing options to minimize the impacts to the

campus and the neighboring communities.•Parking revenue will be substantially decreased so the ability to improve existing parking lots, run shuttle buses, or rent offsite lots will be limitedThe Davies Steering Committee has a website for information updates

and will be continuously updated to keep the campus community informed, http://www.uwec.edu/centers/building/index.htm

Page 6: STUDENT UNION PROJECT

ANY QUESTIONS?