sts-127/2ja · 29 completed during eva4. the procedure t akes the ssrms from the batt f setup 30...

27
STS-127/2JA FD 10 Execute Package MSG Page(s) Title 086 1 - 18 FD10 Flight Plan Revision (pdf) 087 19 - 20 FD10 Mission Summary (pdf) 088 21 - 22 EVA4 Battery F Setup to Overnight Park (pdf) 089 23 - 24 EVA 4 Battery Cribsheet (pdf) 090 25 - 26 Lost and Found: Hitch Pin (pdf) Approved by FAO: T. Melroy Last Updated: Jul 24 2009 8:29AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Upload: others

Post on 08-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

STS-127/2JA FD 10 Execute Package

MSG Page(s) Title

086 1 - 18 FD10 Flight Plan Revision (pdf) 087 19 - 20 FD10 Mission Summary (pdf) 088 21 - 22 EVA4 Battery F Setup to Overnight Park (pdf) 089 23 - 24 EVA 4 Battery Cribsheet (pdf) 090 25 - 26 Lost and Found: Hitch Pin (pdf)

Approved by FAO: T. Melroy Last Updated: Jul 24 2009 8:29AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

 

 

 

Page 2: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 086 - FD10 FLIGHT PLAN REVISION

END OF PAGE 1 OF 18, MSG 086

MSG INDEX 1 2 MSG NO. TITLE 3 086 FD10 Flight Plan Revision 4 087 FD10 Mission Summary 5 088 EVA4 Battery F Setup to Overnight Park 6 089 EVA 4 Battery Cribsheet 7 090 Lost and Found: Hitch Pin 8 9 10 11 1. POST SLEEP CRYO CONFIG 12 13

For today's cryo config, O2 tanks 1, 3, and 4 and H2 tanks 1 and 5 will be active. We'll 14 have an A to B Bus Tie to gain better power transfer while maintaining Fuel Cell 3 at a 15 higher power level to prevent further Fuel Cell 3 Sustaining Heater cycles. 16

17 R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) 18

O2 TK3 HTRS B – AUTO 19 MN BUS TIE A - ON (tb-ON) 20

21 A11 CRYO TK4 HTRS O2 B - AUTO 22

23 A15 CRYO TK5 HTRS O2 A - OFF 24

25 2. SSRMS EVA 4 CONTINGENCY PROCEDURE 26 27

For Doug and Julie: MSG 088 will only be required if all the battery R&Rs are not 28 completed during EVA4. The procedure takes the SSRMS from the Batt F Setup 29 position back to the Overnight Park position. 30

31 3. HITCH PIN 32

33 In the downlinked photos, we noticed there is a hitch pin in the lost and found bag and 34 we think it may have come from the escape pole pip pin or the galley pip pin. Please 35 verify that the starboard escape pole pip pin and the top aft galley pip pin each have a 36 hitch pin in place. If one of the hitch pins is missing, please install the one from the 37 lost and found bag. Use MSG 090 as a reference. 38 39 40 41 42 43 44 45 46 47 48 49 50 51

1

Page 3: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 086 - FD10 FLIGHT PLAN REVISION

END OF PAGE 2 OF 18, MSG 086

4. EVA ITEMS 1 2 Have a great EVA 4! We have a couple last minute items for you: 3

4 1. Please let us know your plans for the J Bag, Camera, and LDTD Tethers. 5

Reference MSG 085 (20-0572) 6 2. An updated version of the EVA 4 Battery Cribsheet can be found in 7

MSG 089 (20-0574). As a result of getting approval to increase nominal 8 release torques on H1 and H2, some of the original cribsheet steps have 9 been moved to the nominal P6 Battery R&R procedure. 10

11 5. ACO TRANSFER STATUS 12

13 As a follow-up to last night's transfer brief, we agree that MF14O is a good location to 14 stow the Post-flight Analysis Packets that were generated on FD08 (Return Item 725). 15 Please note that two more packets (Return Item 726) will be generated today during 16 the PWD Water Collect activity and can be stowed in MF14O as well. Please continue 17 to reference the Transfer List electronic file, titled FD09_Transfer_List_STS127.xls, that 18 has been uplinked to C:\OCA-up\transfer (KFX machine). 19 20

6. UPDATED ROBOTICS PROCEDURE 21 22 MSG 082 - 5.102 EVA4 P6 Battery R&R that was printed on board yesterday is a 23 significantly updated procedure from procedure 5.102 EVA4 P6 Battery R&R that is in 24 the Robotics Flight Supplement book. Do not use the copy of 5.102 from the flown 25 Robotics Flight Supplement book. 26 27

7. REPLACE PAGES 2-32 THROUGH 2-37 AND 3-102 THROUGH 3-111. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

2

Page 4: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

FD09

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

FD09

10.2

DPRS

ISS A/L CAMPOUT @ 10.2 psi

FD10 14.7

RPRS

R

EPLA

NNED

2-32

S T S - 1 2 7

23

07/24

0102

0304

0506

0708

0910

GMT 07/23/09 (204)

008/00

0102

0304

0506

0708

0910

1112

MET

Day 008

CDR

SLEEP

POST SLEEP

PMC

A/G

M U SPAO

PRE SLEEP

PLT

SLEEP

POST SLEEP

PRE SLEEP

MS1

SLEEP

POST

SLEEP

H Y G

B R K /

P R B R T H

PRE SLP

MASK PB/TOOL

CONFIG

PRE

SLEEP

MS2

SLEEP

POST SLEEP

PRE SLEEP

PAOC R E W

D / L

MS3

SLEEP

POST

SLEEP

H Y G

B R K /

P R B R T H

PRE SLP

MASK PB/TOOL

CONFIG

PRE

SLEEP

MS4

SLEEP

POST SLEEP

PRE SLEEP

M D D K #

PAO

DAY/NIGHT

ORBIT

128

129

130

131

132

133

134

135

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

MBS PDGF3 @ WS8

SSRMS POS

#STATUS CHECK

NOTES

2-32

FD09

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

FD09

10.2

DPRS

ISS A/L CAMPOUT @ 10.2 psi

FD10 14.7

RPRS

R

EPLA

NNED

S T S - 1 2 7

23

07/24

0102

0304

0506

0708

0910

GMT 07/23/09 (204)

008/00

0102

0304

0506

0708

0910

1112

MET

Day 008

CDR

SLEEP

POST SLEEP

PMC

A/G

M U SPAO

PRE SLEEP

PLT

SLEEP

POST SLEEP

PRE SLEEP

MS1

SLEEP

POST

SLEEP

H Y G

B R K /

P R B R T H

PRE SLP

MASK PB/TOOL

CONFIG

PRE

SLEEP

MS2

SLEEP

POST SLEEP

PRE SLEEP

PAOC R E W

D / L

MS3

SLEEP

POST

SLEEP

H Y G

B R K /

P R B R T H

PRE SLP

MASK PB/TOOL

CONFIG

PRE

SLEEP

MS4

SLEEP

POST SLEEP

PRE SLEEP

M D D K #

PAO

DAY/NIGHT

ORBIT

128

129

130

131

132

133

134

135

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

SSRMS POS

MBS PDGF3 @ WS8

NOTES

#STATUS CHECK

3

Page 5: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD09

FD10

DE WINNE

R

EPLA

NNED

2-33

ISS D N E X P 1 9 U P E X P 2 0

23

07/24

0102

0304

0506

0708

0910

GMT 07/23/09 (204)

008/00

0102

0304

0506

0708

0910

1112

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

ORBIT

128

129

130

131

132

133

134

135

MBS PDGF3 @ WS8

SSRMS POS

FE-2

PWDPC

PRE SLEEP

SLEEP

NUTR

URN

CLCT

U R N I N S

POST

SLEEP

ISS CDR

PWDPC

PRE SLEEP

SLEEP

POST SLEEP

FE-1

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST SLEEP

FE-2 EXP20

P R E

S L E E P

PRE SLEEP

DPC

SLEEP

S L E E PS A L I V

POST SLEEP

FE-3

PWDPC

PRE SLEEP

SLEEP

POST SLEEP

FE-4

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST SLEEP

FE-5

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST

SLEEP

♣ ♣URN CLCT

NOTES

2-33

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD09

FD10

DE WINNE

R

EPLA

NNED

ISS D N E X P 1 9 U P E X P 2 0

23

07/24

0102

0304

0506

0708

0910

GMT 07/23/09 (204)

008/00

0102

0304

0506

0708

0910

1112

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

ORBIT

128

129

130

131

132

133

134

135

SSRMS POS

MBS PDGF3 @ WS8

FE-2

PWDPC

PRE SLEEP

SLEEP

NUTR

URN

CLCT

U R N I N S

POST

SLEEP

ISS CDR

PWDPC

PRE SLEEP

SLEEP

POST SLEEP

FE-1

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST SLEEP

FE-2 EXP20

P R E

S L E E P

PRE SLEEP

DPC

SLEEP

S L E E PS A L I V

POST SLEEP

FE-3

PWDPC

PRE SLEEP

SLEEP

POST SLEEP

FE-4

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST SLEEP

FE-5

PWDPC

PRE SLEEP

SLEEP

S L E E PS A L I V

POST

SLEEP

NOTES

♣URN CLCT

4

Page 6: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

FD10

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

NO EXERCISE

[DUAL ARM OPS]

EVA 4 - 7:30

10.2

DPRS

NO UNISOLATED EXERCISE

[SSRMS AT EVA WS, P6 BATT INSTALL]

RE

PLAN

NED

2-34

S T S - 1 2 7

11

1213

1415

1617

1819

2021

22GMT 07/24/09 (205)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

CDR

POST SLEEP

MEAL

P/TV 07 S/U

EXERCISE

P/TV 07 EVA

SUPT

M C I U *

ICC

GRPL

RMS ICC

BERTH

I N H I B

P A D

P T V 6 &

C W C # 3

I N I T

C W C # 4

I N I T

C W C

T E R M

C W C

T E R M

CWC

XFER

M O 6 9 M

PLT

POST SLEEP

W C S *EXERCISE

I M U

ICC

GRPL

RMS ICC

BERTH

SSRMS

ICC

MVR

EVA WS

SSRMS EVA 4 SUPT

MS1

HYG BRK/

PRBRTH

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

E G R S

P - R P S

R P R S

S E T U P

CLNUP &

INGRS

POST

EVA

W/H20

P6 BATT R&R & C/U

MS2

POST SLEEP

PRE

SLEEP

EXERCISE

S S R M S

I C C R L S

M U SSSRMS EVA 4 SUPT

SSRMS

ICC

MVR

EVA WS

ICC

MVR

H/O

POST

SLEEP

MS3

HYG BRK/

PRBRTH

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

E G R S

P - R P S

R P R S

S E T U P

CLNUP &

INGRS

POST

EVA

W/H20

P6 BATT R&R & C/U

MS4

POST

SLEEP

HYG

BRK/

HATCH

CLS

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P - R P S

R P R SMEAL

P/TV 07 EVA SUPT

M D D K #

P/TV 07 EVA SUPT

POST

EVA

W/H20

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

MBS PDGF3 @ WS8

SSRMS POS

*FILTER CK

&DEACT

*COMPACT

#STATUS CHECK

NOTES

2-34

FD10

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

NO EXERCISE

[DUAL ARM OPS]

EVA 4 - 7:30

10.2

DPRS

NO UNISOLATED EXERCISE

[SSRMS AT EVA WS, P6 BATT INSTALL]

RE

PLAN

NED

S T S - 1 2 7

11

1213

1415

1617

1819

2021

22GMT 07/24/09 (205)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

CDR

POST SLEEP

MEAL

P/TV 07 S/U

EXERCISE

P/TV 07 EVA

SUPT

M C I U *

ICC

GRPL

RMS ICC

BERTH

I N H I B

P A D

P T V 6 &

C W C # 3

I N I T

C W C # 4

I N I T

C W C

T E R M

C W C

T E R M

CWC

XFER

M O 6 9 M

PLT

POST SLEEP

W C S *EXERCISE

I M U

ICC

GRPL

RMS ICC

BERTH

SSRMS

ICC

MVR

EVA WS

SSRMS EVA 4 SUPT

MS1

HYG BRK/

PRBRTH

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

E G R S

P - R P S

R P R S

S E T U P

CLNUP &

INGRS

POST

EVA

W/H20

P6 BATT R&R & C/U

MS2

POST SLEEP

PRE

SLEEP

EXERCISE

S S R M S

I C C R L S

M U SSSRMS EVA 4 SUPT

SSRMS

ICC

MVR

EVA WS

ICC

MVR

H/O

POST

SLEEP

MS3

HYG BRK/

PRBRTH

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

E G R S

P - R P S

R P R S

S E T U P

CLNUP &

INGRS

POST

EVA

W/H20

P6 BATT R&R & C/U

MS4

POST

SLEEP

HYG

BRK/

HATCH

CLS

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P - R P S

R P R SMEAL

P/TV 07 EVA SUPT

M D D K #

P/TV 07 EVA SUPT

POST

EVA

W/H20

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

SSRMS POS

MBS PDGF3 @ WS8

NOTES

*FILTER CK

&DEACT

*COMPACT

#STATUS CHECK

5

Page 7: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD10

DE WINNE

EVA 4 - 7:30

RE

PLAN

NED

NO EXERCISE

[DUAL ARM OPS]

NO UNISOLATED EXERCISE

[SSRMS AT EVA WS, P6 BATT INSTALL]

2-35

ISS D N E X P 1 9 U P E X P 2 0

11

1213

1415

1617

1819

2021

22GMT 07/24/09 (205)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

MBS PDGF3 @ WS8

SSRMS POS

FE-2

POST

SLEEP

L A BDPC

DPC

PWPW

P I V O T

S W A P

G/T

VLV

INSUL

INSTL

CGSE

CLOSEOUT

INSTAL

H U M I

D E T A C H

B D C U

C L S O U T

EXERCISE

ARED

MIDDAY-MEAL

FFQ

EXERCISE

TVIS

ICC

MVR

H/O

S S R M S

I C C R L S

ISS CDR

POST

SLEEP

PWPW

PWDPC

DPC

EXERCISE

TVIS

TVIS

HYG

ВГК1 DSCT

ГФИ 8 OBS

EXERCISE

CEVIS

MIDDAY-MEAL

IMS-EQUIP-INV3

СОЖ MNT

IMS

FE-1

POST

SLEEP

T E S TPW

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

EXERCISE

TVIS

EXERCISE ARED

MIDDAY-MEALFFQ

E M U - T

G L O V E

R P R S

POST

EVA

W/H20

FE-2 EXP20

POST

SLEEP

HYG

BRK/

HATCH

CLS

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

IVA SUPPORT EVA 4

P - R P S

R P R S

POST

EVA

W/H20

FE-3

POST

SLEEP

PWPW

DPC

DPC

EXERCISE

CEVIS

МБИ

18 PREP

РБО

LUL

VFY

МБИ 18 EX CLST

EXERCISE

TVIS

TVIS

HYG

MIDDAY-MEAL

IMS-EQUIP-INV3

И П - 1

FE-4

POST

SLEEP

PWPW

PWDPC

DPC

EXERCISE ARED

EXERCISE

CEVIS

A L T E A

FFQ

ACC

INST

MIDDAY-MEAL

PCS R12 HD PREP

FE-5

U R N

C L C T

URN

CLCT

URN

CLCT

URN

CLCT

U R N I N 1

P O S T

S L E E P

DPC

DPC

PWPW

PWW R S

EHS-PWD

WATER-CLCT

EXERCISE ARED

R C D

U R N I N S

U R N I N S

U R N I N S

P W D

R E C LFFQ

MIDDAY-MEAL

EXERCISE

CEVIS

X F E R

E X D L

NOTES

2-35

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD10

DE WINNE

EVA 4 - 7:30

RE

PLAN

NED

NO EXERCISE

[DUAL ARM OPS]

NO UNISOLATED EXERCISE

[SSRMS AT EVA WS, P6 BATT INSTALL]

ISS D N E X P 1 9 U P E X P 2 0

11

1213

1415

1617

1819

2021

22GMT 07/24/09 (205)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

SSRMS POS

MBS PDGF3 @ WS8

FE-2

POST

SLEEP

L A BDPC

DPC

PWPW

P I V O T

S W A P

G/T

VLV

INSUL

INSTL

CGSE

CLOSEOUT

INSTAL

H U M I

D E T A C H

B D C U

C L S O U T

EXERCISE

ARED

MIDDAY-MEAL

FFQ

EXERCISE

TVIS

ICC

MVR

H/O

S S R M S

I C C R L S

ISS CDR

POST

SLEEP

PWPW

PWDPC

DPC

EXERCISE

TVIS

TVIS

HYG

ВГК1 DSCT

ГФИ 8 OBS

EXERCISE

CEVIS

MIDDAY-MEAL

IMS-EQUIP-INV3

СОЖ MNT

IMS

FE-1

POST

SLEEP

T E S TPW

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

EXERCISE

TVIS

EXERCISE ARED

MIDDAY-MEALFFQ

E M U - T

G L O V E

R P R S

POST

EVA

W/H20

FE-2 EXP20

POST

SLEEP

HYG

BRK/

HATCH

CLS

CAMPOUT EVA PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

IVA SUPPORT EVA 4

P - R P S

R P R S

POST

EVA

W/H20

FE-3

POST

SLEEP

PWPW

DPC

DPC

EXERCISE

CEVIS

МБИ

18 PREP

РБО

LUL

VFY

МБИ 18 EX CLST

EXERCISE

TVIS

TVIS

HYG

MIDDAY-MEAL

IMS-EQUIP-INV3

И П - 1

FE-4

POST

SLEEP

PWPW

PWDPC

DPC

EXERCISE ARED

EXERCISE

CEVIS

A L T E A

FFQ

ACC

INST

MIDDAY-MEAL

PCS R12 HD PREP

FE-5

U R N

C L C T

URN

CLCT

URN

CLCT

URN

CLCT

U R N I N 1

P O S T

S L E E P

DPC

DPC

PWPW

PWW R S

EHS-PWD

WATER-CLCT

EXERCISE ARED

R C D

U R N I N S

U R N I N S

U R N I N S

P W D

R E C LFFQ

MIDDAY-MEAL

EXERCISE

CEVIS

X F E R

E X D L

NOTES

6

Page 8: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

FD10

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

FD11

R

EPLA

NNED

2-36

S T S - 1 2 7

23

07/25

0102

0304

0506

0708

0910

GMT 07/24/09 (205)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

SLEEP

POST SLEEP

PMC

A/G

PRE SLEEP

RMS

ICC

BERTH

D A P *P T V 6 &

PRE

SLEEP

PLT

SLEEP

PRE SLEEP

POST SLEEP

RMS

ICC

BERTH

MS1

SLEEP

PRE SLEEP

POST SLEEP

A S P R NL O G

S L V A

POST EVA

W/H20

MS2

SLEEP

PRE SLEEP

POST SLEEP

MS3

SLEEP

PRE SLEEP

POST SLEEP

A S P R NL O G

S L V A

POST EVA

W/H20

MS4

SLEEP

PRE SLEEP

POST SLEEP

M D D K #

S L V A

POST EVA

W/H20

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

151

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

MBS PDGF3 @ WS8

SSRMS POS

*UPDATE

&DEACT #S

TATUS CHECK

NOTES

2-36

FD10

POLANSKY

HURLEY

CASSIDY

PAYETTE

MARSHBURN

WOLF

FD11

R

EPLA

NNED

S T S - 1 2 7

23

07/25

0102

0304

0506

0708

0910

GMT 07/24/09 (205)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

SLEEP

POST SLEEP

PMC

A/G

PRE SLEEP

RMS

ICC

BERTH

D A P *P T V 6 &

PRE

SLEEP

PLT

SLEEP

PRE SLEEP

POST SLEEP

RMS

ICC

BERTH

MS1

SLEEP

PRE SLEEP

POST SLEEP

A S P R NL O G

S L V A

POST EVA

W/H20

MS2

SLEEP

PRE SLEEP

POST SLEEP

MS3

SLEEP

PRE SLEEP

POST SLEEP

A S P R NL O G

S L V A

POST EVA

W/H20

MS4

SLEEP

PRE SLEEP

POST SLEEP

M D D K #

S L V A

POST EVA

W/H20

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

151

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

SSRMS POS

MBS PDGF3 @ WS8

NOTES

*UPDATE

&DEACT #S

TATUS CHECK

7

Page 9: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD10

FD11

DE WINNE

R

EPLA

NNED

2-37

ISS D N E X P 1 9 U P E X P 2 0

23

07/25

0102

0304

0506

0708

0910

GMT 07/24/09 (205)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

TDRS

AVAIL

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

151

MBS PDGF3 @ WS8

SSRMS POS

FE-2

PRE SLEEP

SLEEP

J P MPOST SLEEP

ISS CDR

PRE SLEEP

SLEEP

POST SLEEP

FE-1

P O S T

E V A

W / H 2 0

POST

EVA

W/H20

I M A G E

R E B A - I

PRE

SLEEP

SLEEP

S L E E P

POST SLEEP

FE-2 EXP20

POST EVA

W/H20

B S A - I

PRE SLEEP

SLEEP

S L E E P

POST SLEEP

FE-3

PRE SLEEP

SLEEP

POST SLEEP

FE-4

PRE SLEEP

SLEEP

S L E E P

POST SLEEP

FE-5

PRE SLEEP

SLEEP

S L E E P

URN

CLCT

U R N I N S

♣POST

SLEEP

♣NUTR-URINE-STOW

NOTES

2-37

WAKATA

KOPRA

BARRATT

PADALKA

THIRSK

ROMANENKO

FD10

FD11

DE WINNE

R

EPLA

NNED

ISS D N E X P 1 9 U P E X P 2 0

23

07/25

0102

0304

0506

0708

0910

GMT 07/24/09 (205)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

TDRS

AVAIL

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

151

SSRMS POS

MBS PDGF3 @ WS8

FE-2

PRE SLEEP

SLEEP

J P MPOST SLEEP

ISS CDR

PRE SLEEP

SLEEP

POST SLEEP

FE-1

P O S T

E V A

W / H 2 0

POST

EVA

W/H20

I M A G E

R E B A - I

PRE

SLEEP

SLEEP

S L E E P

POST SLEEP

FE-2 EXP20

POST EVA

W/H20

B S A - I

PRE SLEEP

SLEEP

S L E E P

POST SLEEP

FE-3

PRE SLEEP

SLEEP

POST SLEEP

FE-4

PRE SLEEP

SLEEP

S L E E P

POST SLEEP

FE-5

PRE SLEEP

SLEEP

S L E E P

URN

CLCT

U R N I N S

♣POST

SLEEP

NOTES

♣NUTR-URINE-STOW

8

Page 10: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

POLANSKY

PAYETTE

HURLEY

10

FD10 EZ ACTIVITES:

TEPC (ORB OPS, CREW SYS

) CHECK STATUS

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),

& OCA ROUTER.

R

EPLA

NNED

3-102

STS-

127

FD (

)

07:00

08:00

09:00

10:00

GMT

Date

07/24

(205)

08:00

09:00

10:00

11:00

12:00

MET

Day 008

WE

Z

T D R S

~ ~~

~

D / N

D O R B 1 3 1 4 1 5

O R B 1 3 3 1 3 4 1 3 5

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-102

POLANSKY

PAYETTE

HURLEY

10

FD10 EZ ACTIVITES:

TEPC (ORB OPS, CREW SYS

) CHECK STATUS

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),

& OCA ROUTER.

R

EPLA

NNED

STS-

127

FD (

)

07:00

08:00

09:00

10:00

GMT

Date

07/24

(205)

08:00

09:00

10:00

11:00

12:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 1 3 1 4 1 5

O R B 1 3 3 1 3 4 1 3 5

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

9

Page 11: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

ED

3-103

STS-

127

FD (

)

07:00

08:00

09:00

10:00

GMT

Date

07/24

(205)

08:00

09:00

10:00

11:00

12:00

MET

Day 008

WE

Z

T D R S

~ ~

~

~

D / N

D O R B 1 3 1 4 1 5

O R B 1 3 3 1 3 4 1 3 5

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-103

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

EDST

S-12

7 FD

(

)

07:00

08:00

09:00

10:00

GMT

Date

07/24

(205)

08:00

09:00

10:00

11:00

12:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 1 3 1 4 1 5

O R B 1 3 3 1 3 4 1 3 5

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

MS3

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

10

Page 12: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

POLANSKY

PAYETTE

HURLEY

10

A KEEL 1 PWR(ICC) - ON

√1 ILL PWR(ICC) - ON

2 PWR(JLE) - ON

√2 ILL PWR(JLE) - ON

R

EPLA

NNED

3-104

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/24

(205)

12:00

13:00

14:00

15:00

16:00

MET

Day 008

WE

Z

T D R S

~ ~

~

~

D / N

D O R B 1 5 1 2 3

O R B 1 3 5 1 3 6 1 3 7 1 3 8

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

P/TV07 EVA

(PHOTO/TV, SCENES) SETUP

EXERCISE

L17 Check MCIU filter screen

EVA 4 INHIBIT PAD

(EVA, TIMELINES)

P/TV06 ROBOTICS OPERATIONS A

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

WCS COMPACTOR OPS (DUAL-VANE)

(ORB OPS, CUE CARD)

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 1-3

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 1-3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-104

POLANSKY

PAYETTE

HURLEY

10

A KEEL 1 PWR(ICC) - ON

√1 ILL PWR(ICC) - ON

2 PWR(JLE) - ON

√2 ILL PWR(JLE) - ON

R

EPLA

NNED

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/24

(205)

12:00

13:00

14:00

15:00

16:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 1 5 1 2 3

O R B 1 3 5 1 3 6 1 3 7 1 3 8

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV07 EVA

(PHOTO/TV, SCENES) SETUP

EXERCISE

L17 Check MCIU filter screen

EVA 4 INHIBIT PAD

(EVA, TIMELINES)

P/TV06 ROBOTICS OPERATIONS A

PLT

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

WCS COMPACTOR OPS (DUAL-VANE)

(ORB OPS, CUE CARD)

EXERCISE

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 1-3

MS2

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS) EXERCISE

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 1-3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

11

Page 13: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

ED

3-105

STS-

127

FD (

)

11:00

12:00

13:00

14:00

GMT

Date

07/24

(205)

12:00

13:00

14:00

15:00

16:00

MET

Day 008

WE

Z

T D R S

~ ~~

~

D / N

D O R B 1 5 1 2 3

O R B 1 3 5 1 3 6 1 3 7 1 3 8

~ ~B I A S - X L V - Z V VS T S A T T

MS1

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

~

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

MS3

EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

~

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYS: 1.211 HYGIENE BREAK

Steps 21-25

MCC-H performs Step 23

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

NOTES

3-105

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

EDST

S-12

7 FD

(

)

11:00

12:00

13:00

14:00

GMT

Date

07/24

(205)

12:00

13:00

14:00

15:00

16:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 1 5 1 2 3

O R B 1 3 5 1 3 6 1 3 7 1 3 8

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

MS3

~EVA SYS: 1.211 HYGIENE BREAK

Start no earlier than 8:40 hrs

from the end of:

1.206 10.2 PSIA CAMPOUT MASK PREBREATHE

MCC-H performs Steps 1-4,16-20 & 23

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

MS4

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYS: 1.211 HYGIENE BREAK

Steps 21-25

MCC-H performs Step 23

EVA SYS: 1.216 EVA PREP

EVA SYS: 1.220 EMU PURGE

EVA SYS: 1.225 EMU PREBREATHE

EVA SYS: CREWLOCK DEPRESS (CC)

EVA SYS: CREWLOCK POST DEPRESS (CC)

NOTES

12

Page 14: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

POLANSKY

PAYETTE

HURLEY

10

[BATT R&R]

NO UNISOL

EXERCISE

~

NO UNISOL

EXERCISE

[SSRMS AT

EVA WS]

R

EPLA

NNED

3-106

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/24

(205)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R S

~ ~~

~

D / N

D O R B 3 4 5

O R B 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

MEAL

P/TV07 EVA

(PHOTO/TV, SCENES) OPS

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)

Init Fill #3, Ref. MSG 057

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)

Init Fill #4, Ref. MSG 057

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS) FILL TERM

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS) FILL TERM

PLT

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

~

MS2

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

~

NOTES

3-106

POLANSKY

PAYETTE

HURLEY

10

[BATT R&R]

NO UNISOL

EXERCISE

~

NO UNISOL

EXERCISE

[SSRMS AT

EVA WS]

R

EPLA

NNED

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/24

(205)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 3 4 5

O R B 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

MEAL

P/TV07 EVA

(PHOTO/TV, SCENES) OPS

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)

Init Fill #3, Ref. MSG 057

SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS)

Init Fill #4, Ref. MSG 057

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS) FILL TERM

SHUTTLE/ISS H2O CNTR FILL

(ORB OPS, ECLS) FILL TERM

PLT

~

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

MS2

~

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

NOTES

13

Page 15: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

CASSIDY

MARSHBURN

WOLF

10

~

NO UNISOL

EXERCISE

[SSRMS AT

EVA WS]

[BATT R&R]

NO UNISOL

EXERCISE

R

EPLA

NNED

3-107

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/24

(205)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R S

~ ~

~

~

D / N

D O R B 3 4 5

O R B 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

MS1

EVA SYS: CREWLOCK EGRESS (CC)

EVA 4 SETUP

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

~

MS3

EVA SYS: CREWLOCK EGRESS (CC)

EVA 4 SETUP

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

~

MS4

MEAL

MDDK STATUS CHECK (ASSY OPS, P/L) Step 1

P/TV07 EVA

(PHOTO/TV, SCENES) OPS

NOTES

3-107

CASSIDY

MARSHBURN

WOLF

10

~

NO UNISOL

EXERCISE

[SSRMS AT

EVA WS]

[BATT R&R]

NO UNISOL

EXERCISE

R

EPLA

NNED

STS-

127

FD (

)

15:00

16:00

17:00

18:00

GMT

Date

07/24

(205)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 3 4 5

O R B 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

EVA SYS: CREWLOCK EGRESS (CC)

EVA 4 SETUP

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

MS3

EVA SYS: CREWLOCK EGRESS (CC)

EVA 4 SETUP

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

MS4

MEAL

MDDK STATUS CHECK (ASSY OPS, P/L) Step 1

P/TV07 EVA

(PHOTO/TV, SCENES) OPS

NOTES

14

Page 16: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

POLANSKY

PAYETTE

HURLEY

10

[FROM RMS

GRAPPLE

TO SSRMS

RELEASE]

NO EXERCISE

~

NO UNISOL

EXERCISE

[BAT

T R&

R]

R

EPLA

NNED

3-108

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/24

(205)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R S

~~ ~~

D / N

D O R B 6 7 8

O R B 1 4 1 1 4 2 1 4 3

~ ~B I A S - X L V - Z V VS T S A T T

CDR

ICC GRAPPLE FROM SSRMS

(PDRS, ICC NOMINAL)

EXERCISE CONSTRAINT

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

~

CWC TRANSFER

Transfer 2 CWCs to ISS

MO69M LEH O2 8 vlv - CL

PLT

ICC GRAPPLE FROM SSRMS

(PDRS, ICC NOMINAL)

EXERCISE CONSTRAINT

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

~

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

~

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 17-18

EXERCISE CONSTRAINT

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

~

EVA 4 P6 BATTERY R&R

Ref. MSG 086,item 6

Ref. MSG 082, Step 16

NOTES

3-108

POLANSKY

PAYETTE

HURLEY

10

[FROM RMS

GRAPPLE

TO SSRMS

RELEASE]

NO EXERCISE

~

NO UNISOL

EXERCISE

[BAT

T R&

R]

R

EPLA

NNED

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/24

(205)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 4 1 1 4 2 1 4 3

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

ICC GRAPPLE FROM SSRMS

(PDRS, ICC NOMINAL)

EXERCISE CONSTRAINT

~

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

CWC TRANSFER

Transfer 2 CWCs to ISS

MO69M LEH O2 8 vlv - CL

PLT

ICC GRAPPLE FROM SSRMS

(PDRS, ICC NOMINAL)

EXERCISE CONSTRAINT

~

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

~EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

MS2

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 17-18

EXERCISE CONSTRAINT

LOW BACK PAIN QUEST (ASSY OPS, PAYLOADS)

~EVA 4 P6 BATTERY R&R

Ref. MSG 086, item 6

Ref. MSG 082, Steps 4-15

EVA 4 P6 BATTERY R&R

Ref. MSG 086,item 6

Ref. MSG 082, Step 16

NOTES

15

Page 17: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

ED

[FROM RMS

GRAPPLE

TO SSRMS

RELEASE]

NO EXERCISE

~

NO UNISOL

EXERCISE

[BAT

T R&

R]

3-109

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/24

(205)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R S

~

~

~ ~

D / N

D O R B 6 7 8

O R B 1 4 1 1 4 2 1 4 3

~ ~B I A S - X L V - Z V VS T S A T T

MS1

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

EVA 4 CLEANUP AND INGRESS

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

~

MS3

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

EVA 4 CLEANUP AND INGRESS

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

~

MS4

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

P/TV07 EVA

(PHOTO/TV, SCENES) OPS

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

NOTES

3-109

CASSIDY

MARSHBURN

WOLF

10

REP

LANN

ED

[FROM RMS

GRAPPLE

TO SSRMS

RELEASE]

NO EXERCISE

~

NO UNISOL

EXERCISE

[BAT

T R&

R]

STS-

127

FD (

)

19:00

20:00

21:00

22:00

GMT

Date

07/24

(205)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 1 4 1 1 4 2 1 4 3

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

EVA 4 CLEANUP AND INGRESS

~

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

MS3

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

EVA 4 CLEANUP AND INGRESS

~

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

P6 BATTERY R&R & CLEANUP

Ref. MSG 081 & 089

EXERCISE CONSTRAINT

MS4

EVA SYS: PRE REPRESS (CC)

EVA SYS: CREWLOCK REPRESS (CC)

P/TV07 EVA

(PHOTO/TV, SCENES) OPS ~

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

NOTES

16

Page 18: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

POLANSKY

PAYETTE

HURLEY

10

B FOLLOWING ICC BERTH IN PLB:

√A/FREE/VERN

PERMANENT DAP EDIT: A12: CA=2

B12: CA=2

C KEEL 1 PWR(ICC) - OFF

√1 ILL PWR(ICC) - ON

2 PWR(JLE) - OFF

√2 ILL PWR(JLE) - ON

CREW WAKE 9/10:30

R

EPLA

NNED

3-110

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/24

(205)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

D O R B 8 9 1 0 1 1

O R B 1 4 3 1 4 4 1 4 5 1 4 6

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEEP

~

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G(two) -OFF

Perform via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

~

DAP UPDATE B

P/TV06 ROBOTICS OPERATIONS C

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-110

POLANSKY

PAYETTE

HURLEY

10

B FOLLOWING ICC BERTH IN PLB:

√A/FREE/VERN

PERMANENT DAP EDIT: A12: CA=2

B12: CA=2

C KEEL 1 PWR(ICC) - OFF

√1 ILL PWR(ICC) - ON

2 PWR(JLE) - OFF

√2 ILL PWR(JLE) - ON

CREW WAKE 9/10:30

R

EPLA

NNED

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/24

(205)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 1 4 3 1 4 4 1 4 5 1 4 6

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G(two) -OFF

Perform via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

DAP UPDATE B

P/TV06 ROBOTICS OPERATIONS C

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~ICC BERTH IN PLB

(PDRS, ICC NOMINAL)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

17

Page 19: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

FLT PLN/127/FLIGHT

CASSIDY

MARSHBURN

WOLF

10

CREW WAKE 9/10:30

R

EPLA

NNED

3-111

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/24

(205)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

D O R B 8 9 1 0 1 1

O R B 1 4 3 1 4 4 1 4 5 1 4 6

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MDDK STATUS CHECK (ASSY OPS, P/L) Step 1

EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

~

NOTES

3-111

CASSIDY

MARSHBURN

WOLF

10

CREW WAKE 9/10:30

R

EPLA

NNED

STS-

127

FD (

)

23:00

00:00

01:00

02:00

GMT

Date

07/24

(205)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 1 4 3 1 4 4 1 4 5 1 4 6

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

MS3

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

MS4

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MDDK STATUS CHECK (ASSY OPS, P/L) Step 1

~EVA SYS: 1.240 POST EVA

With H2O

Steps 37,39 & 66 not req'd

MCC will perform Steps 43 & 67

Ref: 127 EMU CTCC

In Step 60, temp stow HL Batts

for BSA Init

NOTES

18

Page 20: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 087 - FD10 MISSION SUMMARY

END OF PAGE 1 OF 2, MSG 087

Good morning, Endeavour! 1 2 Thank you very much for all your hard work to make yesterday's operations successful! 3 4 We really appreciate your willingness to sign up for today's "extended version" of EVA 4 and 5 its robotic support. We wish you the all the best, and we'll be with you every step of the 6 way! 7

8

9 YOUR CURRENT ORBIT IS: 188 X 186 NM 10 11 NOTAMS: 12 13 NOTAMS – THREE CHANGES 14 15

EDW - EDW IN USE. EDT ELS DAY / VFR ONLY. 16 EDW - LAKEBED RWY 15/33 - GREEN. RWY 18L - UNUSABLE. 17 NOR - LAKEBED RUNWAYS GREEN. 18 FMH - RWY 05/23 CLOSED. 19 GUA - RWY 24R END LIGHTS OTS. 20 GUA - RWY 06R/24L CLOSED. 21 INN - CLOSED. 22 AMB - CLOSED. 23 IKF - NOT USABLE. NO AGREEMENT. 24 BEN - NOT RECOMMENDED/NOT SUPPORTED. 25 ESN - RWY 03R/21L CLOSED. 26 ILM - CLOSED. 27 KBO - RWY 14L/32R CLOSED. 28

29 NEXT 2 PLS OPPORTUNITIES: 30 31 EDW22 ORB 142 – 8/22:26 SCT150 SCT300 7 200/10P15 (ORB 143 220/14P24) 32 NOR17 ORB 157 – 9/21:17 SCT250 7 200/06P10 33 34 OMS TANK FAIL CAPABILITY: 35 36 L OMS FAILS: NO 37 R OMS FAILS: NO 38 39 LEAKING OMS PRPLT BURN: 40 41 L OMS LEAK: ALWAYS BURN RETROGRADE 42 R OMS LEAK: ALWAYS BURN RETROGRADE 43 44 OMS QUANTITIES(%) 45 46 Subtract interconnect counter for current OMS quantities. 47 48 L OMS OX = 39.5 R OMS OX = 39.7 49 FU = 39.1 FU = 39.4 50 51

19

Page 21: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 087 - FD10 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 087

DELTA V AVAILABLE: 1 2 OMS 394 FPS 3 ARCS (TOTAL ABOVE QTY1) 42 FPS 4 5 TOTAL IN THE AFT 436 FPS 6 7 ARCS (TOTAL ABOVE QTY2) 74 FPS 8 FRCS (ABOVE QTY 1) 28 FPS 9 10 AFT QTY 1 81 % 11 AFT QTY 2 43 % 12 13 14 15 16

SYSTEM FAILURE IMPACT WORK AROUND EPS FC3 Sustaining Heater

remained powered for longer than expected.

Should the heater fail on permanently there will be a large margin impact and the Fuel Cell will not be considered usable as a last fuel cell.

The load on FC3 was increased by taking Main C Bus Tie - OFF, to preclude additional heater cycles and avoid another potential stuck on heater. This is also a margin hit but will be less of an impact than a stuck on heater. EGIL is working on a configuration that will minimize the impact to margins but keep Fuel Cell 3 warm enough to prevent future Sustaining Heater cycles.

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

20

Page 22: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

20-0573 (MSG 088) EVA4 BATTERY F SETUP TO OVERNIGHT PARK Page 1 of 2 pages

23 JUL 09

1. SINGLE JOINT MNVR TO CLEAR SAW 4A

Configure Cameras and overlays as required. Monitor 1 Monitor 2 Monitor 3 SSC 1 (MON 1) SSC 2 (DTV)

07: P1 LOIB (-110, -10)

37: MBS Mast (0, 0)

51: JEM EXT A (-10, +10)

Camera B (-40, +10)

SRMS Elbow (+70, +40)

SRMS EE

Verify EV Crew, tools, and tethers are clear

PCS MSS: SSRMS: SSRMS

Enter Mode – Single (Verify blue)

WARNING The active joint must be checked on the PCS before initiating motion. Failure to do so may result in movement of the wrong joint.

DCP JOINT SELECT → ELBOW PITCH (Verify EP – Selected on PCS) THC Perform “+“ Single Joint maneuver to EP: -30.0 (THC up).

Verify SSRMS at SAW 4A Clear position (within 20cm/5 deg).

SR SY SP EP WP WY WR +72.1 +0.9 -57.2 -30.0 -105.8 -183.9 +144.4

X Y Z Pitch Yaw Roll -67 +1380 -303 +26.0 -19.4 -2.8

FOR Loaded – VCC Mnvr, SY Held Disp VCC>Battery R&R

2. JOCAS TO OVERNIGHT PARK POSN (9:05)

RHC RATE → COARSE (Verify Coarse on PCS)

PCS MSS: SSRMS: SSRMS

Enter Mode – Joint OCAS (Verify blue) SSRMS Joint OCAS

pick File EVA3 Overnight Park

21

Page 23: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

20-0573 (MSG 088) EVA4 BATTERY F SETUP TO OVERNIGHT PARK Page 2 of 2 pages

23 JUL 09

Verify ‘Joint Angles’ ‘Destination’ for Overnight Park position. SR SY SP EP WP WY WR +207.1 +35.5 -86.7 +74.9 -8.8 -141.8 +116.1

cmd Load (Verify Sequence Status – Confirm or Cancel)

MON Verify joint angles and errors are correct on Joint Angle Position overlay. SR SY SP EP WP WY WR

(current) +72.1 +0.9 -57.2 -30.0 -105.8 -183.9 +144.4 TGT +207.1 +35.5 -86.7 +74.9 -8.8 -141.8 +116.1ERR -135.0 -34.6 +29.5 -104.9 -97.0 -42.1 +28.3

PCS cmd Confirm (Verify Sequence Status – Auto Seq sw - Hot)

NOTE

Expect singularity warning for EP between -15 and +15 degrees.

DCP AUTO SEQ → PROC PCS MSS: SSRMS: SSRMS Verify Posn Hold – orange

Verify SSRMS at Overnight Park position (within 5 cm/1 deg). SR SY SP EP WP WY WR

+207.1 +35.5 -86.7 +74.9 -8.8 -141.8 +116.1 X Y Z Pitch Yaw Roll

+898 -207 +560 -65.9 -77.7 -171.6 FOR Loaded – VCC Mnvr, SY Held Disp VCC>Battery R&R

NOTE

Expect the following message when safing is commanded: ‘R3Z - MSS OCS SSRMS Prime(Redun) ACU SRT Cat-1 Brk Stat

Fail’ (SCR 17495) This message should return to Norm.

DCP SAFING → SAFE (Verify ON)

Notify MCC-H Go for Port SARJ and arrays autotrack.

22

Page 24: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

20-0574 (MSG 089) – EVA 4 Battery Cribsheet Page 1 of 2

TASK FAILURE ACTION

XV. BATTERY BOLTS

A. IEA Bolt Removal: H1, H2

1. PGT: Manual ratchet2. Check MCC-H for tie down plan

B. IEA Bolt Installation: H1

1. Back out and reattempt installation 2. Increase PGT setting:

PGT: [B7 (25.5), CCW2, 30.5], 7/16 - 6-ext If no joy: Check MCC-H for tie down plan

C. IEA Bolt Installation: H2

1. Verify pushing while installing (to overcome antirotation device)

2. Verify relieving side loading; push down on H1 end of box3. If high running torque, backout and reattempt installation 4. If still no joy; backout completely and inspect surfaces

(IEA and battery) for FOD; reattempt installation 5. Increase PGT setting: PGT: [B7 (25.5), CCW2, 30.5], 7/16 - 6-ext 6. If still no joy: Check MCC-H

D. ICC-VLD Removal: Torque Break H1

1. If no joy releasing bolt, attempt to reinstall bolt using nominal settings; report torque and turns

2. If no joy reinstalling bolt: Check MCC-H for GO to break shear pin

3. Increase PGT setting (shear pin expected to fail): PGT: [B2 (16.0), CCW2, 30.5], TM Rec 7/16; PGT: 1 turn at bolt (5 turns on PGT)

4. If still no joy, check MCC-H 5. If shear pin breaks, remove TM

PGT: [A7 (9.2), CCW2, 30.5], 7/16-6ext; PGT: Expect 8-9 turns to remove insert

6. Check MCC-H for tie down plan E. ICC-VLD Removal:

Torque Break H2 1. Verify relieving side loading; push down on H1 end of box2. If no joy releasing bolt, attempt to reinstall bolt using

nominal settings; report torque and turns 3. If H2 reinstalls, reinstall H1 using nominal settings; report

torque and turns 4. If no joy reinstalling bolt: Check MCC-H for GO to break

shear pin 5. Increase PGT setting (shear pin expected to fail):

PGT: [B2 (16.0), CCW2, 30.5], TM Rec 7/16 PGT: 1 turn at bolt (5 turns on PGT)

6. If still no joy, check MCC-H 7. If shear pin breaks, remove TM

PGT: [A7 (9.2), CCW2, 30.5], 7/16-6ext; PGT: Expect 8-9 turns to remove insert

8. Check MCC-H for tie down plan F. ICC-VLD Removal:

Bolt release H1 1. If no joy releasing bolt, attempt to reinstall bolt using

nominal settings; report torque and turns 2. If no joy reinstalling bolt: Check MCC-H for GO to break

shear pin 3. Retrieve torque multiplier 4. Increase PGT setting (shear pin expected to fail):

PGT: [B2 (16.0), CCW2, 30.5], TM Rec 7/16 PGT: 1 turn at bolt (5 turns on PGT)

5. If still no joy, check MCC-H 6. If shear pin breaks, remove TM

PGT: [A7 (9.2), CCW2, 30.5], 7/16-6ext; PGT: Expect 8-9 turns to remove insert

7. Check MCC-H for tie down plan

Once Torque Broken go to block F for bolt release

Once Torque Broken go to block G for bolt release

EVA/127/FIN X23

Page 25: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

20-0574 (MSG 089) – EVA 4 Battery Cribsheet Page 2 of 2

TASK FAILURE ACTION G. ICC-VLD Removal:

Bolt Release H2 1. Verify relieving side loading; push down on H1

end of box 2. If no joy releasing bolt, attempt to reinstall bolt

using nominal settings; report torque and turns 3. If H2 reinstalls, reinstall H1 using nominal

settings; report torque and turns 4. If no joy reinstalling bolt: Check MCC-H for GO

to break shear pin 5. Retrieve torque multiplier 6. Increase PGT setting (shear pin expected to fail):

PGT: [B2 (16.0), CCW2, 30.5], TM Rec 7/16 PGT: 1 turn at bolt (5 turns on PGT)

7. If still no joy, check MCC-H 8. If shear pin breaks, remove TM

PGT: [A7 (9.2), CCW2, 30.5], 7/16-6ext; PGT: Expect 8-9 turns to remove insert

9. Check MCC-H for tie down plan H. ICC-VLD Installation:

H2 1. Verify pushing while installing (to overcome

antirotation device) 2. Verify relieving side loading; push down on H1

end of box 3. If high running torque, backout and reattempt

installation 4. If still no joy; backout completely and inspect

surfaces (ICC-VLD and battery) for FOD; reattempt installation

5. Increase PGT setting: PGT: [B7 (25.5), CCW2, 30.5], 7/16 - 6-ext

6. If still no joy: Check MCC-H I. ICC-VLD installation:

H1 1. Back out and reattempt installation 2. Increase PGT setting:

PGT: [B7 (25.5), CCW2, 30.5], 7/16 - 6-ext 3. If no joy: Check MCC-H for tie down plan

24

Page 26: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 090 – LOST AND FOUND: HITCH PIN

END OF PAGE 1 OF 2, MSG 090

Illustration provided to help identify possible locations for lost and found hitch pin. 1

2 Escape Pole Hitch Pin above 3 4

5 6 Galley Hitch Pin 7 8 9 10 11 12 13 14 15

25

Page 27: STS-127/2JA · 29 completed during EVA4. The procedure t akes the SSRMS from the Batt F Setup 30 position back to the Overnight Park position. 31 32 3. HITCH PIN 33 34 In the downlinked

MSG 090 – LOST AND FOUND: HITCH PIN 

END OF PAGE 2 OF 2, MSG 090 

 

 

 

26