stroma brochure

8
M&E Project Works

Upload: shrewdd-marketing

Post on 22-Jul-2016

241 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Stroma brochure

M&E Project Works

Page 2: Stroma brochure

Introduction

Stroma Evolution combines industry leading technical expertise and knowledge with a traditional M&E project service.

We assess, design and install the optimal measures for achieving legislative compliance, meeting carbon reduction and energy efficiency targets, improving building lifecycles and reducing operating costs.

For further information please contact:

Lee BlackburnT: 07467 956327 | E: [email protected]

Mike CooneyT: 07812 975820 | E: [email protected]

National enquiriesT: 08714 370371 | E: [email protected]

Unit B3 Lowfields Close, Elland, West Yorkshire HX5 9DX

Unit 9 Intec Business Park, Wade Road, Basingstoke RG24 8NE

Forsyth House, Lomond Court, Castle Business Park, Stirling FK9 4AU

Northern office:

Southern office:

Scottish office:

ASSESSBuilding Performance Testing

Thermography

Air Conditioning Inspections

Electrical Load Analysis & Harmonics

Lifecycle Replacement Reports

Asset Surveys

Air Tightness Testing

DESIGNSite Surveys

Detail Calculations

Specification Analysis

Finance Solutions

Technical Support

INSTALLBoilers, Controls & Pipework

Air Conditioning Systems

Ventilation Systems

Electrical Systems

Renewable Technologies

Remedial Works

Water Hygiene Solutions

Operating nationally, Stroma Evolution seamlessly become an integral part of your team, committed to finding the most innovative and cost effective solutions and adding real value to your project.

Page 3: Stroma brochure

Assessment & Design

Our design team combines a wealth of knowledge and experience that enables us to provide both traditional and low carbon mechanical and electrical design solutions.

To complement this approach we have developed a sustainability consultancy with the capacity to undertake building performance assessments, dynamic thermal building modelling and low carbon consultancy.

This allows us to work with our clients to assess and design each project holistically to value engineer solutions that deliver energy saving reductions and lifecycle improvements; whilst incorporating a balanced approach to low carbon technologies.

We offer:

Feasibility studies, budget’s & reports

Asset condition surveys and lifecycle replacement reports

Concept designs

Low carbon consultancy (including thermo-graphic and air tightness testing)

Full M&E design service (including CAD facilities)

Post completion audits, testing & inspections

Building compliance testing & certification (including TM44, EPC’s and DEC’s)

Expert witness service

Project Management

Our project management team work seamlessly with our clients to provide specialist support to their business as and when they need it. This can range from providing short term management support, through to full turnkey design and installation solutions.

We offer:

Project scoping

Business case preparation

Finance and funding solutions (including grant applications)

Project delivery plans

Management of project delivery

Post project audits and validation

We tailor our project management methods to suit each individual client and project goal. However, we believe that the key to delivering projects to programme is through effective communication, detailed programming and proactive problem solving.

Our projects team brings together the variety of skills and knowledge needed for each individual project drawing upon our wide range of in-house technical and management resources.And by working in partnership with our clients we ensure that each project is delivered on time and within budget.

Page 4: Stroma brochure

Mechanical & Electrical Services

We work with a variety of customer groups including main contractors, architects, manufacturers, managing agents, building owners and occupiers; and have extensive experience in delivering solutions within the following sectors:

Commercial

Retail

Leisure

Data & IT

Industrial & manufacturing

Healthcare

Education

Nuclear

We provide a wide range of electrical services, including:Did you know?Voltage optimisation

solutions can typically reduce a building’s electrical

consumption by 12-15% per annum with a payback

period of 2.5 years.

LV & HV installation works

Voltage optimisation solutions

Harmonic & PFC solutions

Power generation (solar PV & wind)

Low energy lighting solutions

Emergency lighting systems

Generators & back-up systems

Energy saving solutions

BMS & control solutions

Portable appliance testing

Testing & inspections of existing systems

Remedial works

Page 5: Stroma brochure

5

And also provide a comprehensive range of mechanical services, including:

Boiler installations (gas, oil, electric, biomass)

Renewable technologies (ground/air source heat pumps, solar thermal)

Air conditioning systems

Chiller installations

DHW systems

Pumps

Ventilation systems

Pipework modifications and upgrades

Controls & optimisation solutions

Water hygiene solutions

Energy saving solutions

System testing & inspections

Remedial works

We have an extensive and robust supply chain and work closely with many leading manufacturers, suppliers and specialist fabricators; allowing us to source products on competitive terms and to access their technical support and product training.

Working with our supplier partners we can provide bespoke pre-fabricated and modularised solutions, which offer significant reductions in installation time and costs over traditional installation methods.

All our works are fully guaranteed against design and manufacturing defects, and we are accredited members of NICEIC, Gas Safe, Refcom and the Building & Engineering Association.

Page 6: Stroma brochure

Centre Retail Park covers an area of 245,000sq ft. and is home to key retail occupiers including Argos, Boots and Next. The sites existing car park lighting scheme consisted of 45 column mounted 400W SON luminaires, creating a dull orange glow across the site.

The scheme operated inefficiently consuming over 82,000 kWh per annum, and had high maintenance costs due to significant lamp failures.

Stroma Evolution was engaged to evaluate the existing scheme and provide a low energy alternative that would also enhance the customer experience by creating a brighter and crisper lighting output across the site.

A 98W LED replacement luminaire was proposed which could be retro fitted to the existing lighting columns in order to minimise the installation cost, whilst the unit itself would reduce like for like energy consumption by 89% and minimise future maintenance costs.

Energy saving solutions

Case studyLED lighting technology at Centre Retail Park, Oldham

Key Facts

£58,883 forecast

lifetime net cost savings

Forecast savings expected in year one:

£9,421

80,126kWh

42.03 tCO2e

89%

reductionin energy consumption

Stroma Evolution was subsequently asked to install the proposed scheme which was completed outside trading hours over a three day period.

Page 7: Stroma brochure

7

Committed to QSHEStroma Evolution is committed to providing sustainable,safe and quality assured solutions.

Health & SafetyWe are committed to ensuring the health, safety and welfare of all our employees and of any person who may be affected by our working activities throughout the communities we work in.

As such, our health & safety systems have been designed from the ground up to provide robust working practices and methods, which we believe are at the forefront of best practice.

Our systems are continually tested and developed, and are accredited to the Constructionline, CHAS, Safecontractor and Contractorplus schemes.

QualityOur passion to continually develop and evolve what we do enables us to continually deliver innovative forward thinking solutions.

We therefore encourage a working environment that supports creativity and maintain a customer focused proactive approach to problem solving. This ensures that we always deliver great standards of customer service.

At the heart of our operations is our quality management system which sets out the procedures and policies that all our people follow, the methods we use to deliver our services and the management tools in place to manage our activities.

Our system is continually tested and improved, and has been independently assessed by ISOQAR to ISO 9001:2008 and ISO 14001:2004.

Work towards minimising and improving the environmental impact of our activities and to make the most of the resources available to us.

Aim to deliver exceptional value through resource efficiency, supply chain engagement, life cycle costing and continuous development;

Make a positive contribution within our local communities through engagement and investment;

Provide our employees with training and development, and long term career progression opportunities.

SustainabilityWe also aim to make a meaningful contribution to a more sustainable future by successfully managing the social,environmental and economic impacts arising from our working activities.We recognise that sustainability affects every aspect of our business within each business sector that we work within.

As such, we:

Page 8: Stroma brochure

Building sustainability, efficiency and compliance.

About the Stroma Group.

Multi-disciplinary Stroma is a leading authority on

building sustainability and compliance, with a scope of

services designed to assist all sectors in meeting energy

performance targets, reducing CO2 emissions and

complying with legislation.

The Stroma companies undertake distinct but

complementary activities, ranging from building

performance assessments and testing, to the

improvement and maintenance of building services and

fabric, to the certification and training of assessors and

installers, to the development of innovative software to

serve multiple stakeholders within the industry.

We serve a broad client base, from individual assessors

and installers to major builders, contractors, property

owners and energy suppliers throughout the UK and

Ireland.

www.stromaevolution.comT: 08714 370 371

Unit B3, Lowfields Close, Lowfields Business Park, Elland

HX5 9DX

Unit 9 Intec Business Park, Wade Road, Basingstoke

RG24 8NE

Forsyth House, Lomond Court,Castle Business Park, Stirling

FK9 4AU

Northern office Southern office Scottish office