![Page 1: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/1.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 1Structural Testing & Flow – Rev 6
May 13-16, 2003
Alpha Magnetic Spectrometer (AMS) - 02 Critical Design Review
Structural Testing & Structural Testing & Cyromagnet System Testing FlowCyromagnet System Testing Flow
Phil MottMay 13-16, 2003
![Page 2: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/2.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 2Structural Testing & Flow – Rev 6
May 13-16, 2003
Non-Linear Cryomagnet Support Straps Verification Testing
• Cryomagnet Support System Static Testing (England & US)–All strap components will have multiple tests to failure (completed)–All strap components will have multiple fatigue tests (completed)– 2 complete strap assemblies tested for fatigue & failure
• Static test to 1.0 x limit load to characterize the strap (completed)• Fatigue tested – includes transportation, launch, on-orbit, landing
(completed)• Another static test to 1.0 x limit load to compare to pre-fatigue static
test (completed)• Straps will then be dynamically tested (see dynamic test section)
(completed)• Following all previous testing, straps will be static tested to failure
– Warm test at JSC STL – J13– Cold test at CTG in England
–Each STA & Flight strap will be tested to 1.2 x limit load
![Page 3: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/3.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 3Structural Testing & Flow – Rev 6
May 13-16, 2003
Cryomagnet Static Verification Testing• Flight Cryomagnet Static Testing (England)
–The Flight Cryomagnet will be tested to 1.1 x limit load due to magnetic forces
–Each coil is tested to at least full current.• Strain gages are attached to 1 dipole coil and 1 racetrack coil
for FEM correlation.
![Page 4: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/4.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 4Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing• Component Level Static Tests
–Strap Static Test (JSC STL – J13)• Test to 1.2 * Maximum Flight Load & check for yielding• Repeat Test to Failure
StaticAnchor
StrapAssembly
Static ClevisAssembly
Actuator
Load Cell
![Page 5: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/5.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 5Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing• Component Level Static Tests (cont.)
–VC Joint Stiffness Static Test (JSC STL – J13)• With and without liquid shim in joint clearance holes• Test each configuration to failure• Measure stiffness of each bolted joint for FEM correlation
Anti-Rotation Load Cells
Support Ring Simulator Plate Conical Flange Simulator Plate
Load Cell / Actuator
![Page 6: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/6.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 6Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing• Component Level Static Tests (cont.)
–O-Ring Test Fixture Static Test (JSC STL – J13)• Positive Pressure (0.8 atm gauge)• Help correlate FEM
![Page 7: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/7.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 7Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing• Component Level Static Tests (cont.)
– Interface Plate Static Test (JSC STL – J13)• Lower USS-02 Joint to VC Interface Plate (low margin and
analysis uncertainty)– Flight Interface Plate with Lower Joint Simulator– Test to 1.1 x limit and check for yielding– Repeat test to failure
–Lower Joint Static Test (JSC STL – J13)• Lower USS-02 Joint (low margin)
– Flight Lower Joint– Test to 1.1 x limit and check for yielding– Repeat test to failure
![Page 8: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/8.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 8Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing
Upper LoadTrain
Lower LoadTrain
Test FacilityAdapter
Support Ring Simulator
InterfacePlate
Lower Joint Simulator
Lower StubSimulator
Interface Plate Static Test
![Page 9: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/9.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 9Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification TestingLower Joint Static Test
LowerJoint
InterfacePlate
LoadTrain 3
LoadTrain 4
Upper TrunnionBridge Beam
Load Train 1
Load Train 2
Lower TrunnionBridge Beam
![Page 10: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/10.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 10Structural Testing & Flow – Rev 6
May 13-16, 2003
Component Static Verification Testing• PAS Static Test (LM3 – Completed February 2003)
– ISS Configuration–Static tested to 1.5 x limit load to ensure that it will meet the
required stiffness and deflection requirements
![Page 11: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/11.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 11Structural Testing & Flow – Rev 6
May 13-16, 2003
Static Verification Testing• Full Assembly Static Test (JSC STL – J13)
–Orbiter Configuration simulated with modified test stands from AMS-01 on STS-91
–Test to 1.1 x limit load–Will include enough instrumentation to correlate FEM to 1.4 x
limit load
![Page 12: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/12.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 12Structural Testing & Flow – Rev 6
May 13-16, 2003
Static Verification Testing
Full Assembly Static Test
![Page 13: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/13.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 13Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification Testing• Acoustic Tests
–Cryomagnet System (ESTEC – The Netherlands)• Cryomagnet Structural Test Article (STA) [STA VC, STA SFHe Tank,
Cold Mass Replica] will be tested to flight acoustic levels to determine if there is any o-ring seal leakage
• Test must be performed with cryosystem at room temperature and vacuum in order to measure leaks in the o-ring seals
• Strap preload increased to simulate thermal load of Cold Mass Replica
![Page 14: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/14.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 14Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification TestingAcoustic Test Layout
Cryomagnet STA
Acoustic Test Stand (Supplied by ESTEC)
Support Stands
![Page 15: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/15.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 15Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification Testing• Dynamic Tests
–Cryomagnet Support System (Straps) (LM Denver)• 2 complete strap assemblies were dynamically tested to
determine dynamic and damping characteristics• Included enough instrumentation to dynamically correlate FEM
of 1 DOF model
![Page 16: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/16.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 16Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification Testing• Dynamic Tests (cont.)
–Cryomagnet System Sine Sweep Tests (INFN)• Cryomagnet STA (STA VC, STA SFHe Tank, Cold Mass Replica)
will be tested in a sine sweep test in order to excite the non-linear support straps to load levels so that the strap reaches and extends into the stiffness region associated with the launch strap engagement
• Input environment will be developed using non-linear DCLA results. The Cryomagnet system response will be analytically determined and reproduced during testing.
• Test will be performed with the system at cryogenic temperatures• Will include enough instrumentation to dynamically correlate FEM
(Discussed during the Dynamics Presentation)
![Page 17: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/17.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 17Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification Testing
STA Cryosystem in the Vacuum Case Test Fixture (VCTF)
VCTF
Cryomagnet STA
![Page 18: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/18.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 18Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification TestingSTA Sine Sweep Test X-Y Configuration
VCTF
X-Y Transition Frame
Team Spherical Coupling(Supplied by NASA/LMSO)
Ling Shaker(Supplied by INFN)
TEAM Slip Table(Supplied by INFN)
Spacer Block/Structure
![Page 19: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/19.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 19Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification TestingSTA Sine Sweep Test Z Configuration
VCTF
Z Transition Frame
Team Spherical Coupling(Supplied by NASA/LMSO)
Ling Shaker(Supplied by INFN)
TEAM Slip Table(Supplied by INFN)Spacer Block/Structure
![Page 20: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/20.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 20Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification Testing• Modal Tests
–Full Assembly Modal Test (JSC STL – J13)• Orbiter Configuration simulated with modified test stands from
AMS-01 on STS-91• Test will be performed with the system at cryogenic
temperatures• Will include enough instrumentation to dynamically correlate
FEM
![Page 21: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/21.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 21Structural Testing & Flow – Rev 6
May 13-16, 2003
Frequency & Strength Verification TestingModal Test Layout
![Page 22: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/22.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 22Structural Testing & Flow – Rev 6
May 13-16, 2003
Pressure System Verification Testing–O-Ring Test Fixture (JSC STL – Tests On-Going)
• Sub-scale vacuum vessel will be used to show that the leak rate through the o-ring seals is at an acceptable level
• Used to develop vacuum leak check procedures for the STA & Flight Vacuum Case
• First vacuum pull was instrumented to aid in FEM correlation
![Page 23: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/23.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 23Structural Testing & Flow – Rev 6
May 13-16, 2003
Pressure System Verification Testing–Vacuum Case
• Both the Flight & STA VC will undergo proof pressure testing to 1.0 x MDP (0.8 atm gauge). The STA will be proof tested twice. (This is an emergency case only because the system is designed for normal use as a vacuum vessel and not as a pressure vessel.)
• Both the Flight & STA VC will undergo vacuum leak checks at various stages during the static and dynamic testing.
• Vacuum leak checks at various stages of assembly and at final assembly.
![Page 24: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/24.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 24Structural Testing & Flow – Rev 6
May 13-16, 2003
Pressure System Verification Testing–Cryomagnet Pressure Systems
• SFHe Tank – Proof Pressure Tests to 1.1 x MDP• Plumbing Systems – Proof Pressure Tests to at least 1.5 x MDP• Warm He Tank – Proof Pressure Test to at least 1.5 x MDP• He Leak Tests – Throughout assembly and final assembly• Small Scale Dewar Vent Tests (Successfully Completed)
– Safety Panel agrees that testing proved no Shuttle overboard vent will be required (See minutes “ams2tim011703”)
![Page 25: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/25.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 25Structural Testing & Flow – Rev 6
May 13-16, 2003
Pressure System Verification Testing–TRD & TCS Pressure Systems
• TRD Xe Tank– Proof Pressure Test to 1.5 x MDP– Random Vibration to 8.9 Grms - Exceeds AMS-02 requirements– Same as tank used in Plasma Contactor Unit (PCU) built by Arde
• TRD CO2 Tank– Proof Pressure Test to 1.5 x MDP– Random Vibration to 8.9 Grms (axial) & 4.5 Grms (lateral) - Exceeds
AMS-02 requirements– Also built by Arde
• TCS CO2 Tank– Proof Pressure Test to 1.5 x MDP
• Plumbing Systems– Proof Pressure Tests to at least 1.5 x MDP
• Warm Helium Tank to Operate Cryosystem Warm Valves– Proof Pressure Test to at least 1.5 x MDP
![Page 26: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/26.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 26Structural Testing & Flow – Rev 6
May 13-16, 2003
Cyromagnet System Testing FlowCyromagnet System Testing Flow
![Page 27: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/27.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 27Structural Testing & Flow – Rev 6
May 13-16, 2003
- Sine Sweep Test- Vacuum Leak Checks
during testing- Begin Long Duration
Vacuum Leak Tests
INFN, Italy-AcousticTest
-VacuumLeak Test
ESTEC, Netherlands
Cryomagnet STA
- Initial Assembly & Welding
- Proof Pressure Test- Vacuum Leak Check
SCL, England
England- Small Dewar
Vent Tests
England/JSC/LM Denver- Perform Strap Static/Dynamic/
Thermal/Fatigue TestingCMRw/ STA SFHe Tank
- Proof Pressure Test- He Leak Check
ETH, SCL, HBE
STA VC
- Proof Pressure Test- Vacuum Leak Check- Perform Small Scale
O-ring Leak Testing- Perform Small Scalepressure testing
- Weld tests
JSC / U.S.
Cryomagnet STA
Cryomagnet STA
![Page 28: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/28.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 28Structural Testing & Flow – Rev 6
May 13-16, 2003
AMS-02
- Install ExperimentMass Sims and STA’s onto USS-02
JSC
- Install Cryomagnet STA into USS-02
JSC
- Perform Tests of USS-02Components
- Perform NBL Testing- Perform MM&OD
TestingComponents& MM&OD NBL
- Full PayloadModal Test
- Full PayloadStatic Test
- Vacuum LeakChecks duringTests
JSCJSC
- Remove Cryomagnet STA- Continue Long Duration
Vacuum Leak Check ofCryomagnet STA
- Ship USS-02 to Switzerland
JSC
PAS Static Test
![Page 29: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/29.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 29Structural Testing & Flow – Rev 6
May 13-16, 2003
Magnet
- He Tank Proof Pressure Test
- He Tank He LeakCheck
Integrate Payload in Switzerland
AMS Collaboration
-Experiment Components
-Sub-component Testing
- Continue long durationendurance and leakchecks
SCL, England
Flight VC & Magnet
- Proof Pressure Test- Vacuum Leak Check- Magnetic Load Static
Testing- Quench Testing
JSC
Flight VC
- Proof Pressure Test- Vacuum Leak Check
JSC / U.S.
ETH / SCL / HBE
Cryomagnet STA
![Page 30: Structural Testing & Cyromagnet System Testing Flow · PDF filePhil Mott / Trent Martin ... Frequency & Strength Verification Testing ... Structural Testing & Flow – Rev 6 Test STA](https://reader030.vdocuments.site/reader030/viewer/2022020113/5ab2e1e47f8b9ac3348db587/html5/thumbnails/30.jpg)
Phil Mott / Trent Martin281-333-6451 / [email protected] / [email protected] AMS-02 Critical Design Review
Page: 30Structural Testing & Flow – Rev 6
May 13-16, 2003
- Experiment Calibration
- Thermal VacuumTest @ ESTEC
AMS-02
Switzerland / ESTEC
- KSC Processing
KSC
AMS-02
Launch
3 Operational Years
ISSLanding