structural drawings - nhdcl.bt€¦ · lists of structural drawings for the proposed category iii,...
TRANSCRIPT
LISTS OF STRUCTURAL DRAWINGS FOR THE PROPOSED CATEGORY III, 4 STOREY RESIDENTIAL BUILDING FOR PHUNTSHOLING HOUSING PROJECT
DWG. NO. DRAWING TITLE DATE OF ISSUE
S-01 List of Structural Drawings
S-02(a) General Notes on Structural Drawings
S-02(b) General Notes on Structural Drawings
S-03
Foundation Layout Plan
S-04Foundation Details
S-05
S-06
Column Layout Plan
S-07
S-08
S-09 Typical Location of Splices In Beams and Beam Stirrup Details
S-10
S-11
Plinth Beam Layout Plan
Plinth Beam Details
S-13
First, Second & Third Floor Beam Layout Plan
S-14
First Floor Beam Details
Roof Beam Layout Plan
Roof Beam Details
S-15
Column Details
Typical Location of Splices in Columns and Column Tie Details
Beam - Column Connection Details
S-16
Typical Details Opening Through Web of Beam
S-17
Typical Lintel Beam Details
S-18
Typical Vertical Reinforcement Details of Projected Walls and Lintel Anchorage
S-19
S-20
Typical Detail of Cornice at First Floor and Roof Floor Level
S-21
Bottom Reinforcement Layout
S-22
Top Reinforcement Layout
S-23
Slab Section Details
S-24
S-25
S-26
S-27
S-28
Staircase Plan
May 2016
Roof Truss Layout Plan
Typical Truss Details
Typical Truss Elevation & member schedule
Typical Truss Connection
S-12
Staircase Details
Typical Truss Elevations
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
May 2016
Second Floor Beam Details
Third Floor Beam Details
S-29
S-30
S-31
S-32
S-33
Prop Connection Details
May 2016
May 2016
May 2016
Slab Layout Plan
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
LIST OF STRUCTURAL DRAWINGS FOR THE PROPOSED CLASS IV QUARTERSNTSMay 2016
Sonam ChodenSonam Choden
S-01
ContentsDateRevision
A. GENERAL
1. READ THIS DRAWINGS IN CONJUNCTION WITH ARCHITECTS' AND OTHER ENGINEERS' DRAWINGS AND SPECIFICATIONS, AND SUCH OTHER WRITTEN
INSTRUCTIONS AS MAY BE ISSUED.
2. ALL DIMENSIONS ARE IN MILIMETRE UNLESS STATED OTHERWISE.
3. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWINGS.
4. DESIGN CONFORMS TO:
IS456:2000 CODE OF PRACTICE FOR PLAIN AND REINFORCED CONCRETE
IS4326:1993 EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION OF BUILDINGS
IS13920:1993 DUCTILE DETAILING OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO SEISMIC FORCES
5. VERIFY ALL SETTING OUT DIMENSIONS WITH THE ENGINEER/ARCHITECT. VERIFY LOCATION AND DIMENSIONS OF CHASES, INSERTS,
OPENINGS, WASHES, DRIPS, DEPRESSIONS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON THE STRUCTURAL DRAWINGS.
6. IF IN DOUBT, ASK.
7. REFER ANY DISCREPANCY TO ENGINEER/ARCHITECT BEFORE PROCEEDING WITH THE WORK.
8. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE SPECIFICATIONS FOR BUILDING AND ROAD WORKS TOGETHER WITH THE
REQUIREMENTS OF ALL RELEVANT CODES OF PRACTICE REFERRED TO HEREIN AND THE REQUIREMENTS OF ALL STATUTORY AUTHORITIES.
9. CHECK ALL DIMENSIONS BEFORE STARTING WORK.
10. ALWAYS REFER ADDITIONAL NOTES PROVIDED IN THE DRAWINGS.
11. UNLESS OTHERWISE INDICATED, DETAILS SHOWN ARE TO BE CONSIDERED TYPICAL FOR SIMILAR CONDITIONS.
12. NO FRAMING OR STRUCTURAL MEMBERS ARE TO BE MODIFIED, NOTCHED, OR CUT WITHOUT THE APPROVAL OF THE PROJECT ENGINEER.
13. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE CONTRACT DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
PROJECT ENGINEER BEFOFE PROCEEDING WITH THE AFFECTED WORK. ANY VARIATIONS OR SUBSTITUTIONS OF MATERIALS OR DETAILS FROM THOSE
INDICATED ON THE DRAWINGS MAY ONLY BE MADE WiTH PRIOR APPROVAL OF THE PROJECT ENGINEER.
B. FOUNDATION
1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 150KN/M2 AS PER THE TEST RESULT. VERIFY THE SOIL STRENGTH AND OBTAIN
APPROVAL FROM THE ENGINEER BEFORE PLACING CONCRETE.
2. FOUNDATION SHALL BEAR ON UNDISTURBED NATURAL MATERIAL OR PROPERLY PLACED AND COMPACTED CONTROLLED STRUCTURAL
FILL HAVING A MINIMUM BEARING CAPACITY OF SOIL AS PER THE TEST RESULTS.
3. CONTROLLED STRUCTURAL FILL SHALL CONSIST OF CLEAN GRANULAR MATERIAL FREE OF ORGANIC OR OTHER DELETERIOUS MATTER
AND CONFORM TO THE REQUIREMENTS OF STANDARDS AND QUALITY CONTROL AUTHORITY.
4. MASONRY WALLS IN THE FORM OF RANDOM RUBBLE MASONRY SHALL BE PROVIDED BELOW THE EXTERIOR AS WELL AS INTERIOR PLINTH BEAM.
5. FOOTINGS ARE DESIGNED CONSIDERING THE MINIMUM DEPTH OF 1500MM BELOW THE ORIGINAL GROUND LEVEL. NOTIFY ENGINEER IF
THE DEPTH OF FOOTINGS REQUIRED TO BE PROVIDED VARIES FROM THE DEPTH SPECIFIED ABOVE.
6. ALL EXCAVATION SHALL BE DRY BEFORE PLACING ANY CONCRETE.
7. IF SEEPAGE IS ENCOUNTERED DURING FOUNDATION EXCAVATION, PUMP OUT WATER BEFORE PLACING CONCRETE.
8. THE FOUNDATIONS UNDER THE CONCRETE BASE SLAB SHALL BE COMPACTED THROUGHLY AND A MINIMUM 150MM LAYER OF
COURSE AGGREGATE SHALL BE PLACED OVER THE COMPACTED EARTH AND SEALED WITH 75MM THICK LAYER OF BLINDING CONCRETE.
9. BACKFILLING AGAINST BUILDING FOUNDATION WALLS SHALL BE DONE ONLY AFTER WALLS ARE BRACED TO PREVENT MOVEMENT.
10. CARE SHALL BE TAKEN NOT TO OVERSTRESS ANY ADJACENT RETAINING WALLS AND STRUCTURES DURING BACKFILLING AROUND FOUNDATIONS.
11. COMPACTION OF FOUNDATION SHALL BE APPROVED BY ENGINEER PRIOR TO PLACEMENT OF CONCRETE.
C. LOADING
1. THIS STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING NOMINAL LOADS:
1.1 DEAD LOADS:
UNIT WEIGHT OF WALL 19.6 KN/M3
UNIT WEIGHT OF RCC 25 KN/M3
UNIT WEIGHT OF PCC 24 KN/M3
1.2 SUPERIMPOSED LOADS(LIVE LOADS):
LIVE LOAD FOR FLOORS 2.0 KPA
LIVE LOAD FOR STAIRCASE 3.0 KPA
LIVE LOAD FOR ROOF 0.75 KPA
1.3 WIND LOAD:
BASIC WIND SPEED (ASSUMED) 45 M/S
BUILDING CLASS B
TERRAIN CATEGORY II
1.4 EARTHQUAKE DESIGN DATA
SEISMIC ZONE V
IMPORTANCE FACTOR 1.0
BASIC SEISMIC FORCE RESISTING
SYSTEM SPECIAL MOMENT RESISTING FRAME
2. MAINTAIN STRUCTURE IN STABLE CONDITION DURING CONSTRUCTION.
3. DO NOT PLACE OR STORE BUILDING MATERIALS ON CONCRETE MEMBERS WITHOUT ENGINEER'S APPROVAL.
D. CONCRETE
1. CONCRETE QUALITY SHALL COMPLY WITH IS456:2000
2. PROJECT ASSESSMENT OF CONCRETE STRENGTH IS REQUIRED.
3. GRADE OF CONCRETE IS M20 FOR ALL RCC WORKS.
4. FOR THE ABOVE GRADE TO BE ACHIEVED, MAXIMUM FREE WATER-CEMENT RATIO SHALL BE 0.55, MINIMUM CEMENT CONTENT
SHALL BE 300KG/M3 AND MAXIMUM AMOUNT OF WATER SHALL BE 165L FOR 300KG/M3 OF CEMENT.
5. ONLY POTABLE WATER SHALL BE USED FOR MIXING AND CURING, AND SHALL COMPLY TO THE REQUIREMENTS OF IS456:2000.
6. MECHANICALLY VIBRATE CONCRETE IN THE FORM TO GIVE MAXIMUM COMPACTION WITHOUT SEGREGATION OF THE CONCRETE.
7. CURE CONCRETE AS REQUIRED BY THE CLASUE 13.5 OF IS456:2000 AND WORK SPECIFICATIONS.
8. IN THE DRAWINGS THE BEAM SIZES ARE DESIGNATED WIDTH X DEPTH (INCLUDES SLAB THICKNESS IF ANY).
9. CONCRETE SIZES AS DRAWN ARE MINIMUM AND DO NOT INCLUDE APPLIED FINISHES.
10. DO NOT MAKE UNSPECIFIED HOLES OR CHASES WITHOUT ENGINEER'S PRIOR APPROVAL.
11. DO NOT PLACE CONDUITS, PIPES AND THE LIKE WITHIN COVER CONCRETE.
12. AGGREGATES SHALL COMPLY WITH CLAUSE 5.3 OF IS456:2000. NOMINAL SIZE OF COARSE AGGREGATES SHALL BE 20MM.
13. THE CHARACTERISTIC STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 20MPA. THE CONCRETE SHALL BE ASSESSED AS PER THE
ACCEPTANCE CRITERIA OUTLINED IN CLAUSE 16 OF IS456:2000 OR ANY OTHER STATUTORY AUTHORITIES.
14. ALL FORMWORKS FOR BEAMS AND SLABS ARE TO BE REMOVED BEFORE CONSTRUCTION OF WALLS OR OTHER
PERMANENT LOADINGS. ALL FORMWORK AND ITS REMOVAL MUST BE IN ACCORDANCE TO IS456:2000.
15. ALL FLOOR SLABS ARE REINFORCED CONCRETE SLABS.
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
GENERAL NOTES ON STRUCTURAL DRAWINGNTSMay 2016
Sonam ChodenSonam Choden
S-02 (a)
ContentsDateRevision
E. REINFORCEMENT
1. GRADE OF STEEL USED FOR RCC WORKS SHALL BE FE500(TMT).
2. BAR NOTATION GIVES THE FOLLOWING INFORMATION IN THIS ORDER:NUMBER OF BARS; BAR SIZE(MM); SPACING (MM, IF REQUIRED).
3. REINFORCEMENT IS REPRESENTED DIAGRAMATICALLY AND NOT NECESSARILY IN TRUE PROJECTION.
4. LAP REINFORCEMENT ONLY AT LOCATIONS SHOWN IN THE DRAWINGS. LAP LENGTH SHALL COMPLY WITH IS456:2000. LAP SPLICES
SHALL NOT BE LESS THAN THE DEVELOPMENT LENGTH IN TENSION( GENERALLY 57X Ø).
5. REINFORCEMENT SHALL NOT BE CUT, BENT OR HEATED ON SITE WITHOUT ENGINEER'S PRIOR APPROVAL.
6. THE DEVIATION OF REINFORCEMENT FROM ITS SPECIFIED POSITION SHALL NOT EXCEED THE FOLLOWING(MM):
6.1) TOLERENCE FOR COVER -0,+10 MM. WHERE A NEGATIVE VALUE INDICATES A DECREASE IN SPECIFIED COVER, AND POSITIVE
VALUE INDICATES AN INCREASE IN COVER.
6.2) TOLERENCES ON PLACING OF REINFORCEMENT:
I) FOR SLABS AND STAIRCASE -10,+10MM.
II) FOR BEAMS COLUMNS AND FOUNDATION -15,+15 MM.
7. SPACERS AND SUPPORTS SHALL BE LOCATED AT CENTRES CLOSE ENOUGH(PREFERABLY NOT EXCEEDING 750MM C/C FOR COLUMN
AND BEAM REINFORCEMENT, AND 450MM FOR SLAB REINFORCEMENT) TO PREVENT DISPLACEMENT OF REINFORCEMENT BY
WORKMEN OR EQUIPMENT DURING FIXING AND SUBSEQUENT CONCRETE PLACEMENT WITHIN THE TOLERENCE GIVEN IN 6 ABOVE.
8. THE COVER TO THE REINFORCEMENT NEAREST TO THE CONCRETE SURFACE SHALL NOT BE LESS THAN THE FOLLOWING EXCEPT
WHERE SPECIFIED OTHERWISE:
BEAMS 30 MM
COLUMNS 40 MM
FLOOR SLABS AND STAIRCASE 20 MM
FOUNDATION 50 MM
9. BENDING OF REINFORCEMENT IN BEAMS AND COLUMNS SHALL COMPLY WITH THE REQUIREMENTS OF IS456:2000.
10. REINFORCEMENT SHALL BE SUBJECT TO LABORATORY TEST TO DETERMINE DUCTILE PROPERTY.
11. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR TO SCHEDULED CONCRETE PLACEMENT. NOTIFY
ENGINEER AT LEAST 48 HOURS PRIOR TO SCHEDULED CONRETE PLACEMENT, TO ALLOW TIME FOR INSPECTION.
F. TIMBER
1. ALL STRUCTURAL TIMBER SHALL CONFORM TO THE IS883.
2. MOISTURE CONTENT OF THE STRUCTURAL TIMBER SHALL NOT EXCEED 12%.
G. FORMWORK
1. PROPERLY BRACE AND SHORE FORMWORK TO MAINTAIN ALIGNMENT AND TOLERANCE IN ACCORDANCE WITH IS456:2000.
2. FORMWORK SHALL COMPLY WITH CLAUSE 11 OF IS456:2000.
3. STRIPPING OF FORMWORK SHALL COMPLY WITH CLAUSE 11.3 OF IS456:2000.
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
GENERAL NOTES ON STRUCTURAL DRAWINGNTSMay 2016
Sonam ChodenSonam Choden
S-02 (b)
ContentsDateRevision
NOTES:
1. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMNS SHALL BE
PROVIDED AS DETAILED IN DRAWING NO. S-08.
2. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO
EXTERIOR COLUMNS, ALL EXTEIROR COLUMNS SHALL BE CAST ONLY UPTO
3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER
FLOOR.
3. REFER BEAM DETAILS PRIOR TO CASTING OF COLUMNS.
REFERENCES:
1. REFER DRAWING NO. S-06 FOR COLUMN DETAILS.
2. REFER DRAWING NO. S-07 FOR COLUMN SPLICE LOCATIONS AND COLUMN TIE DETAILS.
3. REFER DRAWING NO. S-08 FOR BEAM-COLUMN CONNECTION DETAILS.
C1
C2
C1
C1C1
C2
C2
C2
C2
C2C2C2C2
C3
C3 C3C3
C2
F1 F1
F1F1
F2 F2 F2 F2
F2F2
F3F3F3F3
F3 F3 F3 F3
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
FOUNDATION LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-03
ContentsDateRevision
Column
Footing
Ldt
50mm
15
00
Ldt
75
L
L
B
D
Bottom reinforcement(refer footing schedule)
Top reinforcement(refer footing schedule)
Plinth beam(refer details)
Beam in orthogonal direction40mm
GL GL
Footing schedule
FootingMark
Footing size & depth (mm) Bottom reinforcement(bothways)
F1
Length(L)
2300
Top reinforcement(bothways)Breadth(B)
2300
Depth(D)
450 12Ø@100C/C 12Ø@200C/C
L
B
15
0
75mm PCC (1:2:4)40mm aggregates
150mm stone soling
60
0
L = 57 X Ø (Ø is the maximum diameter of the column bar)dt
F2 2500 2500 500 12Ø@100C/C 12Ø@200C/C
F3 500 12Ø@100C/C 12Ø@200C/C
Column
Footing
2700 2700
PLINTH LEVEL
75 MM THICK PCC(1:3:6)
RRM IN CM (1:6)
150 MM THICK STONE SOLING
675
875
FOUNDATION FOR INTERNAL WALL BELOW
PARTITION WALL(Where no Plinth Beam is Provided)
375
575
150
15
0
15
00
675
FOUNDATION FOR EXTERNAL WALL
BELOW PLINTH BEAM
PLINTH BEAM
150 MM THICK STONE SOLING
REFER ARCHITECTURAL
DRAWINGS
RRM IN CM (1:6)
75 MM THICK PCC(1:3:6)
375
575
Plinth Beam Level
PARTITION WALL
RL ± 0.000 M
875
RL ( Ref. Arch. Plan)
REFERENCES:
1. REFER DRAWING NO. S-02 FOR GENERAL NOTES ON FOUNDATION.
2. REFER DRAWING NO. S-03 FOR FOOTING LAYOUT.
3. REFER DRAWING NO. S-05 FOR COLUMN LAYOUT.
4. REFER DRAWING NO. S-06 FOR COLUMN DETAILS.
5. REFER DRAWING NO. S-07 FOR TYPICAL LOCATION OF SPLICES IN
COLUMN & COLUMN TIE DETAILS.
15
00
REFER ARCHITECTURAL
DRAWINGS
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
FOUNDATION DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-04
ContentsDateRevision
C1
C2
NOTES:
1. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMNS SHALL BE
PROVIDED AS DETAILED IN DRAWING NO. S-08.
2. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO
EXTERIOR COLUMNS, ALL EXTEIROR COLUMNS SHALL BE CAST ONLY UPTO 3/4
OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR.
3. REFER BEAM DETAILS PRIOR TO CASTING OF COLUMNS
REFERENCES:
1. REFER DRAWING NO. S-06 FOR COLUMN DETAILS.
2. REFER DRAWING NO. S-07 FOR COLUMN SPLICE LOCATIONS AND COLUMN TIE
DETAILS.
3. REFER DRAWING NO. S-08 FOR BEAM-COLUMN CONNECTION DETAILS.
C1
C1C1
C2
C2
C2
C2
C2C2C2C2
C3
C3 C3C3
C2
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
COLUMN LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-05
ContentsDateRevision
S1
4. Column details upto roof level will be the same
d = dia. of tie
5. Ld= 57*Ø= 16Ø=950 20Ø=1150 25Ø=1450
D=over all depth of the beam
C1
TYPICAL COLUMN DETAILS SHOWING TIES
C2
Type
C1
700
700
GL
Ld
SPLICING
500
500
500
500
8Ø @ 75 c/c
4-20Ø
4-16Ø
ties 8Ø
C2
Note:
450 * 450 8 Ø @ 75c/c
Ties (S1) , at splices & below the plinth levelSize
4-20Ø + 4-16Ø
Main Bar
COLUMN SCHEDULE
8Ø @ 150 c/c
1. All splices to be provided near middle of columns2. Not more than 50% of longitudinal bars shall bespliced at one section3. Splices for Column at ground floor is not permitted
8Ø @ 150 c/c
Ties (S2)
Special confiningzone
S2
GL
S1
S2
Non splicing zone
Special confiningzone
3240
3240
Ground floor level
First floor level
500
500
500
700
700
S1
450 * 450 4-25Ø+4-20Ø
COLUMN ELEVATION AND TIE ZONATION
450
450
C2 8Ø @ 75 c/c 8Ø @ 150 c/c450 * 450 8-25Ø
C3
4-25Ø
4-25Ø
ties 8Ø
450
450
4-25Ø
4-20Ø
ties 8Ø
450
450
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
COLUMN DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-06
ContentsDateRevision
NOTES ON SPLICING OF COLUMN REINFORCEMENT:
1. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE SECTION.
2. REINFORCEMENT SHALL BE SPLICED ONLY AT MIDHEIGHT OF COLUMNS.
4. TIE SPACING FOR FULL LENGTH OF SPLICE SHALL NOT BE GREATER THAN 125 MM C/C.
5. MINIMUM SPLICE LENGTH SHALL BE 57 TIMES THE DIAMETER OF MAIN REINFORCEMENT(57XØ).
6. WHERE COLUMNS ARE NOT RESTRAINED BY WALLS ON AT LEAST TWO SIDES, THEY SHALL
BE PROVIDED WITH FULL CONFINING REINFORCEMENT THROUGHOUT THEIR HEIGHT.
EXTERIOR
BEAM-COLUMN
CONNECTION
(REFER DETAIL ON
DWG NO. S-08)
GROUND LEVEL
REFER FOOTING DETAILS
SP
LIC
E R
EG
IO
N
REFER DETAIL
ASIDE
1
0
0
135°
>3
00
40MM COVER(MIN.)
10
0
COLUMN FACE
COVER
50
0
SPLICE
GROUND LEVEL
REFER FOOTING DETAILS
SP
LIC
E R
EG
IO
N
SPLICE
INTERIOR
BEAM-COLUMN
CONNECTION
(REFER DETAILS
IN S-08)
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
REFER DETAIL
ASIDE
>47xØ
SPLICES WITH OFFSET
CRANKED BARS IN COLUMN
70
0
50
0
50
0
70
0
50
0
70
0
50
0
50
0
50
0
50
0
70
0
TYPICAL SPLICE LOCATION INEXTERIOR COLUMNS
TYPICAL SPLICE LOCATION ININTERIOR COLUMNS
TYPICAL COLUMN DETAIL
1
0
0
135°
40MM COVER(MIN.)
TYPICAL COLUMN DETAIL
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL LOCATION OF SPLICES IN COLUMN AND COLUMN TIE DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-07
ContentsDateRevision
CONNECTION DETAIL (PLAN VIEW)
TYPICAL INTERIOR BEAM - COLUMN
COLUMN REINFORCEMENTS
BEAM
COLUMN TIES WITHIN THE JOINT
COLUMN REINFORCEMENT
REINFORCEMENTCOLUMN
BEAM BAR BENT FOR ANCHORAGE
COLUMN TIECOLUMN TIE
REINFORCEMENTBEAM
PCC
BEAM
COLUMN
CONNECTION DETAIL (SIDE VIEW)INTERIOR BEAM - COLUMN
PCC
COLUMN
BEAM REINFORCEMENTS
Ld = 1150 MM FOR 20Ø = 1450 MM FOR 25Ø = 950 MM FOR 16 Ø = 700 MM FOR 12Ø
50 MM (MAX)BEAM
COLUMN TIE
Ld + 10Ø
FOR ANCHORAGEBEAM BAR BENT
50 MM (MAX)
CONNECTION DETAIL ( SIDE VIEW)
TYPICAL EXTERIOR BEAM - COLUMN
BEAM
CONNECTION DETAIL (PLAN VIEW)
TYPICAL EXTERIOR BEAM - COLUMN
50MM (MAX)
COLUMNEXTERIOR COLUMN
SECONDARY BEAM
COLUMN REINFORCEMENT
BEAM
COLUMN
50 MM (MAX)
BEAM STIRRUPS
PRIMARY BEAM
PRIMARY-SECONDARYBEAM JUNCTION DETAILS
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
BEAM-COLUMN CONNECTION DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-08
ContentsDateRevision
TYPICAL BEAM STIRRUP DETAILS
30MM COVER(MIN.)
30
MM
C
OV
ER
(M
IN
.)
1
0
0
1
0
0
1
3
5
°
TYPICAL HOOK DETAILS
TOP BAR SPLICE
TYPICAL SPLICE LOCATION IN END SPAN OF BEAM
2d
L
L/2
BOTTOM BAR SPLICE
TOP BAR SPLICE
L
L/2
BOTTOM BAR SPLICE
2d
TYPICAL SPLICE LOCATION IN INTERIOR SPAN OF BEAM
EXTERIOR
BEAM-COLUMN
CONNECTION (Refer Detail
Drawing No. S-08)
NOTES ON SPLICING OF BEAM REINFORCEMENT:
1. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE SECTION.
2. TOP REINFORCEMENT SHALL BE SPLICED AT MIDSPAN OF BEAM.
3. BOTTOM REINFORCEMENT SHALL BE SPLICED AT A DISTANCE OF 2 TIMES THE EFFECTIVE DEPTH
OF BEAM FROM THE FACE OF COLUMN, BUT SHALL NOT BE SPLICED AT MIDSPAN OF BEAM.
4. STIRRUP SPACING FOR FULL LENGTH OF SPLICE SHALL NOT BE GREATER THAN 125 MM C/C.
5. MINIMUM SPLICE LENGTH SHALL BE 57 TIMES THE DIAMETER OF MAIN REINFORCEMENT(57XØ).
d
d
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
E.E (DESIGN) CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL LOCATION OF SPLICES IN BEAMS AND BEAM STIRRUP DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-09
ContentsDateRevision
REFERENCES:
1. REFER DRAWING NO. S-11 FOR PLINTH BEAM DETAILS.
2. REFER DRAWING NO. S-26 & S-27 FOR STAIRCASE DETAILS.
STAIRCASE
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
PLINTH BEAM LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-10
ContentsDateRevision
E.E (DESIGN)
21
D E FB CA
3425345045753425800800800800800
S1 S1 S1 S1 S1 S1 S1S1S1S2 S2 S2 S2
S1800 800 800 800
104010401050105014001400
4575S2
L-SECTION OF PLINTH BEAM ALONG GRID 1, 2 & 3 (BEAM SIZE 300X400)
300SECTION 1-1
800
2-16Ø 2-16Ø 2-16Ø
4-12Ø
300SECTION 2-2
2-16Ø
21
400 400
REFERENCES:
1. REFER DRAWING NO. S-1 0 FOR PLINTH BEAM LAYOUT PLAN.
2. REFER DRAWING NO. S- 09 FOR TYPICAL SPLICE LOCATION IN BEAMS AND BEAM STIRRUP DETAILS.
3. REFER DRAWING NO. S-08 BEAM-COLUMN CONNECTION DETAILS.
4. REFER DRAWING NO. S-21 FOR CORNICE DETAILS.
5. REFER DRAWING NO. S-1 8 FOR TYPICAL DETAIL OF OPENING THROUGH BEAM WEB.
4-12Ø
4-16Ø
S1 = 8 @100mm c/cS2 = 8 @ 150mm c/c
L-SECTION OF PLINTH BEAM ALONG GRID A, B, C, D, E & F. (BEAM SIZE 300X400)
SECTION 3-3
SECTION 4-4
1040 1040
2-16Ø
1400 1400
2-16Ø
1 2 3
4500800
S1 S1 S1S2
S1800 800 800
136012001200
3925S2
2-20Ø 2-20Ø
4-16Ø 4-16Ø
1360
43
43
4-12Ø4-12Ø4-12Ø4-12Ø
300 300
2-20Ø
4004-16Ø 4-16Ø
2-16Ø
4-16Ø
4-12Ø400
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
2-20Ø
4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø
L-SECTION OF PLINTH BEAM ALONG GRID 3 (BEAM SIZE 300X400)
21
D E FB CA
3425
3450
45753425800800800
S1 S1 S1 S1 S1S1S1S2 S2 S2
S1800 800 800 800
1040104014001400
4575S2800
2-16Ø 2-16Ø
21
1040 1040
2-16Ø
1400 1400
2-16Ø 4-16Ø4-16Ø
4-16Ø4-16Ø4-16Ø4-16Ø4-16Ø
4-16Ø
4-12Ø 4-12Ø 4-12Ø 4-12Ø
800S1
S2
1050
4-12Ø
2-16Ø
600
550
2-12Ø
2-12Ø
1050
800S1
2-12Ø
5504-16Ø 4-16Ø
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
PLINTH BEAM DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-11
ContentsDateRevision
E.E (DESIGN)
REFERENCES:
1. REFER DRAWING NO. S-13, S-14 & S-15 FOR FLOOR BEAM DETAILS.
2. REFER DRAWING NO. S-26 & S-27 FOR STAIRCASE DETAILS.
STAIRCASE
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
FIRST, SECOND & THIRD FLOOR BEAM LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-12
ContentsDateRevision
E.E (DESIGN)
21
D E FB CA
3425345045753425900900900900900
S1 S1 S1 S1 S1 S1 S1S1S1S2 S2 S2 S2
S1900 900 900 900
104010401050105014001400
4575S2
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 1 & GRID 2 (BEAM SIZE 300X450)
300SECTION 1-1
2-20Ø
900
2-25Ø + 2-16Ø 2-25Ø 2-25Ø + 2-16Ø 2-25Ø + 2-16Ø2-25Ø
2-25Ø + 2-16Ø 2-25Ø + 2-16Ø 2-25Ø + 2-16Ø2-25Ø + 2-16Ø
2-25Ø2-25Ø + 2-16Ø
2-25Ø
2-16Ø300
SECTION 2-2
2-20Ø
2-25Ø
21
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF FIRST FLOOR BEAM ALONG GRID A & F. (BEAM SIZE 300X450)
2-25Ø2-25Ø + 2-16Ø 2-25Ø
13602-25Ø + 2-16Ø2-25Ø + 2-16Ø2-25Ø + 2-16Ø
450 450
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 3 (BEAM SIZE 300X450)
REFERENCES:
1. REFER DRAWING NO. S-12 FOR FIRST FLOOR BEAM LAYOUT PLAN.
2. REFER DRAWING NO. S-09 FOR TYPICAL SPLICE LOCATION IN BEAMS AND BEAM STIRRUP DETAILS.
3. REFER DRAWING NO. S-08 BEAM-COLUMN CONNECTION DETAILS.
4. REFER DRAWING NO. S-21 FOR CORNICE DETAILS.
5. REFER DRAWING NO. S-18 FOR TYPICAL DETAIL OF OPENING THROUGH BEAM WEB.
2-16Ø
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
2-16Ø
S1 = 8 @100mm c/cS2 = 8 @ 150mm c/c
L-SECTION OF FIRST FLOOR BEAM ALONG GRID C & D. (BEAM SIZE 300X450)
21
21
300SECTION 3-3
2-25Ø
300SECTION 4-4
2-25Ø
450 4504-20Ø 4-20Ø
2-20Ø
1040 10402-25Ø + 2-16Ø
2-25Ø2-25Ø + 2-16Ø
1400 1400
2-25Ø
21
D E FB CA
3425345045753425900900900
S1 S1 S1 S1 S1S1S1S2 S2 S2
S1900 900 900 900
1040104014001400
4575S2900
2-25Ø + 2-16Ø 2-25Ø 2-25Ø + 2-16Ø 2-25Ø + 2-16Ø 2-25Ø + 2-16Ø2-25Ø + 2-16Ø
2-25Ø2-25Ø + 2-16Ø
21
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
1040 10402-25Ø + 2-16Ø
2-25Ø2-25Ø + 2-16Ø
1400 1400
2-25Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF FIRST FLOOR BEAM ALONG GRID B &E. (BEAM SIZE 300X450)
2-25Ø2-25Ø + 2-20Ø 2-25Ø
4-20Ø 4-20Ø
13602-25Ø + 2-20Ø2-25Ø + 2-20Ø2-25Ø + 2-20Ø
43
43
300
1200
4-20Ø
2-25Ø + 2-20Ø
300
1200
4-20Ø
2-25Ø + 2-20Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
2-25Ø2-25Ø + 2-20Ø 2-25Ø
4-20Ø 4-20Ø
13602-25Ø + 2-20Ø2-25Ø + 2-20Ø2-25Ø + 2-20Ø
43
43
300
12002-25Ø + 2-16Ø
300
1200
4-20Ø
2-25Ø + 2-20Ø
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
FIRST FLOOR BEAM DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-13
ContentsDateRevision
E.E (DESIGN)
65
D E FB CA
3425345045753425900900900900900
S1 S1 S1 S1 S1 S1 S1S1S1S2 S2 S2 S2
S1900 900 900 900
104010401050105014001400
4575S2
L-SECTION OF SECOND FLOOR BEAM ALONG GRID 1 & GRID 2 (BEAM SIZE 300X450)
300SECTION 1-1
2-20Ø
900
2-20Ø 2-20Ø 2-20Ø
2-25Ø
2-16Ø300
SECTION 2-2
2-20Ø
2-25Ø
65
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF SECOND FLOOR BEAM ALONG GRID A & F. (BEAM SIZE 300X450)
2-25Ø2-25Ø + 2-16Ø 2-25Ø
13602-25Ø + 2-16Ø2-25Ø + 2-16Ø2-25Ø + 2-16Ø
450 450
L-SECTION OF SECOND FLOOR BEAM ALONG GRID 3 (BEAM SIZE 300X450)
REFERENCES:
1. REFER DRAWING NO. S-12 FOR SECOND FLOOR BEAM LAYOUT PLAN.
2. REFER DRAWING NO. S-09 FOR TYPICAL SPLICE LOCATION IN BEAMS AND BEAM STIRRUP DETAILS.
3. REFER DRAWING NO. S-08 BEAM-COLUMN CONNECTION DETAILS.
4. REFER DRAWING NO. S-21 FOR CORNICE DETAILS.
5. REFER DRAWING NO. S-18 FOR TYPICAL DETAIL OF OPENING THROUGH BEAM WEB.
2-16Ø
4-16Ø
2-16Ø
S1 = 8 @100mm c/cS2 = 8 @ 150mm c/c
L-SECTION OF SECOND FLOOR BEAM ALONG GRID C & D. (BEAM SIZE 300X450)
21
21
300SECTION 3-3
2-25Ø
300SECTION 4-4
2-25Ø
450 450
4-20Ø 4-20Ø
2-20Ø
1040 1040
2-20Ø4-20Ø
1400 1400
2-20Ø
21
D E FB CA
3425345045753425900900900
S1 S1 S1 S1 S1S1S1S2 S2 S2
S1900 900 900 900
1040104014001400
4575S2900
2-20Ø 2-20Ø
21
1040 1040
2-20Ø
1400 1400
2-20Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF SECOND FLOOR BEAM ALONG GRID B &E. (BEAM SIZE 300X450)
2-25Ø2-25Ø + 2-20Ø 2-25Ø
4-20Ø 4-20Ø
13602-25Ø + 2-20Ø2-25Ø + 2-20Ø2-25Ø + 2-20Ø
43
43
300
1200
4-20Ø
2-25Ø + 2-20Ø
300
1200
4-20Ø
2-25Ø + 2-20Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
2-25Ø2-25Ø + 2-20Ø 2-25Ø
4-20Ø 4-20Ø
13602-25Ø + 2-20Ø2-25Ø + 2-20Ø2-25Ø + 2-20Ø
43
43
300
12002-25Ø + 2-16Ø
300
1200
4-20Ø
2-25Ø + 2-20Ø
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
4-20Ø4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø4-20Ø
4-20Ø4-20Ø
4-20Ø4-20Ø
4-20Ø4-20Ø4-20Ø4-20Ø4-20Ø
4-20Ø
4-16Ø4-16Ø4-16Ø4-16Ø
4-16Ø 4-16Ø 4-16Ø 4-16Ø
300SECTION 5-5
300SECTION 6-6
2-20Ø
450
4-16Ø
4-16Ø
4-20Ø
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
SECOND FLOOR BEAM DETAILS NTSMay 2016
Sonam ChodenSonam Choden
S-14
ContentsDateRevision
ENGINEER (DESIGN)
21
D E FB CA
3425345045753425900900900900900
S1 S1 S1 S1 S1 S1 S1S1S1S2 S2 S2 S2
S1900 900 900 900
104010401050105014001400
4575S2
L-SECTION OF THIRD FLOOR BEAM ALONG GRID 1 & GRID 2 (BEAM SIZE 300X450)
300SECTION 1-1
900
2-20Ø 2-20Ø 2-20Ø
2-20Ø
4-16Ø
300SECTION 2-2
2-20Ø
21
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF THIRD FLOOR BEAM ALONG GRID A & F. (BEAM SIZE 300X450)
2-20Ø2-20Ø + 2-16Ø 2-20Ø
13602-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø
450 450
L-SECTION OF THIRD FLOOR BEAM ALONG GRID 3 (BEAM SIZE 300X450)
REFERENCES:
1. REFER DRAWING NO. S-12 FOR THIRD FLOOR BEAM LAYOUT PLAN.
2. REFER DRAWING NO. S- 09 FOR TYPICAL SPLICE LOCATION IN BEAMS AND BEAM STIRRUP DETAILS.
3. REFER DRAWING NO. S-08 BEAM-COLUMN CONNECTION DETAILS.
4. REFER DRAWING NO. S-21 FOR CORNICE DETAILS.
5. REFER DRAWING NO. S-18 FOR TYPICAL DETAIL OF OPENING THROUGH BEAM WEB.
4-16Ø
2-16Ø
S1 = 8 @100mm c/cS2 = 8 @ 150mm c/c
L-SECTION OF THIRD FLOOR BEAM ALONG GRID C & D. (BEAM SIZE 300X450)
21
21
SECTION 3-3
SECTION 4-4
1040 1040
2-20Ø
1400 1400
2-20Ø
21
D E FB CA
3425345045753425900900900
S1 S1 S1 S1 S1S1S1S2 S2 S2
S1900 900 900 900
1040104014001400
4575S2900
2-20Ø 2-20Ø
21
1040 1040
2-20Ø
1400 1400
2-20Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
L-SECTION OF THIRD FLOOR BEAM ALONG GRID B &E. (BEAM SIZE 300X450)
2-20Ø 2-20Ø
4-16Ø 4-16Ø
1360
43
43
300
1200
4-16Ø
300
1200
4-16Ø
1 2 3
4500900
S1 S1 S1S2
S1900 900 900
136012001200
3925S2
2-20Ø 2-20Ø
4-16Ø 4-16Ø
13604-20Ø
43
43
300
12002-20Ø + 2-16Ø
300
1200
4-16Ø4-16Ø
4-16Ø4-16Ø4-16Ø4-16Ø
4-16Ø 4-16Ø 4-16Ø 4-16Ø
300 300
2-20Ø
4504-16Ø 4-16Ø
4-20Ø
2-20Ø + 2-16Ø2-20Ø + 2-16Ø
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø
2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø2-20Ø + 2-16Ø
2-20Ø + 2-16Ø
4-16Ø 4-16Ø
4-16Ø
4-20Ø 4-20Ø 4-20Ø4-20Ø
4-20Ø4-20Ø 4-20Ø 4-20Ø 4-20Ø
4-20Ø
450
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
THIRD FLOOR BEAM DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-15
ContentsDateRevision
E.E (DESIGN)
REFERENCES:
1. REFER DRAWING NO. S-17FOR ROOF BEAM DETAILS.
3. REFER DRAWING NO. S-21 FOR ROOF CORNICE DETAILS.
STAIRCASE
CORNICE PROJECTION
CORNICE PROJECTION
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
ROOF BEAM LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-16
ContentsDateRevision
E.E (DESIGN)
21
D E FB CA
3425345045753425800800800800800
S1 S1 S1 S1 S1 S1 S1S1S1S2 S2 S2 S2
S1800 800 800 800
104010401050105014001400
4575S2
L-SECTION OF ROOF BEAM ALONG GRID 1, 2 & 3 (BEAM SIZE 300X400)
300SECTION 1-1
800
2-16Ø 2-16Ø 2-16Ø
4-12Ø
300SECTION 2-2
2-16Ø
21
1 2 3
4500800
S1 S1 S1S2
S1800 800 800
136012001200
3925S2
L-SECTION OF ROOF BEAM ALONG GRID A & F. (BEAM SIZE 300X400)
2-16Ø
1360
400 400
REFERENCES:
1. REFER DRAWING NO. S-16 FOR ROOF BEAM LAYOUT PLAN.
2. REFER DRAWING NO. S-09 FOR TYPICAL SPLICE LOCATION IN BEAMS AND BEAM STIRRUP DETAILS.
3. REFER DRAWING NO. S-08 BEAM-COLUMN CONNECTION DETAILS.
4. REFER DRAWING NO. S-21 FOR CORNICE DETAILS.
5. REFER DRAWING NO. S-18 FOR TYPICAL DETAIL OF OPENING THROUGH BEAM WEB.
4-12Ø
4-16Ø
S1 = 8 @100mm c/cS2 = 8 @ 150mm c/c
L-SECTION OF ROOF BEAM ALONG GRID B, C, D & E. (BEAM SIZE 300X400)
21
21
SECTION 3-3
SECTION 4-4
1040 1040
2-16Ø
1400 1400
2-16Ø
1 2 3
4500800
S1 S1 S1S2
S1800 800 800
136012001200
3925S2
2-20Ø 2-20Ø
4-16Ø 4-16Ø
1360
43
43
4-12Ø4-12Ø4-12Ø4-12Ø
300 300
2-20Ø
4004-16Ø 4-16Ø
2-16Ø
4-16Ø
4-12Ø 4-12Ø
4-12Ø400
2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø 2-20Ø + 2-16Ø2-16Ø4-16Ø 4-16Ø 4-16Ø 4-16Ø
2-20Ø
4-16Ø4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
ROOF BEAM DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-17
ContentsDateRevision
E.E (DESIGN)
300
Be
am
D
ep
th
4-12Ø
4-12Ø
3-10Ø@75 C/C
600
2d
12
5
REFER BEAM DETAILS
4-12Ø
600
150
A
18
0
4-12Ø
3-10Ø@75 C/C
SECTION A-A
d
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL DETAILS OPENING THROUGH WEB OF BEAMNTSMay 2016
Sonam ChodenSonam Choden
S-18
ContentsDateRevision
E.E (DESIGN)
Masonry Wall
c
cB
B
300300
DOOR / WINDOW OPENING
LINTEL BAND OVER OPENINGS
LINTEL BAND OVER OPENINGS
DOOR / WINDOW OPENING
SECTION C-C
250
75
2-12Ø2-12Ø
250
1-8Ø per boh
BA
3-12Ø
8Ø@150c/c3-12Ø
150150 2-12Ø
NOTE :
LINTEL BAND IS CONTINUOUS ALL AROUND
2-12Ø3-12Ø
SECTION B-B
250
125
INTERNAL
8Ø@150c/c150
SECTION A-A
BA
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL LINTEL BEAM DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-19
ContentsDateRevision
E.E (DESIGN)
TYPICAL LINTEL BAND DETAIL AT CORNEROVER NON PROJECTED EXTERNAL WALL
TYPICAL LAYOUT OF VERTICAL REINFORCEMENT THROUGH PROJECTED WALLS
MASONRY WALL
DETAIL A
LINTEL BANDREINFORCEMENT
10Ø VERTICALREINFORCEMENT
450
2-12Ø
RCC COLUMNMASONRY
LINTEL BAND
10Ø VERTICALREINFORCEMENT
SECTION X-X
10Ø AS VERTICAL REINFORCEMENT
VERTICAL REINFORCEMENT
DETAIL B
X X
RCC COLUMN
DETAIL CX
X2-12Ø
TYPICAL LINTEL BAND DETAIL AT MIDDLEOVER NON PROJECTED EXTERNAL WALL
MASONRY WALL
RCC COLUMNLINTEL BANDREINFORCEMENT
LINTEL BANDREINFORCEMENT
RCC COLUMN
MASONRY WALL
DETAIL CDETAIL B
BAND REINFORCEMENT
VERTICAL REINFORCEMENT
TYPICAL LINTEL BAND DETAIL AT CORNEROVER PROJECTED EXTERNAL WALL
2-12Ø ( BOTH DIRECTIONS)
LINTEL BANDREINFORCEMENT
RCC COLUMN
TYPICAL LINTEL BAND DETAIL AT MIDDLEOVER PROJECTED EXTERNAL WALL
10Ø AS VERTICAL REINFORCEMENT
DETAIL A
1-10Ø AS VERTICAL REINFORCEMENT
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL VERTICAL REINFORCEMENT DETAILS OF PROJECTED WALLS AND LINTEL ANCHORAGENTSMay 2016
Sonam ChodenSonam Choden
S-20
ContentsDateRevision
E.E (DESIGN)
FIRST FLOOR LEVEL CORNICE
C
2-12Ø THROUGHOUT
COLUMN OUTSIDE FACE
2-10Ø ( PER BOH )
2-10Ø ( PER BOH )
1ST FLOOR BEAM
SLAB REINFORCEMENT800
OF COLUMNL
CL OF COLUMN
MASONARY WALL
2-10 Ø PER BOH
2-10 Ø PER BOH
CORNICE HOLDING BEAM
ROOF BEAM
2-12Ø THROUGHOUT
(Refer roof beam details )
ROOF LEVEL CORNICE (SECTION Y-Y)
(Refer details )
EXTRA U- BARS 10Ø @ 150C/C
Roof Beam Cont.. in the cornice and bars are also cont..till phana
NOTE:1. Roof Beam at the Projected cornice level is cont..till the
phana as shown in the beam details
2. During the Construction the bars coming from Roof Beamshould be anchored nicely in the cornice to prevent the torsion.
CORNICE HOLDING BEAM DETAIL
250
200
3-12 Ø
3-12 Ø
MAIN BEAM
Y
YCORNICE
CORNICE HOLDING BEAM
COLUMN
CORNICE DETAILS (PLAN)
8Ø @ 800C/C
8Ø @ 800C/C
8Ø @ 800C/C
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL DETAILS OF CORNICENTSMay 2016
Sonam ChodenSonam Choden
S-21
ContentsDateRevision
E.E (DESIGN)
REFERENCES:
1. REFER DRAWING NO. S-23, S-24, S-25 FOR SLAB DETAILS.
1. REFER DRAWING NO. S-26 & S-27 FOR STAIRCASE DETAILS.
STAIRCASE
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
SLAB LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-22
ContentsDateRevision
E.E (DESIGN)
NOTES:
FLOOR SLAB THICKNESS 140 MM
ROOF SLAB THICKNESS 110 MM
REFERENCES:
1. REFER DRAWING NO. S-25 FOR SLAB SECTION DETAILS.
2. REFER DRAWING NO. S-25 FOR TYPICAL ANCHORAGE OF SLAB BAR INTO BEAMS.
3. REFER DRAWING NO. S-26 & S-27 FOR STAIRCASE DETAIL.
4. REFER DRAWING NO. S-18 FOR TYPICAL DETAILS OF BEAM WITH OPENING IN THE WEB.
3425 4575 3450 4575 3425
3925
4500
STAIRCASE
10Ø @ 200MM
C/C BOTHWAYS
10Ø @ 200MM
C/C BOTHWAYS
10Ø @ 200MM
C/C BOTHWAYS
10Ø @ 200MM
C/C BOTHWAYS
10Ø @ 200MM
C/C BOTHWAYS
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
BOTTOM REINFORCEMENT LAYOUTNTSMay 2016
Sonam ChodenSonam Choden
S-23
ContentsDateRevision
E.E (DESIGN)
REFERENCES:
1. REFER DRAWING NO. S-25 FOR SLAB SECTION DETAILS.
2. REFER DRAWING NO. S-25 FOR TYPICAL ANCHORAGE OF SLAB BAR INTO BEAMS.
3. REFER DRAWING NO. S-26 & S-27 FOR STAIRCASE DETAIL.
4. REFER DRAWING NO. S-18 FOR TYPICAL DETAILS OF BEAM WITH OPENING IN THE WEB.
NOTES:
FLOOR SLAB THICKNESS 140 MM
ROOF SLAB THICKNESS 110 MM
STAIRCASE
10Ø @ 180MM
C/C BOTHWAYS
10Ø @ 180MM
C/C BOTHWAYS
10Ø @ 180MM
C/C BOTHWAYS
10Ø @ 180MM
C/C BOTHWAYS
10Ø @ 180MM
C/C BOTHWAYS
7001030
7001030
9501400
1400
950 700
10501050
700 9501400 1400
950
1030700
1030700
9201400
1400920
10001499
10001500
34254575 3450 4575 3425
3925
4500
1200
1200
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TOP REINFORCEMENT LAYOUT NTSMay 2016
Sonam ChodenSonam Choden
S-24
ContentsDateRevision
E.E (DESIGN)
3425
1030 1030 1400
10Ø@180C/C 10Ø@180C/C
10Ø@180C/C 10Ø@180C/C
10Ø@200C/C10Ø@200C/C
10Ø@200C/C10Ø@200C/C
1400 1050
10Ø@180C/C
10Ø@180C/C
1050 1400
10Ø@180C/C
10Ø@180C/C
1400 1030
10Ø@180C/C
10Ø@180C/C
1030
10Ø@200C/C10Ø@200C/C
4575 3450 4575 342510Ø@200C/C
10Ø@200C/C10Ø@200C/C
10Ø@200C/C
NOTES:
1. FLOOR SLAB THICKNESS IS 140 MM
2. ROOF SLAB THICKNESS IS 110 MM
3. ADOPT SAME SECTION DETAILS FOR ALL
SLABS
REFERENCES:
1. REFER DRAWING NO. S-23 & S-24 FOR TOP
AND BOTTOM REINFORCEMENT
2. REFER DRAWING NO. S-26 & S-27 FOR
STAIRCASE DETAIL.
3. REFER DRAWING NO. S-18 FOR TYPICAL
DETAILS OF BEAM WITH OPENING IN THE WEB.
700 10Ø360 C/C950 700950700 700 950 950 700 700 10Ø360 C/C10Ø360 C/C10Ø360 C/C10Ø360 C/C
10Ø@180C/C
10Ø@180C/C
1400 1500
10Ø@180C/C
10Ø@180C/C
1500
10Ø@180C/C
10Ø@200C/C
3925 4500
1400
10Ø@200C/C10Ø@200C/C
TYPICAL DETAI OF ANCHORAGE OFSLAB REINFORCEMENT IN BEAM
920 1000 150920 10Ø360 C/C 10Ø360 C/C
BEAM
500 (MIN)SLAB
10Ø@180C/C
120010Ø@200C/C
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
SLAB SECTION DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-25
ContentsDateRevision
E.E (DESIGN)
LANDING BEAM
FLOOR BEAM FLOOR BEAM
NOTES:STAIRCASE DETAILS IS SAME FOR ALL FLOORS EXCEPT FORGROUND FLOOR. REFER ARCHITECTURE DRAWING FORGROUND FLOOR STAIRCASE.ADOPT THE SAME DETAILS FOR ALL STAIRS
1080
1350
300
1350
T=275R=180
UP
1425
1200
18
00
13
75
22
5
3450
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
STAIRCASE PLANNTSMay 2016
Sonam ChodenSonam Choden
S-26
ContentsDateRevision
E.E (DESIGN)
1000
1000
600
12Ø @130C/C
10Ø @200C/C
1425
1425
12Ø @130C/C
10Ø @200C/C
NOTES:TREAD 275MMRISER 180WAIST SLAB THK.= 130MM
FLOOR BEAM(Refer Beam Details)
FLOOR BEAM(Refer Beam Details)
LANDING BEAM(Refer Beam Details)
LANDING BEAM(Refer Beam Details)
DC
3450800800
S1 S1S2
10501050
DETAILS OF LANDING BEAM (BEAM SIZE 300X450)
300SECTION 1-1
4-16Ø
2-20Ø
4-16Ø
4-20Ø
400
SECTION Y-Y
SECTION X-X
La
4-20Ø 4-20Ø
La = 1000mmS1 = 8 @80mm c/cS2 = 8 @ 120mm c/c
600
12Ø @130C/C
10Ø @200C/C
2900
1
3
0
130
10Ø @200C/C
1800
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
STAIRCASE DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-27
ContentsDateRevision
E.E (DESIGN)
NOTES:
1. ROOF TRUSS OVERHANG IS 2000 MM FROM THE OUTER FACE OF THE COLUMN.
2. ROOF ANGLE IS 15 DEGREES.
3. COLUMN SHALL CONTINUE AS PROP WHERE NECESSARY
REFERENCES:
1. REFER DRAWING NO. S-17 FOR ROOF BEAM DETAILS.
3. REFER DRAWING NO. S-21 FOR ROOF CORNICE DETAILS.
4. REFER DRAWING NO. S-29 AND S-30 FOR TRUSS EVELATION.
5. REFER DRAWING NO S-31 & S-32 FOR TRUSS CONNECTION.
6. REFER DRAWING NO. S-33 FOR PROP DETAILS.
T4
T1
T5
T3
T6
T4
T5
T3
T6
T1 T1T1 T1 T1 T1
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
ROOF TRUSS LAYOUT PLANNTSMay 2016
Sonam ChodenSonam Choden
S-28
ContentsDateRevision
E.E (DESIGN)
T5725
764 1053
647
2303
NOTE:
1. PROP HEIGHT IS 750MM
REFERENCES:
1. REFER STR. DRG. NO. S-28 FOR TRUSS
LAYOUT PLAN
2. REFER STR. DRG. NO. S-31, S-32 &
S-33 FOR TRUSS CONNECTION DETAILS
AND PROP CONNECTION DETAILS
2125
569
14272150 1430 1142
1342959
576
6664224119611719
1718 1430 1427 2150
1749
T1
1428 1430 643
5850
T3
1514
2039
2314
1045
2150
576
T4
3145 1615 1615 1114
1514902 22142017
1849
9266
596
T61245 1245
17591542
4804910
1243
2150
576
1615
787
815
1208
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL TRUSS ELEVATIONSNTSMay 2016
Sonam ChodenSonam Choden
S-29
ContentsDateRevision
E.E (DESIGN)
15°
STRUT (VERTICAL)
PURLIN
TOP CHORD/ RAFTER
BOTTOM CHORD/ TIE
STRUT (INCLINED)
MEMBERS
TRUSS MEMBER SCHEDULE
SIZE - OUTER DIA. (MM)
REFERENCES:
1. REFER DRAWING NO. S-29 FOR TRUSS ELEVATION.
2. REFER DRAWING NO. S- 28 FOR TRUSS LAYOUT PLAN.
3. REFER DRAWING NO. S-31, S-32 & S-33 FOR TRUSS CONNECTION AND
PROP CONNECTION DETAILS.
NOTES:
1. ALL DIMENSIONS ARE IN MM.
2. ALL TRUSS MEMBERS ARE OF TUBULAR STEEL OF GRADE St.35(Yst 22 GRADE).
3. ALL TRUSS CONNECTIONS TO BE MADE OF FILLET WELD OF MINIMUM 4 MM SIZE.
4. ROOF ANGLE 15 DEGREES
5. ROOF TRUSS OVER HANGING OF 2000 MM FROM THE FACE OF THE OUTER COLUMN.
A
B
D
CE
RAFTER
STRUT (INCLINED)
STRUT (VERTICAL)
BOTTOM CHORD (TIE)
PROP
60.3 mm OD(M), 5.1 KG/M
60.3 mm OD(M), 5.1 KG/M
60.3 mm OD(M), 5.1 KG/M
60.3 mm OD(M), 5.1 KG/M
60.3 mm OD(M), 5.1 KG/M @1500 C/C oras per the Sheet Length
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TYPICAL TRUSS ELEVATION & MEMBER SCHEDULENTSMay 2016
Sonam ChodenSonam Choden
S-30
ContentsDateRevision
E.E (DESIGN)
1. SAME TRUSS CONNECTION DETAILS SHALL BE ADOPTED IN ALL CONNECTIONS.
NOTES:
4 MM WELD
4 MM WELD
4 MM WELD
4 MM WELD
4 MM WELD
DETAIL - D
TIE/ BOTTOM CHORD
DETAIL - B
RAFTERRAFTER
STRUT (INCLINED)
VERTICAL STRUT
DETAIL - A
DETAIL - CDETAIL - E
PURLIN
G.I DRAIN SHEET
EAVES DRAIN SUPPORTINGPLANT(200x150 deep)
RAFTER10Ø HOOK BOLT
G.I SHEET (24G) ROOFING
150
9550
150
75 Rafter4
EAVES PLATE DETILS
75 75
55
25 50 50 2525
4Ø holes for tapping screwsto secure eaves gutter
STRUT (INCLINED)
VERTICAL STRUT
TIE/ BOTTOM CHORD
10Ø HOOK BOLT
STRUT (INCLINED)
TIE/ BOTTOM CHORD
VERTICAL STRUT
RAFTER
VERTICAL STRUT
STRUT (INCLINED)
1. REFER DRG. NO. S-30 FOR TRUSS LAYOUT PLAN2. REFER DRG. NO. S-31 & S-32 FOR TRUSS ELEVATION3. REFER DRG. NO. S-35 FOR PROP DETAILS
REFERENCES:
4 MM WELD
TIE/ BOTTOM CHORD
DETAIL - B
VERTICAL STRUT
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TRUSS CONNECTION DETAILS (a)NTSMay 2016
Sonam ChodenSonam Choden
S-31
ContentsDateRevision
E.E (DESIGN)
4 MM WELD
4 MM WELD
RAFTER
24G G.I SHEET
35 80 35
3090
30
150
150
BASE PLATETRUSS HOLDING
4-20Ø, 75MM LONG
PURLIN-RAFTER
(TOP VIEW)CONNECTION DETAILS
RAFTER
50x50x3mm washersMS 12Ø bolts with
welded to both purlin ends8mm MS steel plate
8mm MS steel plate welded to steel tubular rafter
welded to both purlin ends8mm MS steel plate
PURLIN-GI SHEET CONNECTION DETAILS
1002525
PURLIN-RAFTER(Side view)
RAFTER
STRUT
welded to the rafter8mm MS steel plate
PURLIN
PURLIN
150x150x10MM BASE PLATE
RCC PROP
4-20Ø, 300MM LONG
TRUSS HOLDING DETAILS
8Ø@75c/c
HIGH DENSITYNUTS & BOLTS
J-HOOK WITHBITUMEN FELT WASHER
VERTICAL STRUT
VERTICAL STRUT
TIE/ BOTTOM CHORD
HIGH DENSITYNUTS & BOLTS
1. SAME TRUSS CONNECTION DETAILS SHALL BE ADOPTED IN ALL CONNECTIONS.
NOTES:
1. REFER DRG. NO. S-30 FOR TRUSS LAYOUT PLAN2. REFER DRG. NO. S-31 & S-32 FOR TRUSS ELEVATION3. REFER DRG. NO. S-35 FOR PROP DETAILS
REFERENCES:
4 MM WELD
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
TRUSS CONNECTION DETAILS (b)NTSMay 2016
Sonam ChodenSonam Choden
S-32
ContentsDateRevision
E.E (DESIGN)
150x150x10MM BASE PLATE
RCC PROP
4-20Ø, 300MM LONG
TRUSS HOLDING DETAILS
8Ø@75c/c
VERTICAL STRUT
TIE/ BOTTOM CHORD
HIGH DENSITYNUTS & BOLTS
4 MM WELD
PROP DETAILS
8Ø@75c/c
ROOF BEAM
A A
500 500
750
4-16Ø
250
250
NOTE:
1. SAME PROP DETAILS SHALL BE ADOPTED FOR ALL PROPS
REFERENCE
1. REFER DRG. NO. S-30 FOR TRUSS LAYOUT PLAN2. REFER DRG. NO. S-33, S-34 & S-35 FOR TRUSS CONNECTION DETAILS AND PROP CONNECTION DETAILS
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
PROP DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-33
ContentsDateRevision
E.E (DESIGN)
850
600
1396
75
75
775
300
KITCHEN WORK TOP DETAIL
1700
8Ø@120MM C/C BOTHWAYS
315
8Ø @ 120MM
C/C BOTHWAYS
KITCHEN SLAB BOTTOM REINFORCEMENT PLAN
8Ø@120MM C/C BOTHWAYS
880
600
200
7520
0
75 A
DETAIL A
SINK
2-8Ø
2-8Ø
KITCHEN
SINK
NOTES:
1. KITCHEN SLAB IS 75MM THICK
2. COVER TO KITCHEN SLAB IS 15MM
Project:
GENERAL MANAGER (D&PS)
Scale:Date:
Drawing No:Drawn By:Designed :
Drawing Title:
CHIEF EXECUTIVE OFFICER (NHDCL)
PHUNTSHOLING HOUSING PROJECT
ROYAL GOVERNMENT OF BHUTAN NATIONAL HOUSING DEVELOPMENT CORPORATION
DESIGN AND PLANNING SERVICES THIMPHU: BHUTAN POST BOX NO. 1439
KITCHEN SLAB REINFORCEMENT DETAILSNTSMay 2016
Sonam ChodenSonam Choden
S-34
ContentsDateRevision
E.E (DESIGN)