AGENCY:CHANDESWAR CONSTRUCTION
Name of the structureName of the structure
Location As per Drg As per Bill
1 0838-M311-BC4-101 Discharge Chute Coal Mill BC 864.220 864.220 0.000 6500 5617.43
2 0838-M311-BC5-101 Discharge Chute Coal Mill BC Tail End 1920.690 1920.690 0.000 6500 1 2484.485
3 0838-M311-BC5-102 Discharge Chute Coal Mill BC HeadEnd
1948.280 1948.280 0.000 6500 12663.82
4 0838-M311-BC3-101 Discharge ChuteCoal Mill Belt
Conveyor2095.920 2095.920 0.000 On Hold
5 A1-08148-BC-102 TR 6 Column 4662.578 4662.578 0.000 6000 27975.468
6 A1-08148-BC-102 TR 6 Column brasings 1220.883 1220.883 0.000 6000 7325.298
7 A1-08148-BC-01Conveyor Gallery
Structure10822.219 11327.271 505.052
Brasings wt
is more6000 64933.314
8 A1-08148-BC-03Conveyor Gallery
Structure3922.344 3922.344 0.000 6000 23534.064
9 A1-08148-BC-102 TR 1 Column 333.162 333.162 0.000 6000 1998.972
10 A1-08148-BC-103 TR 2 Column 569.584 569.584 0.000 6000 3417.504
11 A1-08148-L1-1-13 Truck Tripler Structure Coal Handling Shed 24000.440 24000.440 0.000 6000 144002.64
12 A1-08148-L1-1-14 Truck Tripler Structure Coal Handling Shed 9079.755 9079.755 0.000 6000 54478.53
13 POC 111300 BC1 Transfer Tower
walkwayCoal Mill 825.038 1380.934 555.896
Gratings wt
added6000 4950.228
Total 62265.113 63326.061 1060.948 363381.75
FABRICATION BILL
9/5/2011DESCRIPTION
Coal Mill Belt
Conveyor Gallery
Remarks Total Value
BILL No:RA 02
S.No. Drg.No.
Total wt in KgS Diffrence
Wt in KgsRate per
MT
-
7/27/2019 Structures Vinod KJS
2/15
4662.578 864.220
1220.883 1920.690
10822.219 1948.280
3922.344
333.162
569.584
24000.440
9079.755
825.038
55436.003 4733.190 60169.193
55436.000 4733.19
6000.000 6500.000
332616.00 30765.74 363381.74
-
7/27/2019 Structures Vinod KJS
3/15
5617.43
12484.485
12663.82
27975.468
7325.298
67963.626
23534.064
1998.972
3417.504
144002.64
54478.53
8285.604
369747.441 6365.69
-
7/27/2019 Structures Vinod KJS
4/15
AGENCY:CHANDESWAR CONSTRUCTION
As per Bill As per Drg
Excess
Qty
1 0838-M361 BC2-101 Discharge Chute 0.785 0.785 0.000 6500.00 5099.00 5099.77
2 0838-M361 BC1-101 Discharge Chute 0.641 0.641 0.000 6500.00 4166.00 4166.24
3 0838-M361 BC4-101 Discharge Chute 0.637 0.637 0.000 6500.00 4143.00 4143.49
4 0838-M361 BC3-101 Discharge Chute 0.722 0.722 0.000 6500.00 4691.00 4691.44
5 0 838-M311 BC1-105 Discharge Chute 2.096 2.096 0.000 6500.00 13623.00 13623.48
6 0 8148-BC1-1-02 Conveyor Column TR6 4.929 4.929 0.000 6000.00 29573.00 29573.74
7 08148-BC1-15 GTU Support Column 10.835 10.835 0.000 6000.00 65011.00 65011.23
8 46016307Gantry 1 for Coal Reclaimer
Yard3.067 3.067
0.000 6000.00 18403.00 18403.20
9 46016307Gantry 2 for Coal Reclaimer
Yard2.874 2.874
0.000 6000.00 17242.00 17242.56
10 KSSPL Standard gallery 500BW 1.689 1.6890.000 6000.00 10133.71 10133.71
11A1-08148-BC1-01 Conveyor Gallery for
Supporting Girder8.033 8.033
0.000 6000.00 48198.00 48198.83
12 A1-08148-BC1-101Walkway for Conveyor
Gallery1.095 1.095 0.000 6000.00 6572.00 6572.53
13 A1-08148-BC1-01a way or onveyor
1.225 1.225 0.000 6000.00 7351.00 7351.02
Total 234205.71 234211.24
FABRICATION BILL
BILL No:RA 03
.No. Drg.No. DESCRIPTION
Rate per
unit in
Rs/-
Billed Amount in
Rs/-
Payable
Amount in Rs/-
Material Wt in MT
Payable Amount is Rs/- 234211.00
-
7/27/2019 Structures Vinod KJS
5/15
10/13/2011
Remarks
-
7/27/2019 Structures Vinod KJS
6/15
AGENCY:CHANDESWAR CONSTRUCTION
As per Bill As per DrgExcess
Qty
abrication1 311 BC4(RMH) Discharge Chute 0.527 0.527 0.000 6500.00 3423.68 3423.68 0.00
2 0838-M-331-BC3-101 Discharge Chute 2.194 2.194 0.000 6500.00 14263.99 14263.99 0.00
3 0838-M361 BC5-101 Discharge Chute 0.772 0.772 0.000 6500.00 5014.82 5014.82 0.00
Total 3.493 3.493 0.000 22702.49 22702.49 0.00
abrication5 A-08148-BC1-1-03 Conveyor Gallery 4.445 4.445 0.000 6000.00 26670.85 26670.85 0.00
6 A1-08148-BC1-1-01 Conveyor Gallery 4.063 4.063 0.000 6000.00 24376.02 24376.02 0.00
7 A1-08148-BC1-1-01 Conveyor Gallery 6.803 6.803 0.000 6000.00 40818.96 40818.96 0.00
8 A1-08148-BC1-1-01 Conveyor Gallery 6.863 6.863 0.000 6000.00 41178.36 41178.36 0.00
9 A-08148-BC1-1-03 Conveyor Gallery 8.567 8.567 0.000 6000.00 51404.37 51404.37 0.00
10 A-08148-BC1-1-02 TR6(ii) Loose Brasings 1.605 1.605 0.000 6000.00 9630.04 9630.04 0.00
11 A2-08148-BC1-15 GTU support Loose Brasings 3.408 3.408 0.000 6000.00 20445.31 20445.31 0.00
12 A-08148-BC1-1-02 TR6(iii) Loose Brasings 1.654 1.654 0.000 6000.00 9923.22 9923.22 0.00
13 A-08148-BC1-1-03 Stools for Conveyor Gallery 2.328 2.328 0.000 6000.00 13966.56 13966.56 0.00
Total 39.736 39.736 0.000 238413.69 238413.69 0.00
rection
14A1-08148-BC1-1-01
Conveyor Gallery 37.680 33.912 3.768 5500.00207238.19
186514.3720723.82
15 A-08148-BC1-1-03 Conveyor Gallery 18.160 16.344 1.816 5500.00 99880.28 89892.25 9988.03
16 A-08148-BC1-1-02 Tresiles 22.093 19.884 2.209 5500.00 121510.63 109359.56 12151.06
17 A2-08148-BC1-15 GTU support 14.243 12.818 1.424 5500.00 78335.16 70501.64 7833.52
18 A-08148-BC1-1-03 Stools for Conveyor Gallery 2.328 2.095 0.233 5500.00 12802.68 11522.41 1280.27
Total 94.503 85.053 9.450 519766.93 467790.24 51976.69
137.73 128.28 9.45 780883.10 728906.41G.Total
As per Mech.Depot.Recommended Bill Amount in Rs/- 780883.10
As per Trusst Engineers Recommended Amount Rs/- 728906.41
Billed Amount
in Rs/-
Payable
Amount in Rs/-
BILL No:RA 04
.No. Drg.No. DESCRIPTION
Material Wt in MT Rate per
unit in
Rs/-
Excess / Hold
usst Engineers
-
7/27/2019 Structures Vinod KJS
7/15
29-Nov-11
Hold 10% due to
Erection Alignment
is not completed
Remarks
usst Engineers
-
7/27/2019 Structures Vinod KJS
8/15
AGENCY:CHANDESWAR CONSTRUCTION
As per Bill As per DrgExcess
Qty
Fabrication
1 46016311 Fab. of Reclaimer Gantry to TT4 3.620 3.620 0.000 6000.00 21718.35 15202.85 6515.51
2 A1-08148-BC1-47 Fab.of L 11BC1 GT4 Suppt. Column 4.467 4.467 0.000 6000.00 26804.51 26804.51 0.00
3 A1-08148-BC1-47 Fab.of Conv.Gallery of L11 BC1 11.935 11.355 0.580 6000.00 71611.98 68131.38 3480.60
4 A1-08148-BC1-47 Stool Fabrication of L11 BC1 1.017 1.017 0.000 6000.00 6101.94 6101.94 0.005 46016095 Walkway Fab.for TT2 of L11 BC1 0.245 0.245 0.000 6000.00 1467.72 1467.72 0.00
6 Water treatment p Staircase Fabrication 0.459 0.459 0.000 6000.00 2753.22 2753.22 0.00
21.743 21.163 0.580 130457.72 120461.61 9996.11
Erection
7 46016311 Erection of Reclaimer Gantry to TT4 9.664 9.664 0.000 5500.00 53149.99 37204.99 15945.00
8 A1-08148-BC1-47 Fab.of L 11 BC1 GT4 Suppt. Conveyor 4.467 4.467 0.000 5500.00 24570.80 24570.80 0.00
9 A1-08148-BC1-47 Erec.of Conv.Gallery of L11 BC1 11.935 11.355 0.580 5500.00 65644.32 62453.77 3190.55
10 A1-08148-BC1-47 Stool Erection of L11 BC1 1.017 1.017 0.000 5500.00 5593.45 5593.45 0.00
11 46016095 Gratings Erection for TT2 0.826 0.826 0.000 3200.00 2644.14 2644.14 0.00
12 46016095 Handrailing Erection 79 Mtrs 79 Mtrs 0.000 140.00 11061.00 11061.00 0.00
13 46016095 Walkway Fab.for TT2 of L11 BC1 0.245 0.245 0.000 5500.00 0.00 1345.41 -1345.41
14 46016095 Erectrion 1.070 0.000 1.070 5500.00 5883.12 0.00 5883.1215 Water treatment plant Staircase Erection 0.459 0.459 0.000 5500.00 2523.79 2523.79 0.00
16 Water treatment plant Gratings Erection 0.179 0.179 0.000 3200.00 571.58 571.58 0.00
17 Water treatment plant Handrailing Erection 24.8 Mtrs 24.8 Mtrs 0.000 140.00 3472.00 3472.00 0.00
18 Packing Plant Weigh Bridge 45.000 22.500 22.500 7000.00 315000.00 157500.00 157500.00
45.000 22.500 22.500 490114.18 308940.92 181173.26
66.743 43.663 23.080 620571.90 429402.53 191169.36
As per Trusst Engineers Recommended Amount Rs/- 429402.53
Billed Amount
in Rs/-
Payable
Amount in Rs/-
G.Total
As per Mech.Dept.Recommended Bill Amount in Rs/- 620571.90
Rate per
unit in
Rs/-
Excess/Hold
Amount
Total
Total
BILL No:RA 05
.No. Drg.No. DESCRIPTION
Material Wt in MT
russt Engineers
-
7/27/2019 Structures Vinod KJS
9/15
russt Engineers
-
7/27/2019 Structures Vinod KJS
10/15
5-Jan-12
30% hold due to
Gantrys rectification
work.
Excess Wt
30% hold due to
Gantrys rectification
work.
Excess Wt
Excess Wt
50% Hold of 45MT as
ts Wt is not confirmed
o far.
Remarks
Trusst Engineers
-
7/27/2019 Structures Vinod KJS
11/15
russt Engineers
-
7/27/2019 Structures Vinod KJS
12/15
AGENCY:CHANDESWAR CONSTRUCTION
As per Bill As per DrgExcess
Qty
Fabrication1 Satna Project KSSPL Gallery Fabrication 3.448 3.448 0.000 6000.00 20685.59 20685.59 0.00
2 PHS-080-55-WBExtra Support Structure Erection for
Truck Trippler0.507 0.507 0.000 6000.00 3039.17 3039.17 0.00
3 46016309 Gantry III Fabrication 0.964 0.964 0.000 6000.00 5781.29 5781.29 0.00
4 46016309 Gantry I,II,III Walkway Fabrication 5.025 5.025 0.000 6000.00 30147.96 30147.96 0.005 61D00 430/01
.0.265 0.265 0.000 6000.00 1592.34 1592.34 0.00
6 No Drg. No.Support Stru. For Cable Gallery at
Water Treatment Plant1.066 1.066 0.000 6000.00 6395.82 6395.82 0.00
67642.17 67642.17 0.00
Erection
1 PHS-080-55-WBExtra Support Structure Erection for
Truck Trippler0.507 0.507 0.000 5500.00 2785.90 2785.90 0.00
2 46016309 Gantry III Erection 0.964 0.964 0.000 5500.00 5299.51 5299.51 0.00
3 46016309 Gantry I,II,III Walkway Erection 5.025 5.025 0.000 5500.00 27635.63 27635.63 0.00
4 61D00 430/01Support Stru. For Un Burnt Silo Bulk
Loading Hopper0.265 0.265 0.000 5500.00 1459.64 1459.65 0.00
No Drg. No.Support Stru. For Cable Gallery at
Water Treatment Plant1.066 1.066 0.000 5500.00 5862.83 5862.83 0.00
5 PHS-080-55-WB Truck Tripler Hydraulic System 16.000 16.000 0.000 7000.00 112000.00 112000.00 0.00
6 A1-08148-L1-02-01 Feeder Erection 11.500 11.500 0.000 7000.00 80500.00 80500.00 0.007 A1-08148-BC1-47 Gratings Erection 3.549 3.549 0.000 3200.00 11356.80 11356.80 0.00
8 A1-08148-BC1-48 Gratings Erection 10.824 10.824 0.000 3200.00 34638.24 34638.24 0.00
9 46016309 Gratings Erection 3.510 3.510 0.000 3200.00 11232.00 11232.00 0.00
10 A1-08148-BC1-47 Hand Railing 170Mtrs 170Mtrs 0.000 140.00 23800.00 23800.00 0.00
11 46016309 Hand Railing 164Mtrs 164Mtrs 0.000 140.00 22960.00 22960.00 0.00
12 A1-08148-BC1-48 Hand Railing 502.980 502.980 0.000 140.00 70417.00 70417.00 0.00409947.55 409947.56 0.00
477589.00 477589.00 0.00
Total
BILL No:RA 06
S.No. Drg.No. DESCRIPTION
Material Wt in MT Billed
Amount in
Rs/-
Payable
Amount in Rs/-
Excess/
Hold
Amount
Total
Rate per
unit in
Rs/-
G.Total
As per Mech.Dept.Recommended Bill Amount in Rs/- 477589.00
As per Trusst Engineers Recommended Amount Rs/- 477589.00
RUSST ENGINEERS
-
7/27/2019 Structures Vinod KJS
13/15
20-Jan-12
emarks
RUSST ENGINEERS
-
7/27/2019 Structures Vinod KJS
14/15
As per Bill As per Drg Excess Qty
14 A1-08148-BC1-1-01 Conveyor Gallery 37.680 33.912 3.76815 A-08148-BC1-1-03 Conveyor Gallery 18.160 16.344 1.816
16 A-08148-BC1-1-02 Tresiles 22.093 19.884 2.209
17 A2-08148-BC1-15 GTU support 14.243 12.818 1.424
18A-08148-BC1-1-03
Stools for Conveyor
Gallery2.328 2.095 0.233
Total 94.503 85.053 9.450
S.No. Drg.No. DESCRIPTIONMaterial Wt in MT
KJS CEMENT LIMITED
FOR-6000 TPD GREENFIED CEMENT PR
-
7/27/2019 Structures Vinod KJS
15/15
5500.00 207238.19 186514.37 20723.825500.00 99880.28 89892.25 9988.03
5500.00 121510.63 109359.56 12151.06
5500.00 78335.16 70501.64 7833.52
5500.0012802.68
11522.411280.27
519766.93 467790.24 51976.69
Hold 10% due to
Erection
Alignment is not
completed
Rate per unit
in Rs/-
Billed Amount
in Rs/-
Payable
Amount inExcess / Hold Remarks
JECT